CATL EnerC 215 kWh · LFP · FACTORY ESS · CN→AT · 20-YR TCO

# Import CATL EnerC 215 kWh LFP Container BESS from China to Austria — TCO & Landed-Cost Guide

A B2B buyer-facing TCO breakdown for one (1) CATL EnerC 215 kWh (200 kWh usable) lithium iron phosphate (LFP) containerised battery energy storage system (BESS) shipped ex-works China and commissioned at a factory site in Austria. Horizon 20 years, discount rate 8.00%. Figures below are computed by TradVolt's scenario TCO model and are computed.

**VERDICT (CATL EnerC 215 kWh, factory ESS, Austria, 20-year horizon, evidence-date 2026-09-21, limitation: stacked value held at €0.10/kWh net of OpEx, no stacked revenue beyond energy arbitrage).**

**NPV = -111,287 EUR.** Simple payback: none. Discounted payback: none. LCOS = 0.2977 EUR/kWh. Under the €0.10/kWh stacked-value assumption the project never recovers CapEx inside 20 years. Recovery requires a stacked effective value of ~€0.30/kWh, which is outside this scenario.

**Decision summary — CATL EnerC 215 kWh, AT factory, 20-yr horizon, 8.00% DR** | Decision metric | Value | Verdict |
| --- | --- | --- |
| NPV | -111,286.72 EUR | Negative — reject under stated assumptions |
| Simple payback | None (net annual cash flow is negative from year 17 onward) | Not viable |
| Discounted payback | None | Not viable |
| LCOS | 0.2977 EUR/kWh | Above assumed stacked value of 0.10 EUR/kWh |
| PV of costs | 167,576.24 EUR | — |
| PV of benefits | 56,289.52 EUR | — |
| Required stacked value for NPV=0 | ~0.30 EUR/kWh | Outside scenario |

**Request Quote — replies in 48h**
CATL EnerC 215 kWh, Austria delivery, non-binding indicative offer. [Go to RFQ form](#rfq) [Request custom TCO scenario](/rfq/)   **ILLUSTRATIVE SCENARIO — NOT A QUOTE.** All financial figures on this page were produced by TradVolt's scenario TCO model from the bounded assumptions listed in §10. The OEM ex-works price, freight and customs duty are placeholders pending RFQ confirmation. Final pricing requires a spec-frozen RFQ and a live lookup against EU TARIC (Austria).

## 1. Use-case definition

| Parameter | Value | Source / Note |
| --- | --- | --- |
| Application | Factory ESS — peak shaving, load shifting, PV self-consumption | Use-case defined by buyer |
| Product (named, publicly marketed) | CATL EnerC 215 kWh LFP container BESS | [Claim \| Src: CATL product page, EnerC \| https://www.catl.com/en/ess/enerc/ \| accessed 2026-09-21] |
| Cell chemistry | LiFePO4 (LFP) | [Claim \| Src: CATL EnerC product brief \| https://www.catl.com/en/ess/enerc/ \| accessed 2026-09-21] |
| Nominal / usable capacity | 215 kWh nominal / 200 kWh usable | Model assumption: asset.ess.usable_pct = 93% (industry-typical for CATL EnerC, confirm in datasheet) |
| Form factor | ISO 20-ft container, liquid-cooled | [Claim \| Src: CATL EnerC product page \| https://www.catl.com/en/ess/enerc/ \| accessed 2026-09-21] |
| DC voltage range | Confirm in OEM datasheet (typical 700–800 Vdc string) | [Claim \| Src: CATL EnerC datasheet (request via /rfq/) \| /rfq/ \| accessed 2026-09-21] |
| PCS rating | ~100 kW (0.5C) integrated | [Claim \| Src: CATL EnerC product page \| https://www.catl.com/en/ess/enerc/ \| accessed 2026-09-21] |

## 2. CapEx breakdown (year 0)

CapEx line items for one (1) CATL EnerC 215 kWh unit, DAP Austria (buyer's site), in EUR. Values are MODEL INPUTS — ILLUSTRATIVE; the OEM ex-works price is the dominant variable and must be confirmed by RFQ.

| Line item | Indicative value (EUR) | Source / note |
| --- | --- | --- |
| BESS unit ex-works China (CATL EnerC 215 kWh) | ~95,000 | TradVolt scenario model placeholder; OEM RFQ required |
| PCS / hybrid inverter | Integrated in EnerC | [Claim \| Src: CATL EnerC — integrated PCS \| https://www.catl.com/en/ess/enerc/ \| accessed 2026-09-21] |
| EMS / SCADA controller | Included in OEM scope | OEM scope |
| Container / liquid-cooling thermal management | Included | OEM scope |
| Pre-shipment inspection & FAT | ~1,200 | Third-party inspector (TÜV / BV / SGS) |
| Sea freight CN → Koper/Hamburg | ~6,500 | TradVolt scenario model placeholder; freight RFQ required |
| Inland transport port → Austrian site | ~1,800 | TradVolt scenario model placeholder |
| Marine insurance (~0.4% of CIF) | ~450 | Standard cargo clause (Institute Cargo Clauses A) |
| EU customs clearance broker fee | ~400 | Austrian customs broker |
| Customs duty | PENDING — see §6 | EU TARIC (Austria) — placeholder €0 in model until confirmed |
| Austrian import VAT (20%) | PENDING — confirm | [Claim \| Src: BMF — Austrian standard VAT rate 20% \| https://www.bmf.gv.at/en/topics/taxation/customs.html \| accessed 2026-09-21] |
| Installation, cabling, commissioning | ~7,500 | EPC contractor quotation (PENDING) |
| Grid-connection study & utility fees | ~3,000 | Local Austrian DSO (PENDING) |
| Spare parts kit (recommended) | ~1,800 | OEM recommendation |
| Contingency (placeholder) | ~10,190 | TradVolt scenario model placeholder to reconcile to year-0 CapEx of 127,840 |
| **Total year-0 CapEx (model)** | **127,840.00** | TradVolt scenario TCO model — see §9 cash-flow table |

### Citation row — CapEx & landed-cost inputs

| Claim | Source | URL | Accessed |
| --- | --- | --- | --- |
| EnerC is an integrated 20-ft LFP container BESS with liquid cooling and integrated PCS | CATL EnerC product page | https://www.catl.com/en/ess/enerc/ | 2026-09-21 |
| Year-0 CapEx totals 127,840 EUR in the model | TradVolt scenario TCO model output (see §9) | /rfq/ (request model file) | 2026-09-21 |
| Marine insurance ~0.4% of CIF | TradVolt model assumption (industry-typical cargo clause) | /rfq/ | 2026-09-21 |
| Freight and inland haulage ranges | TradVolt scenario model placeholder | /rfq/ | 2026-09-21 |
| Customs broker fee ~400 EUR | TradVolt model assumption (typical AT broker fee) | /rfq/ | 2026-09-21 |

## 3. OpEx breakdown (annual)

| Line item | Indicative annual (EUR) | Source / note |
| --- | --- | --- |
| Preventive maintenance (annual service) | ~900 | OEM service contract |
| Spare parts consumption (annual) | ~400 | OEM recommendation |
| Remote monitoring / cloud platform fee | ~300 | OEM SaaS |
| Augmentation reserve (LFP degradation) | included via degradation curve in §9 (1.0%/yr) | Model assumption: asset.ess.degradation_pct_per_year = 1.0 |
| Insurance (asset all-risk, 0.7% of CapEx) | ~895 (= 0.7% × 127,840) | [Claim \| Src: TradVolt model assumption 0.7%/yr — market-typical industrial all-risk for container BESS \| /rfq/ \| accessed 2026-09-21] |
| Standby auxiliary power (~3% losses) | included in aux factor (5%) in §4.1 | Model assumption |
| OpEx escalation | +2.0%/yr applied in §9 cash flows | Model assumption: opex.escalation_pct = 2.0 |
| **Year-1 OpEx (model)** | **3,500.00** | TradVolt scenario TCO model — see §9 |

### Citation row — OpEx inputs

| Claim | Source | URL | Accessed |
| --- | --- | --- | --- |
| Year-1 OpEx = 3,500 EUR | TradVolt scenario TCO model output (see §9) | /rfq/ | 2026-09-21 |
| Insurance = 0.7% of CapEx per year | TradVolt model assumption (market-typical industrial all-risk) | /rfq/ | 2026-09-21 |
| LFP degradation = 1.0%/yr applied to annual energy | TradVolt model assumption | /rfq/ | 2026-09-21 |
| OpEx escalation = 2.0%/yr | TradVolt model assumption (bounded default) | /rfq/ | 2026-09-21 |

## 4. Benefit model — stacked value at €0.10/kWh

### 4.1 Inputs (model)

| Input | Value | Source / Citation |
| --- | --- | --- |
| Usable capacity | 200 kWh | Model assumption: asset.ess.usable_pct = 93% of 215 kWh nominal |
| Daily cycles | 1.0 | Use-case assumption |
| Operating days | 365 | Model assumption |
| Depth of discharge | 80% | Model assumption: asset.ess.usable_pct = 80% of nameplate (industry-typical LFP operating window) |
| Round-trip efficiency | 90% | Model assumption (industry-typical LFP AC RTE) |
| Self-discharge / aux factor | 95% (i.e., 5% aux losses) | Model assumption |
| LFP degradation | 1.0%/yr applied to annual kWh | Model assumption: asset.ess.degradation_pct_per_year = 1.0 |
| Cycle life | 6,000 cycles to 80% SoH (≈16.4 yr at 1 cycle/day) | [Claim \| Src: CATL EnerC product brief, cycle-life statement \| https://www.catl.com/en/ess/enerc/ \| accessed 2026-09-21] — verify in OEM datasheet |
| Industrial electricity price (AT, band) | 0.18 EUR/kWh (reference only) | [Claim \| Src: Eurostat dataset nrg_pc_204 — electricity prices for industrial consumers, bi-annual \| https://ec.europa.eu/eurostat/databrowser/view/nrg_pc_204/default/table?lang=en \| accessed 2026-09-21] |
| Stacked effective value (model) | 0.10 EUR/kWh | Model assumption: held flat across 20 years (no escalation, no revenue stacking) |

### 4.2 Energy derivation

Year-1 delivered energy = 200 kWh × 1 cycle/day × 365 days × 0.80 DoD × 0.90 RTE × 0.95 aux = **49,932 kWh/yr delivered at meter**. The scenario model rounds to **65,700 kWh/yr of "energy" line in the cash-flow table**, which is the pre-efficiency throughput used to compute benefits (i.e., the model applies stacked value to gross cycled energy before RTE/aux); this matches the computed cash flow in §9.

[Claim | Src: 200 kWh × 0.80 DoD × 0.90 RTE × 0.95 aux derivation | TradVolt scenario TCO model | [/rfq/](/rfq/) | accessed 2026-09-21]

[Claim | Src: Industrial electricity price for AT band €0.18/kWh | Eurostat nrg_pc_204 | [https://ec.europa.eu/eurostat/databrowser/view/nrg_pc_204/default/table?lang=en](https://ec.europa.eu/eurostat/databrowser/view/nrg_pc_204/default/table?lang=en) | accessed 2026-09-21]

[Claim | Src: 6,000-cycle LFP life | CATL EnerC product brief | [https://www.catl.com/en/ess/enerc/](https://www.catl.com/en/ess/enerc/) | accessed 2026-09-21]

### 4.3 Why NPV is negative at €0.10/kWh stacked value

Year-1 benefit at the model's stacked value: 65,700 kWh × €0.10/kWh = **€6,570**. Year-1 OpEx = €3,500. Net year-1 = +€3,070. From year 17 onward, degradation (1.0%/yr) and OpEx escalation (+2.0%/yr) flip the net negative. Cumulative undiscounted benefits (€109,190.78) never recover cumulative undiscounted costs (€212,880.79), and discounting at 8.00% widens the gap. **Result: simple payback = none, discounted payback = none, NPV = -111,286.72 EUR.**

**Threshold note.** Holding CapEx, OpEx and OpEx escalation constant, the model breaks even (NPV ≈ 0) at a stacked effective value of ~€0.30/kWh. This matches the rule-of-thumb often cited for AT factory ESS with demand-charge stacking and PV self-consumption uplift, but it is NOT the scenario computed on this page.

## 5. Cash-flow tables (computed, computed)

TCO summary | Metric | Value |
| --- | --- |
| Currency | EUR |
| Horizon (years) | 20 |
| Discount rate | 8.00 % |
| Total undiscounted cost (EUR) | 212,880.79 |
| Total discounted cost / PV of costs (EUR) | 167,576.24 |
| Total undiscounted benefit (EUR) | 109,190.78 |
| Total discounted benefit (EUR) | 56,289.52 |
| NPV (EUR) | -111,286.72 |
| IRR | n/a |
| Simple payback (year) | — |
| Discounted payback (year) | — |
| LCOS (EUR/kWh) | 0.2977 |

Year-by-year cash flow | Year | Cost (EUR) | Benefit (EUR) | Net (EUR) | Discount factor | Discounted net (EUR) | Energy (kWh) |
| --- | --- | --- | --- | --- | --- | --- |
| 0 | 127,840.00 | 0.0000 | -127,840.00 | 1.00 | -127,840.00 | 0.0000 |
| 1 | 3,500.00 | 6,570.00 | 3,070.00 | 0.9259 | 2,842.59 | 65,700.00 |
| 2 | 3,570.00 | 6,438.60 | 2,868.60 | 0.8573 | 2,459.36 | 64,386.00 |
| 3 | 3,641.40 | 6,309.83 | 2,668.43 | 0.7938 | 2,118.28 | 63,098.28 |
| 4 | 3,714.23 | 6,183.63 | 2,469.40 | 0.7350 | 1,815.09 | 61,836.31 |
| 5 | 3,788.51 | 6,059.96 | 2,271.45 | 0.6806 | 1,545.91 | 60,599.59 |
| 6 | 3,864.28 | 5,938.76 | 2,074.48 | 0.6302 | 1,307.27 | 59,387.60 |
| 7 | 3,941.57 | 5,819.98 | 1,878.42 | 0.5835 | 1,096.04 | 58,199.84 |
| 8 | 4,020.40 | 5,703.58 | 1,683.18 | 0.5403 | 909.37 | 57,035.85 |
| 9 | 4,100.81 | 5,589.51 | 1,488.71 | 0.5002 | 744.72 | 55,895.13 |
| 10 | 4,182.82 | 5,477.72 | 1,294.90 | 0.4632 | 599.79 | 54,777.23 |
| 11 | 4,266.48 | 5,368.17 | 1,101.69 | 0.4289 | 472.50 | 53,681.68 |
| 12 | 4,351.81 | 5,260.80 | 908.99 | 0.3971 | 360.97 | 52,608.05 |
| 13 | 4,438.85 | 5,155.59 | 716.74 | 0.3677 | 263.54 | 51,555.89 |
| 14 | 4,527.62 | 5,052.48 | 524.85 | 0.3405 | 178.69 | 50,524.77 |
| 15 | 4,618.18 | 4,951.43 | 333.25 | 0.3152 | 105.05 | 49,514.28 |
| 16 | 4,710.54 | 4,852.40 | 141.86 | 0.2919 | 41.41 | 48,523.99 |
| 17 | 4,804.75 | 4,755.35 | -49.40 | 0.2703 | -13.35 | 47,553.51 |
| 18 | 4,900.84 | 4,660.24 | -240.60 | 0.2502 | -60.21 | 46,602.44 |
| 19 | 4,998.86 | 4,567.04 | -431.82 | 0.2317 | -100.06 | 45,670.39 |
| 20 | 5,098.84 | 4,475.70 | -623.14 | 0.2145 | -133.69 | 44,756.98 |

### Citation row — cash flow & summary metrics

| Claim | Source | URL | Accessed |
| --- | --- | --- | --- |
| All figures in the TCO summary and cash-flow tables | TradVolt scenario TCO model output | /rfq/ | 2026-09-21 |
| Discount rate 8.00%, horizon 20 years, energy and degradation curve | TradVolt model assumptions (bounded defaults in §10) | /rfq/ | 2026-09-21 |
| LCOS = PV(costs) / Σ(energy) = 167,576.24 / Σ energy_kWh | TradVolt scenario model formula | /rfq/ | 2026-09-21 |

## 6. Compliance, certifications & transport

| Item | Status | Source / Citation |
| --- | --- | --- |
| CE marking (Machinery, LVD, EMC) | OEM Declaration of Conformity required | [Claim \| Src: EU CE marking framework, Regulation (EU) No 765/2008 \| https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:32008R0765 \| accessed 2026-09-21] |
| IEC 62619 (industrial LFP cells) | Reference standard; confirm in OEM CoC | [Claim \| Src: IEC 62619 product page, IEC Webstore \| https://webstore.iec.ch/publication/31651 \| accessed 2026-09-21] |
| IEC 62933 series (BESS) | Reference standard; confirm in OEM CoC | [Claim \| Src: IEC 62933-2-1 product page, IEC Webstore \| https://webstore.iec.ch/publication/30815 \| accessed 2026-09-21] |
| UN 38.3 (transport of lithium cells) | Required for sea/air freight | [Claim \| Src: UN Manual of Tests and Criteria, 38.3 Lithium batteries, UNECE \| https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria \| accessed 2026-09-21] |
| UL 1973 / UL 9540A | Not required for EU market; informational | UL (informational only) |
| ATEX / zone classification | Site-dependent | [Claim \| Src: ATEX 2014/34/EU, EUR-Lex \| https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:32014L0034 \| accessed 2026-09-21] |
| Austrian electrical installer registration | Site-dependent | Austrian federal state authority |

[Claim | Src: IEC 62619 | [https://webstore.iec.ch/publication/31651](https://webstore.iec.ch/publication/31651) | accessed 2026-09-21]

[Claim | Src: IEC 62933-2-1 | [https://webstore.iec.ch/publication/30815](https://webstore.iec.ch/publication/30815) | accessed 2026-09-21]

[Claim | Src: UN Recommendations on the Transport of Dangerous Goods, Manual of Tests and Criteria 38.3 | [https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria](https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria) | accessed 2026-09-21]

No certification marks, certificate numbers or "No.1" rankings are asserted on this page. Final compliance evidence must be the OEM's signed Declarations of Conformity and test reports.

## 7. Duty / HS / VAT stack

| HS national line | Program | As-of | SoT |
| --- | --- | --- | --- |
| 8507.xx (electric accumulators) or 8504.xx (static converters), BESS configuration-dependent | EU Common Customs Tariff → Austria national line | 2026-09-21 | PENDING — lookup required |

**Duty rate:** PENDING — lookup via the EU TARIC database for Austria before procurement. Confirm the 10-digit national line for AT and any anti-dumping or surveillance measures on lithium batteries originating in CN.

[Claim | Src: EU TARIC consultation, European Commission | [https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en](https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en) | accessed 2026-09-21]

**Austrian VAT (import):** PENDING — confirm standard rate and reverse-charge applicability (reverse-charge does not apply to CN origin; import VAT is due at the standard rate, currently 20%).

[Claim | Src: Austrian Federal Ministry of Finance — Customs | [https://www.bmf.gv.at/en/topics/taxation/customs.html](https://www.bmf.gv.at/en/topics/taxation/customs.html) | accessed 2026-09-21]

## 8. RFQ form

On submission via [/rfq/](/rfq/), TradVolt returns a non-binding indicative offer within 48 business hours, conditional on a frozen specification and confirmed Austrian duty/VAT from the official portals cited above. SKU "CATL-ENERC-215KWH" is a TradVolt catalogue identifier for the CATL EnerC 215 kWh; final SKU is OEM-confirmed at quote stage.

## 9. FAQ

### Q1. What is the TCO verdict?

NPV = **-111,286.72 EUR** over a 20-year horizon at 8.00% discount rate, with LCOS = **0.2977 EUR/kWh**. Simple payback = none. Discounted payback = none. The project is not viable under the assumed €0.10/kWh stacked effective value; it requires ~€0.30/kWh stacked value to reach NPV = 0.

### Q2. What is the HS code for a CATL EnerC 215 kWh LFP container BESS imported into Austria?

BESS units commonly classify under HS heading **8507** (electric accumulators) or **8504** (static converters / power supplies) depending on configuration. The exact 10-digit national line for AT must be confirmed via the [EU TARIC database (Austria)](https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en).

### Q3. Which EU/Austrian conformity marks apply?

**CE marking** under applicable EU directives (Low Voltage, EMC, Machinery) is mandatory. Industry-typical product standards referenced include **IEC 62619** (industrial LFP cells) and the **IEC 62933** series (BESS). **UN 38.3** is required for transport. Final list is set by the OEM's Declaration of Conformity.

### Q4. Are duty and VAT included?

No hardcoded rates are published. The duty and VAT lines are marked **PENDING — lookup** and must be confirmed via the [EU TARIC](https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en) and [BMF](https://www.bmf.gv.at/en/topics/taxation/customs.html) portals before any procurement commitment.

### Q5. What is the standard warranty?

Industry-typical LFP BESS warranties are **10 years** or a defined cycle count, with capacity retention ≥80%. Exact terms are OEM-specific and must be confirmed via the signed warranty statement.

### Q6. Can I get a binding quote?

Submit the RFQ form above (action="/rfq/"). TradVolt returns a non-binding indicative offer within 48 hours, pending spec freeze, certification scope and confirmation of Austrian duty/VAT.

## 10. Model assumptions (explicit bounded defaults)

| Assumption key | Value used | Note |
| --- | --- | --- |
| horizon_years | 20 | Model default |
| discount_rate | 8.00 % | Model default (TradVolt WACC proxy for EU SME buyer) |
| opex.escalation_pct | 2.0 %/yr | Bounded default |
| residual_value.amount | 0 EUR | Conservative — salvage excluded |
| residual_value.year | n/a | Not applied |
| asset.ess.usable_pct (operating DoD) | 80 % | Bounded default for LFP operating window |
| asset.ess.degradation_pct_per_year | 1.0 %/yr | Bounded default; energy throughput reduced 1%/yr |
| Stacked effective value | 0.10 EUR/kWh | Held flat across horizon (no escalation, no revenue stacking) |
| Industrial electricity price (AT reference) | 0.18 EUR/kWh | Eurostat nrg_pc_204 band, not used as stacked value |

## 11. Sources (allow-listed, with full URLs)

- CATL — EnerC product page: [https://www.catl.com/en/ess/enerc/](https://www.catl.com/en/ess/enerc/) — accessed 2026-09-21

- EU TARIC consultation, European Commission: [https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en](https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en) — accessed 2026-09-21

- Austrian Federal Ministry of Finance — Customs: [https://www.bmf.gv.at/en/topics/taxation/customs.html](https://www.bmf.gv.at/en/topics/taxation/customs.html) — accessed 2026-09-21

- Eurostat — Electricity prices for industrial consumers (dataset nrg_pc_204): [https://ec.europa.eu/eurostat/databrowser/view/nrg_pc_204/default/table?lang=en](https://ec.europa.eu/eurostat/databrowser/view/nrg_pc_204/default/table?lang=en) — accessed 2026-09-21

- IEC Webstore — IEC 62619 (industrial LFP cells): [https://webstore.iec.ch/publication/31651](https://webstore.iec.ch/publication/31651) — accessed 2026-09-21

- IEC Webstore — IEC 62933-2-1 (BESS): [https://webstore.iec.ch/publication/30815](https://webstore.iec.ch/publication/30815) — accessed 2026-09-21

- UNECE — UN Manual of Tests and Criteria, 38.3 Lithium batteries: [https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria](https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria) — accessed 2026-09-21

- EUR-Lex — Regulation (EU) No 765/2008 (CE marking framework): [https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:32008R0765](https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:32008R0765) — accessed 2026-09-21

- EUR-Lex — Directive 2014/34/EU (ATEX): [https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:32014L0034](https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:32014L0034) — accessed 2026-09-21

- TradVolt scenario TCO model output (Sep 2026): [/rfq/](/rfq/) — accessed 2026-09-21

**Request Quote — replies in 48h**
CATL EnerC 215 kWh, Austria delivery, non-binding indicative offer. [Go to RFQ form](#rfq) [Request custom TCO scenario](/rfq/)

© TradVolt. Figures produced by the TradVolt scenario TCO model from the bounded assumptions in §10; not a quotation. Product named is CATL EnerC 215 kWh; verify all ratings, voltages and cycle-life claims against the OEM datasheet before procurement. Specifications subject to OEM datasheet and confirmation of certifications and customs treatment.