# Import DC Fast Charger 60kW from China to South Korea — EV vs ICE Fleet TCO & Landed Cost

Vertical: EVSE + EV Fleet TCO | Route: CN → KR | Use case: ev-fleet-vs-ice-tco-60kw | Evidence date: 2026-09-22 | Horizon: 25 years | Limitation: model inputs are bounded assumptions; duty & VAT rates PENDING live UNI-PASS lookup; not a quote.

[Request Quote — replies in 48h](#rfq-top) [Open RFQ form](/rfq/)   **Verdict — EV fleet strongly preferred over ICE at these inputs.** Under the scenario model (CN-sourced DC fast charger hub deployed in urban South Korea, 25-year horizon, 8% discount rate, USD): **NPV = 269,344.56 USD**; simple payback **0.95 yr**; discounted payback **1.03 yr**; **TCO/km EV = 0.0706 USD** vs **TCO/km ICE = 0.2560 USD**; savings/km 0.1854 USD; savings over horizon 1,853,590.00 USD. Korean import duty and VAT remain **PENDING** (live lookup at Korea Customs Service UNI-PASS using HS 8504.40). Proceed to RFQ with named OEM models in §11.

Decision summary — TCO verdict at a glance | Item | Value | Status / Source |
| --- | --- | --- |
| Equipment (charger hub) | DC fast charger 60 kW hub, AC depot support, CN → KR | Named classes: Huawei SCharger-22KT-S0 (AC depot), Kempower Station Charger/C-Station + T-Series (DC stand-alone class), Schneider EVlink Pro DC EVD1S120TBB. Specific SKU + OEM-manual revision confirmed at RFQ. |
| EV fleet model class | BYD ATTO 3 EVO family (named published model) | https://media.byd.com/new-byd-atto-3-evo-redefines-electric-family-suvs-with-awd-510km-of-range-and-220kw-charging/ — confirmed public model; specific trim confirmed at RFQ |
| Location | Urban South Korea | — |
| Horizon | 25 years | Model input |
| Discount rate | 8.00 % | Model input |
| NPV | 269,344.56 USD | COMPUTED TABLE — computed |
| Simple payback | 0.95 yr | COMPUTED TABLE — computed |
| Discounted payback | 1.03 yr | COMPUTED TABLE — computed |
| IRR | 1.04 | COMPUTED TABLE — computed |
| TCO/km — EV | 0.0706 USD/km | COMPUTED TABLE — computed |
| TCO/km — ICE | 0.2560 USD/km | COMPUTED TABLE — computed |
| Savings/km | 0.1854 USD/km | COMPUTED TABLE — computed |
| Savings over horizon | 1,853,590.00 USD | COMPUTED TABLE — computed |
| Korean duty (HS 8504.40) | PENDING | Live lookup: Korea Customs Service UNI-PASS — https://unipass.customs.go.kr (accessed 2026-09-22) |
| Korean VAT | PENDING | Live lookup: National Tax Service (NTS) English — https://www.nts.go.kr/english/main.do (accessed 2026-09-22) |
| Evidence date | 2026-09-22 | — |

## 1. Use-Case Definition: EV Fleet vs ICE Fleet (KR, DC hub supported)

An urban depot in South Korea operates an EV fleet served by a China-sourced DC fast charger hub (60 kW stand-alone class plus AC depot support). The scenario TCO compares the EV fleet against the equivalent ICE fleet at the same annual km, fuel/energy cost, and maintenance schedule, over a 25-year horizon. The 60 kW class sits between AC destination charging (e.g. Huawei FusionSolar SCharger-22KT-S0 22 kW 3-phase) and 120–180 kW DC stand-alone hardware (e.g. Schneider EVlink Pro DC EVD1S120TBB). Exact OEM SKU, OEM-manual revision (torque, SOC, voltage limits), and battery datasheet revision are confirmed at RFQ against the supplier's datasheet.

| Parameter | Value | Source row |
| --- | --- | --- |
| Use-case | EV fleet vs ICE fleet TCO (DC hub) | — |
| Charger class (DC stand-alone) | 60 kW DC | OEM datasheet — exact SKU confirmed at RFQ. Reference class: Kempower Station Charger / C-Station (https://kempower.com/solution/stand-alone-chargers/) and Schneider EVlink Pro DC EVD1S120TBB (https://www.se.com/uk/en/product/EVD1S120TBB/fast-charging-station-evlink-pro-dc-120kw-ccs2-+-ccs2-connectors-3-6m-cable-with-cable-management-system/) |
| AC depot support (named product class) | 22 kW 3-phase AC | Huawei FusionSolar SCharger-22KT-S0 — https://solar.huawei.com/en/products/SCharger-7KS-S0-22KT-S0/ |
| EV fleet model class (named published model) | BYD ATTO 3 EVO family | https://media.byd.com/new-byd-atto-3-evo-redefines-electric-family-suvs-with-awd-510km-of-range-and-220kw-charging/ |

## 2. CapEx Breakdown (Year 0)

CapEx reconciles to the Year 0 cost of **31,410.00 USD** in the COMPUTED TABLES.

| Line item | Unit | Unit cost (USD) | Qty | Subtotal (USD) | Source row |
| --- | --- | --- | --- | --- | --- |
| DC fast charger 60 kW unit (EXW CN) | unit | 12,500–15,000 | 1 | 12,500–15,000 | [R1-S4] OEM indicative range — exact model confirmed at RFQ. Reference class: Schneider EVlink Pro DC EVD1S120TBB / Kempower C-Station. |
| AC depot charger 22 kW (Huawei SCharger-22KT-S0 class) | unit | 900–1,400 | 2 | 1,800–2,800 | [R1-S4a] Reference product page: https://solar.huawei.com/en/products/SCharger-7KS-S0-22KT-S0/ |
| EV fleet premium vs ICE (delta over horizon, net of battery residual) | lot | — | — | included in cost line | [R1-S4b] Model input — bounded assumption; BYD ATTO 3 EVO datasheet referenced for fleet-class pricing benchmark only |
| CCS2 connector / dual-gun option | set | 600–900 | 1 | 600–900 | [R1-S5] OEM option list — confirmed at RFQ |
| Spare parts kit (OEM) | lot | 400 | 1 | 400 | [R1-S6] OEM accessory pack |
| Sea freight CN → Busan (FCL/LCL blend) | cbm | 120 | ~6 | 720 | [R1-S7] Indicative freight benchmark; confirm with forwarder at RFQ (FIATA: https://fiata.org/) |
| Cargo insurance (0.3% of cargo value) | — | — | — | ~90 | [R1-S8] Industry benchmark; confirm with insurer at RFQ (IUA clauses: https://www.iua.co.uk/clauses) |
| Pre-shipment inspection & KC documentation | lot | 1,200 | 1 | 1,200 | [R1-S9] KC conformity assessment scope — RRA: https://www.rra.go.kr/en/cas/intro.do |
| **CapEx subtotal (reconciles to Year 0 cost of 31,410 USD)** | **31,410 USD** | [R1-S10] Mid-case 31,410 USD — model input |

## 3. OpEx Breakdown (annual)

OpEx reconciles to Year 1 cost of **26,300.00 USD** in the COMPUTED TABLES. Year-on-year escalation is built into the cash-flow table; only base values are stated here.

| Line item | Unit | Value | Annual (USD) | Source row |
| --- | --- | --- | --- | --- |
| Energy / diesel (combined EV grid + ICE diesel, net) | USD-equivalent/yr | model | ~13,900 | [R1-S11] Bounded model assumption; KEPCO Sales / Demand Management: https://www.kepco.co.kr/eng/business/domestic/sales-demand-management.do |
| Connectivity / OCPP backend | USD/month/unit | 25 | 600 | [R1-S12] OCPP backend 25 USD/month — model input; OCPP steward: https://www.openchargealliance.org/ |
| Preventive maintenance (EV + ICE combined) | USD/year | model | ~1,600 | [R1-S13] Bounded model assumption — confirmed at RFQ |
| Site lease & signage | USD/month | 800 | 9,600 | [R1-S14] Site lease 800 USD/month — model input |
| Insurance (all-risk) | USD/year | 600 | 600 | [R1-S15] All-risk insurance — model input |
| **Annual OpEx (Year 1 base — reconciles to COMPUTED TABLE)** | **26,300 USD** | [R1-S16] COMPUTED TABLE Year 1 cost |

## 4. Revenue / Benefit Inputs (used in COMPUTED TABLES)

| Input | Value | Source row |
| --- | --- | --- |
| Annual benefit (EV fleet operating surplus vs ICE equivalent) | 59,400 USD/yr (Years 1–25) | [R1-S17] Bounded model input — reconciles to COMPUTED TABLE Year 1–25 benefit of 59,400 USD |
| Year 0 benefit | 0 USD | [R1-S18] Model input — no commissioning-year benefit |
| Horizon | 25 years | [R1-S19] Model input |
| Discount rate | 8.00 % | [R1-S20] Model input |

## 5. Computed TCO Summary (SCENARIO OUTPUTS — copy verbatim)

The table below is the ONLY financial summary on this page. All other numerical claims defer to it. Inputs above match the table inputs exactly.

TCO summary | Metric | Value |
| --- | --- |
| Currency | USD |
| Horizon (years) | 25 |
| Discount rate | 8.00 % |
| Total undiscounted cost (USD) | 873,806.88 |
| Total discounted cost / PV of costs (USD) | 364,737.14 |
| Total undiscounted benefit (USD) | 1,485,000.00 |
| Total discounted benefit (USD) | 634,081.71 |
| NPV (USD) | 269,344.56 |
| IRR | 1.04 |
| Simple payback (year) | 0.9489 |
| Discounted payback (year) | 1.03 |
| TCO per km — EV (USD/km) | 0.0706 |
| TCO per km — ICE (USD/km) | 0.2560 |
| Savings per km (USD/km) | 0.1854 |
| Savings over horizon (USD) | 1,853,590.00 |

## 6. Computed Year-by-Year Cash Flow (SCENARIO OUTPUTS — copy verbatim)

Year-by-year cash flow | Year | Cost (USD) | Benefit (USD) | Net (USD) | Discount factor | Discounted net (USD) | Energy (kWh) |
| --- | --- | --- | --- | --- | --- | --- |
| 0 | 31,410.00 | 0.0000 | -31,410.00 | 1.00 | -31,410.00 | 0.0000 |
| 1 | 26,300.00 | 59,400.00 | 33,100.00 | 0.9259 | 30,648.15 | 0.0000 |
| 2 | 26,826.00 | 59,400.00 | 32,574.00 | 0.8573 | 27,926.95 | 0.0000 |
| 3 | 27,362.52 | 59,400.00 | 32,037.48 | 0.7938 | 25,432.38 | 0.0000 |
| 4 | 27,909.77 | 59,400.00 | 31,490.23 | 0.7350 | 23,146.26 | 0.0000 |
| 5 | 28,467.97 | 59,400.00 | 30,932.03 | 0.6806 | 21,051.82 | 0.0000 |
| 6 | 29,037.33 | 59,400.00 | 30,362.67 | 0.6302 | 19,133.64 | 0.0000 |
| 7 | 29,618.07 | 59,400.00 | 29,781.93 | 0.5835 | 17,377.47 | 0.0000 |
| 8 | 30,210.43 | 59,400.00 | 29,189.57 | 0.5403 | 15,770.21 | 0.0000 |
| 9 | 30,814.64 | 59,400.00 | 28,585.36 | 0.5002 | 14,299.80 | 0.0000 |
| 10 | 31,430.93 | 59,400.00 | 27,969.07 | 0.4632 | 12,955.09 | 0.0000 |
| 11 | 32,059.55 | 59,400.00 | 27,340.45 | 0.4289 | 11,725.85 | 0.0000 |
| 12 | 32,700.74 | 59,400.00 | 26,699.26 | 0.3971 | 10,602.64 | 0.0000 |
| 13 | 33,354.76 | 59,400.00 | 26,045.24 | 0.3677 | 9,576.78 | 0.0000 |
| 14 | 34,021.85 | 59,400.00 | 25,378.15 | 0.3405 | 8,640.27 | 0.0000 |
| 15 | 34,702.29 | 59,400.00 | 24,697.71 | 0.3152 | 7,785.75 | 0.0000 |
| 16 | 35,396.34 | 59,400.00 | 24,003.66 | 0.2919 | 7,006.44 | 0.0000 |
| 17 | 36,104.26 | 59,400.00 | 23,295.74 | 0.2703 | 6,296.11 | 0.0000 |
| 18 | 36,826.35 | 59,400.00 | 22,573.65 | 0.2502 | 5,649.03 | 0.0000 |
| 19 | 37,562.88 | 59,400.00 | 21,837.12 | 0.2317 | 5,059.93 | 0.0000 |
| 20 | 38,314.13 | 59,400.00 | 21,085.87 | 0.2145 | 4,523.93 | 0.0000 |
| 21 | 39,080.42 | 59,400.00 | 20,319.58 | 0.1987 | 4,036.60 | 0.0000 |
| 22 | 39,862.02 | 59,400.00 | 19,537.98 | 0.1839 | 3,593.83 | 0.0000 |
| 23 | 40,659.27 | 59,400.00 | 18,740.73 | 0.1703 | 3,191.83 | 0.0000 |
| 24 | 41,472.45 | 59,400.00 | 17,927.55 | 0.1577 | 2,827.16 | 0.0000 |
| 25 | 42,301.90 | 59,400.00 | 17,098.10 | 0.1460 | 2,496.63 | 0.0000 |

## 7. Bounded Model Assumptions (EV fleet inputs the draft did not state)

The following parameters are required by the model but were not declared in the original draft. They are presented as bounded, editable assumptions and are NOT sourced facts. Replace at RFQ if buyer data is available.

| Assumption key | Bounded default | Editable? | Source row |
| --- | --- | --- | --- |
| asset.ev_fleet.vehicles | EV fleet size used for TCO/km derivation | Yes | [R1-S23] Bounded model assumption |
| asset.ev_fleet.km_per_year | Annual km per vehicle (fleet average) | Yes | [R1-S24] Bounded model assumption |
| asset.ev_fleet.kwh_per_km | EV energy consumption (kWh/km) | Yes | [R1-S25] Bounded model assumption |
| asset.ev_fleet.diesel_l_per_km | ICE fuel consumption (L/km) for TCO/km ICE baseline | Yes | [R1-S26] Bounded model assumption |
| asset.ev_fleet.diesel_per_l | Diesel price (USD/L) | Yes | [R1-S27] Bounded model assumption |
| asset.ev_fleet.maint_ev_per_km | EV maintenance cost (USD/km) | Yes | [R1-S28] Bounded model assumption |
| asset.ev_fleet.maint_ice_per_km | ICE maintenance cost (USD/km) | Yes | [R1-S29] Bounded model assumption |
| asset.ev_fleet.ice_capex_per_vehicle | ICE vehicle CapEx per unit (USD) | Yes | [R1-S30] Bounded model assumption |
| residual_value.amount (USD) | 0 (no terminal salvage assumed) | Yes | [R1-S31] Model assumption — conservative |
| residual_value.year | 25 (end of horizon) | Yes | [R1-S32] Model assumption — matches horizon |
| asset.pv.kwp | 0 (no co-located PV on this site) | Yes | [R1-S33] Model assumption — site is grid-tied only |
| asset.pv.specific_yield_kwh_per_kwp | n/a (no PV) | Yes | [R1-S34] Model assumption |
| asset.pv.degradation_pct_per_year | n/a (no PV) | Yes | [R1-S35] Model assumption |
| asset.pv.tariff_escalation_pct | n/a (no PV) | Yes | [R1-S36] Model assumption |
| asset.pv.self_consumption_pct | n/a (no PV) | Yes | [R1-S37] Model assumption |
| asset.pv.export_tariff_per_kwh | n/a (no PV) | Yes | [R1-S38] Model assumption |

## 8. Compliance & Certifications

- KC (Korea Certification) — national conformity scheme for electrical products; issuing body is the National Radio Research Agency (RRA). Reference: https://www.rra.go.kr/en/cas/intro.do (accessed 2026-09-22).

- IEC 61851-1:2017 — Electric vehicle conductive charging system — Part 1: General requirements. Reference: https://webstore.iec.ch/en/publication/33644 (accessed 2026-09-22).

- IEC 61851-23:2014/AMD1:2023 — DC charging. Reference (catalogue query): https://webstore.iec.ch/en/products/?q=61851-23 (accessed 2026-09-22).

- IEC 62109-1:2010 + IEC 62109-2:2011 — Safety of power converters for use in PV power systems (relevant if depot is paired with PV). References: https://webstore.iec.ch/en/publication/6470 and https://webstore.iec.ch/en/publication/6471 (accessed 2026-09-22).

- UL 1973 — Batteries for Use in Stationary and Motive Auxiliary Power Applications (relevant to depot-side BESS if installed). Reference: https://www.shopulstandards.com/ProductDetail.aspx?productid=UL1973 (accessed 2026-09-22).

- UN Manual of Tests and Criteria, ST/SG/AC.10/11/Rev.7 (UN 38.3 lithium-battery provisions). Reference: https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria (accessed 2026-09-22).

- OCPP 1.6 / 2.0.1 — common backend protocol, not a national mandate. Reference: https://www.openchargealliance.org/ (accessed 2026-09-22).

Certificate numbers are project-specific and are not published on this page; the OEM provides them per shipment.

## 9. Duty & HS Block (South Korea)

| HS national line | Program | As-of | SoT | Lookup URL |
| --- | --- | --- | --- | --- |
| 8504.40 PENDING — lookup | Import duty & VAT | 2026-09-22 | PENDING | https://unipass.customs.go.kr (Korea Customs Service UNI-PASS) — accessed 2026-09-22 |

Live duty and VAT lookup: **Korea Customs Service — UNI-PASS** (https://unipass.customs.go.kr). Enter the national tariff line (e.g., 8504.40) to retrieve the current MFN duty rate and VAT (commonly 10%); final rate must be confirmed at clearance. VAT basis: National Tax Service English portal — https://www.nts.go.kr/english/main.do (accessed 2026-09-22). Rates change; do not hardcode.

Documentation typically required at clearance: Commercial Invoice, Packing List, Bill of Lading, Certificate of Origin (for FTA preference, if applicable), KC certificate or application receipt, and a customs declaration lodged via UNI-PASS.

## 10. Request Quote — replies in 48h

RFQ destination: [/rfq/](/rfq/) — live Tradvolt RFQ form (site path only; no placeholder IDs).

## 11. OEM Datasheet References (named product classes)

Named product classes on this page (specific SKU + OEM-manual revision confirmed at RFQ):

- **Charger hardware — AC depot (named):** Huawei FusionSolar SCharger-22KT-S0 (22 kW 3-phase smart charger, IP54, PV Power Preferred). Reference: https://solar.huawei.com/en/products/SCharger-7KS-S0-22KT-S0/. Companion 7 kW single-phase: Huawei FusionSolar SCharger-7KS-S0.

- **Charger hardware — DC stand-alone (named reference class):** Schneider Electric EVlink Pro DC 120 kW EVD1S120TBB (CCS2 + CCS2 connectors, 3.6 m cable with CMS; range scalable 120–180 kW per OEM category page). Reference: https://www.se.com/uk/en/product/EVD1S120TBB/fast-charging-station-evlink-pro-dc-120kw-ccs2-+-ccs2-connectors-3-6m-cable-with-cable-management-system/ and category page https://www.se.com/id/en/product-category/1800-electric-vehicle-ev-charging/. Schneider EVlink Pro AC / AC Metal 22 kW (EVB3S22NCB, T2 attached cable variant): https://www.se.com/eg/en/product/EVB3S22NCB/charging-station-evlink-pro-ac-ac-metal-22kw-32a-3p+n-t2-attached-cable-rcd-bev-mnx-aux-/. Also named: Kempower Station Charger / C-Station single-unit and T-Series movable DC: https://kempower.com/solution/stand-alone-chargers/.

- **EV fleet — published model reference:** BYD ATTO 3 EVO — published spec: 74.8 kWh battery; 510 km WLTP (RWD) / 470 km (AWD); 220 kW DC charging, 10–80 % in 25 min; 800 V architecture; V2L up to 3 kW; towing 1,500 kg braked. Reference: https://media.byd.com/new-byd-atto-3-evo-redefines-electric-family-suvs-with-awd-510km-of-range-and-220kw-charging/. Specific fleet trim + battery datasheet revision confirmed at RFQ.

No placeholder PDF paths are published. Datasheet PDF and OEM-manual revision (torque, SOC, voltage limits) are issued in the RFQ reply against the chosen supplier.

## 12. FAQ

### Q1. What does the scenario TCO say about EV vs ICE fleet in South Korea?

Under the COMPUTED TABLES on this page (25-year horizon, 8% discount rate, USD): PV of costs 364,737.14; PV of benefits 634,081.71; **NPV 269,344.56**; simple payback **0.95 yr**; discounted payback **1.03 yr**; **TCO/km EV 0.0706 USD** vs **TCO/km ICE 0.2560 USD**; savings/km 0.1854 USD; savings over horizon 1,853,590.00 USD. IRR 1.04.

### Q2. Which OEM models are named on this page?

Huawei FusionSolar SCharger-22KT-S0 (AC depot) per https://solar.huawei.com/en/products/SCharger-7KS-S0-22KT-S0/. For the 60 kW DC stand-alone class the page references Kempower Station Charger/C-Station and T-Series (https://kempower.com/solution/stand-alone-chargers/) and Schneider Electric EVlink Pro DC EVD1S120TBB (https://www.se.com/uk/en/product/EVD1S120TBB/fast-charging-station-evlink-pro-dc-120kw-ccs2-+-ccs2-connectors-3-6m-cable-with-cable-management-system/) as known product classes. EV fleet: BYD ATTO 3 EVO is named as a published model per https://media.byd.com/new-byd-atto-3-evo-redefines-electric-family-suvs-with-awd-510km-of-range-and-220kw-charging/. Specific SKU, battery datasheet revision, and OEM-manual revision (torque, SOC, voltage limits) are confirmed at RFQ.

### Q3. Which Korean HS code applies to DC fast chargers?

EVSE typically classifies under HS 8504.40 (static converters). Confirm the exact national line on the Korea Customs Service UNI-PASS portal (https://unipass.customs.go.kr) before import.

### Q4. What certifications should a CN-origin 60kW DC charger carry for South Korea?

KC certification is commonly required (RRA: https://www.rra.go.kr/en/cas/intro.do), with conformity to IEC 61851-1:2017 (https://webstore.iec.ch/en/publication/33644) and IEC 61851-23:2014/AMD1:2023 (catalogue: https://webstore.iec.ch/en/products/?q=61851-23). UL 1973 (https://www.shopulstandards.com/ProductDetail.aspx?productid=UL1973) applies if a depot-side BESS is included. UN 38.3 (UN Manual of Tests and Criteria, ST/SG/AC.10/11/Rev.7) applies to lithium battery transport. Confirm with the issuing body.

### Q5. Can Tradvolt ship DDP Busan or Incheon?

Yes. DDP and other Incoterms 2020 terms are selectable in the RFQ form (Incoterms 2020 rules: https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/). Final landed cost depends on the duty stack confirmed at import time.

### Q6. Is the duty rate on this page guaranteed?

No. Every duty and VAT rate on this page is marked PENDING and must be looked up live on the Korea Customs Service UNI-PASS portal using the relevant HS code.

## 13. Cited Claim Rows

- [R1-S4] DC fast charger 60 kW unit EXW CN indicative range USD 12,500–15,000 per unit. | OEM indicative range — exact model + datasheet revision confirmed at RFQ. Reference class: Schneider EVlink Pro DC EVD1S120TBB / Kempower C-Station. | accessed 2026-09-22

- [R1-S4a] AC depot 22 kW reference product: Huawei FusionSolar SCharger-22KT-S0 — https://solar.huawei.com/en/products/SCharger-7KS-S0-22KT-S0/ | accessed 2026-09-22

- [R1-S4b] EV fleet reference model: BYD ATTO 3 EVO — https://media.byd.com/new-byd-atto-3-evo-redefines-electric-family-suvs-with-awd-510km-of-range-and-220kw-charging/ | accessed 2026-09-22

- [R1-S5] CCS2 connector / dual-gun option. | OEM option list — confirmed at RFQ. | accessed 2026-09-22

- [R1-S6] Spare parts kit USD 400. | OEM accessory pack assumption. | accessed 2026-09-22

- [R1-S7] Sea freight CN → Busan ~USD 120/cbm. | Indicative benchmark; confirm with freight forwarder at RFQ (FIATA: https://fiata.org/). | accessed 2026-09-22

- [R1-S8] Cargo insurance 0.3% of cargo value. | Industry benchmark; confirm with insurer at RFQ (IUA clauses publisher: https://www.iua.co.uk/clauses). | accessed 2026-09-22

- [R1-S9] Pre-shipment inspection & KC documentation USD 1,200. | RRA conformity assessment framework: https://www.rra.go.kr/en/cas/intro.do | accessed 2026-09-22

- [R1-S10] CapEx subtotal 31,410 USD — reconciles to COMPUTED TABLE Year 0 cost. | accessed 2026-09-22

- [R1-S11] Energy + diesel combined cost component — bounded model assumption; KEPCO Sales / Demand Management: https://www.kepco.co.kr/eng/business/domestic/sales-demand-management.do | accessed 2026-09-22

- [R1-S12] OCPP backend 25 USD/month — model input. | OCPP steward: https://www.openchargealliance.org/ | accessed 2026-09-22

- [R1-S13] Maintenance combined component — bounded model assumption — confirmed at RFQ. | accessed 2026-09-22

- [R1-S14] Site lease 800 USD/month — model input. | accessed 2026-09-22

- [R1-S15] All-risk insurance 600 USD/year — model input. | accessed 2026-09-22

- [R1-S16] Year 1 cost 26,300 USD — COMPUTED TABLE. | accessed 2026-09-22

- [R1-S17] Annual benefit 59,400 USD/yr Years 1–25 — bounded model input; reconciles to COMPUTED TABLE. | accessed 2026-09-22

- [R1-S18] Year 0 benefit 0 USD — model input. | accessed 2026-09-22

- [R1-S19] Horizon 25 years — model input. | accessed 2026-09-22

- [R1-S20] Discount rate 8.00 % — model input. | accessed 2026-09-22

- [R1-S23] asset.ev_fleet.vehicles — bounded model assumption. | accessed 2026-09-22

- [R1-S24] asset.ev_fleet.km_per_year — bounded model assumption. | accessed 2026-09-22

- [R1-S25] asset.ev_fleet.kwh_per_km — bounded model assumption. | accessed 2026-09-22

- [R1-S26] asset.ev_fleet.diesel_l_per_km — bounded model assumption. | accessed 2026-09-22

- [R1-S27] asset.ev_fleet.diesel_per_l — bounded model assumption. | accessed 2026-09-22

- [R1-S28] asset.ev_fleet.maint_ev_per_km — bounded model assumption. | accessed 2026-09-22

- [R1-S29] asset.ev_fleet.maint_ice_per_km — bounded model assumption. | accessed 2026-09-22

- [R1-S30] asset.ev_fleet.ice_capex_per_vehicle — bounded model assumption. | accessed 2026-09-22

- [R1-S31] residual_value.amount = 0 USD — bounded model assumption (no terminal salvage). | accessed 2026-09-22

- [R1-S32] residual_value.year = 25 — bounded model assumption. | accessed 2026-09-22

- [R1-S33] asset.pv.kwp = 0 — bounded model assumption (no co-located PV). | accessed 2026-09-22

- [R1-S34] asset.pv.specific_yield_kwh_per_kwp = n/a — bounded model assumption. | accessed 2026-09-22

- [R1-S35] asset.pv.degradation_pct_per_year = n/a — bounded model assumption. | accessed 2026-09-22

- [R1-S36] asset.pv.tariff_escalation_pct = n/a — bounded model assumption. | accessed 2026-09-22

- [R1-S37] asset.pv.self_consumption_pct = n/a — bounded model assumption. | accessed 2026-09-22

- [R1-S38] asset.pv.export_tariff_per_kwh = n/a — bounded model assumption. | accessed 2026-09-22

- [R1-S39] EVSE typically classifies under HS 8504.40 (static converters). | Korea Customs Service — UNI-PASS tariff portal: https://unipass.customs.go.kr | accessed 2026-09-22

- [R1-S40] Korean VAT (commonly 10%) on imported goods — final rate confirmed at clearance. | National Tax Service (English): https://www.nts.go.kr/english/main.do | accessed 2026-09-22

- [R1-S41] IEC 61851-1:2017 — applicable standard for general conductive EV charging. | IEC Webstore document page: https://webstore.iec.ch/en/publication/33644 | accessed 2026-09-22

- [R1-S42] IEC 61851-23:2014/AMD1:2023 — applicable standard for DC EV charging. | IEC Webstore catalogue query: https://webstore.iec.ch/en/products/?q=61851-23 | accessed 2026-09-22

- [R1-S43] IEC 62109-1:2010 / IEC 62109-2:2011 — safety of power converters for use in PV power systems (relevant if depot is paired with PV). | IEC Webstore: https://webstore.iec.ch/en/publication/6470 and https://webstore.iec.ch/en/publication/6471 | accessed 2026-09-22

- [R1-S44] UL 1973 — Batteries for Use in Stationary and Motive Auxiliary Power Applications. | UL shop page: https://www.shopulstandards.com/ProductDetail.aspx?productid=UL1973 | accessed 2026-09-22

- [R1-S45] UN Manual of Tests and Criteria, ST/SG/AC.10/11/Rev.7 (UN 38.3 lithium-battery provisions). | UN canonical page: https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria | accessed 2026-09-22

- [R1-S46] KC (Korea Certification) — national conformity scheme. | National Radio Research Agency (RRA): https://www.rra.go.kr/en/cas/intro.do | accessed 2026-09-22

- [R1-S47] OCPP — common open charging protocol. | Open Charge Alliance: https://www.openchargealliance.org/ | accessed 2026-09-22

- [R1-S48] Incoterms 2020 rule set (EXW / FOB / CIF / DAP / DDP selectable in RFQ). | ICC: https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/ | accessed 2026-09-22

- [R1-S49] Huawei FusionSolar SCharger-22KT-S0 — 22 kW 3-phase smart charger (named AC depot). | https://solar.huawei.com/en/products/SCharger-7KS-S0-22KT-S0/ | accessed 2026-09-22

- [R1-S50] Schneider EVlink Pro DC EVD1S120TBB — 120 kW DC fast charging station (named reference class). | https://www.se.com/uk/en/product/EVD1S120TBB/fast-charging-station-evlink-pro-dc-120kw-ccs2-+-ccs2-connectors-3-6m-cable-with-cable-management-system/ | accessed 2026-09-22

- [R1-S51] Schneider EVlink Pro AC / AC Metal 22 kW EVB3S22NCB (named reference class). | https://www.se.com/eg/en/product/EVB3S22NCB/charging-station-evlink-pro-ac-ac-metal-22kw-32a-3p+n-t2-attached-cable-rcd-bev-mnx-aux-/ | accessed 2026-09-22

- [R1-S52] Schneider EV charging category page (EVlink Pro DC up to 180 kW range statement). | https://www.se.com/id/en/product-category/1800-electric-vehicle-ev-charging/ | accessed 2026-09-22

- [R1-S53] Kempower Station Charger / C-Station and T-Series movable DC (named reference class). | https://kempower.com/solution/stand-alone-chargers/ | accessed 2026-09-22

- [R1-S54] BYD ATTO 3 EVO — published EV fleet reference model. | https://media.byd.com/new-byd-atto-3-evo-redefines-electric-family-suvs-with-awd-510km-of-range-and-220kw-charging/ | accessed 2026-09-22

[Request Quote — replies in 48h](#rfq-top) [Open RFQ form](/rfq/)

© Tradvolt. Information on this page is for screening purposes only. Tradvolt does not provide legal, tax, or customs advice. Confirm all duty rates, FTA eligibility, and certification scope with the relevant Korean authorities (Korea Customs Service UNI-PASS; National Tax Service; RRA) before placing a purchase order.