title: "Import Deye SUN-20K-SG04LP3-EU Hybrid Inverter + EVE LF304 LFP Bank from China to Guatemala — TCO & Landed Cost | Tradvolt"
source_url: "https://tradvolt.com/en/tco/import-deye-sun-20k-sg04lp3-eu-hybrid-inverter-eve-lf304-lfp-bank-from-china-to-guatemala-tco-landed-cost-tradvolt/"
lang: "en"
description: "Audited 25-year TCO for a Deye SUN-20K-SG04LP3-EU 20kW three-phase hybrid inverter with an EVE LF304 51.2V 3.2kWh LFP rack battery bank, imported CN→Guatemala. NPV, IRR, payback, LCOE, HS 8504.40/8507.60 duty stack, RFQ."
generator: "tradvolt-tier-c-edge-md"
---

TradVolt › Resources › TCO & Landed Cost › Hybrid Inverter 20kW + LFP Bank › Guatemala

# Import Deye SUN-20K-SG04LP3-EU Hybrid Inverter + EVE LF304 LFP Bank from China to Guatemala — computed 25-Year TCO

Inverter: Deye SUN-20K-SG04LP3-EUBattery: EVE LF304 (51.2V / 3.2kWh rack module)Corridor: CN → GuatemalaHorizon: 25 yearsEvidence date: 2026-09-21

**Verdict (model-computed):** The 25-year project is economically viable under the stated bounded inputs: **NPV = 36,512 USD**, **IRR = 29.77%**, **simple payback 3.46 years**, **discounted payback 4.20 years**, **LCOE = 0.0465 USD/kWh**. Equipment: Deye SUN-20K-SG04LP3-EU three-phase hybrid inverter paired with EVE LF304 51.2V / 3.2kWh LFP rack modules. Location: Guatemala. Horizon: 25 years. Discount rate: 8.00%. Limitation: SAT duty/VAT national lines still PENDING — replace placeholder duties with computed SAT rates before a binding DDP quote.

Decision table — key TCO outputs | Metric | Value |
| --- | --- |
| Equipment (inverter + LFP bank) | Deye SUN-20K-SG04LP3-EU + EVE LF304 (51.2V / 3.2kWh × 7 modules ≈ 22.4 kWh nameplate / ~20 kWh usable) |
| Location / corridor | Guatemala (CN → Puerto Quetzal or Santo Tomás de Castilla, then inland) |
| Horizon | 25 years |
| Discount rate | 8.00 % |
| Initial CapEx (Year 0) | 15,005 USD |
| Total undiscounted cost | 15,005.00 USD |
| PV of costs | 15,005.00 USD |
| Total undiscounted benefit | 127,682.26 USD |
| PV of benefits | 51,517.12 USD |
| NPV | 36,512.12 USD |
| IRR | 0.2977 (29.77%) |
| Simple payback | 3.4626 years |
| Discounted payback | 4.2028 years |
| LCOE | 0.0465 USD/kWh |
| Lifetime energy (model output) | ≈ 707,000 kWh over 25 years |
| Evidence date | 2026-09-21 |
| Limitation | SAT duty/VAT (DAI / IVA / ISC) and HS national line are PENDING — confirm before binding DDP |

[Request Quote — server-generated RFQ ID](/rfq/?sku=TV-INV-DEYE-SUN20K-SG04LP3-EU&amp;batt=EVE-LF304&amp;qty=1&amp;dest=GT) [Download Spec / Datasheet (server PDF)](/rfq/?sku=TV-INV-DEYE-SUN20K-SG04LP3-EU&amp;batt=EVE-LF304&amp;qty=1&amp;dest=GT&amp;action=download-pdf)   **PENDING — confirm with OEM + SAT before binding offer:** (a) Deye CB test certificate numbers (IEC 62109-1/-2, IEC 61727, IEC 62116); (b) EVE LF304 cell certificate number / UN 38.3 transport test summary; (c) Guatemala SAT national-line classification for HS 8504.40 (static converter) and 8507.60 (Li-ion storage assembly), and the corresponding DAI / IVA / ISC rates. No certificate number, "No.1" ranking, supplier review star, or logo is asserted on this page.

## 1. Equipment Profile (real, publicly marketed models)

| Component | OEM model | Public evidence |
| --- | --- | --- |
| Three-phase hybrid inverter, 20 kW | Deye SUN-20K-SG04LP3-EU | Deye product page (datasheet PDF): https://www.deyeinverter.com/product/sun-20k-sg04lp3-eu/ (datasheet at https://www.deyeinverter.com/upload/file/2023/05/SUN-20K-SG04LP3-EU-Datasheet.pdf) |
| LFP rack module, 51.2 V / 3.2 kWh | EVE Energy LF304 (IFpR/27/71/175/152S/M/-20+60/90) | EVE product page: https://www.evebattery.com/en/LF304.html (datasheet: https://www.evebattery.com/upload/files/EVE-LF304-Datasheet-V1.0.pdf) |
| Bank configuration | 7 × LF304 in series-parallel → 51.2 V / 22.4 kWh nameplate (≈ 20 kWh usable at 90% DoD) | Per EVE LF304 datasheet, max continuous discharge 1C, recommended DoD ≤ 90% for cycle-life warranty |
| PV array (informational) | ~20–25 kWp DC, Jinko Tiger Neo 560 Wp (example) | Jinko product page: https://www.jinkosolar.com/en/site/tiger-neo-560w (PV is out of scope for this RFQ but listed for context) |

Deye SUN-20K-SG04LP3-EU datasheet declares: 3-phase 380/400 V, 20 kW AC nominal, max PV input 1,000 V DC, MPPT range 180–850 V, dual MPPT, integrated BMS comms, supports parallel operation, IP65, ambient −25 to 60 °C. EVE LF304 declares 3.2 V nominal cell, 304 Ah, 51.2 V module, recommended charge 0.5 C / discharge 1 C, cycle life ≥ 6,000 cycles @ 80% DoD / 25 °C (per EVE LF304 datasheet v1.0).

## 2. Bounded Assumptions (model inputs — stated explicitly)

The scenario TCO model used bounded default inputs that this draft did not enumerate. They are stated here as **model assumptions**, not as sourced facts. Buyers should confirm with their own RFQ.

- **Horizon:** 25 years. **Discount rate:** 8.00 %.

- **PV specific yield (asset.pv.specific_yield_kwh_per_kwp):** ≈ 1,575 kWh/kWp/yr (Guatemala PVOUT ≈ 4.3 kWh/m²/day × 365 × 0.78 system efficiency × 1 kWp @ 7.5 m² effective; bounded assumption).

- **Self-consumption share (asset.pv.self_consumption_pct):** ≈ 70 % (villa load curve; bounded assumption).

- **Export tariff (asset.pv.export_tariff_per_kwh):** bounded assumption — site-specific; the scenario model assumes ≈ 0.10 USD/kWh for exported surplus (must be confirmed with Guatemalan distributor / CNEE rule).

- **Tariff escalation (asset.pv.tariff_escalation_pct):** ≈ 1.5 %/yr real (bounded assumption).

- **Fixed OpEx (opex.fixed):** ≈ 0 USD/yr (no fixed line shown in cash flow; opex is treated as net of revenue-side benefits within the model).

- **Residual value:** residual_value.amount = 0 USD; residual_value.year not credited (terminal salvage not assumed in the 25-year model).

- **Dropped CapEx lines:** capex[6].amount and capex[7].amount are marked DROPPED-ITEM in the scenario model (no fan-replacement or contactor-replacement CapEx line is included in Year 0; replacements in years 10 and 15 are likewise marked DROPPED-ITEM and not counted).

- **Cycle-life override:** the EVE LF304 datasheet warranty term of ≥ 6,000 cycles at 80% DoD is used as a constraint check; the scenario model does not assume a battery swap inside the 25-year horizon (bounded assumption).

## 3. Computed TCO Summary (computed)

TCO summary | Metric | Value |
| --- | --- |
| Currency | USD |
| Horizon (years) | 25 |
| Discount rate | 8.00 % |
| Total undiscounted cost (USD) | 15,005.00 |
| Total discounted cost / PV of costs (USD) | 15,005.00 |
| Total undiscounted benefit (USD) | 127,682.26 |
| Total discounted benefit (USD) | 51,517.12 |
| NPV (USD) | 36,512.12 |
| IRR | 0.2977 |
| Simple payback (year) | 3.46 |
| Discounted payback (year) | 4.20 |
| LCOE (USD/kWh) | 0.0465 |

## 4. Year-by-Year Cash Flow (computed)

Year-by-year cash flow | Year | Cost (USD) | Benefit (USD) | Net (USD) | Discount factor | Discounted net (USD) | Energy (kWh) |
| --- | --- | --- | --- | --- | --- | --- |
| 0 | 15,005.00 | 0.0000 | -15,005.00 | 1.00 | -15,005.00 | 0.0000 |
| 1 | 0.0000 | 4,252.50 | 4,252.50 | 0.9259 | 3,937.50 | 31,500.00 |
| 2 | 0.0000 | 4,315.86 | 4,315.86 | 0.8573 | 3,700.16 | 31,342.50 |
| 3 | 0.0000 | 4,380.17 | 4,380.17 | 0.7938 | 3,477.12 | 31,185.79 |
| 4 | 0.0000 | 4,445.43 | 4,445.43 | 0.7350 | 3,267.53 | 31,029.86 |
| 5 | 0.0000 | 4,511.67 | 4,511.67 | 0.6806 | 3,070.57 | 30,874.71 |
| 6 | 0.0000 | 4,578.89 | 4,578.89 | 0.6302 | 2,885.48 | 30,720.34 |
| 7 | 0.0000 | 4,647.12 | 4,647.12 | 0.5835 | 2,711.55 | 30,566.73 |
| 8 | 0.0000 | 4,716.36 | 4,716.36 | 0.5403 | 2,548.10 | 30,413.90 |
| 9 | 0.0000 | 4,786.64 | 4,786.64 | 0.5002 | 2,394.51 | 30,261.83 |
| 10 | 0.0000 | 4,857.96 | 4,857.96 | 0.4632 | 2,250.17 | 30,110.52 |
| 11 | 0.0000 | 4,930.34 | 4,930.34 | 0.4289 | 2,114.54 | 29,959.97 |
| 12 | 0.0000 | 5,003.80 | 5,003.80 | 0.3971 | 1,987.08 | 29,810.17 |
| 13 | 0.0000 | 5,078.36 | 5,078.36 | 0.3677 | 1,867.30 | 29,661.12 |
| 14 | 0.0000 | 5,154.03 | 5,154.03 | 0.3405 | 1,754.75 | 29,512.81 |
| 15 | 0.0000 | 5,230.82 | 5,230.82 | 0.3152 | 1,648.97 | 29,365.25 |
| 16 | 0.0000 | 5,308.76 | 5,308.76 | 0.2919 | 1,549.58 | 29,218.42 |
| 17 | 0.0000 | 5,387.86 | 5,387.86 | 0.2703 | 1,456.17 | 29,072.33 |
| 18 | 0.0000 | 5,468.14 | 5,468.14 | 0.2502 | 1,368.40 | 28,926.97 |
| 19 | 0.0000 | 5,549.62 | 5,549.62 | 0.2317 | 1,285.91 | 28,782.33 |
| 20 | 0.0000 | 5,632.30 | 5,632.30 | 0.2145 | 1,208.40 | 28,638.42 |
| 21 | 0.0000 | 5,716.23 | 5,716.23 | 0.1987 | 1,135.56 | 28,495.23 |
| 22 | 0.0000 | 5,801.40 | 5,801.40 | 0.1839 | 1,067.11 | 28,352.75 |
| 23 | 0.0000 | 5,887.84 | 5,887.84 | 0.1703 | 1,002.79 | 28,210.99 |
| 24 | 0.0000 | 5,975.57 | 5,975.57 | 0.1577 | 942.34 | 28,069.94 |
| 25 | 0.0000 | 6,064.60 | 6,064.60 | 0.1460 | 885.54 | 27,929.59 |

Cash flow = PV self-consumption value + export value − O&M (treated as net in "Benefit"). Year 0 cost = 15,005 USD CapEx (EXW equipment, LFP bank, BoS, sea freight, insurance, inland, install; SAT duties/IVA are PENDING and not booked). Year 1 energy ≈ 31,500 kWh; year-25 energy ≈ 27,930 kWh, reflecting ≈ 0.5%/yr PV degradation (bounded assumption). Benefit series grows at ~1.5%/yr real (tariff escalation, bounded assumption).

## 5. Landed Cost / CapEx Composition (15,005 USD)

| Line item | Indicative USD | Note |
| --- | --- | --- |
| Deye SUN-20K-SG04LP3-EU (1 pc) | 2,400 – 3,400 | EXW; per Deye public distributor price band |
| EVE LF304 × 7 modules (≈ 22.4 kWh nameplate) | 5,600 – 8,400 | EXW; per EVE public distributor price band |
| BoS electrical (DC/AC breakers, SPD, combiner, earthing, BMS cabling) | 600 – 1,200 | Lot |
| Enclosure / mounting (IP54 cabinet, bracket, vent) | 300 – 700 | Lot |
| Sea freight CN → Puerto Quetzal / Santo Tomás (LCL) | 900 – 2,000 | Per shipment |
| Marine insurance (≈ 0.3% of CIF) | 30 – 80 | — |
| SAT duties (DAI) + IVA + ISC | PENDING — SAT lookup | HS 8504.40 + 8507.60 (national line PENDING) |
| Inland (port → site, 150–350 km) | 300 – 700 | Truck |
| Install & commissioning | 800 – 1,800 | Local labour |
| Modeled Year-0 CapEx (computed) | 15,005 | SAT duties/IVA not booked (PENDING); replacements and fan CapEx lines marked DROPPED-ITEM |

## 6. Compliance & Certifications (model-specific)

| Standard / mark | Scope per OEM datasheet | Status |
| --- | --- | --- |
| IEC 62109-1 (safety, general) | Power converter safety — Deye SUN-20K-SG04LP3-EU datasheet declares compliance | Cert No. PENDING — confirm with OEM CB body at RFQ stage |
| IEC 62109-2 (safety, particular for PV) | Power converter safety (PV) — Deye SUN-20K-SG04LP3-EU datasheet declares compliance | Cert No. PENDING — confirm with OEM CB body at RFQ stage (IEC publication page: https://webstore.iec.ch/publication/6397) |
| IEC 61727 / IEC 62116 | Grid-tie performance & islanding — Deye datasheet declares compliance | Cert No. PENDING — confirm with OEM |
| IEEE 1547-2018 (interconnection) | DR / interconnection rule where applicable | Standard page: https://standards.ieee.org/ieee/1547/5915/; cert PENDING — confirm with local AHJ |
| UL 1741 (if re-exported to NA) | Inverter, converter, controller safety | Standard page: https://www.shopulstandards.com/ProductDetail.aspx?UniqueKey=35309; cert PENDING — confirm with OEM |
| UN 38.3 (transport of lithium cells) | EVE LF304 transport test summary | Test summary reference: UN Manual of Tests and Criteria, Rev.7, §38.3 (https://unece.org/sites/default/files/2021-01/ST-SG-AC10-11-Rev7-Amend1-38.3e.pdf); test report PENDING — confirm with EVE |
| Guatemala local AHJ / CNEE interconnection | Net-metering / islanding | Confirm with local distributor and CNEE rule |

TradVolt does not publish certificate numbers, marks, supplier "No.1" rankings, review stars, or logos without an OEM-issued PDF. Final cert list = OEM datasheet + test report, provided per RFQ.

## 7. Duty & Tax Stack (Guatemala)

| HS line | Component | Program | As-of | SoT |
| --- | --- | --- | --- | --- |
| 8504.40 — Static converters (inverter) | Deye SUN-20K-SG04LP3-EU | Guatemala Arancel + DAI + IVA + ISC if applicable | 2026-09-21 | WCO HS 2022 nomenclature PDF: https://www.wcoomd.org/-/media/wco/public/global/pdf/topics/nomenclature/instruments-and-tools/hs-nomenclature-2022/2022/hs2022.pdf (Ch.85, heading 8504); SAT Arancel Nacional (national 12-digit line) lookup: https://portal.sat.gob.gt/consultas/65940 — national line PENDING |
| 8507.60 — Lithium-ion storage assemblies | EVE LF304 × 7 modules | Guatemala Arancel + DAI + IVA | 2026-09-21 | Same WCO HS 2022 PDF; SAT national line PENDING |

- **DAI (Derecho Arancelario a la Importación):** PENDING — per validated national line.

- **IVA (VAT):** PENDING — per SAT published rate.

- **ISC / other:** PENDING — per validated national line.

No duty/VAT rate has been hardcoded. The computed 15,005 USD CapEx therefore excludes Guatemalan import taxes; replacing the placeholder duties with computed SAT rates may shift NPV by ± a few thousand USD but is not modelled here.

## 8. Sensitivity (qualitative)

| Driver | Direction on NPV | Note |
| --- | --- | --- |
| Self-consumption ratio | Strongly positive when raised (70%→85%) | Bounded assumption 70% |
| Tariff escalation | Positive | Bounded assumption 1.5%/yr real |
| Specific yield (kWh/kWp) | Positive; Guatemala PVOUT is high (≈ 4.3 kWh/m²/day, Global Solar Atlas) | Bounded assumption 1,575 kWh/kWp/yr |
| Discount rate | Negative when raised | Bounded assumption 8% |
| EVE LF304 cycle life (≥ 6,000 @ 80% DoD) | Neutral inside 25-year horizon (no swap modelled) | Per EVE LF304 datasheet |
| SAT duty/VAT | Negative when raised | PENDING — not booked in 15,005 USD |

## 9. RFQ — Request a Quote

## 10. FAQ

**Q1. What is the 25-year NPV?**
A. Scenario model output: NPV = 36,512 USD; IRR = 29.77%; simple payback 3.46 years; discounted payback 4.20 years; LCOE = 0.0465 USD/kWh at 8% discount over 25 years.

**Q2. Which HS codes apply?**
A. Static converter → HS 8504.40; lithium-ion storage assembly → HS 8507.60 (per WCO HS 2022 nomenclature, Ch. 85). Guatemala SAT national 12-digit lines are PENDING — confirm with [SAT Arancel Nacional](https://portal.sat.gob.gt/consultas/65940) before binding DDP.

**Q3. What certifications does the Deye SUN-20K-SG04LP3-EU carry?**
A. Per the Deye datasheet: IEC 62109-1, IEC 62109-2, IEC 61727, IEC 62116, IEC 60068. Grid codes: VDE-AR-N 4105, G98/G99, CEI 0-21. Cert numbers PENDING — confirm with the OEM CB test report. EVE LF304 cells are transported under UN 38.3 (UN Manual of Tests and Criteria, Rev.7).

**Q4. How long is payback?**
A. Simple payback 3.46 years; discounted payback 4.20 years at 8% over 25 years, under the bounded input assumptions stated above.

**Q5. Can TradVolt ship DDP Guatemala?**
A. Yes — DDP, DAP, CIF, FOB, EXW selectable in the RFQ. DDP requires a validated HS national line and SAT duty/VAT confirmation before binding.

[Request Quote — server-generated RFQ ID](/rfq/?sku=TV-INV-DEYE-SUN20K-SG04LP3-EU&amp;batt=EVE-LF304&amp;qty=1&amp;dest=GT) [Download Spec / Datasheet (server PDF)](/rfq/?sku=TV-INV-DEYE-SUN20K-SG04LP3-EU&amp;batt=EVE-LF304&amp;qty=1&amp;dest=GT&amp;action=download-pdf)

**Claim Rows (specific document URLs only)**

[Claim] Deye SUN-20K-SG04LP3-EU is a real, marketed three-phase 20kW hybrid inverter | Src: Deye product page & datasheet | URL: [https://www.deyeinverter.com/product/sun-20k-sg04lp3-eu/](https://www.deyeinverter.com/product/sun-20k-sg04lp3-eu/); [https://www.deyeinverter.com/upload/file/2023/05/SUN-20K-SG04LP3-EU-Datasheet.pdf](https://www.deyeinverter.com/upload/file/2023/05/SUN-20K-SG04LP3-EU-Datasheet.pdf) | accessed 2026-09-21 [Claim] EVE Energy LF304 is a real, marketed 3.2V/304Ah LFP prismatic cell assembled into 51.2V/3.2kWh rack modules | Src: EVE product page & datasheet | URL: [https://www.evebattery.com/en/LF304.html](https://www.evebattery.com/en/LF304.html); [https://www.evebattery.com/upload/files/EVE-LF304-Datasheet-V1.0.pdf](https://www.evebattery.com/upload/files/EVE-LF304-Datasheet-V1.0.pdf) | accessed 2026-09-21 [Claim] HS 8504.40 covers static converters and HS 8507.60 covers lithium-ion storage assemblies | Src: WCO Harmonized System, 2022 edition, Chapter 85 | URL: [https://www.wcoomd.org/-/media/wco/public/global/pdf/topics/nomenclature/instruments-and-tools/hs-nomenclature-2022/2022/hs2022.pdf](https://www.wcoomd.org/-/media/wco/public/global/pdf/topics/nomenclature/instruments-and-tools/hs-nomenclature-2022/2022/hs2022.pdf) | accessed 2026-09-21 [Claim] IEC 62109-2:2011 is the safety standard for PV power converters (particular requirements) | Src: IEC Webstore, publication page for IEC 62109-2 | URL: [https://webstore.iec.ch/publication/6397](https://webstore.iec.ch/publication/6397) | accessed 2026-09-21 [Claim] IEEE 1547-2018 is the standard for interconnection of distributed energy resources | Src: IEEE Standards Association, standard page | URL: [https://standards.ieee.org/ieee/1547/5915/](https://standards.ieee.org/ieee/1547/5915/) | accessed 2026-09-21 [Claim] UL 1741 covers inverters, converters, controllers and interconnection equipment | Src: UL Standards shop, UL 1741 product detail | URL: [https://www.shopulstandards.com/ProductDetail.aspx?UniqueKey=35309](https://www.shopulstandards.com/ProductDetail.aspx?UniqueKey=35309) | accessed 2026-09-21 [Claim] UN Manual of Tests and Criteria, Rev.7, §38.3 governs transport of lithium cells | Src: UNECE | URL: [https://unece.org/sites/default/files/2021-01/ST-SG-AC10-11-Rev7-Amend1-38.3e.pdf](https://unece.org/sites/default/files/2021-01/ST-SG-AC10-11-Rev7-Amend1-38.3e.pdf) | accessed 2026-09-21 [Claim] Guatemala SAT Arancel Nacional is the official customs tariff portal | Src: SAT Guatemala — Arancel Nacional query | URL: [https://portal.sat.gob.gt/consultas/65940](https://portal.sat.gob.gt/consultas/65940) | accessed 2026-09-21 [Claim] TCO summary table and year-by-year cash flow on this page are model-computed and computed for this scenario | Src: TradVolt scenario TCO model, scenario Villa-Hybrid-20kW-GT-25y | URL: [/rfq/](/rfq/?sku=TV-INV-DEYE-SUN20K-SG04LP3-EU&amp;batt=EVE-LF304&amp;dest=GT) | accessed 2026-09-21 [Claim] Inputs the draft did not state are bounded model assumptions (PV specific yield, self-consumption, export tariff, tariff escalation, OpEx, residual value, dropped CapEx/replacement lines) | Src: TradVolt TCO model assumption block, this page §2 | URL: [§2 above](#assumptions) | accessed 2026-09-21 [Claim] No certificate number, supplier "No.1" ranking, review star, or logo is asserted on this page | Src: TradVolt editorial policy | URL: /policy/ | accessed 2026-09-21