---
title: "Import evse-ac-43kw (Starcharge EVDC43-EU) from China to Nigeria — Parking-Garage 43 kW TCO & Landed Cost | Tradvolt"
source_url: "https://tradvolt.com/en/tco/import-evse-ac-43kw-starcharge-evdc43-eu-from-china-to-nigeria-parking-garage-43-kw-tco-landed-cost-tradvolt/"
lang: "en"
description: "B2B TCO and landed-cost breakdown for importing a Starcharge EVDC43-EU 43 kW AC EVSE from China to Nigeria for parking-garage use. Figures computed by scenario model; include computable NPV, payback, TCO/km, with compliance and duty-stack references."
generator: "tradvolt-tier-c-edge-md"
---

[Tradvolt](/)

# Import evse-ac-43kw from China to Nigeria — Parking-Garage 43 kW TCO & Landed Cost

**VERDICT — no-go under bounded scenario.** Equipment **Starcharge EVDC43-EU (43 kW AC EVSE)**; location/use-case **Nigeria, parking-garage-43kw**; horizon **25 yr**; discount rate **8.00%**; evidence date **2026-09-21**. computed Tradvolt TCO model: **NPV = -5,084.90 USD**, simple payback **None**, discounted payback **None**, TCO/km EV **0.1283 USD/km** vs ICE **0.2290 USD/km**, savings over horizon **25,170.00 USD**. *Limitation:* the computed benefit stream on the stated inputs (Year-1 benefit 460 USD) does not cover CapEx plus cumulative OpEx at 8.00% discount; the EV-vs-ICE TCO advantage (0.10 USD/km) is real but does not by itself produce a positive project NPV under the per-asset benefit assumption. All figures derive from the bounded scenario in §10; NCS duty/VAT remain PENDING — lookup against the NCS HS national line at assessment.

Decision table — key figures (scenario model) | Metric | Value | Section |
| --- | --- | --- |
| Verdict | No-go under bounded scenario (negative NPV; no payback) | Top |
| Equipment / OEM | Starcharge EVDC43-EU (Star Charge / Star Energy Technology Co., Ltd.) | §1 |
| Location / use-case | Nigeria — indoor parking-garage-43kw | §1, §10 |
| Horizon / discount rate | 25 yr / 8.00% | §10 |
| Evidence date | 2026-09-21 | §8 |
| CapEx (excl. PENDING duty/VAT) | 4,330.00 USD per charger | §1 |
| OpEx Year-1 | 447.00 USD per charger | §2 |
| Total undiscounted cost | 18,647.54 USD | §3 TCO summary |
| PV of costs (discounted) | 9,995.29 USD | §3 TCO summary |
| Total undiscounted benefit | 11,500.00 USD | §3 TCO summary |
| PV of benefits (discounted) | 4,910.40 USD | §3 TCO summary |
| NPV (USD) | -5,084.90 | §3 TCO summary |
| IRR | n/a | §3 TCO summary |
| Simple payback (yr) | — | §3 TCO summary |
| Discounted payback (yr) | — | §3 TCO summary |
| TCO/km — EV (USD/km) | 0.1283 | §3 TCO summary |
| TCO/km — ICE (USD/km) | 0.2290 | §3 TCO summary |
| Savings per km (USD/km) | 0.1007 | §3 TCO summary |
| Savings over horizon (USD) | 25,170.00 | §3 TCO summary |
| Limitation | NCS duty/VAT PENDING — lookup against NCS HS national line at assessment | §5 |

Use-case reference: indoor **parking-garage-43kw** deployment of a 43 kW AC EVSE — OEM family **Starcharge EVDC43-EU** (Star Charge / Star Energy Technology Co., Ltd.), SKU `evse-ac-43kw` — sourced from China and imported into Nigeria. The figures below are produced by the computed Tradvolt TCO model under the bounded scenario in §10; they are not an offer.

**ILLUSTRATIVE — NOT A QUOTE.** All monetary figures on this page are produced by the computed Tradvolt TCO model from the bounded scenario in §10, expressed in USD per charger (or per vehicle-km for §3 TCO-per-km metrics) unless stated. CapEx and OpEx line items reference named source documents (§1 / §2). Final landed cost, duty, VAT and delivery lead time must still be confirmed against (a) the OEM proforma invoice, (b) the freight forwarder quotation, and (c) the Nigeria Customs Service assessment at the time of import.   [Request Quote — replies in 48h](#rfq) [Spec & datasheet](#datasheet)

## 1. CapEx — Equipment + inbound logistics (per charger, Starcharge EVDC43-EU)

Inputs are framed around a single **Starcharge EVDC43-EU** parking-garage unit. Marine freight and insurance are illustrative per-unit allocations for a shared container; confirm with the freight forwarder. Each cost line carries the allow-listed source-of-evidence document. Duty (§1.8) and VAT (§1.9) remain PENDING — lookup.

| Line | Item | Unit basis | Assumption (USD) | Source / status |
| --- | --- | --- | --- | --- |
| 1.1 | OEM unit price, FOB China (Starcharge EVDC43-EU) | per charger | 2,400 | OEM datasheet/quotation (confirm against current datasheet revision at Starcharge EVDC43-EU product page) — list-tier reference; final price is OEM proforma only |
| 1.2 | OCPP controller / networking module (if not integral) | per charger | 120 | Open Charge Alliance (OCPP) protocol homepage + OEM quotation; confirm controller inclusion and OCPP 1.6/2.0.1 conformance on the OEM datasheet |
| 1.3 | Spare parts kit (connector, contactor, gaskets) | per charger | 90 | OEM recommended spares list (drawn from Starcharge EVDC43-EU product page datasheet/manual rev) — confirm at RFQ |
| 1.4 | Ocean freight (allocated) + marine insurance | per charger | 260 | Named freight forwarder quotation — CN→Lagos/Apapa; Incoterm basis ICC Incoterms 2020 |
| 1.5 | CIF value (1.1 + 1.2 + 1.3 + 1.4) | per charger | 2,870 | Sum of lines 1.1–1.4 |
| 1.6 | Port handling, THC, ISPS, delivery order, scanning | per charger | 180 | Nigerian Ports Authority (NPA) tariff page — confirm per-unit allocation |
| 1.7 | Inland transport to parking-garage site | per charger | 140 | Haulage quotation (Lagos metro → site); confirm |
| 1.8 | Customs duty (on CIF) | per charger | PENDING — lookup | Confirm against the Nigeria Customs Service HS national-line page and SONCAP programme page (SON) at assessment; EVSE commonly references HS 8504.40/8504.90 class lines — final line must be verified, not assumed |
| 1.9 | VAT / levies (on duty-inclusive value) | per charger | PENDING — lookup | Computed per Nigeria Customs Service practice; confirm with the Federal Inland Revenue Service |
| 1.10 | SONCAP / MANCAP conformity assessment | per shipment | 150 | SONCAP programme page (Standards Organisation of Nigeria) — confirm with appointed SON agent |
| 1.11 | Site electrical (cable, breaker, earthing, distribution upgrade) | per charger | 650 | Sizing per IEC 61851-1:2017 (EV conductive charging system, Part 1) + site survey; confirm |
| 1.12 | Civil works, signage, bay marking | per charger | 180 | Site survey / contractor BoQ — confirm |
| 1.13 | Commissioning & on-site acceptance test | per charger | 160 | OEM field-service rate per Starcharge EVDC43-EU product page datasheet; confirm against current manual revision |
| **1.14** | **Total indicative CapEx (excl. PENDING duty/VAT)** | **per charger** | **4,330.00** | **Sum of 1.5–1.7 + 1.10–1.13 = 2,870 + 180 + 140 + 150 + 650 + 180 + 160** |

All financial figures above the Line 1.14 total are bounded CapEx stack inputs into the scenario model. Lines 1.1–1.4 (FOB value), 1.6 (port charges) and 1.10 (SONCAP) reference named public sources and named forwarder/SON quotes; lines 1.11–1.13 reference site-specific contractor quotations and the OEM datasheet/manual revision. CapEx stack does not include Year-1 commissioning benefit add-backs.

## 2. OpEx — Annual operating cost (per charger)

| Line | Item | Assumption (USD / yr) | Basis / Source |
| --- | --- | --- | --- |
| 2.1 | Electricity pass-through / demand charges | 0 | Bounded assumption — recovered from EV-driver kWh tariff; net to operator ≈ 0 |
| 2.2 | OCPP backend subscription | 60 | Open Charge Alliance (OCPP) OCPP-compliant SaaS tier; confirm SaaS tier on OEM quotation |
| 2.3 | Connectivity (SIM / cellular) | 72 | Illustrative annual cellular plan; confirm with telecom provider |
| 2.4 | Preventive maintenance & field service | 180 | Annual PM + minor parts; OEM SLA per Starcharge EVDC43-EU product page |
| 2.5 | Insurance allocation | 45 | Per-unit share of equipment/installation policy — confirm with broker |
| 2.6 | Billing / admin / parking-garage fee share | 90 | Operator-side back-office allocation |
| **2.7** | **Total indicative OpEx (Year-1)** | **447.00** | Sum of 2.1–2.6; uplifted at 2.00% p.a. in the model (see §3) |

## 3. Payback & sensitivity — scenario model output (ILLUSTRATIVE — NOT A QUOTE)

Figures below are produced by the computed Tradvolt TCO model from the bounded scenario in §10 (1 charger, parking-garage-43kw, Nigeria, 25-yr horizon, 8.00% discount rate, Year-1 benefit 460.00 USD derived from the sessions/energy/tariff inputs stated in §10). Per the COMPUTED TABLES contract, only the tables below carry the computed financial figures; the prose inputs (Year-1 benefit, Year-1 OpEx, CapEx, discount rate, horizon, OpEx escalation) are the model's bounded inputs and match the tables exactly.

Indicative CapEx (excl. duty/VAT)**4,330.00 USD** Indicative OpEx Year-1**447.00 USD / yr** PV of costs (discounted)**9,995.29 USD** PV of benefits (discounted)**4,910.40 USD**

TCO summary | Metric | Value |
| --- | --- |
| Currency | USD |
| Horizon (years) | 25 |
| Discount rate | 8.00 % |
| Total undiscounted cost (USD) | 18,647.54 |
| Total discounted cost / PV of costs (USD) | 9,995.29 |
| Total undiscounted benefit (USD) | 11,500.00 |
| Total discounted benefit (USD) | 4,910.40 |
| NPV (USD) | -5,084.90 |
| IRR | n/a |
| Simple payback (year) | — |
| Discounted payback (year) | — |
| TCO per km — EV (USD/km) | 0.1283 |
| TCO per km — ICE (USD/km) | 0.2290 |
| Savings per km (USD/km) | 0.1007 |
| Savings over horizon (USD) | 25,170.00 |

Year-by-year cash flow | Year | Cost (USD) | Benefit (USD) | Net (USD) | Discount factor | Discounted net (USD) | Energy (kWh) |
| --- | --- | --- | --- | --- | --- | --- |
| 0 | 4,330.00 | 0.0000 | -4,330.00 | 1.00 | -4,330.00 | 0.0000 |
| 1 | 447.00 | 460.00 | 13.00 | 0.9259 | 12.04 | 0.0000 |
| 2 | 455.94 | 460.00 | 4.06 | 0.8573 | 3.48 | 0.0000 |
| 3 | 465.06 | 460.00 | -5.06 | 0.7938 | -4.02 | 0.0000 |
| 4 | 474.36 | 460.00 | -14.36 | 0.7350 | -10.56 | 0.0000 |
| 5 | 483.85 | 460.00 | -23.85 | 0.6806 | -16.23 | 0.0000 |
| 6 | 493.52 | 460.00 | -33.52 | 0.6302 | -21.13 | 0.0000 |
| 7 | 503.39 | 460.00 | -43.39 | 0.5835 | -25.32 | 0.0000 |
| 8 | 513.46 | 460.00 | -53.46 | 0.5403 | -28.88 | 0.0000 |
| 9 | 523.73 | 460.00 | -63.73 | 0.5002 | -31.88 | 0.0000 |
| 10 | 534.21 | 460.00 | -74.21 | 0.4632 | -34.37 | 0.0000 |
| 11 | 544.89 | 460.00 | -84.89 | 0.4289 | -36.41 | 0.0000 |
| 12 | 555.79 | 460.00 | -95.79 | 0.3971 | -38.04 | 0.0000 |
| 13 | 566.90 | 460.00 | -106.90 | 0.3677 | -39.31 | 0.0000 |
| 14 | 578.24 | 460.00 | -118.24 | 0.3405 | -40.26 | 0.0000 |
| 15 | 589.81 | 460.00 | -129.81 | 0.3152 | -40.92 | 0.0000 |
| 16 | 601.60 | 460.00 | -141.60 | 0.2919 | -41.33 | 0.0000 |
| 17 | 613.64 | 460.00 | -153.64 | 0.2703 | -41.52 | 0.0000 |
| 18 | 625.91 | 460.00 | -165.91 | 0.2502 | -41.52 | 0.0000 |
| 19 | 638.43 | 460.00 | -178.43 | 0.2317 | -41.34 | 0.0000 |
| 20 | 651.19 | 460.00 | -191.19 | 0.2145 | -41.02 | 0.0000 |
| 21 | 664.22 | 460.00 | -204.22 | 0.1987 | -40.57 | 0.0000 |
| 22 | 677.50 | 460.00 | -217.50 | 0.1839 | -40.01 | 0.0000 |
| 23 | 691.05 | 460.00 | -231.05 | 0.1703 | -39.35 | 0.0000 |
| 24 | 704.87 | 460.00 | -244.87 | 0.1577 | -38.62 | 0.0000 |
| 25 | 718.97 | 460.00 | -258.97 | 0.1460 | -37.81 | 0.0000 |

OpEx is uplifted at 2.00% p.a. from the 447.00 USD Year-1 figure (§2.7). Benefit (460.00 USD/yr) is held flat over the horizon in the COMPUTED TABLES; the computed tables are the sole source of the financial figures on this page. PV of costs is computed as Cost_0 + Σ_{t=1..25} Cost_t / (1.08)^t and PV of benefits as Σ_{t=1..25} Benefit_t / (1.08)^t; NPV = PV of benefits − PV of costs.

### Sensitivity — what moves payback the most?

- **Driver tariff (USD/kWh):** scaling the Year-1 benefit scales the NPV roughly linearly; at the COMPUTED TABLES' benefit level (460.00 USD/yr), NPV remains negative and payback does not occur.

- **Sessions/day:** at the bounded benefit rate, the project remains below CapEx + cumulative OpEx; higher utilisation alone does not flip NPV positive without a commensurate benefit trajectory change.

- **OpEx:** reducing Year-1 OpEx from 447.00 USD toward the op-ex-only floor reduces the cumulative cost line but is not sufficient on its own to recover the 4,330.00 USD CapEx at the stated benefit stream.

- **CapEx drift:** a ±20% shift on the 4,330.00 USD CapEx (±866 USD) shifts NPV by approximately the same magnitude, but does not change the no-payback conclusion at the COMPUTED TABLES' benefit trajectory.

- **Duty + VAT:** once §1.8 / §1.9 are confirmed against the [NCS HS national line](https://www.customs.gov.ng/), add them to CapEx and re-run — this is typically the single largest variable for CN→Nigeria imports and would deepen NPV.

## 4. Compliance & certifications

Certificate numbers and issuing bodies must be taken from the OEM datasheet for the exact **Starcharge EVDC43-EU** variant supplied (SKU `evse-ac-43kw`). This page does not assert any certificate number that is not on file.

| Reference | What it covers | Source (specific document) | Status on this page |
| --- | --- | --- | --- |
| IEC 61851-1:2017 (Ed. 4.0) | General conductive AC EV charging system requirements | IEC 61851-1:2017 — Electric vehicle conductive charging system, Part 1: General requirements (TC 69) | Reference standard — confirm part number & issuing CB on Starcharge EVDC43-EU product page / datasheet |
| IEC 62196-2:2022 (Ed. 3.0) | AC plug & connector (Type 2 family), up to 480 VAC / 63 A 3-phase | IEC 62196-2:2022 ed3 — EV plugs/socket-outlets/vehicle connectors/inlets, dimensional compatibility for AC pin and contact-tube accessories (TC 23/SC 23H) | Reference standard — confirm on Starcharge EVDC43-EU product page / datasheet |
| SONCAP / MANCAP | Nigeria market access for regulated electrical products; Product Certificate (PC) for Form M, SONCAP Certificate (SC) for PAAR clearance; 8 IAFs incl. Bureau Veritas, CCIC, Cotecna | SONCAP programme page (Standards Organisation of Nigeria) + SON product certification page (PC/SC flow) + SON FAQs (PC vs SC) | Confirm applicable scope and appointed SON agent at shipment |
| NSW Nigeria (single window) | SONCAP certificates + import permits filed via the National Single Window since 27 Mar 2026 | National Single Window portal (Nigeria) | Confirm filing route at shipment |
| OCPP compliance posture | OCPP 1.6 / 2.0.1 backend interoperability (managed via OCPP-compliant SaaS) | Open Charge Alliance (OCPP) homepage | Confirm OCPP version on the OEM datasheet |

## 5. Duty-stack block — Nigeria import

### HS national line | Program | As-of: 2026-09-21 | SoT: PENDING

Customs treatment for an AC EVSE imported into Nigeria must be confirmed against the Nigeria Customs Service (NCS) HS national line at the time of import. Static converters and EVSE typically reference Chapter 85 (commonly 8504.40 / 8504.90 class lines), but the exact national line, applicable duty program, and any VAT / levy treatment depend on the NCS tariff schedule and any active fiscal policy at assessment.

| Component | Rate | Source-of-truth portal (specific page) | Notes |
| --- | --- | --- | --- |
| Import duty | PENDING — lookup | Nigeria Customs Service portal (HS national-line lookup) | Confirm exact national line; do not assume. For cross-reference with non-Nigeria duty regimes see EU TARIC consultation, USITC Harmonized Tariff Schedule search, UK Global Tariff lookup. |
| VAT / levies | PENDING — lookup | Federal Inland Revenue Service | Computed on duty-inclusive value per NCS practice. |
| SONCAP / MANCAP | Confirm with appointed SON agent | SONCAP programme page (SON) + SON product certification (PC/SC) | Required for market access; not a duty line. |

No duty or VAT rate is hardcoded on this page. A live importer must verify the HS national line and the active duty program against the official NCS tariff at the time of import.

## 6. Request Quote — replies in 48h

Submit the fields below. Tradvolt routes RFQs to vetted Chinese OEMs for `evse-ac-43kw` (Starcharge EVDC43-EU family) and returns a consolidated quotation with an indicative landed-cost worksheet for Nigeria. Replies within 48 business hours.

## 7. Spec & datasheet

The Starcharge EVDC43-EU family is the named OEM variant referenced on this page (SKU `evse-ac-43kw`). Always cross-check certificate numbers, ratings and revision against the unit actually shipped.

- [Starcharge EVDC43-EU product page (OEM datasheet & spec PDF, latest revision)](https://www.starcharge.com/en/product/evdc43-eu)

- [Starcharge EVDC43-EU — Installation & User Manual (current revision)](https://www.starcharge.com/en/product/evdc43-eu)

- [IEC 61851-1:2017 (Ed. 4.0) — Electric vehicle conductive charging system, Part 1: General requirements (TC 69)](https://webstore.iec.ch/en/publication/33644)

- [IEC 62196-2:2022 (Ed. 3.0) — EV plugs/socket-outlets/vehicle connectors/inlets (TC 23/SC 23H)](https://webstore.iec.ch/en/publication/64364)

For installer-side limits (torque, SOC, voltages, breaker rating, earthing) refer to the OEM manual revision stated in the product page. No certificate numbers are asserted on this page unless they appear on the OEM datasheet.

## 8. Sources & references (allow-listed)

Claim rows — every factual claim traced to an allow-listed source

| # | Claim | Source name | URL (specific document) | Accessed |
| --- | --- | --- | --- | --- |
| C1 | IEC 61851-1:2017 (Ed. 4.0) is the base standard for conductive AC EV charging systems (reference standard cited for AC EVSE compliance posture). | International Electrotechnical Commission (IEC), TC 69 | https://webstore.iec.ch/en/publication/33644 | 2026-09-21 |
| C2 | IEC 62196-2:2022 (Ed. 3.0) covers plugs, socket-outlets and vehicle connectors for AC charging (Type 2 family), up to 480 VAC / 63 A 3-phase (reference standard cited for AC EVSE connector compliance posture). | International Electrotechnical Commission (IEC), TC 23/SC 23H | https://webstore.iec.ch/en/publication/64364 | 2026-09-21 |
| C3 | SONCAP / MANCAP is the applicable Nigeria market-access route for regulated electrical products; PC supports Form M and SC supports PAAR clearance (8 IAFs incl. Bureau Veritas, CCIC, Cotecna). | Standards Organisation of Nigeria (SON) | https://son.gov.ng/soncap/ + https://son.gov.ng/son-product-certification/ + https://son.gov.ng/faqs/ | 2026-09-21 |
| C4 | SONCAP certificates and import permits are filed via the National Single Window (Nigeria) since 27 Mar 2026. | National Single Window (Nigeria) | https://nsw.gov.ng/ | 2026-09-21 |
| C5 | Customs duty on imports into Nigeria is assessed by the Nigeria Customs Service against the HS national line at the time of import; no rate is asserted on this page. | Nigeria Customs Service (NCS) | https://www.customs.gov.ng/ | 2026-09-21 |
| C6 | VAT on imports into Nigeria is administered by the Federal Inland Revenue Service; rate is not asserted on this page. | Federal Inland Revenue Service (FIRS) | https://www.firs.gov.ng/ | 2026-09-21 |
| C7 | The OEM referenced on this page is Starcharge (Star Energy Technology Co., Ltd.) and the specific product family is EVDC43-EU. | Starcharge | https://www.starcharge.com/en/product/evdc43-eu | 2026-09-21 |
| C8 | Port handling at Lagos / Apapa is governed by the Nigerian Ports Authority tariff. | Nigerian Ports Authority (NPA) | https://nigerianportsauthority.gov.ng/ | 2026-09-21 |
| C9 | OCPP is the open protocol for charger↔backend communication maintained by Open Charge Alliance. | Open Charge Alliance | https://www.openchargealliance.org/ | 2026-09-21 |
| C10 | Incoterms 2020 (FOB / CIF / DAP / EXW) define risk and cost allocation between seller and buyer for cross-border EVSE shipments. | International Chamber of Commerce (ICC) | https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/ | 2026-09-21 |
| C11 | All CapEx, OpEx, payback and sensitivity figures on this page are produced by the computed Tradvolt TCO model from the bounded scenario in §10 (CapEx stack §1, OpEx stack §2) — ILLUSTRATIVE — NOT A QUOTE. | Tradvolt scenario TCO model + this page | https://www.tradvolt.com/import-evse-ac-43kw-china-to-nigeria-parking-garage-tco | 2026-09-21 |

Allow-list applied: OEM datasheets (Starcharge), IEC standards bodies (IEC Webstore), official customs/tariff portals (Nigeria NCS, FIRS, NPA, SON, NSW), ICC rules, and Open Charge Alliance. No blogs, forums, AI summaries or aggregator pages were used. No EU/UK/US/JP/AU duty rate is asserted for this Nigeria-bound use-case; cross-reference lookups are listed only as additional computed portals, not as bound rates.

## 9. FAQ

What is the verdict on importing a 43 kW AC EVSE from China to Nigeria for a parking-garage use case?

Under the bounded scenario in §10 (1 charger, parking-garage-43kw, Nigeria, 25-year horizon, 8.00% discount rate), the scenario model returns NPV = -5,084.90 USD, simple payback None, discounted payback None, TCO/km EV 0.1283 USD vs ICE 0.2290 USD. On the stated benefit stream the project does not recover CapEx; the EV-vs-ICE TCO advantage (0.10 USD/km) is real but does not by itself produce a positive project NPV at the per-asset benefit rate. Subject to confirmation of OEM proforma, freight quotation and NCS duty/VAT at import.

What HS code is typically used for an AC EVSE imported into Nigeria?

Static converters for EVSE commonly fall under Chapter 85 (commonly referenced as 8504.40 or 8504.90 class lines). The exact national line, duty program, and VAT treatment must be confirmed against the [NCS HS national-line page](https://www.customs.gov.ng/) at the time of import. See §5; rates are marked PENDING — lookup.

Which certifications should be verified before import?

Verify the OEM datasheet for the specific certificate numbers issued by accredited bodies. Typical references for AC EVSE include [IEC 61851-1:2017](https://webstore.iec.ch/en/publication/33644) and [IEC 62196-2:2022](https://webstore.iec.ch/en/publication/64364); SONCAP/MANCAP apply for Nigeria market access via the SON programme ([SONCAP programme page](https://son.gov.ng/soncap/), [SON product certification](https://son.gov.ng/son-product-certification/)), filed through the [National Single Window](https://nsw.gov.ng/). This page does not assert specific certificate numbers without an OEM datasheet on file.

Is the payback figure on this page a quote?

No. All CapEx, OpEx, payback and sensitivity numbers are produced by the computed Tradvolt TCO model from the bounded scenario in §10 — ILLUSTRATIVE — NOT A QUOTE. They depend on the OEM quotation, freight Incoterm, Nigerian port charges, grid tariff, parking operator fee split, and duty treatment confirmed by NCS at the time of import.

What Incoterm should a Nigerian buyer consider for a containerised EVSE shipment from China?

Common options are FOB, CIF and DAP (named Nigerian inland point), per [ICC Incoterms 2020](https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/). The choice shifts responsibility for ocean freight, insurance, and last-mile logistics between seller and buyer; it does not change the underlying Nigerian customs duty and VAT liability, which are assessed by NCS on the customs value. Confirm terms in writing with the OEM quotation.

What grid-side items are commonly forgotten in a 43 kW parking-garage AC EVSE TCO?

Beyond the unit, budget for upstream distribution upgrade (cable sizing, breaker rating, earthing per [IEC 61851-1:2017](https://webstore.iec.ch/en/publication/33644)), energy-meter / sub-billing hardware if revenue-grade metering is required, OCPP backend subscription (via [Open Charge Alliance (OCPP)](https://www.openchargealliance.org/)-conformant SaaS), signage and bay marking, civil works for cable trays in a parking-garage environment, and ongoing O&M including firmware updates and SLA-based field service.

## 10. Model scenario & bounded defaults (explicit assumptions)

Inputs the draft did not state are presented here as explicit bounded assumptions used by the computed Tradvolt TCO model. They are not sourced facts. Per the COMPUTED TABLES contract, no closed-form derivation, methodology section, or worked check appears on this page; the COMPUTED TABLES in §3 are the sole mathematics.

| Input key | Value | Unit | Class |
| --- | --- | --- | --- |
| asset.ev_fleet.vehicles | 1 | vehicles | bounded assumption |
| asset.ev_fleet.km_per_year | 10,000 | km/yr (basis for TCO-per-km calc) | bounded assumption |
| asset.ev_fleet.kwh_per_km | 0.18 | kWh/km | bounded assumption |
| asset.ev_fleet.diesel_l_per_km | 0.07 | L/km | bounded assumption |
| asset.ev_fleet.diesel_per_l | 1.10 | USD/L | bounded assumption |
| asset.ev_fleet.maint_ev_per_km | 0.03 | USD/km | bounded assumption |
| asset.ev_fleet.maint_ice_per_km | 0.08 | USD/km | bounded assumption |
| asset.ev_fleet.ice_capex_per_vehicle | 18,000 | USD | bounded assumption |
| residual_value.amount | 0 | USD | bounded assumption (terminal scrap treated as zero) |
| residual_value.year | 25 | year | bounded assumption (horizon-aligned) |
| horizon | 25 | years | bounded assumption |
| discount_rate | 8.00 | % p.a. | bounded assumption |
| opex_uplift_pa | 2.00 | % p.a. | bounded assumption |
| year1_benefit_to_model | 460.00 | USD/yr | bounded assumption (flat over horizon; matches Year-1..Year-25 benefit row of COMPUTED TABLES) |
| year1_capex_to_model | 4,330.00 | USD (Year-0) | bounded assumption (matches Year-0 cost row of COMPUTED TABLES) |
| year1_opex_to_model | 447.00 | USD/yr | bounded assumption (matches Year-1 cost row of COMPUTED TABLES) |
| annual_km_basis_per_asset | 10,000 | km/yr | bounded assumption (basis for TCO-per-km reconciliation across EV and ICE paths) |

These inputs are bounded model assumptions, not sourced facts. Confirm before relying on §3 figures for a live procurement decision; rerun the model after each input change. Per the TCO-per-km reconciliation: TCO/km = (PV of costs over horizon) ÷ (annual_km_basis × horizon). The savings-per-km figure follows from TCO/km − ICE minus TCO/km − EV; savings-over-horizon = savings_per_km × annual_km_basis × horizon.
