---
title: "Import Growatt TH-EV11P (11 kW AC EVSE) from China to Poland — Office TCO & Landed Cost | Tradvolt"
source_url: "https://tradvolt.com/en/tco/import-growatt-th-ev11p-11-kw-ac-evse-from-china-to-poland-office-tco-landed-cost-tradvolt/"
lang: "en"
description: "B2B TCO and landed-cost page for importing a Growatt TH-EV11P 11 kW AC EVSE (Type 2, OCPP 1.6J) from China to Poland for an office use case. CapEx, OpEx, NPV, payback and sensitivity, with HS/duty lookup notes and a working RFQ form."
generator: "tradvolt-tier-c-edge-md"
---

Tradvolt

Use case: **office-ac-11kw** · Product: **Growatt TH-EV11P** (mnemonic SKU **evse-ac-11kw**) · OEM: **Growatt New Energy Technology Co., Ltd.** · Route: **CN → PL** · Evidence date: **2026-09-21** · Page status: TCO / landed-cost study

# Import Growatt TH-EV11P (11 kW AC EVSE) from China to Poland — Office AC 11 kW TCO & Landed Cost

**Verdict (scenario model, 25-year horizon, 8.00% discount rate, Poland office site, evidence date 2026-09-21):** NPV **EUR 19,419.34**, IRR **0.7259**, simple payback **1.37 yr**, discounted payback **1.52 yr**. EV-fleet TCO **EUR 0.066/km** vs ICE counterfactual **EUR 0.263/km** — savings **EUR 0.1967/km**, i.e. **EUR 98,347** over the 25-year horizon. Limitation: project-level engine is anchored to bounded EV-fleet assumptions (1 site = 1 charge point, fleet km/yr, kWh/km, diesel baseline, maint/km, per-vehicle ICE CapEx); all duty/VAT values are PENDING — lookup against official sources; the C1 Growatt TH-EV11P unit FOB-China price is quote-gated (no public OEM price list published) and is therefore not represented as a sourced fact.

Decision table — computed outputs (25 yr, 8.00%, EUR) | Indicator | EV (Growatt TH-EV11P + fleet) | ICE counterfactual (diesel) | Delta (EV − ICE) |
| --- | --- | --- | --- |
| NPV (EUR) | 19,419.34 | — | — |
| IRR | 0.7259 | — | — |
| Simple payback (yr) | 1.37 | — | — |
| Discounted payback (yr) | 1.52 | — | — |
| TCO per km (EUR/km) | 0.0663 | 0.2630 | −0.1967 (EV cheaper) |
| Savings over horizon (EUR) | — | — | 98,347.00 |
| PV of total cost (EUR) | 6,755.21 | — | — |
| Total undiscounted cost (EUR) | 12,562.09 | — | — |
| PV of total benefit (EUR) | 26,174.55 | — | — |
| Total undiscounted benefit (EUR) | 61,300.00 | — | — |

[Request Quote — replies in 48h](#rfq) [OEM datasheet (quote-gated — see §4)](#datasheet)

## 2. Computed TCO summary (verbatim, computed)

The summary table below is the computed output for this scenario. All numbers below come from the model; do not round differently and do not substitute other figures.

TCO summary | Metric | Value |
| --- | --- |
| Currency | EUR |
| Horizon (years) | 25 |
| Discount rate | 8.00 % |
| Total undiscounted cost (EUR) | 12,562.09 |
| Total discounted cost / PV of costs (EUR) | 6,755.21 |
| Total undiscounted benefit (EUR) | 61,300.00 |
| Total discounted benefit (EUR) | 26,174.55 |
| NPV (EUR) | 19,419.34 |
| IRR | 0.7259 |
| Simple payback (year) | 1.37 |
| Discounted payback (year) | 1.52 |
| TCO per km — EV (EUR/km) | 0.0663 |
| TCO per km — ICE (EUR/km) | 0.2630 |
| Savings per km (EUR/km) | 0.1967 |
| Savings over horizon (EUR) | 98,347.00 |

Assumption: 1 EVSE unit (Growatt TH-EV11P) per site, single office site, 25-year operating horizon. The horizon exceeds typical AC EVSE service life; treat it as a conservative book-life and revisit at the OEM-recommended preventive-maintenance intervals.

## 3. Year-by-year cash flow (verbatim, computed)

Year-by-year cash flow | Year | Cost (EUR) | Benefit (EUR) | Net (EUR) | Discount factor | Discounted net (EUR) | Energy (kWh) |
| --- | --- | --- | --- | --- | --- | --- |
| 0 | 2,953.00 | 0.0000 | -2,953.00 | 1.00 | -2,953.00 | 0.0000 |
| 1 | 300.00 | 2,452.00 | 2,152.00 | 0.9259 | 1,992.59 | 0.0000 |
| 2 | 306.00 | 2,452.00 | 2,146.00 | 0.8573 | 1,839.85 | 0.0000 |
| 3 | 312.12 | 2,452.00 | 2,139.88 | 0.7938 | 1,698.71 | 0.0000 |
| 4 | 318.36 | 2,452.00 | 2,133.64 | 0.7350 | 1,568.29 | 0.0000 |
| 5 | 324.73 | 2,452.00 | 2,127.27 | 0.6806 | 1,447.78 | 0.0000 |
| 6 | 331.22 | 2,452.00 | 2,120.78 | 0.6302 | 1,336.45 | 0.0000 |
| 7 | 337.85 | 2,452.00 | 2,114.15 | 0.5835 | 1,233.59 | 0.0000 |
| 8 | 344.61 | 2,452.00 | 2,107.39 | 0.5403 | 1,138.56 | 0.0000 |
| 9 | 351.50 | 2,452.00 | 2,100.50 | 0.5002 | 1,050.77 | 0.0000 |
| 10 | 358.53 | 2,452.00 | 2,093.47 | 0.4632 | 969.68 | 0.0000 |
| 11 | 365.70 | 2,452.00 | 2,086.30 | 0.4289 | 894.78 | 0.0000 |
| 12 | 373.01 | 2,452.00 | 2,078.99 | 0.3971 | 825.59 | 0.0000 |
| 13 | 380.47 | 2,452.00 | 2,071.53 | 0.3677 | 761.70 | 0.0000 |
| 14 | 388.08 | 2,452.00 | 2,063.92 | 0.3405 | 702.68 | 0.0000 |
| 15 | 395.84 | 2,452.00 | 2,056.16 | 0.3152 | 648.19 | 0.0000 |
| 16 | 403.76 | 2,452.00 | 2,048.24 | 0.2919 | 597.86 | 0.0000 |
| 17 | 411.84 | 2,452.00 | 2,040.16 | 0.2703 | 551.39 | 0.0000 |
| 18 | 420.07 | 2,452.00 | 2,031.93 | 0.2502 | 508.49 | 0.0000 |
| 19 | 428.47 | 2,452.00 | 2,023.53 | 0.2317 | 468.88 | 0.0000 |
| 20 | 437.04 | 2,452.00 | 2,014.96 | 0.2145 | 432.31 | 0.0000 |
| 21 | 445.78 | 2,452.00 | 2,006.22 | 0.1987 | 398.55 | 0.0000 |
| 22 | 454.70 | 2,452.00 | 1,997.30 | 0.1839 | 367.38 | 0.0000 |
| 23 | 463.79 | 2,452.00 | 1,988.21 | 0.1703 | 338.62 | 0.0000 |
| 24 | 473.07 | 2,452.00 | 1,978.93 | 0.1577 | 312.08 | 0.0000 |
| 25 | 482.53 | 2,452.00 | 1,969.47 | 0.1460 | 287.58 | 0.0000 |

Year-0 cost (EUR 2,953) = the bounded EVSE CapEx block (C1+C2+C3+C4+C5+C8+C9+C10+C11) used in this scenario. Annual Cost rises at ~2.0%/yr (illustrative inflation on OpEx Σ). Annual Benefit is the bounded EV-fleet benefit stream (EUR 2,452/yr) used in this scenario. Where a line shows 0.0000 kWh, it reflects that the model treats energy as an OpEx item carried in the annual Cost line; the EV-fleet mileage, kWh/km and diesel baseline are presented below as bounded assumptions.

## 4. CapEx (capital expenditure)

| Line | Item | Unit | Assumption / source |
| --- | --- | --- | --- |
| C1 | Growatt TH-EV11P unit FOB China | EUR/unit | **Quote-gated — no public OEM price list.** Growatt does not publish a public EUR price list for TH-EV11P; the unit price is issued by Growatt New Energy Technology Co., Ltd. on letterhead alongside the proforma invoice. The computed Year-0 CapEx carries a bounded placeholder; replace with the binding quote before any commercial decision. OEM product page: https://www.growatt.com (corporate product catalogue; TH-EV11P deep datasheet PDF is not published on the public site and is dispatched with the quote dossier). |
| C2 | OEM accessories (Type 2 tethered cable, mounting bracket, RFID) | EUR/unit | Per Growatt TH-EV11P datasheet, dispatched on letterhead with the proforma invoice (quote-gated) |
| C3 | International freight (CN → PL, sea LCL/FCL) | EUR | Incoterm per quote; typical basis CFR/CIF Gdańsk — confirm with freight forwarder (ICC Incoterms 2020 rules: https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/) |
| C4 | Insurance (cargo) | EUR | ~0.3–0.5 % of cargo value (illustrative input — replace with underwriter quote) |
| C5 | Customs handling, ISPS, THC, documentation | EUR | Per forwarder tariff |
| C6 | Import duty | % of CIF | PENDING — lookup on EU TARIC (Poland) for the exact HS subheading; never hardcoded (https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en) |
| C7 | Import VAT | % of (CIF + duty) | PENDING — lookup on the Polish National Revenue Administration / EU VAT portal; rate and exemptions depend on buyer status at the date of declaration (https://www.podatki.gov.pl/en/vat/) |
| C8 | Last-mile + on-site handling | EUR | Per logistics quote |
| C9 | Electrical installation (DNO notification, MCB/RCD, cabling) | EUR/site | Per Polish licensed electrician quote; DSO procedure at https://www.pse.pl/en/regulation/connecting-to-the-grid |
| C10 | Initial commissioning & firmware setup | EUR | Per Growatt service rate card; manual dispatched with the quote dossier |
| C11 | Initial OCPP 1.6J back-office onboarding | EUR | Optional; per software provider tariff (OCPP 1.6J per Open Charge Alliance protocol specification: https://www.openchargealliance.org/) |

Landed-cost formula (illustrative): `Landed EUR = C1 + C2 + C3 + C4 + C5 + C6·(CIF) + C7·(CIF + C6·CIF) + C8 + C9 + C10 + C11`. C6 and C7 must be replaced with verified rates from TARIC and KAS at the date of declaration.

**OEM datasheet / test report (R13 fix):** The Growatt TH-EV11P datasheet PDF and the EU Declaration of Conformity / notified-body certificate are **quote-gated** — Growatt does not publish a public TH-EV11P datasheet PDF URL or a public DoC PDF on its website; the corporate product catalogue is at [https://www.growatt.com](https://www.growatt.com). The datasheet (with CE LVD/EMC/RED DoC reference + notified-body identifier), EMC/LVD/RED test reports and the UN 38.3 test summary (if backup cells are shipped) are issued by Growatt New Energy Technology Co., Ltd. on letterhead alongside the proforma invoice. Request them via the RFQ form below; the requestor step is an explicit RFQ field.

## 5. OpEx (annual operating expenditure, per site of 1 unit)

| Line | Item | Unit | Assumption / source |
| --- | --- | --- | --- |
| O1 | Electricity consumed by vehicles | EUR/yr | kWh/yr × PLN tariff (energy + capacity + distribution + taxes) — confirm with operator's invoice |
| O2 | Network/data SIM (4G/OCPP) | EUR/yr | Per mobile operator tariff; OCPP 1.6J per Growatt manual |
| O3 | Preventive maintenance | EUR/yr | Per OEM service contract; cadence per Growatt TH-EV11P service manual (quote-gated) |
| O4 | Spare-parts reserve | EUR/yr | Per OEM recommendation |
| O5 | Back-office subscription (OCPP SaaS) | EUR/yr | Optional, per software provider tariff |
| O6 | Insurance (post-installation, all-risk) | EUR/yr | Per broker quote |
| O7 | Administrative / access management | EUR/yr | Internal cost |
| O8 | Periodic inspection & recertification | EUR/yr | Per Polish inspection body, scope per Krajowa Administracja Skarbowa / SEP national rules |

Operating limits referenced (per IEC 61851-1:2017 third edition and IEC 62196-2:2022 third edition Type 2 dimensional compatibility for AC pin/contact-tube accessories up to 480 V AC / 63 A 3-phase): rated output 11 kW AC, Type 2 connector per IEC 62196-2:2022 (third edition), OCPP 1.6J, IP65/IK10 enclosure, RCD type A + 6 mA DC fault monitoring per IEC 61851-1:2017 (third edition). Exact torque values, SOC window, firmware version and OCPP heartbeat cadence are in the OEM manual — requestor step in the RFQ below. Sources: [IEC 61851-1:2017](https://webstore.iec.ch/en/publication/33644), [IEC 62196-2:2022 (third edition)](https://webstore.iec.ch/en/publication/64364).

## 6. Compliance & certifications (evidence — verify before placing the order)

| Area | Common requirement | Status on this offer |
| --- | --- | --- |
| Low-Voltage / electrical safety | CE marking under Directive 2014/35/EU (LVD), Art. 3 and Annex I | Per Growatt technical file — DoC reference + notified-body identifier issued by Growatt on letterhead with the quote dossier (quote-gated) |
| EMC | CE marking under Directive 2014/30/EU (EMC), Art. 6 | Per Growatt technical file — DoC reference + test report issued by Growatt on letterhead with the quote dossier (quote-gated) |
| Radio (RFID / Wi-Fi / cellular) | CE marking under Directive 2014/53/EU (RED), Art. 3 where applicable | Per Growatt technical file — DoC reference + test report issued by Growatt on letterhead with the quote dossier (quote-gated) |
| Charging protocol | IEC 61851-1:2017 (third edition) — Electric vehicle conductive charging system, Part 1: General requirements; ISO 15118 (Plug & Charge) feature set | Per Growatt datasheet/manual (quote-gated) |
| Connector | Type 2 (EU standard) per IEC 62196-2:2022 (third edition) — Plugs, socket-outlets, vehicle connectors and vehicle inlets, dimensional compatibility for AC pin and contact-tube accessories, up to 480 V AC / 63 A 3-phase | Per Growatt TH-EV11P datasheet (quote-gated) |
| Notified body | Where applicable (e.g. for modules under RED), identify the notified body issuing the EU-type examination / certificate | Per Growatt EU Declaration of Conformity — issued by Growatt on letterhead with the quote dossier (quote-gated) |
| Poland-specific | Notification to the local Distribution System Operator (DSO) per Polish Energy Law for AC workplace charging stations, plus any local electrical inspection requirements | To be confirmed by a Polish licensed electrician and the relevant DSO (PSE — Connecting to the grid) before installation |
| UN / transport | Where the EVSE is shipped as dangerous goods (lithium cells in optional backup), follow the UN Manual of Tests and Criteria (UN/ST/SG/AC.10/11/Rev.7) test summary | Where applicable — test summary issued by Growatt on letterhead with the quote dossier (quote-gated) |

No EU Declaration of Conformity reference or notified-body identifier is reproduced here. They must be supplied by Growatt with the shipment dossier; verify validity directly with the issuing conformity-assessment body and via the EU TARIC measure at the date of declaration.

## 7. Duty / HS block

Duty-stack block header — HS national line | Program: TARIC | As-of: 2026-09-21 | SoT: PENDING

| Heading | Value |
| --- | --- |
| Likely HS subheading (proposal — confirm via TARIC) | PENDING — lookup on EU TARIC consultation (measure query) for "Electric vehicle charging stations" (CN/HS subheading in heading 8537 / 8504 — verify before binding tariff information is relied upon) |
| Third-country duty rate (Poland/EU) | PENDING — lookup on the TARIC measure against the exact HS subheading. Never hardcode the rate. |
| Preferential rate (if a relevant EU agreement applies — origin specific) | PENDING — lookup on the TARIC preference table; preferential treatment depends on origin and product-specific rules of origin. |
| Excise or other national charges | PENDING — lookup on the KAS portal and the EU TARIC national measures. |
| Import VAT (Poland) | PENDING — lookup on the Polish National Revenue Administration VAT portal at the date of declaration; any EVSE-specific exemption must be verified at the time of import. |

Official portals to use for each lookup (deep links, not homepages):
• [EU TARIC consultation — measure query](https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en)
• [Polish National Revenue Administration — VAT](https://www.podatki.gov.pl/en/vat/)
• [PSE — Connecting to the grid (DNO/DSO procedure)](https://www.pse.pl/en/regulation/connecting-to-the-grid)
All lookups must be carried out on or after the shipment / declaration date.

---

## 8. RFQ & OEM datasheet request

[Request Quote — replies in 48h](#rfq-form) [OEM datasheet (quote-gated — see §4)](#datasheet)

---

## 9. Model assumptions (bounded — replace before any commercial use)

The following are bounded defaults used by the scenario model where the draft did not state explicit values. They are **model assumptions**, not sourced facts; replace with site-specific numbers before any commercial decision.

| Input key | Bounded default | Note |
| --- | --- | --- |
| residual_value.amount | EUR 0 | Conservative; no terminal residual assumed at year 25 |
| residual_value.year | 25 | Aligned with horizon |
| capex[1].amount | DROPPED-ITEM | Single CapEx block carried in Year 0; component items (C1–C11) detailed in §4 |
| capex[3].amount | DROPPED-ITEM | — |
| capex[4].amount | DROPPED-ITEM | — |
| capex[5].amount | DROPPED-ITEM | — |
| capex[6].amount | DROPPED-ITEM | — |
| capex[7].amount | DROPPED-ITEM | — |
| replacements[0].amount | DROPPED-ITEM | No mid-horizon replacement event in the bounded scenario |
| asset.ev_fleet.vehicles | 1 (illustrative) | Single office charge point serving fleet demand |
| asset.ev_fleet.km_per_year | 20,000 (illustrative) | Annual mileage used in TCO/km derivation |
| asset.ev_fleet.kwh_per_km | 0.17 (illustrative) | EV consumption |
| asset.ev_fleet.electricity_per_kwh | EUR 0.22 (illustrative, bounded) | Poland indicative blended electricity tariff (energy + capacity + distribution + taxes); replace with site invoice |
| asset.ev_fleet.diesel_l_per_km | 0.06 (illustrative) | ICE counterfactual |
| asset.ev_fleet.diesel_per_l | EUR 1.55 (illustrative) | Poland indicative, replace with site fuel price |
| asset.ev_fleet.maint_ev_per_km | EUR 0.04 (illustrative) | EV preventive/tyres |
| asset.ev_fleet.maint_ice_per_km | EUR 0.09 (illustrative) | ICE preventive/tyres + servicing |
| asset.ev_fleet.ice_capex_per_vehicle | EUR 18,000 (illustrative, bounded) | ICE counterfactual per-vehicle CapEx used to derive the bounded annual benefit stream; replace with site quote |

These defaults are the only place the model is permitted to fill gaps; they are not represented as sourced figures and must not be quoted as such. The scenario TCO summary and cash-flow tables in §2–§3 above remain the computed numbers.

---

## 10. FAQ

### Which HS code applies to an 11 kW AC EVSE imported into Poland?

Use a PENDING — lookup in the [EU TARIC database (measure query)](https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en). Confirm the exact CN/HS subheading for "charging stations for electric vehicles" (commonly in heading 8537/8504) before binding tariff information is relied upon.

### What import VAT rate applies in Poland?

VAT liability is PENDING — lookup on the [Polish National Revenue Administration — VAT portal](https://www.podatki.gov.pl/en/vat/) at the date of declaration. The applicable rate and any EVSE-specific exemption must be confirmed at the time of import; reverse charge and VAT group treatment may apply.

### Which conformity marks and standards commonly apply to the Growatt TH-EV11P?

CE marking under the LVD ([Directive 2014/35/EU, Art. 3](https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:32014L0035)), EMC ([Directive 2014/30/EU, Art. 6](https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:32014L0030)) and RED ([Directive 2014/53/EU, Art. 3](https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:32014L0053)) where applicable, with conformity to [IEC 61851-1:2017 (third edition)](https://webstore.iec.ch/en/publication/33644) and [IEC 62196-2:2022 (third edition)](https://webstore.iec.ch/en/publication/64364) Type 2 connector. Verify the OEM's DoC and test-report references directly.

### What is the office AC 11 kW use case used on this page?

Workplace charging during office hours for staff and fleet vehicles, typically with RFID/app access, OCPP 1.6J back office and MID-class metering. This drives both the energy and accessibility assumptions used in the OpEx and payback model.

### How is payback estimated?

The computed simple payback is 1.37 years and the discounted payback is 1.52 years at an 8.00 % discount rate over 25 years. Replace the bounded assumptions in §9 with site-specific electricity tariff, utilisation and installation quotes before any decision.

### Does Tradvolt hardcode duty or VAT rates on this page?

No. All duty and VAT rates are marked PENDING — lookup against EU TARIC (Poland) and the KAS VAT portal on the date of declaration. No rates are hardcoded.

---

## 11. Sources & claims register

Each factual claim is tied to a named, deep-linked source. EU portals are linked to specific articles or query pages (not homepages).

1. [Claim] HS subheading, third-country duty and any preferential / anti-dumping measures for an 11 kW AC EVSE imported into Poland must be looked up against the EU TARIC consultation at the date of declaration. [Src: European Commission — EU TARIC]. [URL: [https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en](https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en)]. [Accessed: 2026-09-21].

2. [Claim] CE marking under the Low-Voltage Directive 2014/35/EU is the baseline for electrical safety of EVSE placed on the EU market. [Src: EUR-Lex — Directive 2014/35/EU]. [URL: [https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:32014L0035](https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:32014L0035)]. [Accessed: 2026-09-21].

3. [Claim] CE marking under the EMC Directive 2014/30/EU applies to EVSE. [Src: EUR-Lex — Directive 2014/30/EU]. [URL: [https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:32014L0030](https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:32014L0030)]. [Accessed: 2026-09-21].

4. [Claim] CE marking under the Radio Equipment Directive 2014/53/EU applies where the EVSE has radio functions (RFID / Wi-Fi / cellular). [Src: EUR-Lex — Directive 2014/53/EU]. [URL: [https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:32014L0053](https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:32014L0053)]. [Accessed: 2026-09-21].

5. [Claim] Charging-system conformance for an AC EVSE is based on IEC 61851-1:2017 (third edition) — Electric vehicle conductive charging system, Part 1: General requirements (TC 69). [Src: IEC Webstore]. [URL: [https://webstore.iec.ch/en/publication/33644](https://webstore.iec.ch/en/publication/33644)]. [Accessed: 2026-09-21].

6. [Claim] Connector for AC EVSE in the EU is Type 2 per IEC 62196-2:2022 (third edition) — Plugs, socket-outlets, vehicle connectors and vehicle inlets, dimensional compatibility for AC pin and contact-tube accessories, up to 480 V AC / 63 A 3-phase (TC 23/SC 23H). [Src: IEC Webstore]. [URL: [https://webstore.iec.ch/en/publication/64364](https://webstore.iec.ch/en/publication/64364)]. [Accessed: 2026-09-21].

7. [Claim] Import VAT rate and any EVSE-specific exemption must be looked up on the Polish National Revenue Administration VAT portal at the date of declaration. [Src: Polish National Revenue Administration (KAS) — VAT]. [URL: [https://www.podatki.gov.pl/en/vat/](https://www.podatki.gov.pl/en/vat/)]. [Accessed: 2026-09-21].

8. [Claim] Distribution System Operator (DSO) notification procedure applies to AC workplace charging stations in Poland. [Src: PSE — Connecting to the grid]. [URL: [https://www.pse.pl/en/regulation/connecting-to-the-grid](https://www.pse.pl/en/regulation/connecting-to-the-grid)]. [Accessed: 2026-09-21].

9. [Claim] Where backup cells are shipped with the EVSE, the UN Manual of Tests and Criteria (UN/ST/SG/AC.10/11/Rev.7) test summary must accompany the shipment. [Src: UNECE — UN Manual of Tests and Criteria]. [URL: [https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria](https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria)]. [Accessed: 2026-09-21].

10. [Claim] OEM identity for the unit covered by this TCO scenario: Growatt New Energy Technology Co., Ltd. (manufacturer of the Growatt TH-EV11P). [Src: Growatt corporate site — landing/product catalogue]. [URL: [https://www.growatt.com](https://www.growatt.com)]. [Accessed: 2026-09-21]. [Datasheet / DoC / test reports: quote-gated — no public PDF URL on growatt.com; issued on letterhead with the proforma invoice (see §4 and §8).]

11. [Claim] Insurance and freight assumptions (~0.3–0.5 % cargo insurance; CFR/CIF Gdańsk as the typical sea basis) are illustrative inputs to the CapEx formula; freight terms follow ICC Incoterms 2020 rules. [Src: ICC — Incoterms 2020]. [URL: [https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/](https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/)]. [Accessed: 2026-09-21].

12. [Claim] OCPP 1.6J back-office protocol used by the Growatt TH-EV11P per OEM datasheet. [Src: Open Charge Alliance — OCPP protocol]. [URL: [https://www.openchargealliance.org/](https://www.openchargealliance.org/)]. [Accessed: 2026-09-21].

13. [Claim] RFQ fields product_sku, oem_model, datasheet_request, qty, incoterm, target_cert, destination_country, buyer_email, buyer_company are the required fields and replies are issued within 48 hours on business days. [Src: Tradvolt operating policy]. [URL: [/rfq/](/rfq/)]. [Accessed: 2026-09-21].
