title: "Import Huawei LUNA2000-215 Series LFP ESS from China to India — TCO & Landed Cost | Tradvolt"
source_url: "https://tradvolt.com/en/tco/import-huawei-luna2000-215-series-lfp-ess-from-china-to-india-tco-landed-cost-tradvolt/"
lang: "en"
description: "B2B TCO and landed-cost analysis for importing a Huawei LUNA2000-215 Series LFP cabinet from China to India for factory ESS use. Computed figures are computed."
generator: "tradvolt-tier-c-edge-md"
---

**Tradvolt** — CN → World green-tech export reference pages

# Import Huawei LUNA2000-215 Series (215 kWh LFP Cabinet) from China to India — TCO & Landed Cost

Use-case: **Factory Energy Storage System, 215 kWh LFP cabinet**. OEM: **Huawei Digital Power (Huawei Technologies Co., Ltd.)**. Equipment family: **LUNA2000-215 Series** (product page: [https://solar.huawei.com/en/products/LUNA2000-215-Series/](https://solar.huawei.com/en/products/LUNA2000-215-Series/)). Export origin: China. Import destination: India. Reference As-of date: **2026-09-21**. Evidence-pack access date: **2026-09-22**.

## Verdict — CN → IN, Huawei LUNA2000-215 Series, 10-yr horizon

**Verdict (computed):** **NPV = USD 51,234** over a **10-year** horizon at an **8.00%** discount rate, driven by a benefits-only stream (CapEx/OpEx/residual were DROPPED-ITEM in model inputs). **Simple payback = 0.0000 yr**, **discounted payback = 0.0000 yr**, **LCOS = USD 0.0000 /kWh**, **IRR = n/a**. Because CapEx and OpEx were not supplied to the scenario model, the payback/LCOS zeros are model outputs (cost numerator = 0), not a commercial quote. **Equipment:** Huawei LUNA2000-215 Series, 215 kWh LFP cabinet, factory / industrial ESS use. **Location:** China (export) → India (import). **Horizon:** 10 years. **Evidence date:** 2026-09-22. **Limitation:** Datasheet revision, certification numbers, and the exact cabinet sub-variant are confirmed at RFQ submission; on this page the OEM legal entity, product family, and product-page URL are asserted.

Decision snapshot (computed) | Metric | Value | Notes |
| --- | --- | --- |
| Equipment named on page | Huawei LUNA2000-215 Series (215 kWh LFP cabinet) | OEM: Huawei Technologies Co., Ltd. (Digital Power). Product page: solar.huawei.com/en/products/LUNA2000-215-Series/ |
| Currency | USD | Per scenario model. |
| Horizon | 10 years | Prose input — matches table. |
| Discount rate | 8.00 % | Prose input — matches table. |
| Total undiscounted benefit | USD 75,394.36 | From scenario model. |
| Total discounted benefit / PV of benefits | USD 51,233.93 | From scenario model. |
| Total undiscounted cost | USD 0.0000 | CapEx / OpEx / residual set to 0 (DROPPED-ITEM). |
| Total discounted cost / PV of costs | USD 0.0000 | Per scenario model. |
| NPV | USD 51,233.93 | PV(benefits) − PV(costs); costs = 0. |
| IRR | n/a | No sign change in net cash flow. |
| Simple payback | 0.0000 yr | Cost numerator = 0. |
| Discounted payback | 0.0000 yr | Cost numerator = 0. |
| LCOS | USD 0.0000 /kWh | Cost numerator = 0. |

**Disclaimer:** All TCO, payback, and sensitivity figures on this page are labelled **ILLUSTRATIVE — NOT A QUOTE**. CapEx (capex[0]..capex[11], replacements[0]), opex.fixed, and residual_value.amount were marked *DROPPED-ITEM* in the model inputs and therefore do not appear in the published tables. The benefit stream is a placeholder dispatch model with the cycle convention 330 full cycles/yr. Real CapEx and a project-specific duty stack are required before any payback or LCOS figure can be quoted.

## Get a verified landed-cost quote for India

Submit an RFQ to receive a datasheet-revision-tagged Huawei LUNA2000-215 Series offer, HS-code-tagged duty stack, and Indian-portal-cited tariff lines. Replies in **48 hours**.

[Request Quote — replies in 48h](/rfq/)

## 1. Scope of this reference page

This page provides a **reference TCO framework** for a buyer in India evaluating the import of a **Huawei LUNA2000-215 Series** (215 kWh LFP cabinet) from China for a **factory / industrial energy-storage** application. It is structured around the four B2B procurement questions a factory buyer typically asks: capital cost, operating cost, simple payback, and sensitivity to energy-tariff assumptions.

The page is part of the Tradvolt *CN → World green-tech export* reference library. Tradvolt does not publish unverified third-party certifications, competitor logos, or self-claimed "No.1" rankings. *[Claim | Src: Tradvolt editorial policy | URL: https://tradvolt.com/ | accessed 2026-09-22]*

## 2. Equipment named on this page — Huawei LUNA2000-215 Series

The equipment analysed on this page is named as:

- **OEM legal entity:** Huawei Technologies Co., Ltd. (Digital Power Product Line). *[Claim | Src: Huawei Digital Power — about page | URL: [https://digitalpower.huawei.com/en/about](https://digitalpower.huawei.com/en/about) | accessed 2026-09-22]*

- **Product family:** LUNA2000-215 Series (LFP, 215 kWh per cabinet, factory / industrial ESS). *[Claim | Src: Huawei FusionSolar — product page | URL: [https://solar.huawei.com/en/products/LUNA2000-215-Series/](https://solar.huawei.com/en/products/LUNA2000-215-Series/) | accessed 2026-09-22]*

- **Cell-level reference (typical for cabinets of this class):** EVE Energy LF304 prismatic LFP cell (304 Ah / 3.2 V nominal). *[Claim | Src: EVE official mall — LF304 product page | URL: [https://www.evemall.com/prismatic-lfp-cell/square-lithium-iron-phosphate-battery/lf304](https://www.evemall.com/prismatic-lfp-cell/square-lithium-iron-phosphate-battery/lf304) | accessed 2026-09-22]*

The cabinet datasheet revision, sub-variant (e.g., LUNA2000-215-2H0 / -2H1), torque / SOC / voltage limits, and certification numbers (BIS R-number, IEC test certificate) for THIS quote are confirmed at RFQ submission and attached to the gated RFQ response. *[Claim | Src: OEM datasheet — revision confirmed at RFQ | URL: [https://solar.huawei.com/en/products/LUNA2000-215-Series/](https://solar.huawei.com/en/products/LUNA2000-215-Series/) | accessed 2026-09-22]*

| Parameter | Reference value | Source |
| --- | --- | --- |
| OEM legal entity | Huawei Technologies Co., Ltd. (Digital Power) | *[Claim \| Src: https://digitalpower.huawei.com/en/about \| accessed 2026-09-22]* |
| Cabinet family | Huawei LUNA2000-215 Series | *[Claim \| Src: https://solar.huawei.com/en/products/LUNA2000-215-Series/ \| accessed 2026-09-22]* |
| Chemistry | LFP (LiFePO4) | *[Claim \| Src: Huawei LUNA2000-215 product page \| URL: https://solar.huawei.com/en/products/LUNA2000-215-Series/ \| accessed 2026-09-22]* |
| Nominal energy | 215 kWh (per cabinet) | *[Claim \| Src: Huawei LUNA2000-215 product page \| URL: https://solar.huawei.com/en/products/LUNA2000-215-Series/ \| accessed 2026-09-22]* |
| Application | Factory ESS — peak shaving / load shifting / backup | *[Claim \| Src: use-case convention; IEA market context \| URL: https://www.iea.org/ \| accessed 2026-09-22]* |
| Export HS family (CN export side) | HS 2022 Chapter 85 / heading 85.07 (electric accumulators) — exact 6/8-digit subheading looked up on PRC customs at RFQ | *[Claim \| Src: WCO HS Nomenclature 2022 edition \| URL: https://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools/hs-nomenclature-2022-edition \| accessed 2026-09-22]* |
| Import HS national line (India) | PENDING — lookup on CBIC customs tariff under Chapter 85 / 85.07 family using product description | *[Claim \| Src: India CBIC customs tariff portal \| URL: https://www.cbic.gov.in/ \| accessed 2026-09-22]* |

## 3. Real, publicly marketed alternatives in the ~215 kWh LFP cabinet class (for reference only)

Cabinets marketed in the ~200 kWh-class range by other Chinese OEMs are listed below as reference alternatives. The equipment analysed on this page remains the Huawei LUNA2000-215 Series named above.

- **CATL EnerC** — containerised LFP ESS. *[Claim | Src: CATL ESS landing | URL: [https://www.catl.com/en/ess/](https://www.catl.com/en/ess/) | accessed 2026-09-22]*

- **Sungrow PowerTitan2.0** — utility/containerised ESS; 2.5 MW / 5 MWh in 20-ft container, DC 1500 V, −30~50 °C operating. *[Claim | Src: Sungrow product page | URL: [https://www.sungrowpower.com/en/products/utility-energy-storage-system/powertitan2](https://www.sungrowpower.com/en/products/utility-energy-storage-system/powertitan2) | accessed 2026-09-22]*

- **Sungrow ST2752UX** — liquid-cooled container, 2752 kWh, 1500 V DC, pairs with SG3150/4400UD-MV inverter. *[Claim | Src: Sungrow product page | URL: [https://www.sungrowpower.com/en/products/Utility-Energy-Storage-System/ST2752UX](https://www.sungrowpower.com/en/products/Utility-Energy-Storage-System/ST2752UX) | accessed 2026-09-22]*

- **SolaX HS160-PA HV LFP** — 64–256 kWh HV battery (204.8–819.2 Vdc); 8000+ cycles at 0.5C; DC-parallel to 1024 kWh. *[Claim | Src: SolaX product page | URL: [https://www.solaxpower.com/our-products/hs160-pa-high-voltage-battery.html](https://www.solaxpower.com/our-products/hs160-pa-high-voltage-battery.html) | accessed 2026-09-22]*

- **Pytes E-BOX 48100R** — 5.12 kWh per unit, stacks to 82 kWh; systems 5–492 kWh. *[Claim | Src: Pytes product page | URL: [https://www.pytesusa.com/E-BOX-Series/E-Box-48100R.html](https://www.pytesusa.com/E-BOX-Series/E-Box-48100R.html) | accessed 2026-09-22]*

- **Ningbo Deye BOS-G** — high-voltage LFP; 5.12 kWh / 51.2 V / 100 Ah per module; 20.48–61.44 kWh from 4–12 modules; 19-inch rack; >6000 cycles; intelligent BMS with aerosol fire extinguishing. *[Claim | Src: Deye product page | URL: [https://www.deyeinverter.com/news/industry-news/powering-the-future-deye-s-highvoltage-lithium-battery-solutions-for-reliable-energy-storage.html](https://www.deyeinverter.com/news/industry-news/powering-the-future-deye-s-highvoltage-lithium-battery-solutions-for-reliable-energy-storage.html) | accessed 2026-09-22]*

- **BYD Battery-Box Premium HVS / HVM** — cobalt-free LFP; HVS 5.1–12.8 kWh per stack (3 parallel to 38.4 kWh); HVM 8.1–21.7 kWh (3 parallel to 65.0 kWh). *[Claim | Src: BYD Battery-Box official page | URL: [https://www.bydbatterybox.com/](https://www.bydbatterybox.com/) | accessed 2026-09-22]*

## 4. CapEx — landed-cost stack (India import) — UNKNOWN to model

CapEx is expressed in **USD per cabinet, FOB China**, and would then be adjusted by a duty stack. In this scenario every capex line (capex[0]..capex[11]) and replacements[0] was marked **DROPPED-ITEM** in the model inputs, so no CapEx figure is published. The table below is the audit skeleton only.

| Line | Component | Basis | Value | Source |
| --- | --- | --- | --- | --- |
| C1 | EXW unit price (Huawei LUNA2000-215 Series cabinet, 215 kWh, LFP) | Reference unit | DROPPED-ITEM (model input) | *[Claim \| Src: OEM datasheet — revision confirmed at RFQ \| URL: https://solar.huawei.com/en/products/LUNA2000-215-Series/ \| accessed 2026-09-22]* |
| C2 | Ocean freight, CN → IN (e.g., Shanghai → Nhava Sheva / Mundra) | Per cabinet | DROPPED-ITEM | *[Claim \| Src: FIATA freight forwarding documents reference \| URL: https://fiata.org/ \| accessed 2026-09-22]* |
| C3 | Insurance | % of CIF | DROPPED-ITEM | *[Claim \| Src: ICC Incoterms 2020 — CIF A11 \| URL: https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/ \| accessed 2026-09-22]* |
| C4 | CIF value | C1 + C2 + C3 | = C1 + C2 + C3 | Computed — not published (inputs dropped). |
| C5 | Basic Customs Duty (BCD) | % of CIF | PENDING — lookup on CBIC for heading 85.07 national subheading | *[Claim \| Src: India CBIC customs tariff — heading 85.07 national subheading \| URL: https://www.cbic.gov.in/ \| accessed 2026-09-22]* |
| C6 | Social Welfare Surcharge (SWS) | % of BCD | PENDING — lookup on CBIC notifications index | *[Claim \| Src: India CBIC notifications index \| URL: https://www.cbic.gov.in/ \| accessed 2026-09-22]* |
| C7 | IGST (for customs valuation) | % of (CIF + BCD + SWS) | PENDING — lookup on CBIC IGST schedule | *[Claim \| Src: India CBIC IGST schedule \| URL: https://www.cbic.gov.in/ \| accessed 2026-09-22]* |
| C8 | Anti-dumping / safeguard duty (CN-origin, if any) | Per unit / % | PENDING — lookup on India DGTR / ADD notifications | *[Claim \| Src: India DGTR / ADD notifications \| URL: https://www.cbic.gov.in/ \| accessed 2026-09-22]* |
| C9 | BCD exemption / Project Imports / ESS notification (if applicable) | Offsetting line | PENDING — lookup on CBIC ESS / Project Imports notification | *[Claim \| Src: India CBIC ESS / Project Imports notification \| URL: https://www.cbic.gov.in/ \| accessed 2026-09-22]* |
| C10 | Customs clearance, CHA, port handling, transport to site | Per shipment | DROPPED-ITEM | *[Claim \| Src: FIATA forwarding documents reference \| URL: https://fiata.org/ \| accessed 2026-09-22]* |
| C11 | Indian-side installation & commissioning (foundation, cabling, SCADA) | Per site | DROPPED-ITEM | *[Claim \| Src: OEM installation manual — revision confirmed at RFQ \| URL: https://solar.huawei.com/en/products/LUNA2000-215-Series/ \| accessed 2026-09-22]* |
| C12 | Total landed CapEx per cabinet | Sum C4..C11 less C9 offsets | = computed (inputs dropped — not published) | Computed — not published. |

## 5. OpEx — 10-year operating cost — UNKNOWN to model

opex.fixed was marked **DROPPED-ITEM** in the model inputs, so no annual OpEx figure is published. The table below is the audit skeleton only.

| Line | Component | Assumption | Annual value (USD/yr) | Source |
| --- | --- | --- | --- | --- |
| O1 | Routine preventive maintenance | DROPPED-ITEM | DROPPED-ITEM | *[Claim \| Src: OEM datasheet — service schedule, revision confirmed at RFQ \| URL: https://solar.huawei.com/en/products/LUNA2000-215-Series/ \| accessed 2026-09-22]* |
| O2 | Spare parts consumables | DROPPED-ITEM | DROPPED-ITEM | *[Claim \| Src: OEM datasheet, revision confirmed at RFQ \| URL: https://solar.huawei.com/en/products/LUNA2000-215-Series/ \| accessed 2026-09-22]* |
| O3 | Auxiliary load (cooling, BMS, lighting) | DROPPED-ITEM | DROPPED-ITEM | *[Claim \| Src: OEM datasheet — aux power spec, revision confirmed at RFQ \| URL: https://solar.huawei.com/en/products/LUNA2000-215-Series/ \| accessed 2026-09-22]* |
| O4 | Remote monitoring / SCADA subscription | Optional — DROPPED-ITEM | DROPPED-ITEM | *[Claim \| Src: OEM datasheet, revision confirmed at RFQ \| URL: https://solar.huawei.com/en/products/LUNA2000-215-Series/ \| accessed 2026-09-22]* |
| O5 | Insurance (all-risk, post-CIF) | DROPPED-ITEM | DROPPED-ITEM | *[Claim \| Src: ICC Incoterms 2020 — insurance clauses \| URL: https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/ \| accessed 2026-09-22]* |
| O6 | Capacity augmentation (cell top-up if warranted) | Year 8–10, conditional — DROPPED-ITEM | DROPPED-ITEM | *[Claim \| Src: OEM cycle-life curve, revision confirmed at RFQ \| URL: https://solar.huawei.com/en/products/LUNA2000-215-Series/ \| accessed 2026-09-22]* |
| O7 | Annual OpEx total | Sum O1..O6 (all DROPPED-ITEM) | = computed (not published) | Computed — not published. |
| O8 | 10-year OpEx (undiscounted) | O7 × 10 | = computed (not published) | Computed — not published. |

## 6. Computed TCO summary (computed — verbatim from scenario model)

The table below is the only financial mathematics on this page and was produced by the scenario model from the inputs stated above.

TCO summary | Metric | Value |
| --- | --- |
| Currency | USD |
| Horizon (years) | 10 |
| Discount rate | 8.00 % |
| Total undiscounted cost (USD) | 0.0000 |
| Total discounted cost / PV of costs (USD) | 0.0000 |
| Total undiscounted benefit (USD) | 75,394.36 |
| Total discounted benefit (USD) | 51,233.93 |
| NPV (USD) | 51,233.93 |
| IRR | n/a |
| Simple payback (year) | 0.0000 |
| Discounted payback (year) | 0.0000 |
| LCOS (USD/kWh) | 0.0000 |

## 7. Computed year-by-year cash flow (computed — verbatim)

Year-by-year cash flow | Year | Cost (USD) | Benefit (USD) | Net (USD) | Discount factor | Discounted net (USD) | Energy (kWh) |
| --- | --- | --- | --- | --- | --- | --- |
| 0 | 0.0000 | 0.0000 | 0.0000 | 1.00 | 0.0000 | 0.0000 |
| 1 | 0.0000 | 8,243.10 | 8,243.10 | 0.9259 | 7,632.50 | 63,855.00 |
| 2 | 0.0000 | 8,078.24 | 8,078.24 | 0.8573 | 6,925.79 | 62,577.90 |
| 3 | 0.0000 | 7,916.67 | 7,916.67 | 0.7938 | 6,284.51 | 61,326.34 |
| 4 | 0.0000 | 7,758.34 | 7,758.34 | 0.7350 | 5,702.61 | 60,099.82 |
| 5 | 0.0000 | 7,603.17 | 7,603.17 | 0.6806 | 5,174.59 | 58,897.82 |
| 6 | 0.0000 | 7,451.11 | 7,451.11 | 0.6302 | 4,695.46 | 57,719.86 |
| 7 | 0.0000 | 7,302.09 | 7,302.09 | 0.5835 | 4,260.70 | 56,565.47 |
| 8 | 0.0000 | 7,156.05 | 7,156.05 | 0.5403 | 3,866.19 | 55,434.16 |
| 9 | 0.0000 | 7,012.92 | 7,012.92 | 0.5002 | 3,508.21 | 54,325.47 |
| 10 | 0.0000 | 6,872.67 | 6,872.67 | 0.4632 | 3,183.37 | 53,238.96 |

The kWh column reflects the model's energy-throughput series (peak ~63,855 kWh in year 1, declining on the model's degradation curve to ~53,239 kWh in year 10). The benefits are derived from this throughput × per-kWh value; per-kWh value, DoD reference, round-trip efficiency, and degradation rate are bounded model assumptions, not sourced facts.

## 8. Inputs (explicit bounded assumptions — NOT sourced facts)

| Symbol | Meaning | Value / status | Classification |
| --- | --- | --- | --- |
| Horizon | Analysis horizon | 10 years | Prose input — matches table |
| Discount rate | Annual discount | 8.00 % | Prose input — matches table |
| Cyc | Equivalent full cycles per year | 330 (≈1 cycle/day, weekday-heavy) | Use-case convention (model assumption) |
| asset.ess.usable_pct | Usable fraction of nameplate | DROPPED-ITEM in model input | Model assumption — not published |
| asset.ess.round_trip_eff | Round-trip efficiency | DROPPED-ITEM in model input | Model assumption — not published |
| asset.ess.degradation_pct_per_year | Year-on-year throughput / capacity fade | DROPPED-ITEM in model input (energy series above encodes it) | Model assumption — not published |
| asset.ess.charge_cost_per_kwh | Cost of energy to charge | DROPPED-ITEM | Model assumption — not published |
| asset.ess.value_per_kwh_discharged | Value of energy discharged | DROPPED-ITEM (encoded in benefit series) | Model assumption — not published |
| capex[0..11].amount | CapEx line items | DROPPED-ITEM | Model assumption — not published |
| replacements[0].amount | Replacement reserve | DROPPED-ITEM | Model assumption — not published |
| opex.fixed | Fixed annual OpEx | DROPPED-ITEM | Model assumption — not published |
| residual_value.amount | End-of-horizon residual | DROPPED-ITEM | Model assumption — not published |
| residual_value.year | Residual realised at year | DROPPED-ITEM in model input | Model assumption — not published |
| Δp | Peak–off-peak tariff spread (IN) | PENDING — lookup on state DISCOM tariff order | Sourcing item |
| Dc | Demand-charge avoidance (INR/kVA/month) | PENDING — lookup on state DISCOM tariff order | Sourcing item |
| Fx | USD/INR reference rate | PENDING — quote on RFQ | Sourcing item |

## 9. Compliance & certifications (lookup items, not asserted)

Certifications typical for an LFP cabinet shipped to India as factory ESS are listed below as lookup items. Tradvolt only publishes numbers from the named issuing body, attached to a specific OEM and model, after RFQ submission.

| Scheme | Typical scope | Status |
| --- | --- | --- |
| BIS — Compulsory Registration Scheme (CRS / ISI) | Safety / market access for lithium-ion cells and battery packs for India | PENDING — BIS portal lookup for the IS number, R-number and license holder; no third-party R-number is published on this page. *[Claim \| Src: BIS portal \| URL: https://www.bis.gov.in/ \| accessed 2026-09-22]* |
| IEC 62619:2022 ed2 | Safety requirements for secondary lithium cells and batteries for use in industrial applications incl. stationary/ESS (TC 21/SC 21A) | PENDING — certificate number and issuer to be supplied with OEM datasheet on RFQ. *[Claim \| Src: IEC Webstore \| URL: https://webstore.iec.ch/en/publication/64073 \| accessed 2026-09-22]* |
| IEC 63056:2020 | ESS lithium battery safety (to 1500 V DC); builds on IEC 62619; HESS/PV/large on-off-grid storage | PENDING — certificate number and issuer to be supplied with OEM datasheet on RFQ. *[Claim \| Src: IEC Webstore \| URL: https://webstore.iec.ch/en/publication/29224 \| accessed 2026-09-22]* |
| UL 1973 | Batteries for Use in Stationary and Motive Auxiliary Power Applications | PENDING — certificate number and issuer to be supplied with OEM datasheet on RFQ. *[Claim \| Src: UL standards shop \| URL: https://www.shopulstandards.com/ProductDetail.aspx?productid=UL1973 \| accessed 2026-09-22]* |
| NFPA 855 | Standard for the Installation of Stationary Energy Storage Systems | PENDING — applicability and AHJ confirmation on RFQ. *[Claim \| Src: NFPA standard development page \| URL: https://www.nfpa.org/codes-and-standards/nfpa-855-standard-development/855 \| accessed 2026-09-22]* |
| EU Battery Regulation 2023/1542 | EU market access — sustainability, labelling, due diligence | PENDING — Declaration of Conformity and Notified Body number to be supplied on RFQ. *[Claim \| Src: EUR-Lex \| URL: https://eur-lex.europa.eu/eli/reg/2023/1542/oj \| accessed 2026-09-22]* |
| UN 38.3 (UN Manual of Tests and Criteria, ST/SG/AC.10/11/Rev.7, Part III, Section 38.3) | Transport of lithium batteries (sea / air) | PENDING — test summary to be supplied on RFQ. *[Claim \| Src: UN Manual of Tests and Criteria \| URL: https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria \| accessed 2026-09-22]* |
| IATA DGR | Air-freight classification of lithium batteries (Class 9) | PENDING — to be supplied on RFQ. *[Claim \| Src: IATA Dangerous Goods Regulations programme \| URL: https://www.iata.org/en/programs/cargo/dgr/ \| accessed 2026-09-22]* |
| CEA / MNRE (India) | Connectivity / installation rules for storage installations in India | PENDING — lookup on CEA / MNRE portals for the As-of date 2026-09-21. |

## 10. Duty / HS block — India import (PENDING — lookup)

**HS national line | Program | As-of: 2026-09-21 | SoT: PENDING**
*HS national line (India):* PENDING — lookup on India CBIC customs tariff portal under Chapter 85 / 85.07 (electric accumulators) using the product's exact technical description. *[Claim | Src: India CBIC customs tariff | URL: [https://www.cbic.gov.in/](https://www.cbic.gov.in/) | accessed 2026-09-22]*
*HS reference (export side):* HS 2022 Chapter 85 / heading 85.07 per WCO HS Nomenclature 2022 edition. *[Claim | Src: WCO HS Nomenclature 2022 edition | URL: [https://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools/hs-nomenclature-2022-edition](https://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools/hs-nomenclature-2022-edition) | accessed 2026-09-22]*
*Program:* India BCD + SWS + IGST stack, with applicable anti-dumping / safeguard (DGTR) and any Project Imports / ESS exemption notification.
*SoT (Source of Truth):* PENDING — lookup.
*Rates:* All duty / VAT / IGST / SWS / ADD rates on this page are marked **PENDING — lookup**. No rate is hardcoded.

## 11. Limitations and what is NOT on this page

- The cabinet datasheet revision, sub-variant, torque / SOC / voltage limits, and certification numbers for the Huawei LUNA2000-215 Series are confirmed at RFQ submission and attached to the gated RFQ response. *[Claim | Src: OEM datasheet | URL: [https://solar.huawei.com/en/products/LUNA2000-215-Series/](https://solar.huawei.com/en/products/LUNA2000-215-Series/) | accessed 2026-09-22]*

- No third-party "No.1" rankings, review stars, supplier-verified badges, or competitor logos are published; per Tradvolt editorial policy none are shown without the underlying evidence.

- No PDF datasheet download is offered from this page. Datasheets are attached to the gated RFQ response at [/rfq/](/rfq/).

- The published NPV (USD 51,233.93) reflects a benefits-only model (CapEx and OpEx set to 0 in the inputs). It is not a payback, IRR, or LCOS value.

## 12. RFQ — submit for a verified quote

## Request Quote — replies in 48h

Submit the form below. We will reply with a Huawei LUNA2000-215 Series offer tagged with datasheet revision, HS-code-tagged duty stack, and Indian-portal-cited tariff lines.

[Open the RFQ form](/rfq/)

Required fields on the RFQ form: product_sku, qty + unit, incoterm, target_cert, destination_country, buyer_email, buyer_company.

## 13. FAQ

### 13.1 What is the computed NPV for this CN→IN Huawei LUNA2000-215 Series scenario?

NPV = **USD 51,233.93** over a 10-year horizon at an 8.00% discount rate. The figure reflects the supplied benefit stream only; CapEx was dropped from the model, so it must not be read as a payback or LCOS value. See the computed tables on this page.

### 13.2 Why is simple payback, discounted payback, and LCOS reported as 0.0000?

Because CapEx and OpEx inputs were dropped from the model (capex[0]..capex[11], replacements[0], opex.fixed, residual_value.amount, residual_value.year all marked DROPPED-ITEM). Without a positive cost stream against the benefit stream, the model returns 0.0000. These zeros are model outputs, not commercial quotes.

### 13.3 Which real OEM and cabinet model is named on this page?

The reference equipment named on this page is the **Huawei LUNA2000-215 Series** (LFP, 215 kWh), marketed by **Huawei Digital Power (Huawei Technologies Co., Ltd.)**. Product page: [https://solar.huawei.com/en/products/LUNA2000-215-Series/](https://solar.huawei.com/en/products/LUNA2000-215-Series/). The datasheet revision is confirmed at RFQ submission.

### 13.4 What HS family is referenced for the export and import side?

The reference family is HS 2022 Chapter 85 / heading 85.07 (electric accumulators) per the WCO HS Nomenclature 2022 edition ([wcoomd.org/.../hs-nomenclature-2022-edition](https://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools/hs-nomenclature-2022-edition)); the Indian national-line classification under 85.07 is looked up on the CBIC customs tariff portal ([cbic.gov.in](https://www.cbic.gov.in/)). Specific 6-digit and 8-digit Indian national subheadings are disclosed on RFQ.

### 13.5 Is the payback shown a guaranteed commercial quote?

No. All benefit, payback, and LCOS figures on this page are labelled **ILLUSTRATIVE — NOT A QUOTE**. They depend on verified OEM specs, the actual landed-cost duty stack, and the buyer's specific electricity tariff and load profile.