title: "Import Hybrid Inverter + LFP Battery from China to Mozambique — Workshop TCO & Landed Cost | Tradvolt"
source_url: "https://tradvolt.com/en/tco/import-hybrid-inverter-lfp-battery-from-china-to-mozambique-workshop-tco-landed-cost-tradvolt/"
lang: "en"
description: "B2B TCO and landed-cost guide for importing a workshop hybrid 12 kW inverter with LFP battery from China to Mozambique. CapEx, OpEx, payback, sensitivity, customs."
generator: "tradvolt-tier-c-edge-md"
---

Use case · Workshop · Hybrid 12 kW · CN → Mozambique

# Import a 12 kW Hybrid Inverter + LFP Battery from China to Mozambique — Workshop TCO & Landed-Cost

Tradvolt export channel · Vertical: LFP battery & solar BoS · Audience: Mozambique B2B buyers (workshops, SMEs, EPCs) · Equipment: Sunsynk SYNK-12K-SG04LP3 three-phase hybrid inverter (12 kW) with LFP battery rack · Horizon 25 yr · Evidence date 2026-09-21

**Answer / verdict (first 100 words).** For the workshop base scenario in this page — a **Sunsynk SYNK-12K-SG04LP3** three-phase hybrid inverter (12 kW) paired with an LFP rack, exported CN → MZ, 25-year horizon, 8.00% discount rate — the scenario TCO model returns **NPV = −10,557.74 USD** (total undiscounted cost USD 23,210.60; PV of costs USD 16,435.91; total undiscounted benefit USD 12,780.71; PV of benefits USD 5,878.17), **LCOS = 0.7112 USD/kWh**, and **neither simple nor discounted payback** is reached within 25 years. Verdict: at the model-default inputs the system does not pay back within horizon. Equipment pricing **PENDING pending OEM datasheet**; Mozambique AT duty/VAT **PENDING pending AT tariff lookup**. Decision is illustrative, not a quote.

TCO summary | Metric | Value |
| --- | --- |
| Currency | USD |
| Horizon (years) | 25 |
| Discount rate | 8.00 % |
| Total undiscounted cost (USD) | 23,210.60 |
| Total discounted cost / PV of costs (USD) | 16,435.91 |
| Total undiscounted benefit (USD) | 12,780.71 |
| Total discounted benefit (USD) | 5,878.17 |
| NPV (USD) | -10,557.74 |
| IRR | n/a |
| Simple payback (year) | — |
| Discounted payback (year) | — |
| LCOS (USD/kWh) | 0.7112 |

## 1. Use case definition

The workshop use case pairs a **Sunsynk SYNK-12K-SG04LP3** three-phase hybrid inverter (12 kW LV hybrid, IP65, parallel up to 16 units per maker page) with an **LFP battery rack** and a PV balance-of-system to displace diesel generator runtime for small commercial workshops in Mozambique. Daytime PV generation supplemented by grid where present or a diesel genset as fallback; overnight the LFP rack feeds a mixed load of power tools, lighting and ventilation. Inverter-side safety is governed by IEC 62109-1:2010 and IEC 62109-2:2011 (TC 82 — Safety of power converters for use in PV power systems) and the battery cells/modules by IEC 62619:2022 ed2 (TC 21/SC 21A — Secondary lithium cells and batteries for use in industrial applications, incl. stationary/ESS); cell-level transport is governed by the UN Recommendations on the Transport of Dangerous Goods, Manual of Tests and Criteria, UN 38.3 (ST/SG/AC.10/11/Rev.7). [Claim | Src: Sunsynk SYNK-12K-SG04LP3 product page | URL: https://www.sunsynk.org/product/hybrid-inverter-12kw-3p | accessed 2026-09-21] [Claim | Src: IEC 62109-1:2010 (TC 82) | URL: https://webstore.iec.ch/en/publication/6470 | accessed 2026-09-21] [Claim | Src: IEC 62109-2:2011 (TC 82) | URL: https://webstore.iec.ch/en/publication/6471 | accessed 2026-09-21] [Claim | Src: IEC 62619:2022 ed2 (TC 21/SC 21A) | URL: https://webstore.iec.ch/en/publication/64073 | accessed 2026-09-21]

## 2. Equipment & procedure limits (from OEM manuals)

- **Sunsynk SYNK-12K-SG04LP3** — 12 kW three-phase low-voltage hybrid, IP65, net 38.5 kg; parallel up to 16 units per OEM page. Detailed MPPT count, MPPT voltage range, max DC input voltage, battery voltage window, max charge/discharge current and recommended SOC window are not shown on the linked product page — confirm against the OEM datasheet / installation manual revision before shipment (RFQ-pending). [Claim | Src: Sunsynk SYNK-12K-SG04LP3 product page | URL: https://www.sunsynk.org/product/hybrid-inverter-12kw-3p | accessed 2026-09-21]

- **LFP battery rack (model family TBD at RFQ)** — modular LFP rack, manufacturer and exact module model to be confirmed at RFQ; modelled usable energy in this TCO is consistent with the bounded defaults in section 5 (DoD 80%, 92% round-trip efficiency, 2%/yr usable-energy decay).

- **Battery sizing basis used in this TCO** — the modelled asset.ess.usable_pct of 80 is a bounded model default, consistent with IEC 62619:2022 ed2 SOC operating envelope and typical LFP datasheet cycle-life curves; it is not a sourced fact.

- **Compliance documents to request from OEM** — CE Declaration of Conformity, IEC 62109-1:2010 and IEC 62109-2:2011 CB test certificates (inverter), IEC 62619:2022 ed2 CB test certificate (LFP cells/modules), UN 38.3 (ST/SG/AC.10/11/Rev.7) test summary (cells/modules for sea freight), Certificate of Origin from China (China Council for the Promotion of International Trade, or authorised issuing body).

## 3. CapEx table & Equipment Scope (ILLUSTRATIVE — NOT A QUOTE)

**Equipment scope (in price vs. excluded):** The **12,000.00 USD Year-0 CapEx** in the cash-flow model is a bundled scenario assumption covering **1 × Sunsynk SYNK-12K-SG04LP3 (12 kW three-phase LV hybrid inverter)**, **1 × 9.6 kWh nominal LFP battery rack** (providing 7.68 kWh usable capacity at 80% DoD, derived from the Year-1 discharge of 2,534.40 kWh ÷ 330 cycles/yr), rooftop PV modules with DC/AC protection switchgear, LCL sea freight to Maputo or Beira, marine cargo insurance, and local workshop installation/commissioning. **Excluded from the 12,000.00 USD price:** Mozambique *Autoridade Tributária* (AT) import duties and 16%/17% IVA (which remain PENDING tariff lookup), port storage/demurrage at Maputo/Beira, backup diesel generator purchase or overhaul, three-phase workshop machine-tool rewiring, structural roof reinforcement, and mid-life LFP cell augmentation or inverter replacement.

| Line | Item | Scope & Traceability Classification | Unit basis |
| --- | --- | --- | --- |
| 1 | Hybrid inverter — Sunsynk SYNK-12K-SG04LP3 | **Public-source** hardware specs (12 kW 3P LV, IP65, 38.5 kg net, up to 16 units parallel per sunsynk.org; safety standards IEC 62109-1:2010 / IEC 62109-2:2011); unit price **supplier-quoted at RFQ** (rolled into 12,000 USD Year-0 CapEx assumption) | per set |
| 2 | LFP rack (9.6 kWh nominal / 7.68 kWh usable at 80% DoD) | **Stated scenario assumption** for 9.6 kWh nominal pack size (implied by 2,534.40 kWh Year-1 throughput ÷ 330 cycles ÷ 0.80 DoD); cell safety standard **public-source** IEC 62619:2022 ed2; unit price **supplier-quoted at RFQ** | per set |
| 3 | PV modules & mounting BoS | **Stated scenario assumption** (rooftop racking, DC cabling, combiner included in 12,000 USD aggregate; itemized cost **supplier-quoted at RFQ**) | per system |
| 4 | Protection, switchgear, AC distribution | **Stated scenario assumption** (breakers, SPDs, earthing included in 12,000 USD aggregate; itemized cost **supplier-quoted at RFQ**) | per system |
| 5 | Freight (CN→MZ, sea) | **Stated scenario assumption** (LCL sea freight FOB Ningbo/Shanghai → Maputo or Beira included in 12,000 USD aggregate; firm rate **supplier-quoted at RFQ**) | per shipment |
| 6 | Marine insurance | **Stated scenario assumption** (~0.3–0.5% of cargo value allowance included in 12,000 USD aggregate) | per shipment |
| 7 | Installation & commissioning | **Stated scenario assumption** (local EPC electrical installation included in 12,000 USD aggregate; excluded: civil works & genset integration) | per site |

Individual BOM sub-lines (1–7) are unbundled in the public model (marked `DROPPED-ITEM` in §5) and rolled into the 12,000.00 USD Year-0 CapEx scenario assumption. Submit the RFQ form for supplier-quoted unit prices and confirmed Mozambique AT customs duties.

## 4. OpEx table (annual, ILLUSTRATIVE)

| Line | Driver | Mechanism | Unit basis |
| --- | --- | --- | --- |
| O1 | Diesel displacement | kWh shifted from genset to PV/LFP; value per kWh discharged model default | USD/yr |
| O2 | Maintenance reserve | Inverter service, fan/inverter replacement reserve (annual escalator in cost table) | USD/yr |
| O3 | Battery augmentation | Augment beyond warranty term if throughput warrants | USD/yr |
| O4 | Insurance / compliance renewals | Annual policy, site inspection | USD/yr |
| O5 | Remote monitoring | Data SIM / cloud platform fee | USD/yr |
| O6 | Charge cost (grid top-up / genset top-up) | asset.ess.charge_cost_per_kwh model default for in-window top-up kWh | USD/yr |

## 5. Computed TCO — Input Traceability & Arbitrage Mechanics

Every parameter driving the Section 6 cash-flow table is classified below as **public-source**, **supplier-quoted** (none until RFQ), or a **stated scenario assumption**. Note the underlying energy-arbitrage arithmetic: in Year 1, the 9.6 kWh nominal LFP rack delivers `9.6 kWh × 80% DoD × 330 cycles = 2,534.40 kWh` of discharged energy, earning a net spread of `0.4500 − (0.1800 ÷ 0.92 round-trip efficiency) = 0.254348 USD/kWh`, or **644.62 USD** in Year-1 gross benefit.

| Parameter | Value | Traceability / Source Classification |
| --- | --- | --- |
| Inverter rating & weight | 12 kW 3P / IP65 / 38.5 kg | **Public-source** (Sunsynk SYNK-12K-SG04LP3 product specification, sunsynk.org) |
| Nominal LFP battery capacity | 9.60 kWh (7.68 kWh usable) | **Stated scenario assumption** (derived from Year-1 discharge 2,534.40 kWh ÷ 330 cycles/yr = 7.68 kWh/cycle at 80% DoD) |
| Year-0 CapEx total (USD) | 12,000.00 | **Stated scenario assumption** (bundled equipment + sea freight + local install allowance; excludes Mozambique AT duty/IVA) |
| Year-1 OpEx (USD) & escalator | 350.00 (+2.00%/yr) | **Stated scenario assumption** (fixed annual maintenance & monitoring reserve escalating 2.00%/yr; rises to 562.95 USD by Year 25) |
| Discount rate & horizon | 8.00% real / 25 years | **Stated scenario assumption** (Mozambique SME hard-currency hurdle rate and evaluation horizon) |
| residual_value.amount (USD) | 0.00 at Year 25 | **Stated scenario assumption** (zero terminal salvage value) |
| asset.ess.usable_pct (%) | 80.00 | **Stated scenario assumption** (depth-of-discharge window; operating safety governed by **public-source** IEC 62619:2022 ed2) |
| asset.ess.round_trip_eff (%) | 92.00 | **Stated scenario assumption** (AC-to-battery-to-AC round-trip efficiency; requires 1.087 kWh charge per 1.000 kWh discharged) |
| asset.ess.cycles_per_year | 330.00 | **Stated scenario assumption** (one full cycle per working day, excluding Sundays/holidays) |
| asset.ess.degradation_pct_per_year (%) | 2.00 | **Stated scenario assumption** (compound annual usable-capacity decay; reduces annual discharge from 2,534.40 kWh in Year 1 to 1,560.63 kWh in Year 25) |
| asset.ess.charge_cost_per_kwh (USD/kWh) | 0.1800 | **Stated scenario assumption** (blended grid/PV charging cost; equals 0.19565 USD per kWh discharged at 92% RTE) |
| asset.ess.value_per_kwh_discharged (USD/kWh) | 0.4500 | **Stated scenario assumption** (avoided small-genset diesel cost per kWh delivered to workshop loads) |
| CapEx sub-lines (items 1–7) | DROPPED-ITEM | **Supplier-quoted at RFQ** (unbundled unit prices omitted from base run to prevent drift from the 12,000.00 USD aggregate assumption) |

## What Would Change This Answer

Under the base scenario assumptions, this system is **uneconomic (NPV = −10,557.74 USD, LCOS = 0.7112 USD/kWh, no payback)** because a 7.68 kWh usable battery cycling once daily generates only 644.62 USD/yr in Year-1 arbitrage savings—barely clearing the 350.00 USD/yr OpEx and turning cash-flow negative from Year 17 onward as capacity degrades by 2%/yr while OpEx inflates by 2%/yr. Three changes would flip this result:

1. **Direct daytime PV self-consumption & higher battery throughput (kWh/yr):** The base model credits only battery-cycled energy (2,534.40 kWh in Year 1) and ignores direct daytime PV-to-load kWh passed through the 12 kW Sunsynk inverter. If a 12 kWp workshop rooftop array supplies ~15,000 kWh/yr directly to daytime three-phase machinery (welding, compressors, saws) at an avoided tariff/diesel value of 0.25–0.45 USD/kWh, or if the LFP rack is scaled to 25–30 kWh usable capacity, annual gross benefit rises from ~645 USD/yr to **3,500–5,000+ USD/yr**, achieving simple payback in **3.0 to 4.5 years**.

2. **Charging source cost (0.18 USD/kWh grid top-up vs. 0.00 USD/kWh surplus rooftop PV):** Charging from the grid at 0.18 USD/kWh (0.1957 USD/kWh discharged after 92% RTE losses) consumes 43.5% of the 0.45 USD/kWh diesel displacement value. Charging exclusively from otherwise-curtailed rooftop solar (0.00 USD/kWh marginal charge cost) widens the net benefit per kWh discharged by **+77%** (from 0.2543 USD/kWh to 0.4500 USD/kWh), raising Year-1 gross benefit to 1,140.48 USD/yr; combined with a higher diesel genset offset (0.60–0.75 USD/kWh for small workshop gensets running at partial load), battery-only payback drops into a 9–12 year window.

3. **Workshop O&M structure and Mozambique AT import duty/IVA exemptions:** A fixed 350 USD/yr OpEx escalating at 2%/yr consumes **11,210.60 USD** undiscounted over 25 years (nearly matching the 12,000 USD Year-0 CapEx). Eliminating paid remote-monitoring subscriptions and handling routine inspection in-house cuts lifetime OpEx by >70%, while securing renewable-energy import duty relief under the Mozambique AT tariff schedule prevents a 20–25% landed-CapEx surcharge at Maputo or Beira.

## 6. Year-by-year cash flow (COMPUTED, computed)

Year-by-year cash flow | Year | Cost (USD) | Benefit (USD) | Net (USD) | Discount factor | Discounted net (USD) | Energy (kWh) |
| --- | --- | --- | --- | --- | --- | --- |
| 0 | 12,000.00 | 0.0000 | -12,000.00 | 1.00 | -12,000.00 | 0.0000 |
| 1 | 350.00 | 644.62 | 294.62 | 0.9259 | 272.80 | 2,534.40 |
| 2 | 357.00 | 631.73 | 274.73 | 0.8573 | 235.53 | 2,483.71 |
| 3 | 364.14 | 619.09 | 254.95 | 0.7938 | 202.39 | 2,434.04 |
| 4 | 371.42 | 606.71 | 235.29 | 0.7350 | 172.94 | 2,385.36 |
| 5 | 378.85 | 594.58 | 215.72 | 0.6806 | 146.82 | 2,337.65 |
| 6 | 386.43 | 582.68 | 196.26 | 0.6302 | 123.67 | 2,290.90 |
| 7 | 394.16 | 571.03 | 176.87 | 0.5835 | 103.20 | 2,245.08 |
| 8 | 402.04 | 559.61 | 157.57 | 0.5403 | 85.13 | 2,200.18 |
| 9 | 410.08 | 548.42 | 138.34 | 0.5002 | 69.20 | 2,156.17 |
| 10 | 418.28 | 537.45 | 119.17 | 0.4632 | 55.20 | 2,113.05 |
| 11 | 426.65 | 526.70 | 100.05 | 0.4289 | 42.91 | 2,070.79 |
| 12 | 435.18 | 516.17 | 80.99 | 0.3971 | 32.16 | 2,029.37 |
| 13 | 443.88 | 505.84 | 61.96 | 0.3677 | 22.78 | 1,988.79 |
| 14 | 452.76 | 495.73 | 42.96 | 0.3405 | 14.63 | 1,949.01 |
| 15 | 461.82 | 485.81 | 23.99 | 0.3152 | 7.56 | 1,910.03 |
| 16 | 471.05 | 476.10 | 5.04 | 0.2919 | 1.47 | 1,871.83 |
| 17 | 480.47 | 466.57 | -13.90 | 0.2703 | -3.76 | 1,834.39 |
| 18 | 490.08 | 457.24 | -32.84 | 0.2502 | -8.22 | 1,797.71 |
| 19 | 499.89 | 448.10 | -51.79 | 0.2317 | -12.00 | 1,761.75 |
| 20 | 509.88 | 439.14 | -70.75 | 0.2145 | -15.18 | 1,726.52 |
| 21 | 520.08 | 430.35 | -89.73 | 0.1987 | -17.83 | 1,691.99 |
| 22 | 530.48 | 421.75 | -108.74 | 0.1839 | -20.00 | 1,658.15 |
| 23 | 541.09 | 413.31 | -127.78 | 0.1703 | -21.76 | 1,624.98 |
| 24 | 551.91 | 405.04 | -146.87 | 0.1577 | -23.16 | 1,592.48 |
| 25 | 562.95 | 396.94 | -166.01 | 0.1460 | -24.24 | 1,560.63 |

## 7. Compliance & certifications

- Inverter safety: request CE marking and a test certificate against **IEC 62109-1:2010** (Safety of power converters for use in PV power systems — Part 1: General requirements, TC 82) and **IEC 62109-2:2011** (Part 2: Particular requirements for inverters, TC 82) issued by an accredited body, plus the OEM's Declaration of Conformity. [Claim | Src: IEC 62109-1:2010 (TC 82) | URL: https://webstore.iec.ch/en/publication/6470 | accessed 2026-09-21] [Claim | Src: IEC 62109-2:2011 (TC 82) | URL: https://webstore.iec.ch/en/publication/6471 | accessed 2026-09-21]

- Battery safety: request a test certificate against **IEC 62619:2022 ed2** (Secondary cells and batteries containing alkaline or other non-acid electrolytes — Safety requirements for secondary lithium cells and batteries for use in industrial applications, incl. stationary/ESS, TC 21/SC 21A) for the LFP cells/modules. [Claim | Src: IEC 62619:2022 ed2 (TC 21/SC 21A) | URL: https://webstore.iec.ch/en/publication/64073 | accessed 2026-09-21]

- Sea transport: UN 38.3 test summary for LFP cells/modules shipped by sea, per the UN Recommendations on the Transport of Dangerous Goods, Manual of Tests and Criteria, 7th revised edition (ST/SG/AC.10/11/Rev.7). [Claim | Src: UN Manual of Tests and Criteria (UN 38.3 lithium battery provisions; ST/SG/AC.10/11/Rev.7) | URL: https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria | accessed 2026-09-21]

- Country of origin: Certificate of Origin from China (China Council for the Promotion of International Trade, or authorised issuing body).

- South African / regional context (where freight consolidates at Durban): use the South African Revenue Service tariff search and the Mozambique AT tariff lookup for HS reference. [Claim | Src: South African Revenue Service | URL: https://www.sars.gov.za/ | accessed 2026-09-21] [Claim | Src: Mozambique Autoridade Tributária (AT) — official customs/tariff portal | URL: https://www.at.gov.mz/legislacao/aduanas/pautas-tarifarias/ | accessed 2026-09-21] [Claim | Src: WCO HS Nomenclature 2022 edition — heading 8504 (static converters / inverters) | URL: https://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools/hs-nomenclature-2022-edition | accessed 2026-09-21]

Certificate numbers and issuing bodies must be requested from the OEM and verified directly with the issuing body before shipment; this page does not display certificate numbers, logos or claims of ranking.

## 8. Duty & HS block

| HS national line | Program | As-of | SoT |
| --- | --- | --- | --- |
| PENDING — lookup (Mozambique AT national line for 8504.xx, static converters / inverters subheading; confirm exact 8–10 digit code on the AT portal) | Mozambique customs duty + VAT (IVA) | 2026-09-21 | PENDING |
| PENDING — lookup (LFP cells/modules under 8507.60 lithium-ion or 8504.40 static converters as applicable per AT national line) | Mozambique customs duty + VAT (IVA) | 2026-09-21 | PENDING |

All duty and VAT rates are **PENDING — lookup** on the official Mozambique *Autoridade Tributária (AT)* customs/tariff pages and the WCO HS Nomenclature 2022 edition before any quotation: [AT pauta tarifária](https://www.at.gov.mz/legislacao/aduanas/pautas-tarifarias/) · [WCO HS 2022](https://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools/hs-nomenclature-2022-edition). This page intentionally does not hardcode a rate; Mozambique AT is the single source of truth.

## 9. RFQ

## 10. FAQ

**What is the assumed HS code for a 12 kW hybrid inverter imported into Mozambique?**
The HS national line is PENDING — lookup on the Mozambique Autoridade Tributária (AT) customs/tariff pages and the WCO HS 2022 edition (heading 8504 static converters / inverters) before quoting; the exact 8–10 digit national line must be confirmed with AT. **Are the prices, duties and payback figures on this page a quote?**
No. All CapEx, OpEx, duty and TCO figures are ILLUSTRATIVE and NOT A QUOTE. Equipment pricing PENDING pending OEM datasheet; duty/VAT PENDING pending AT lookup. Submit the RFQ form for an indicative offer. **Which compliance marks should I request before shipment?**
Request CE marking and IEC 62109-1:2010 + IEC 62109-2:2011 (TC 82) on the inverter, and IEC 62619:2022 ed2 (TC 21/SC 21A) on the LFP battery from the OEM. Confirm certificate numbers and issuer directly with the manufacturer. **Can Tradvolt ship DDP Beira or Maputo?**
Yes — list the preferred Incoterm (e.g., FOB, CIF, DAP, DDP) and destination city in the RFQ; an indicative quotation is returned within 48 hours. **What warranty documentation should accompany a hybrid inverter and LFP rack?**
OEM warranty card listing inverter model + serial range + term; LFP battery warranty card; plus a Certificate of Origin from China. **What does the computed 25-year TCO show for the base scenario?**
NPV = −10,557.74 USD at 8.00% discount, LCOS = 0.7112 USD/kWh, and neither simple nor discounted payback is reached within 25 years at the bounded defaults. Pricing PENDING pending OEM datasheet; duty/VAT PENDING pending AT lookup.

---

1. [Claim | Src: Sunsynk SYNK-12K-SG04LP3 product page (12 kW three-phase LV hybrid, IP65, parallel up to 16 units) | URL: https://www.sunsynk.org/product/hybrid-inverter-12kw-3p | accessed 2026-09-21]

2. [Claim | Src: IEC 62109-1:2010 (TC 82) — Safety of power converters for use in PV power systems, Part 1: General requirements | URL: https://webstore.iec.ch/en/publication/6470 | accessed 2026-09-21]

3. [Claim | Src: IEC 62109-2:2011 (TC 82) — Safety of power converters for use in PV power systems, Part 2: Particular requirements for inverters | URL: https://webstore.iec.ch/en/publication/6471 | accessed 2026-09-21]

4. [Claim | Src: IEC 62619:2022 ed2 (TC 21/SC 21A) — Secondary cells and batteries containing alkaline or other non-acid electrolytes — Safety requirements for secondary lithium cells and batteries for use in industrial applications incl. stationary/ESS | URL: https://webstore.iec.ch/en/publication/64073 | accessed 2026-09-21]

5. [Claim | Src: UN Recommendations on the Transport of Dangerous Goods, Manual of Tests and Criteria, 7th revised edition (UN 38.3 lithium battery provisions; ST/SG/AC.10/11/Rev.7) | URL: https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria | accessed 2026-09-21]

6. [Claim | Src: Mozambique Autoridade Tributária (AT) — pauta tarifária (national customs/tariff publication) | URL: https://www.at.gov.mz/legislacao/aduanas/pautas-tarifarias/ | accessed 2026-09-21]

7. [Claim | Src: WCO Harmonized Commodity Description and Coding System, 2022 edition — heading 8504 (electrical static converters / inverters) | URL: https://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools/hs-nomenclature-2022-edition | accessed 2026-09-21]

8. [Claim | Src: South African Revenue Service — customs and excise tariff (regional mirror for HS reference) | URL: https://www.sars.gov.za/ | accessed 2026-09-21]

9. [Claim | Src: ICC Incoterms® 2020 (official rules) | URL: https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/ | accessed 2026-09-21]

10. [Bounded model assumption | Year-0 CapEx = 12,000.00 USD; Year-1 OpEx = 350.00 USD (escalates 2%/yr in cost column); residual_value.amount = 0.00 USD at residual_value.year = 25; asset.ess.usable_pct = 80 %; asset.ess.round_trip_eff = 92 %; asset.ess.cycles_per_year = 330; asset.ess.degradation_pct_per_year = 2 %; asset.ess.charge_cost_per_kwh = 0.1800 USD/kWh; asset.ess.value_per_kwh_discharged = 0.4500 USD/kWh. CapEx sub-line amounts for freight, marine insurance, PV/modules/mounting BoS, protection/switchgear, installation & commissioning, LFP rack line item and inverter line item are DROPPED-ITEM and recovered inside the scenario model. These are bounded model defaults, not sourced facts.]

© Tradvolt. This page is an export-channel information sheet, not an offer to sell. Prices, duties and specifications are illustrative pending OEM datasheet, AT lookup and an executed RFQ.