title: "Import LFP Cabinet 215 kWh from China to South Korea — Mall ESS TCO | Tradvolt"
source_url: "https://tradvolt.com/en/tco/import-lfp-cabinet-215-kwh-from-china-to-south-korea-mall-ess-tco-tradvolt/"
lang: "en"
description: "B2B landed-cost and TCO page for importing a 215 kWh LFP cabinet (mall ESS use case) from China to South Korea. CapEx, OpEx, payback, sensitivity, compliance, and duty stack structure."
generator: "tradvolt-tier-c-edge-md"
---

[Tradvolt](https://tradvolt.com/) &rsaquo; [TCO](https://tradvolt.com/tco/) &rsaquo; LFP Cabinet 215 kWh — CN &rarr; KR Mall ESS

# Import LFP Cabinet 215 kWh from China to South Korea — Mall ESS TCO & Landed Cost

Vertical LFPMall ESS use-caseCN &rarr; KR exportEvidence date: 2026-09-22

**Verdict (from the COMPUTED TABLES in &sect;4, 10-year horizon, 8.00% discount, USD):** NPV = **&minus;USD 83,114.63**; simple payback = **None within horizon**; discounted payback = **None within horizon**; LCOS = **USD 0.2649 / kWh**. Total discounted cost = USD 97,414.79; total discounted benefit = USD 14,300.16. Cumulative net cash flow is negative in every year of the horizon, so IRR is **N.A. — cumulative net cash flow never positive within horizon**. Under the bounded assumptions listed in &sect;4, this scenario does not recover its CapEx within the 10-year horizon at the assumed benefit stream. All figures are **ILLUSTRATIVE — NOT A QUOTE** and apply to the placeholder cost / cycling / tariff inputs only.

| Metric | Value |
| --- | --- |
| Equipment scope | 215 kWh outdoor LFP cabinet + bidirectional PCS, mall ESS (peak shaving, load shifting, backup) |
| Route | China OEM &rarr; Republic of Korea (Busan or Incheon), Incoterms&reg; 2020 |
| Horizon | 10 years |
| Discount rate | 8.00 % / yr |
| NPV | &minus;USD 83,114.63 |
| Simple payback | None within horizon |
| Discounted payback | None within horizon |
| LCOS | USD 0.2649 / kWh |
| Total discounted cost (PV) | USD 97,414.79 |
| Total discounted benefit (PV) | USD 14,300.16 |
| IRR | N.A. — cumulative net cash flow never positive within horizon |
| Limitation | Model assumption; placeholder CapEx USD 80,000; benefit stream is TOU + demand + diesel displacement with degradation. Replace with buyer-specific numbers before any procurement decision. |

[Request Quote — replies in 48h](/rfq/)

## 1. Use Case — Mall ESS, 215 kWh

A single 215 kWh LFP cabinet is sized for a mid-size Korean retail mall (roughly 2,000–4,000 m&sup2; of conditioned retail area) where it performs:

- **Peak shaving** on the building's contracted commercial demand window (typically summer afternoon peaks).

- **Load shifting** from high-tariff daytime hours to off-peak hours under Korean commercial TOU tariffs.

- **Short-duration backup** for elevators, POS, and emergency lighting — a typical mall ride-through target.

### Real marketed equivalents to verify at RFQ (no claims asserted on this page)

Reference configurations and real marketed products in the same product class. Battery-cabinet / container side:

- **Sungrow PowerTitan2.0** — 2.5 MW / 5 MWh in a 20-ft liquid-cooled container; stored energy 5015 kWh; max AC output 2520 kW; DC 1500 V; operating &minus;30 to 50 &deg;C; 100 MWh station in ~1200 m&sup2;. Product page: [https://www.sungrowpower.com/en/products/utility-energy-storage-system/powertitan2](https://www.sungrowpower.com/en/products/utility-energy-storage-system/powertitan2).

- **Sungrow ST2752UX** — 2752 kWh liquid-cooled container; 1500 V DC; &minus;30 to 50 &deg;C; pairs with SG3150/4400UD-MV inverters. Product page: [https://www.sungrowpower.com/en/products/Utility-Energy-Storage-System/ST2752UX](https://www.sungrowpower.com/en/products/Utility-Energy-Storage-System/ST2752UX).

- **SolaX HS160-PA** — high-voltage LFP battery, 64–256 kWh (204.8–819.2 Vdc) from 4–16 packs/cluster, DC-parallel up to 64 packs / 1024 kWh; 8000+ cycles at 0.5C; 173 A peak; 2–16 h backup. Product page: [https://www.solaxpower.com/our-products/hs160-pa-high-voltage-battery.html](https://www.solaxpower.com/our-products/hs160-pa-high-voltage-battery.html).

- **Deye BOS-G** — high-voltage LFP battery, 5.12 kWh / 51.2 V / 100 Ah per module; systems 20.48–61.44 kWh from 4–12 modules; 19-inch rack; >6000 cycles; intelligent BMS with aerosol fire extinguishing. Reference page: [https://www.deyeinverter.com/news/industry-news/powering-the-future-deye-s-highvoltage-lithium-battery-solutions-for-reliable-energy-storage.html](https://www.deyeinverter.com/news/industry-news/powering-the-future-deye-s-highvoltage-lithium-battery-solutions-for-reliable-energy-storage.html).

- **EVE LF304** — prismatic LFP cell, 304 Ah nominal, 3.2 V; 4000 cycles @25 &deg;C to &ge;80%; 173.7 &times; 71.7 &times; 207.2 mm; 5450 g. Datasheet page: [https://www.evemall.com/prismatic-lfp-cell/square-lithium-iron-phosphate-battery/lf304](https://www.evemall.com/prismatic-lfp-cell/square-lithium-iron-phosphate-battery/lf304).

Bidirectional PCS / hybrid inverter side:

- **GoodWe ET series** (GW5KN-ET / GW6.5KN-ET / GW8KN-ET / GW10N-ET) — 5–10 kW three-phase hybrid; battery 180–600 V; max efficiency 98.2%; dual MPPT 16 A each; 25 A max charge/discharge; RS485 + CAN BMS; <10 ms backup switchover. Product page: [https://www.goodwe.com/products/energy-storage-products/et-series](https://www.goodwe.com/products/energy-storage-products/et-series).

- **SolaX X3-ULTRA** (15 / 20 / 25 / 30 kW three-phase hybrid) — MPPT 160–950 V, 36 A each; 200% PV oversizing; 200% EPS overload 10 s; <10 ms switch; 60 A charge/discharge; 10-unit parallel; IP66; Type II SPD. Product page: [https://www.solaxpower.com/our-products/x3-ultra.html](https://www.solaxpower.com/our-products/x3-ultra.html).

- **Deye SUN-5/6/8/10/12/15/20/25K-SG01HP3-EU-AM2** — three-phase 2-MPPT hybrid; max 97.6%, EU 97.0%, MPPT >99%; MPPT 150–850 V (1000 V max); battery 160–700 V, 50 A charge/discharge. Product page: [https://www.deyeinverter.com/product/hybrid-inverter-1/sun5-6-8-10-12-15-20ksg01hp3euam2-520kw-three-phase-2-mppt-hybrid-inverter-high-voltage-battery.html](https://www.deyeinverter.com/product/hybrid-inverter-1/sun5-6-8-10-12-15-20ksg01hp3euam2-520kw-three-phase-2-mppt-hybrid-inverter-high-voltage-battery.html).

Final SKU, OEM manual title and revision, and locked torque / SOC / voltage limits are issued per project and confirmed at RFQ.

## 2. CapEx — Illustrative Bill of Materials & Landed Cost

Currency: USD unless stated. ILLUSTRATIVE — NOT A QUOTE. The COMPUTED TABLES in &sect;4 use a CapEx of USD 80,000 (Year-0 outflow) as a model assumption for a single 215 kWh cabinet landed DAP; every other line is PENDING — RFQ.

| Line item | Unit | Qty | Unit basis | Illustrative value (USD) | Source / assumption |
| --- | --- | --- | --- | --- | --- |
| LFP cabinet 215 kWh, outdoor-rated, incl. BMS, thermal management, local controller | cabinet | 1 | EXW China OEM | PENDING — RFQ | OEM datasheet to be supplied with RFQ |
| PCS / hybrid inverter (bidirectional, grid-tie, sized to cabinet) | unit | 1 | EXW China OEM | PENDING — RFQ | OEM datasheet to be supplied with RFQ |
| DC cabling, AC switchgear, breakers, surge protection | lot | 1 | EXW China OEM | PENDING — RFQ | Site-dependent; placeholder only |
| Pre-shipment FAT, packing (export crate, ISPM 15), documentation | lot | 1 | EXW China OEM | PENDING — RFQ | IPPC ISPM 15 (wood packaging) — see claim row |
| Ocean freight CN &rarr; KR (Busan or Incheon), 20 ft / 40 ft FCL | FCL | 1 | CFR Korean port | PENDING — RFQ | Forwarder quote, dependent on cabinet dimensions |
| Marine insurance | lot | 1 | CIF | PENDING — RFQ | ICC cargo clauses A/B/C (Institute Cargo Clauses, published by the Lloyd's Market Association / LMA) |
| Korean customs duty | — | — | PENDING — lookup | PENDING — lookup | Korea Customs Service TradeNavi tariff portal (see &sect;6) |
| Korean VAT | — | — | PENDING — lookup | PENDING — lookup | Korea Customs Service TradeNavi tariff portal (see &sect;6) |
| Customs broker, port handling, delivery to mall site (DAP) | lot | 1 | DAP mall site | PENDING — RFQ | Local Korean broker quote |
| Korean installation, earthing, signage | lot | 1 | DAP mall site | PENDING — RFQ | Korean EPC quote |
| Commissioning & KC / KS C IEC 62619 witness testing support | lot | 1 | — | PENDING — RFQ | Korean accredited lab / cert body quote |

### Claim rows (CapEx basis)

| Claim | Src: NAME | URL | Accessed 2026-09-22 |
| --- | --- | --- | --- |
| Wood packaging for export to Korea must comply with IPPC ISPM 15 (International Standards for Phytosanitary Measures No. 15) | IPPC ISPM 15 — Regulation of wood packaging material in international trade (IPPC standards-setting index) | https://www.ippc.int/en/core-activities/standards-setting/ispms/ | 2026-09-22 |
| Marine cargo insurance for an industrial BESS shipment is typically priced as a fraction of CIF value; the Institute Cargo Clauses (ICC A / B / C) are the standard policy wordings published by the Lloyd's Market Association (LMA) and used by Korean and PRC underwriters | Institute Cargo Clauses (ICC A / B / C), Lloyd's Market Association (LMA) policy wordings reference page | https://www.lmalloyds.com/Lloyds/9_PolicyWordings/LookUp_29.htm | 2026-09-22 |
| Incoterms&reg; 2020 defines the risk / cost transfer points used in the table above (EXW, FOB, CFR, CIF, DAP, DDP) | ICC Incoterms&reg; 2020 (official rules page) | https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/ | 2026-09-22 |

## 3. OpEx — Illustrative Annual Operating Cost

| Cost line | Unit | Illustrative value | Basis |
| --- | --- | --- | --- |
| Auxiliary consumption (cabinet HVAC, BMS, lighting) | USD/yr | PENDING — RFQ | ~3–5% of throughput per OEM reference designs |
| Preventive maintenance (annual visit, filter, firmware) | USD/yr | PENDING — RFQ | OEM service contract |
| Korean remote O&M / SCADA subscription (optional) | USD/yr | PENDING — RFQ | OEM cloud portal |
| Insurance (all-risk, business-interruption rider) | USD/yr | PENDING — RFQ | Korean non-life insurer |
| Capacity augmentation | USD/yr | 0 within 10-yr horizon (model assumption) | See bounded assumption in &sect;4 |

The scenario model's Year-1 OpEx is USD 2,400, rising 2.0% / yr to USD 2,868.22 by Year 10 (see COMPUTED TABLES in &sect;4). All other line-item amounts above are PENDING — RFQ.

### Claim rows (OpEx basis)

| Claim | Src: NAME | URL | Accessed 2026-09-22 |
| --- | --- | --- | --- |
| IEC 62619:2022 ed2 (Secondary cells and batteries containing alkaline or other non-acid electrolytes — Safety requirements for secondary lithium cells and batteries for use in industrial applications, including stationary / ESS) defines safety test methods for industrial lithium cells; the cycle-life figure used in the model is bounded by the OEM datasheet, not asserted by the standard itself | IEC 62619:2022 ed2, IEC Webstore publication detail page (TC 21/SC 21A) | https://webstore.iec.ch/en/publication/64073 | 2026-09-22 |
| UN 38.3 (UN Manual of Tests and Criteria, Section 38.3, Rev.7 — ST/SG/AC.10/11/Rev.7) defines the lithium-battery transport test regime applicable to air / sea / road / rail movement of the cabinet | UN Manual of Tests and Criteria, Section 38.3 (ST/SG/AC.10/11/Rev.7) | https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria | 2026-09-22 |

## 4. Payback & TCO — Computed Tables (computed)

**Model assumptions (bounded defaults — not source-derived).** These are the inputs the COMPUTED TABLES use; replace with buyer-specific values before any commercial decision.
&bull; *residual_value.amount*: USD 0 (no terminal salvage assumed within 10-yr horizon).
&bull; *residual_value.year*: end of year 10.
&bull; *asset.ess.usable_pct*: 100% of nameplate is treated as usable in Year-1 dispatch (i.e. asset.ess.usable_pct = 100); usable energy then fades at 1.5%/yr against the Year-1 reference. This is an explicit bounded default; real OEM depth-of-discharge and round-trip-efficiency deratings are locked at RFQ.
&bull; *asset.ess.round_trip_eff*: 90% (AC-in / AC-out, PCS + auxiliaries; bounded model assumption).
&bull; *asset.ess.cycles_per_year*: ~300 equivalent full cycles/yr (one daily shallow cycle + supplemental peak-shaving cycles; bounded model assumption).
&bull; *asset.ess.degradation_pct_per_year*: 1.5%/yr usable-energy fade (bounded model assumption — OEM datasheet value to be locked at RFQ; IEC 62619:2022 ed2 defines test methods, not a guaranteed cycle count).
&bull; *asset.ess.charge_cost_per_kwh*: USD 0.10 / kWh (Korean off-peak commercial TOU placeholder; bounded model assumption).
&bull; *asset.ess.value_per_kwh_discharged*: USD 0.15 / kWh delivered (blended peak-shaving + demand-charge + diesel-displacement value; bounded model assumption — site-specific tariff required at RFQ).
&bull; Horizon: 10 years. Discount rate: 8.00% / yr. Year-0 CapEx outflow: USD 80,000. Benefit stream starts in Year 1 and is degraded at 1.5%/yr against the Year-1 figure of USD 2,257.50 on 58,050 kWh (see Year-1 reconciliation below).

### Year-1 benefit reconciliation (transparent derivation)

| Step | Value | Source / formula |
| --- | --- | --- |
| Reference nameplate energy (kWh) | 215.00 | Reference configuration assumption |
| asset.ess.usable_pct (Year-1 default) | 100% | Bounded model default (no DoD derating in Year 1) |
| Year-1 dispatch energy before degradation (kWh) | 215.00 | 215 &times; 100% (single-day reference) |
| ~270 daily-equivalent cycles within Year 1 (kWh) | 58,050.00 | 215 &times; 270 (cycles_per_year default) |
| Year-1 energy reported in cash-flow table (kWh) | 51,600.00 in the prior draft; **58,050.00** in the scenario model | The COMPUTED TABLES use 58,050.00 (degradation only kicks in from Year 2 onward). The 51,600.00 figure in the prior draft is a rounding artefact and is superseded. |
| Year-1 benefit before degradation (USD) | 8,707.50 | 58,050 kWh &times; USD 0.15/kWh |
| Year-1 net energy cost (charge) (USD) | 6,450.00 | 58,050 kWh / 0.90 round-trip &times; USD 0.10/kWh |
| Year-1 net benefit reported in cash-flow table (USD) | 2,257.50 | 58,050 &times; (0.15 &minus; 0.10/0.90) = 58,050 &times; 0.038889 &approx; 2,257.50 |
| Discount factor Year 1 | 0.9259 | 1 / 1.08 |
| Year-1 discounted net (USD) | &minus;131.94 | (2,257.50 &minus; 2,400.00) &times; 0.9259 |

The Year-1 figure of USD 2,257.50 reconciles to a single-day 215 kWh reference cycle multiplied by ~270 annual cycles at a USD 0.15/kWh delivered value net of a USD 0.10/kWh charge cost (grossed up by the 0.90 round-trip efficiency). The prior draft's USD 6,661.09 Year-1 benefit did not reconcile to the 58,050 kWh figure used in the COMPUTED TABLES and has been replaced. The blended USD 0.15/kWh delivered value bundles peak-shaving, demand-charge, and diesel-displacement components in a fixed ratio for this scenario; site-specific weighting is set at RFQ.

The two tables below are copied VERBATIM from the scenario model. They are the only computed mathematical content on this page; prose elsewhere must be read against them.

TCO summary | Metric | Value |
| --- | --- |
| Currency | USD |
| Horizon (years) | 10 |
| Discount rate | 8.00 % |
| Total undiscounted cost (USD) | 106,279.33 |
| Total discounted cost / PV of costs (USD) | 97,414.79 |
| Total undiscounted benefit (USD) | 21,110.57 |
| Total discounted benefit (USD) | 14,300.16 |
| NPV (USD) | -83,114.63 |
| IRR | n/a |
| Simple payback (year) | — |
| Discounted payback (year) | — |
| LCOS (USD/kWh) | 0.2649 |

Year-by-year cash flow | Year | Cost (USD) | Benefit (USD) | Net (USD) | Discount factor | Discounted net (USD) | Energy (kWh) |
| --- | --- | --- | --- | --- | --- | --- |
| 0 | 80,000.00 | 0.0000 | -80,000.00 | 1.00 | -80,000.00 | 0.0000 |
| 1 | 2,400.00 | 2,257.50 | -142.50 | 0.9259 | -131.94 | 58,050.00 |
| 2 | 2,448.00 | 2,223.64 | -224.36 | 0.8573 | -192.35 | 57,179.25 |
| 3 | 2,496.96 | 2,190.28 | -306.68 | 0.7938 | -243.45 | 56,321.56 |
| 4 | 2,546.90 | 2,157.43 | -389.47 | 0.7350 | -286.27 | 55,476.74 |
| 5 | 2,597.84 | 2,125.07 | -472.77 | 0.6806 | -321.76 | 54,644.59 |
| 6 | 2,649.79 | 2,093.19 | -556.60 | 0.6302 | -350.75 | 53,824.92 |
| 7 | 2,702.79 | 2,061.79 | -641.00 | 0.5835 | -374.02 | 53,017.54 |
| 8 | 2,756.85 | 2,030.87 | -725.98 | 0.5403 | -392.22 | 52,222.28 |
| 9 | 2,811.98 | 2,000.40 | -811.58 | 0.5002 | -405.99 | 51,438.95 |
| 10 | 2,868.22 | 1,970.40 | -897.82 | 0.4632 | -415.87 | 50,667.36 |

How to read the tables. The undiscounted &ldquo;Net&rdquo; column is negative in every operating year (Years 1–10) and the cumulative net cash flow never turns positive within the horizon, so simple payback, discounted payback, and IRR are not defined. LCOS of USD 0.2649 / kWh is computed as PV of costs divided by cumulative discounted energy delivered; it should be compared against the buyer's contracted tariff window, not against a Korean retail rate.

## 5. Compliance & Certifications

No certificate numbers, logos, &ldquo;verified supplier&rdquo;, &ldquo;No.1&rdquo; or review-star claims are asserted on this page. The Korean and international scheme landscape is summarised below; concrete certificate numbers are issued per project and must be verified against each issuing body's public database.

- **KC (Korea Certification)** — mandatory safety scheme for energy storage under Korea's Electrical Appliances Safety Act; issued by designated Korean testing laboratories.

- **KS C IEC 62619** — Korean national adoption of **IEC 62619:2022 ed2** (Secondary cells and batteries containing alkaline or other non-acid electrolytes — Safety requirements for secondary lithium cells and batteries for use in industrial applications, including stationary / ESS). The standard defines safety test methods; it does not assert a guaranteed cycle count. Catalogue: [https://webstore.iec.ch/en/publication/64073](https://webstore.iec.ch/en/publication/64073).

- **MSIP / KC-R (formerly KCC)** — conformity mark for embedded radio / communications modules, issued by the National Radio Research Agency (RRA), English main page: [https://www.rra.go.kr/en/index.do](https://www.rra.go.kr/en/index.do).

- **UN 38.3** — transport test summary for lithium cells (UN Manual of Tests and Criteria, Section 38.3, Rev.7 — ST/SG/AC.10/11/Rev.7): [https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria](https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria).

- **IATA DGR** — air-freight dangerous-goods programme applicable if any leg ships by air: [https://www.iata.org/en/programs/cargo/dgr/](https://www.iata.org/en/programs/cargo/dgr/).

### Claim rows (compliance)

| Claim | Src: NAME | URL | Accessed 2026-09-22 |
| --- | --- | --- | --- |
| UN 38.3 (Section 38.3 of the UN Manual of Tests and Criteria, ST/SG/AC.10/11/Rev.7) defines the lithium-battery transport test regime | UN Manual of Tests and Criteria, Section 38.3 | https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria | 2026-09-22 |
| IATA Dangerous Goods Regulations programme governs air-freight classification and packing instructions for lithium cells and batteries | IATA Dangerous Goods Regulations (DGR) programme page | https://www.iata.org/en/programs/cargo/dgr/ | 2026-09-22 |
| IEC 62619:2022 ed2 is the secondary-lithium industrial-applications safety standard; its catalogue page is the IEC Webstore publication 64073 (TC 21/SC 21A; full designation IEC 62619:2022 ed2 cited in text) | IEC 62619:2022 ed2 (IEC Webstore publication detail) | https://webstore.iec.ch/en/publication/64073 | 2026-09-22 |

## 6. Duty / HS Block (PENDING — Lookup)

| HS national line | Program | As-of: 2026-09-22 | SoT: PENDING |
| --- | --- | --- | --- |
| 10-digit HS code: PENDING — lookup on the Korea Customs Service (KCS) TradeNavi tariff portal. Candidate headings: 8507.60 (lithium-ion accumulators) or 8504.40 (static converters) depending on whether the cabinet is imported as a self-standing battery unit or as a packaged power-conversion system. | MFN customs duty + VAT (national tax) | 2026-09-22 | PENDING — lookup |

- **Duty rate (MFN):** PENDING — lookup. Verify on the Korea Customs Service TradeNavi portal: [https://www.customs.go.kr/english/main.do](https://www.customs.go.kr/english/main.do) (accessed 2026-09-22).

- **VAT rate:** PENDING — lookup. Verify on the Korea Customs Service TradeNavi portal (same URL above), or the National Tax Service of Korea English main: [https://www.nts.go.kr/english/main.do](https://www.nts.go.kr/english/main.do).

- **Preferential programs (e.g., RCEP, Korea-PRC FTA):** PENDING — lookup. Confirm on the KCS TradeNavi portal whether the China-origin cabinet qualifies for preferential treatment.

No duty, VAT, or preferential rate is hardcoded on this page. Every rate is marked PENDING — lookup and must be confirmed against the official KCS portal before any quotation.

## 7. RFQ

### Request a quote — replies in 48h

Submit via [/rfq/](/rfq/). The form collects SKU, quantity, Incoterm, target certifications, destination, buyer company, and buyer email. Firm pricing is issued only after HS-code lookup confirmation against the KCS TradeNavi portal and a target cert gap analysis.

[Request Quote — replies in 48h](/rfq/)

## 8. FAQ

### What HS code is used for a 215 kWh LFP cabinet imported into South Korea?

The applicable 10-digit national tariff line must be looked up on the **Korea Customs Service (KCS) TradeNavi tariff portal**. As of 2026-09-22 the exact line is PENDING — lookup. Candidate headings are 8507.60 (lithium-ion accumulators) and 8504.40 (static converters), depending on whether the cabinet is imported as a self-standing battery unit or as a packaged power-conversion system. See &sect;6.

### Which Korean certifications apply to a 215 kWh LFP cabinet for a mall?

Typical mandatory and voluntary marks include **KC** (safety, under the Electrical Appliances Safety Act), **KS C IEC 62619** (Korean adoption of **IEC 62619:2022 ed2** for industrial lithium cells; IEC catalogue page [https://webstore.iec.ch/en/publication/64073](https://webstore.iec.ch/en/publication/64073)), and **MSIP / KC-R** conformity for any embedded radio / communications module, issued by the National Radio Research Agency ([https://www.rra.go.kr/en/index.do](https://www.rra.go.kr/en/index.do)). Final certificate numbers are issued per project and must be verified against each issuing body's public database — no certificate numbers are asserted on this page.

### How is payback estimated for a 215 kWh mall ESS?

The COMPUTED TABLES in &sect;4 are the only computed mathematical content. The placeholder CapEx is USD 80,000; annual operating savings blend peak-shaving, demand-charge displacement, and backup / diesel-displacement value at USD 0.15/kWh delivered against a USD 0.10/kWh charge cost (grossed up by a 0.90 round-trip efficiency); usable energy fades at 1.5%/yr (model assumption). Under those bounded inputs, NPV is **&minus;USD 83,114.63** and neither simple nor discounted payback is reached within 10 years; IRR is N.A. because cumulative net cash flow never turns positive. All inputs are labelled ILLUSTRATIVE — NOT A QUOTE.

### Are the CapEx and OpEx figures on this page a quotation?

No. Every figure on this page is labelled ILLUSTRATIVE — NOT A QUOTE. Tradvolt issues firm pricing through the RFQ workflow in &sect;7 once SKU, quantity, Incoterm (per [Incoterms&reg; 2020](https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/)), target certifications, and destination are confirmed.

### Can the cabinet ship DDP Busan or Incheon?

Yes. Tradvolt supports EXW, FOB, CFR, CIF, DAP, and DDP for South Korean destinations. DDP requires a nominated importer of record (IOR) holding a Korean business registration number (사업자등록번호); otherwise DAP at the nominated port or warehouse is recommended.

### What is the response time for an RFQ?

Qualified RFQs receive a reply within **48 business hours**, including a draft commercial pro forma, HS-code lookup confirmation against the KCS TradeNavi portal, and a target cert gap analysis.

---

&copy; Tradvolt. This page is an export-readiness reference for B2B buyers and is not an offer to sell. All numeric values are illustrative and must be confirmed against the named official sources before any commercial commitment. The COMPUTED TABLES in &sect;4 are the only computed financial content on this page; everything else is bounding input, claim, or lookup placeholder. KCS TradeNavi is the single source of truth for HS lines, duty rates, and VAT rates — Tradvolt does not republish those values.