title: "Import LFP Container 2 MWh from China to Ghana — TCO & Landed Cost | Tradvolt"
source_url: "https://tradvolt.com/en/tco/import-lfp-container-2-mwh-from-china-to-ghana-tco-landed-cost-tradvolt/"
lang: "en"
description: "Computed TCO / landed-cost for a 2 MWh LFP container BESS imported from China to Ghana. NPV, simple and discounted payback, LCOS, HS 8507 customs stack and compliance checklist."
generator: "tradvolt-tier-c-edge-md"
---

[Tradvolt](https://tradvolt.com/)      Computed TCO · Port ESS 2 MWh · China → Ghana

# Import a 2 MWh LFP Container BESS from China to Ghana — TCO & Landed Cost

**Illustrative landed-cost range USD 1.26 M all-in CapEx at year 0 over a 25-year horizon; binding quote requires an RFQ; computed simple payback ≈ 9.31 years and discounted payback ≈ 20.91 years under the stated assumptions (8 % discount rate, USD 13,000/yr Year-1 OpEs escalating 2 %/yr, energy benefits starting at USD 162,408/yr and degrading with ESS capacity).** Equipment reference: CATL LFP 280 Ah cells in a CATL EnerC containerised cabinet driven by a Sungrow ST500CP-250HV PCS, origin Shanghai/Ningbo, destination Tema port under ICC Incoterms® 2020 CIF Tema. NPV at the stated discount rate is USD 56,214; LCOS is USD 0.1306/kWh delivered. All customs rates are **PENDING — lookup** on the GRA ICUMS portal.

Evidence date: 2026-09-21. Limitation: figures are illustrative model outputs — no certificate, no Notified Body ID and no Ghana permit number is asserted on this page.

### Get a binding landed-cost quotation

Submit an RFQ — Tradvolt replies within 48 hours with an itemised CIF Tema / DAP site price, valid HS code check and a filled compliance matrix.

[Request Quote — replies in 48h](#rfq) [View Reference Datasheet List](#datasheet)      **On this page**

1. [1. Decision table & verdict](#decision)

2. [2. Use-case definition & reference product](#use-case)

3. [3. CapEx breakdown](#capex)

4. [4. OpEx breakdown](#opex)

5. [5. Computed payback, NPV & cash flow](#payback)

6. [6. Compliance checklist (no certificate asserted)](#compliance)

7. [7. Duty stack & HS code (Ghana)](#duty)

8. [8. Model assumptions & sources](#assumptions)

9. [9. RFQ form](#rfq)

10. [10. FAQ](#faq)

## 1. Decision table & verdict

| Question | Computed answer | Basis |
| --- | --- | --- |
| Is the project NPV-positive at 8 % over 25 years? | Yes — NPV = USD 56,214 | Computed from stated inputs (table §5) |
| Simple payback | 9.31 years | Computed, undiscounted cumulative cash flow crossing zero |
| Discounted payback | 20.91 years | Computed, discounted at 8 % |
| Levelised cost of storage (LCOS) | USD 0.1306 / kWh delivered | PV of costs ÷ cumulative energy delivered |
| Internal rate of return (IRR) | 8.59 % | Computed from net cash-flow series |
| Year-0 CapEx assumed (all-in) | USD 1,260,000 | Model input (battery + PCS + MV skid + BoP + freight + duties) |
| What does a binding number require? | An executed RFQ with confirmed HS national line, duty stack and freight quote | GRA ICUMS lookup + freight forwarder quote |

Reading note: simple payback answers "when do undiscounted cash flows cover the cheque"; discounted payback answers "when do present-value cash flows cover the cheque at 8 %". They are not interchangeable; both are reported above on a consistent basis from the same input set.

## 2. Use-case definition & reference product

This page models a **port energy storage system (port-ess-2mwh)** for a Ghanaian port terminal: peak-shaving of diesel-generated port power, shore-power for berthed vessels and backup for refrigerated container (reefer) plugs.

### Reference configuration (named public products)

| Component | Reference model | OEM | Public evidence |
| --- | --- | --- | --- |
| Battery cells | CATL LFP 280 Ah prismatic cell | Contemporary Amperex Technology Co., Ltd. (CATL) | CATL product page (LFP 280 Ah) |
| Battery enclosure | CATL EnerC containerised cabinet (20 ft ISO, ~2 MWh class) | CATL | CATL EnerC product page |
| Power conversion system (PCS) | Sungrow ST500CP-250HV (500 kW bidirectional, MV-ready) | Sungrow Power Supply Co., Ltd. | Sungrow ST500CP-250HV product page |
| EMS / SCADA gateway | Sungrow iSolarCloud / CommBox integration kit (vendor-neutral Modbus TCP) | Sungrow | Sungrow iSolarCloud documentation |
| MV transformer & switchgear skid | Configured to local grid (MV level TBD) | Buyer / EPC | Buyer to confirm with ECG / GridCo |

### Operating envelope (OEM-stated limits; revision cited)

| Parameter | OEM-stated value | Document / revision |
| --- | --- | --- |
| Cell nominal capacity | 280 Ah @ 1/3 C, 3.2 V nominal | CATL LFP 280 Ah product page (rev. 2024) |
| Cycle life reference | ≥ 6,000 cycles @ 80 % DoD, 25 °C, 1 C/1 C | CATL LFP 280 Ah product page (rev. 2024) |
| Round-trip efficiency (DC-side, at BoL) | ≥ 95 % | CATL EnerC datasheet (rev. 2024) |
| PCS rated AC power | 500 kW @ 50 °C, PF 0.8 lead/lag | Sungrow ST500CP-250HV datasheet |
| DC voltage window | 600–1,000 V DC (battery interface) | Sungrow ST500CP-250HV datasheet |
| Ambient operating temperature | −30 °C to +50 °C (with derating above 45 °C) | Sungrow ST500CP-250HV datasheet |
| Container form factor | 20 ft ISO, IP54, outdoor-rated | CATL EnerC datasheet (rev. 2024) |

**Why CATL + Sungrow?** They are real, publicly marketed LFP cell / container and bidirectional PCS families with publicly available datasheets, and they pair at the 1 C/1 C voltage window stated above. Substitutions to other LFP suppliers (EVE Energy, BYD, REPT) or other PCSs (Huawei SmartLogger / SUN2000, Growatt, KACO) are possible; the model assumes one representative pairing.   **Model assumptions (bounded defaults)**

- `residual_value.amount` = USD 0; `residual_value.year` = end of horizon (25) — model assumption, not sourced.

- `capex[0].amount` = USD 1,260,000 (year-0 all-in) — model assumption.

- `capex[1..10].amount` = DROPPED-ITEM (no further discrete CapEx tranches; mid-life module augmentation is treated inside the OpEx/cash-flow stream rather than as a discrete tranche).

- `replacements[0].amount` = DROPPED-ITEM (no replacement tranche scheduled within the 25-year horizon).

- `asset.ess.degradation_pct_per_year` = 2.0 %/yr energy-throughput derate — model assumption (consistent with the implied energy series 1,196,032 → 736,493 kWh/yr, i.e. ≈ 2.0 %/yr compound).

- `asset.ess.charge_cost_per_kwh` = USD 0.12/kWh (charge energy cost) — model assumption, indicative Tema industrial tariff.

- `asset.ess.value_per_kwh_discharged` = USD 0.1358/kWh (effective Year-1 benefit per kWh) — model assumption, derived so Year-1 benefit = USD 162,408.56.

- Discount rate = 8.00 % (model assumption, not a market quote).

- OpEx escalation = 2.00 %/yr (model assumption).

- Annual revenue series assumes ESS throughput degrades at the energy-derate rate above.

## 3. CapEx breakdown

CapEx covers the equipment ex-works China, ocean freight, marine insurance, Ghana-side customs duties and VAT, last-mile delivery and installation. The year-0 all-in figure of **USD 1,260,000** is the single input that drives the §5 computed tables; line items below are bounded illustrations only.

| Line item | Unit | Qty | Unit price (USD) | Subtotal (USD) | Source / status |
| --- | --- | --- | --- | --- | --- |
| CATL EnerC 20 ft container, ~2 MWh DC, ex-works | unit | 1 | PENDING — RFQ | PENDING — RFQ | CATL RFQ (see product page) |
| Sungrow ST500CP-250HV PCS, ex-works | unit | 1 | PENDING — RFQ | PENDING — RFQ | Sungrow RFQ (see product page) |
| MV transformer & switchgear skid | lot | 1 | PENDING — RFQ | PENDING — RFQ | EPC scope |
| EMS / SCADA integration (Sungrow iSolarCloud + Modbus TCP) | lot | 1 | PENDING — RFQ | PENDING — RFQ | Sungrow scope |
| Spare module set (≈ 5 % of modules) | lot | 1 | ~5 % of battery line | PENDING — RFQ | OEM option |
| Ocean freight Shanghai/Ningbo → Tema (40 ft HC) | shipment | 1 | PENDING — quote | PENDING — quote | Freight forwarder (Incoterms® 2020 CIF Tema) |
| Marine insurance (≈ 0.3 % of CIF) | policy | 1 | 0.30 % × CIF | PENDING — quote | ICC cargo clause A (Lloyd's market) |
| Ghana import duty (HS 8507) | PENDING — lookup (GRA ICUMS) | PENDING — lookup | Ghana Revenue Authority — ICUMS |
| Ghana import VAT, NHIL, GETFund, COVID, ECOWAS, AU, EXIM, SIL levies | PENDING — lookup (GRA ICUMS) | PENDING — lookup | Ghana Revenue Authority — ICUMS |
| Customs brokerage & destination charges (Tema) | lot | 1 | PENDING — quote | PENDING — quote | Licensed broker, Tema |
| Last-mile transport Tema → port site | lot | 1 | PENDING — quote | PENDING — quote | Local haulier |
| Erection, commissioning, training | lot | 1 | PENDING — quote | PENDING — quote | OEM site services |
| **Year-0 all-in CapEx (model input)** |  | **1,260,000.00** | Model input |

Note on the "CapEx uplift" term used in market decks: the model does not apply a separate uplift multiplier. USD 1,260,000 is the single all-in year-0 figure; sensitivity to duty/VAT is handled by re-running the model after ICUMS lookup, not by an uplift.

## 4. OpEx breakdown

The §5 cash flow uses a Year-1 OpEx of **USD 13,000** escalating at **2.00 %/yr** through Year 25 (USD 13,260 in Year 2, USD 13,525.20 in Year 3, …, USD 20,909.68 in Year 25). The line items below are bounded illustrations consistent with that envelope.

| OpEx line | Year 1 (USD) | Years 2–10 avg (USD/yr) | Source / status |
| --- | --- | --- | --- |
| Preventive maintenance & Sungrow/CATL service contract | ~7,000 | ~7,500 | Sungrow/CATL service scope (RFQ) |
| Spares consumption (annual) | ~2,000 | ~2,200 | OEM spares list (RFQ) |
| Site security, insurance, telemetry (cellular/sat) | ~2,500 | ~2,700 | Local quote — Tema security vendor |
| Energy throughput degradation reserve (DoD / cycle) | — | embedded in revenue derate | CATL degradation curve |
| Mid-life augmentation / module top-up (year 8 onward) | — | DROPPED-ITEM | Treated inside the OpEx/cash-flow stream, not as a discrete tranche |
| **Total Year-1 OpEx (model input)** | **13,000.00** | — | Model input (2 %/yr escalation) |

## 5. Computed payback, NPV & cash flow

All figures below are **ILLUSTRATIVE — NOT A QUOTE**. They are produced by the scenario model from the §8 input set on a consistent basis (both discounted and undiscounted series from the same Year-0 CapEx, OpEx and benefit inputs). A binding calculation requires an RFQ.

### Headline metrics

TCO summary | Metric | Value |
| --- | --- |
| Currency | USD |
| Horizon (years) | 25 |
| Discount rate | 8.00 % |
| Total undiscounted cost (USD) | 1,676,393.90 |
| Total discounted cost / PV of costs (USD) | 1,424,762.47 |
| Total undiscounted benefit (USD) | 3,220,036.03 |
| Total discounted benefit (USD) | 1,480,976.57 |
| NPV (USD) | 56,214.10 |
| IRR | 0.0859 |
| Simple payback (year) | 9.31 |
| Discounted payback (year) | 20.91 |
| LCOS (USD/kWh) | 0.1306 |

### Year-by-year cash flow

Year-by-year cash flow | Year | Cost (USD) | Benefit (USD) | Net (USD) | Discount factor | Discounted net (USD) | Energy (kWh) |
| --- | --- | --- | --- | --- | --- | --- |
| 0 | 1,260,000.00 | 0.0000 | -1,260,000.00 | 1.00 | -1,260,000.00 | 0.0000 |
| 1 | 13,000.00 | 162,408.56 | 149,408.56 | 0.9259 | 138,341.26 | 1,196,032.00 |
| 2 | 13,260.00 | 159,160.38 | 145,900.38 | 0.8573 | 125,086.06 | 1,172,111.36 |
| 3 | 13,525.20 | 155,977.18 | 142,451.98 | 0.7938 | 113,082.97 | 1,148,669.13 |
| 4 | 13,795.70 | 152,857.63 | 139,061.93 | 0.7350 | 102,214.67 | 1,125,695.75 |
| 5 | 14,071.62 | 149,800.48 | 135,728.86 | 0.6806 | 92,374.78 | 1,103,181.84 |
| 6 | 14,353.05 | 146,804.47 | 132,451.42 | 0.6302 | 83,466.86 | 1,081,118.20 |
| 7 | 14,640.11 | 143,868.38 | 129,228.27 | 0.5835 | 75,403.45 | 1,059,495.83 |
| 8 | 14,932.91 | 140,991.01 | 126,058.10 | 0.5403 | 68,105.27 | 1,038,305.92 |
| 9 | 15,231.57 | 138,171.19 | 122,939.62 | 0.5002 | 61,500.42 | 1,017,539.80 |
| 10 | 15,536.20 | 135,407.77 | 119,871.57 | 0.4632 | 55,523.73 | 997,189.00 |
| 11 | 15,846.93 | 132,699.61 | 116,852.69 | 0.4289 | 50,116.11 | 977,245.22 |
| 12 | 16,163.87 | 130,045.62 | 113,881.76 | 0.3971 | 45,224.01 | 957,700.32 |
| 13 | 16,487.14 | 127,444.71 | 110,957.57 | 0.3677 | 40,798.87 | 938,546.31 |
| 14 | 16,816.89 | 124,895.82 | 108,078.93 | 0.3405 | 36,796.66 | 919,775.39 |
| 15 | 17,153.22 | 122,397.90 | 105,244.68 | 0.3152 | 33,177.51 | 901,379.88 |
| 16 | 17,496.29 | 119,949.94 | 102,453.65 | 0.2919 | 29,905.24 | 883,352.28 |
| 17 | 17,846.21 | 117,550.94 | 99,704.73 | 0.2703 | 26,947.09 | 865,685.24 |
| 18 | 18,203.14 | 115,199.92 | 96,996.79 | 0.2502 | 24,273.35 | 848,371.53 |
| 19 | 18,567.20 | 112,895.93 | 94,328.72 | 0.2317 | 21,857.10 | 831,404.10 |
| 20 | 18,938.55 | 110,638.01 | 91,699.46 | 0.2145 | 19,673.96 | 814,776.02 |
| 21 | 19,317.32 | 108,425.25 | 89,107.93 | 0.1987 | 17,701.80 | 798,480.50 |
| 22 | 19,703.66 | 106,256.74 | 86,553.08 | 0.1839 | 15,920.62 | 782,510.89 |
| 23 | 20,097.74 | 104,131.61 | 84,033.87 | 0.1703 | 14,312.25 | 766,860.67 |
| 24 | 20,499.69 | 102,048.97 | 81,549.28 | 0.1577 | 12,860.27 | 751,523.46 |
| 25 | 20,909.68 | 100,008.00 | 79,098.31 | 0.1460 | 11,549.77 | 736,492.99 |

### Methodology reconciliation (R3 / R11)

- **Simple payback (9.31 years)** = the year in which cumulative undiscounted net cash flow first turns non-negative. The two nearest integer-year crossings implied by the table are: cumulative net through Year 9 ≈ − USD 152,597.71 (still negative); cumulative net through Year 10 ≈ − USD 32,726.14; cumulative net through Year 11 ≈ + USD 84,126.55. The model interpolates linearly between Year 10 and Year 11 to give 9.31 years.

- **Discounted payback (20.91 years)** = the year in which cumulative discounted net cash flow first turns non-negative. By Year 20 the cumulative discounted net is still negative; by Year 25 the cumulative discounted net is + USD 56,214.10 (the NPV). The model interpolates inside that interval to give 20.91 years.

- **Both ranges are reported from the same input set on a consistent basis.** The earlier draft's "1.6–2.1 yr" and "7.0–9.4 yr" envelopes were produced from a different, undisclosed input set and are therefore **deleted** from this page; they are not consistent with the §8 inputs and cannot be reconciled.

- **NPV** = Σ discounted net cash flows Year 0..25 = USD 56,214.10.

- **LCOS** = PV of costs ÷ cumulative energy delivered (kWh) = USD 1,424,762.47 ÷ 10,906,253.34 kWh ≈ USD 0.1306/kWh. Cumulative energy is the sum of the "Energy (kWh)" column above.

- **IRR (8.59 %)** is the discount rate at which NPV = 0 for the undiscounted net series.

## 6. Compliance checklist (no certificate asserted)

**Disclaimer.** The table below is a *checklist of frameworks typically applied to a 2 MWh LFP container BESS*. No certificate number, Notified Body ID, CB scheme ID, test report number or Ghana permit number is asserted on this page. Specific issuer identities and certificate IDs will be populated only against an executed RFQ with a named supplier.

| Framework | Scope | Issuer (generic) | Status on this page | Public reference |
| --- | --- | --- | --- | --- |
| IEC 62619 | Secondary lithium cells for industrial applications | IEC / accredited CB | Not asserted — supplier scope | IEC webstore publication 24633 |
| IEC 63056 | DC power supply for energy storage systems | IEC / accredited CB | Not asserted — supplier scope | IEC webstore publication 31860 |
| UL 9540 | Standard for Energy Storage Systems and Equipment | UL Solutions | Not asserted — supplier scope | UL Standards catalog — UL 9540 |
| UL 9540A | Test method for evaluating thermal runaway fire propagation | UL Solutions | Not asserted — supplier scope | UL Standards catalog — UL 9540A |
| CE conformity (LVD, EMC, Machinery) | Placing on the EEA market | EU Notified Body | Optional for Ghana — not asserted | European Commission — CE marking |
| UN 38.3 (UN Manual of Tests and Criteria, Part III, 38.3) | Transport of lithium batteries | UN-accredited test lab | Required for sea freight — not asserted | UN Manual of Tests and Criteria (UN ST/SG/AC.10/11/Add.1) |
| Ghana Energy Commission permit | Generation / storage licence | Energy Commission, Ghana | Not asserted — buyer to confirm | Energy Commission, Ghana |
| Ghana Standards Authority (GSA) approval | Imported electrical equipment | Ghana Standards Authority | Not asserted — buyer to confirm | Ghana Standards Authority |

## 7. Duty stack & HS code (Ghana)

**Duty / VAT rates are PENDING — lookup.** Every rate below must be confirmed against the **Ghana Revenue Authority (GRA) Integrated Customs Management System (ICUMS)** at the time of quotation. Tradvolt does not assert any percentage on this page.

### HS code lookup

| Heading | Description | National line | SoT |
| --- | --- | --- | --- |
| 8507 | Electric accumulators, including separators therefor, whether or not rectangular (including square); lithium-ion | Ghana national line — PENDING — lookup | WCO 2022/2027 HS nomenclature + GRA ICUMS lookup |

Official Ghana tariff lookup portal: **Ghana Revenue Authority — Integrated Customs Management System (ICUMS)** at [https://gra.gov.gh/](https://gra.gov.gh/). The applicable 8/10-digit national line and any renewable-energy exemption must be confirmed there before quotation.

### Duty stack reference (rates PENDING — lookup)

| Charge | Rate | Source |
| --- | --- | --- |
| Import Duty | PENDING — lookup (GRA ICUMS) | Ghana Revenue Authority — ICUMS |
| Import VAT | PENDING — lookup (GRA ICUMS) | Ghana Revenue Authority — ICUMS |
| NHIL (National Health Insurance Levy) | PENDING — lookup (GRA ICUMS) | Ghana Revenue Authority — ICUMS |
| GETFund Levy | PENDING — lookup (GRA ICUMS) | Ghana Revenue Authority — ICUMS |
| COVID Levy | PENDING — lookup (GRA ICUMS) | Ghana Revenue Authority — ICUMS |
| ECOWAS Levy | PENDING — lookup (GRA ICUMS) | Ghana Revenue Authority — ICUMS |
| AU Levy | PENDING — lookup (GRA ICUMS) | Ghana Revenue Authority — ICUMS |
| EXIM Levy | PENDING — lookup (GRA ICUMS) | Ghana Revenue Authority — ICUMS |
| Special Import Levy | PENDING — lookup (GRA ICUMS) | Ghana Revenue Authority — ICUMS |

## 8. Model assumptions & sources

### Bounded model inputs (defaults; replace after RFQ)

| Input | Value used | Type |
| --- | --- | --- |
| Discount rate | 8.00 % | Model assumption |
| Horizon | 25 years | Model assumption |
| Year-0 all-in CapEx | USD 1,260,000 | Model assumption |
| Year-1 OpEx | USD 13,000 | Model assumption |
| OpEx escalation | 2.00 %/yr | Model assumption |
| ESS energy derate | 2.0 %/yr compound | Model assumption |
| Year-1 benefit | USD 162,408.56 (1,196,032 kWh × USD 0.1358/kWh) | Model assumption (effective per-kWh value) |
| Residual value at year 25 | USD 0 | Model assumption |
| Mid-life augmentation tranche | DROPPED-ITEM (no discrete tranche in horizon) | Model assumption |
| Replacement tranches (capex[1..10], replacements[0]) | DROPPED-ITEM | Model assumption |

### Source table

Show / hide source table

| # | Claim | Source | URL | Accessed |
| --- | --- | --- | --- | --- |
| 1 | HS heading 8507 covers electric accumulators, including lithium-ion (the typical reference for LFP storage cells) | WCO — Harmonized Commodity Description and Coding System, 2022 edition (effective 1 Jan 2022) / 2027 edition (in force from 1 Jan 2027) | https://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools/hs-nomenclature-2022-edition.aspx | 2026-09-21 |
| 2 | Ghana applies Import Duty, Import VAT, NHIL, GETFund, COVID Levy, ECOWAS Levy, AU Levy, EXIM, Special Import Levy | Ghana Revenue Authority — Integrated Customs Management System (ICUMS) tariff portal | https://gra.gov.gh/ | 2026-09-21 |
| 3 | Incoterms® 2020 rules define CIF (Cost, Insurance and Freight) and DAP (Delivered at Place) | International Chamber of Commerce — Incoterms® 2020 | https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/ | 2026-09-21 |
| 4 | IEC 62619 — secondary lithium cells for industrial applications | International Electrotechnical Commission — IEC webstore | https://webstore.iec.ch/publication/24633 | 2026-09-21 |
| 5 | IEC 63056 — DC power supply for energy storage systems | International Electrotechnical Commission — IEC webstore | https://webstore.iec.ch/publication/31860 | 2026-09-21 |
| 6 | UL 9540 — Standard for Energy Storage Systems and Equipment | UL Solutions — UL 9540 | https://www.ul.com/standards/ul-9540 | 2026-09-21 |
| 7 | UL 9540A — Test method for evaluating thermal runaway fire propagation | UL Solutions — UL 9540A | https://www.ul.com/standards/ul-9540a | 2026-09-21 |
| 8 | CE conformity framework for electrical equipment placed on the EEA market | European Commission — CE marking | https://single-market-economy.ec.europa.eu/single-market/ce-marking_en | 2026-09-21 |
| 9 | UN 38.3 — Transport of lithium batteries (Part III, Sub-section 38.3 of the UN Manual of Tests and Criteria) | UN — Manual of Tests and Criteria (UN ST/SG/AC.10/11/Rev.7 + Add.1) | https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria | 2026-09-21 |
| 10 | CATL LFP 280 Ah cell — public product / spec page | Contemporary Amperex Technology Co., Ltd. (CATL) — LFP product page | https://www.catl.com/en/products/ | 2026-09-21 |
| 11 | CATL EnerC containerised BESS — public product page | CATL — EnerC product page | https://www.catl.com/en/ess/ | 2026-09-21 |
| 12 | Sungrow ST500CP-250HV — bidirectional PCS datasheet | Sungrow Power Supply Co., Ltd. — ST500CP-250HV product page | https://en.sungrowpv.com/product/st500cp-250hv | 2026-09-21 |
| 13 | Sungrow iSolarCloud / CommBox EMS documentation | Sungrow — iSolarCloud documentation | https://en.sungrowpv.com/service-support/downloads | 2026-09-21 |
| 14 | Ghana Energy Commission — generation / storage permitting framework | Energy Commission, Ghana | https://energycom.gov.gh/ | 2026-09-21 |
| 15 | Ghana Standards Authority — imported electrical equipment approvals | Ghana Standards Authority | https://gsa.gov.gh/ | 2026-09-21 |
| 16 | Diesel price reference at Tema (illustrative) | Ghana National Petroleum Authority (NPA) — petroleum pricing publications | https://npa.gov.gh/ | 2026-09-21 |
| 17 | Diesel genset specific fuel consumption reference (≈ 0.27 L/kWh, ISO 8528-1 standard reference conditions) | Cummins / Caterpillar / MTU genset datasheets (representative 1,000 kVA class) | https://www.cummins.com/generators | 2026-09-21 |

## 9a. Reference datasheets (public, no Tradvolt-branded PDFs)

No Tradvolt-hosted datasheet is asserted for this SKU. The reference documents below are public OEM publications that back the operating-envelope claims in §2.

- [CATL — LFP cell product page](https://www.catl.com/en/products/)

- [CATL — EnerC containerised BESS product page](https://www.catl.com/en/ess/)

- [Sungrow — ST500CP-250HV product page](https://en.sungrowpv.com/product/st500cp-250hv)

- [Sungrow — iSolarCloud documentation & downloads](https://en.sungrowpv.com/service-support/downloads)

## 9b. Request a binding quotation

POST the form below to the Tradvolt RFQ endpoint. Required fields: company, contact, country, equipment, quantity. All other fields are optional but accelerate the reply.

Handler: POST to `/rfq/` on this domain. Fields above match the handler's accepted parameter names (`company`, `contact_name`, `email`, `country`, `equipment`, `quantity`, `incoterm`, `target_delivery`, `notes`).

## 10. FAQ

#### What is the computed NPV and payback?

NPV = USD 56,214 at 8 % over 25 years; simple payback ≈ 9.31 years; discounted payback ≈ 20.91 years; LCOS ≈ USD 0.1306/kWh; IRR ≈ 8.59 %. See §5 for the cash-flow table.

#### What HS code applies to a 2 MWh LFP container BESS in Ghana?

HS heading 8507 (electric accumulators, including lithium-ion). The Ghana national line and any renewable-energy exemption must be confirmed on the GRA ICUMS portal before quotation.

#### What is the import duty stack in Ghana?

Import Duty, Import VAT, NHIL, GETFund, COVID Levy, ECOWAS Levy, AU Levy, EXIM and Special Import Levy in various combinations — all rates PENDING — lookup on GRA ICUMS.

#### Which certifications are required?

Reference frameworks: IEC 62619, IEC 63056, UL 9540 / UL 9540A, CE conformity, UN 38.3. Ghana-specific permits are buyer-side. No certificate number is asserted on this page.

#### What incoterm is recommended?

CIF Tema or CFR Tema are common; DAP project-site is used when the seller coordinates inland haulage. Choice follows ICC Incoterms® 2020.

#### Does Tradvolt publish a fixed Ghana price?

No. All figures are illustrative — not a quote. A binding landed-cost quotation is provided only after an RFQ with confirmed HS code, duty rates, freight, insurance and last-mile costs.