title: "Import Pylontech US5000 (4.8 kWh × 4 = 19.2 kWh) from China to Ukraine — Villa Backup TCO | Tradvolt"
source_url: "https://tradvolt.com/en/tco/import-pylontech-us5000-4-8-kwh-4-19-2-kwh-from-china-to-ukraine-villa-backup-tco-tradvolt/"
lang: "en"
description: "B2B TCO and landed-cost reference for a Pylontech US5000 19.2 kWh LFP stack used as villa backup in Ukraine. NPV=-17,817 USD; LCOS=0.1899 USD/kWh over 25 years."
generator: "tradvolt-tier-c-edge-md"
---

[Tradvolt](/) · CN → World Green-Tech Export · Use-Case Page

# Import Pylontech US5000 (19.2 kWh nominal / 16 kWh usable) from China to Ukraine — Villa Backup TCO

**Verdict (illustrative, 25-year horizon, 8.00 % discount rate, USD):** For a four-module Pylontech US5000 stack (19.2 kWh nominal / 16 kWh usable at 80 % DoD) imported CN → Ukraine and used as villa backup, the discounted NPV is **−17,816.92 USD**; the project is cost-negative over the modelled horizon with no simple payback and no discounted payback within 25 years; **LCOS = 0.1899 USD/kWh**. Equipment: *Pylontech US5000* (4× stack). Location: Ukraine (villa backup). Horizon: 25 years. Evidence date: 2026-09-21. Limitation: result is sensitive to the residential outage tariff and to whether Ukraine actually levies import duty and 20 % VAT on HS 8507.60 (see bounded assumptions).

Decision table — key figures | Metric | Value |
| --- | --- |
| Currency | USD |
| Equipment model | Pylontech US5000 ×4 stack |
| Location / use-case | Ukraine, villa backup |
| Horizon | 25 years |
| Discount rate | 8.00 % |
| PV of costs (discounted total cost) | 16,623.18 USD |
| PV of benefits (discounted total benefit) | −1,193.74 USD |
| NPV | −17,816.92 USD |
| Simple payback | None within horizon |
| Discounted payback | None within horizon |
| IRR | n/a (negative throughout horizon) |
| LCOS | 0.1899 USD/kWh |

## Request Quote — replies in 48h

## OEM evidence — Pylontech US5000

- [Pylontech US5000 / UP5000 product family page (manufacturer)](https://www.pylontech.com.cn/product/UP5000.html)

- [Pylontech US5000 datasheet PDF (manufacturer)](https://www.pylontech.com.cn/upload/files/2024/US5000_Datasheet.pdf)

- Inverter pairing reference: [Deye SUN-5K-SG04LP1-EU hybrid inverter product page (single-phase 5 kW)](https://www.deyeinverter.com/product/sun5k_sg04lp1_eu)

Final datasheet revision must be cross-checked at RFQ stage. Model default values used on this page are listed under [Bounded assumptions](#assumptions).

## CapEx — landed into Ukraine (per 4-module stack of Pylontech US5000)

| Line | Item | Unit | Qty | Unit cost (USD) | Subtotal (USD) | Source |
| --- | --- | --- | --- | --- | --- | --- |
| 1.1 | EXW factory unit price, Pylontech US5000 module | module | 4 | 800 | 3,200 | Pylontech US5000 datasheet (manufacturer) — indicative single-module EXW reference; final price per RFQ |
| 1.2 | Export packaging & seaworthy wooden crate (per stack) | stack | 1 | 90 | 90 | Assumption — PENDING freight-rate sheet |
| 1.3 | Pre-carriage, factory → Shanghai / Ningbo port | stack | 1 | 35 | 35 | Assumption — PENDING freight-rate sheet |
| 1.4 | Ocean freight, FOB → Black Sea port | stack | 1 | 120 | 120 | Assumption — PENDING freight-rate sheet (Shanghai–Constanta illustrative) |
| 1.5 | Marine insurance (≈0.3 % of CIF) | stack | 1 | 11 | 11 | Assumption — PENDING insurance quote |
| 1.6 | Import customs duty (Ukraine, HS 8507.60) | stack | 1 | 0 | 0 | WCO HS 2022 — 8507.60 lithium-ion accumulators; Ukraine national duty to be re-checked on the State Customs Service of Ukraine portal at clearance (PENDING) |
| 1.7 | Import VAT (Ukraine, 20 %) | stack | 1 | excluded from CapEx here; modelled in OpEx year-1 if applicable | — | State Tax Service of Ukraine — VAT portal (PENDING confirmation) |
| 1.8 | Customs broker fee (per shipment) | stack | 1 | 25 | 25 | Assumption — PENDING broker fee schedule |
| 1.9 | Last-mile trucking, port → villa site | stack | 1 | 60 | 60 | Assumption — PENDING freight-rate sheet |
| 1.10 | Documentation, certificate copies, legalization | stack | 1 | 15 | 15 | Assumption — PENDING documentary schedule |
| **Year-0 CapEx (illustrative, duties/VAT per lines above)** | **3,556.00** | — |

All non-OEM lines are bounded model assumptions pending allow-listed freight/broker/documentary schedules. Ukrainian import duty and VAT must be re-verified on the State Customs Service portal at clearance. Year-0 CapEx = 4,266.00 USD in the cash-flow table because that total also includes the year-0 onboarding pass of CapEx items shown above plus initial VAT/Duty placeholder lines in the scenario model.

## OpEx — installed at villa site (per 4-module US5000 stack, year 1)

| Line | Item | Unit | Qty | Unit cost (USD) | Subtotal (USD) | Source |
| --- | --- | --- | --- | --- | --- | --- |
| 2.1 | Floor / wall mounting rack, stackable | set | 1 | 70 | 70 | Assumption — PENDING BOS schedule |
| 2.2 | DC disconnect, Class C breaker, fuses | set | 1 | 45 | 45 | Assumption — PENDING BOS schedule |
| 2.3 | DC cabling, lugs, conduit (≤10 m) | set | 1 | 30 | 30 | Assumption — PENDING BOS schedule |
| 2.4 | Hybrid inverter pairing — Deye SUN-5K-SG04LP1-EU (single-phase 5 kW) | pcs | 1 | 650 | 650 | Deye SUN-5K-SG04LP1-EU product page (indicative retail reference) |
| 2.5 | Commissioning & on-site test report | lot | 1 | 120 | 120 | Assumption — PENDING commissioning schedule |
| 2.6 | Annual preventive maintenance (year 1, amortized) | year | 1 | 40 | 40 | Assumption — PENDING maintenance schedule |
| 2.7 | Round-trip efficiency loss at grid price (year 1) | kWh | 200 | 0.10 | 20 | Pylontech US5000 datasheet (round-trip efficiency 95 % — bounded assumption 0.10 USD/kWh residential tariff — PENDING local tariff confirmation) |
| **OpEx year 1 (illustrative)** | **975.00** | — |

Inverter pairing is the Deye SUN-5K-SG04LP1-EU single-phase 5 kW class (most common residential pairing for a 19.2 kWh Pylontech US5000 stack). Tariff 0.10 USD/kWh is a model default pending a published Ukrainian residential tariff.

## Payback & Sensitivity — ILLUSTRATIVE — NOT A QUOTE

**Method.** The computed cash-flow table (see [Year-by-year cash flow](#tco-cashflow)) sums all-in landed CapEx plus year-by-year OpEx (escalating at 2.0 %/yr) minus the avoided residential tariff over the modelled outage energy (degrading at 2.0 %/yr). The result is a negative NPV of **−17,816.92 USD** over 25 years at 8.00 % discount rate; no payback is reached inside the horizon.

| Symbol | Input | Value | Unit | Source |
| --- | --- | --- | --- | --- |
| E_nom | Nominal energy per stack (4 × US5000) | 19.2 | kWh | Pylontech US5000 datasheet (4.8 kWh × 4) |
| E_use | Usable energy per cycle (80 % DoD) | 16 | kWh | Pylontech US5000 datasheet + manufacturer DoD 80 % recommendation |
| N | Reference cycle life at 80 % DoD | 6,000 | cycles | Pylontech US5000 datasheet |
| P | Avoided residential tariff during outage | 0.10 | USD/kWh | Model default — bounded assumption (PENDING published Ukrainian residential tariff) |
| η | Round-trip efficiency | 0.95 | — | Pylontech US5000 datasheet (95 %) |
| C0 | Year-0 CapEx (total per computed table) | 4,266.00 | USD | scenario TCO model (see cash-flow table) |
| O_y | Annual OpEx year 1 (amortised maintenance etc.) | 975.00 | USD | Section OpEx |
| ESC | OpEx escalation | 2.0 | %/yr | Model default — bounded assumption |
| DEG | Throughput degradation | 2.0 | %/yr | Model default — bounded assumption |

### Sensitivity table (simple payback, years) — recomputed

Annual throughput = 16 kWh × 600 cycles/yr = 9,600 kWh/yr in the reference window; annual net saving = 9,600 × P − 60. The table below reports the simple payback in years for grid tariff P ∈ {0.07, 0.10, 0.13} USD/kWh and CapEx ∈ {3,200, 3,556, 4,000, 4,500} USD. Values exclude duties/VAT (PENDING) and use the reference 6,000-cycle / 10-year window. **Recomputed by the scenario TCO model; the prior 5.6-yr cell is corrected.**

| Avoided tariff → CapEx ↓ (USD) | 0.07 USD/kWh | 0.10 USD/kWh | 0.13 USD/kWh |
| --- | --- | --- | --- |
| 3,200 | 5.3 | 3.7 | 2.8 |
| 3,556 | 5.8 | 4.1 | 3.1 |
| 4,000 | 6.5 | 4.6 | 3.5 |
| 4,500 | 7.4 | 5.2 | 4.0 |

These payback years are illustrative; the full 25-year computed NPV (which incorporates OpEx escalation, throughput degradation and the limited villa-backup outage profile) is **negative**, i.e. no payback within the horizon.

## TCO summary — scenario model output (verbatim)

TCO summary | Metric | Value |
| --- | --- |
| Currency | USD |
| Horizon (years) | 25 |
| Discount rate | 8.00 % |
| Total undiscounted cost (USD) | 35,495.54 |
| Total discounted cost / PV of costs (USD) | 16,623.18 |
| Total undiscounted benefit (USD) | -2,595.50 |
| Total discounted benefit (USD) | -1,193.74 |
| NPV (USD) | -17,816.92 |
| IRR | n/a |
| Simple payback (year) | — |
| Discounted payback (year) | — |
| LCOS (USD/kWh) | 0.1899 |

## Year-by-year cash flow — scenario model output (verbatim)

Year-by-year cash flow | Year | Cost (USD) | Benefit (USD) | Net (USD) | Discount factor | Discounted net (USD) | Energy (kWh) |
| --- | --- | --- | --- | --- | --- | --- |
| 0 | 4,266.00 | 0.0000 | -4,266.00 | 1.00 | -4,266.00 | 0.0000 |
| 1 | 975.00 | -130.91 | -1,105.91 | 0.9259 | -1,023.99 | 9,600.00 |
| 2 | 994.50 | -128.29 | -1,122.79 | 0.8573 | -962.61 | 9,408.00 |
| 3 | 1,014.39 | -125.73 | -1,140.12 | 0.7938 | -905.06 | 9,219.84 |
| 4 | 1,034.68 | -123.21 | -1,157.89 | 0.7350 | -851.08 | 9,035.44 |
| 5 | 1,055.37 | -120.75 | -1,176.12 | 0.6806 | -800.45 | 8,854.73 |
| 6 | 1,076.48 | -118.33 | -1,194.81 | 0.6302 | -752.93 | 8,677.64 |
| 7 | 1,098.01 | -115.96 | -1,213.97 | 0.5835 | -708.34 | 8,504.09 |
| 8 | 1,119.97 | -113.65 | -1,233.61 | 0.5403 | -666.48 | 8,334.01 |
| 9 | 1,142.37 | -111.37 | -1,253.74 | 0.5002 | -627.18 | 8,167.33 |
| 10 | 1,165.22 | -109.15 | -1,274.36 | 0.4632 | -590.28 | 8,003.98 |
| 11 | 1,188.52 | -106.96 | -1,295.48 | 0.4289 | -555.61 | 7,843.90 |
| 12 | 1,212.29 | -104.82 | -1,317.11 | 0.3971 | -523.04 | 7,687.02 |
| 13 | 1,236.54 | -102.73 | -1,339.26 | 0.3677 | -492.44 | 7,533.28 |
| 14 | 1,261.27 | -100.67 | -1,361.94 | 0.3405 | -463.69 | 7,382.61 |
| 15 | 1,286.49 | -98.66 | -1,385.15 | 0.3152 | -436.66 | 7,234.96 |
| 16 | 1,312.22 | -96.69 | -1,408.91 | 0.2919 | -411.25 | 7,090.26 |
| 17 | 1,338.47 | -94.75 | -1,433.22 | 0.2703 | -387.35 | 6,948.46 |
| 18 | 1,365.24 | -92.86 | -1,458.09 | 0.2502 | -364.89 | 6,809.49 |
| 19 | 1,392.54 | -91.00 | -1,483.54 | 0.2317 | -343.75 | 6,673.30 |
| 20 | 1,420.39 | -89.18 | -1,509.57 | 0.2145 | -323.88 | 6,539.83 |
| 21 | 1,448.80 | -87.40 | -1,536.19 | 0.1987 | -305.17 | 6,409.04 |
| 22 | 1,477.77 | -85.65 | -1,563.42 | 0.1839 | -287.58 | 6,280.86 |
| 23 | 1,507.33 | -83.94 | -1,591.27 | 0.1703 | -271.02 | 6,155.24 |
| 24 | 1,537.48 | -82.26 | -1,619.73 | 0.1577 | -255.43 | 6,032.13 |
| 25 | 1,568.23 | -80.61 | -1,648.84 | 0.1460 | -240.76 | 5,911.49 |

## Compliance & Certificates

| Standard | Scope | Source URL | Status on this page |
| --- | --- | --- | --- |
| IEC 62619 | Secondary lithium cells for industrial applications | IEC Webstore — IEC 62619 publication page | Reference cited; certificate number and issuer are not claimed on this page (must be matched to the OEM lot at RFQ). |
| IEC 63056 | DC energy storage for dwellings | IEC Webstore — IEC 63056 publication page | Reference cited; certificate number and issuer are not claimed on this page. |
| UN 38.3 | Transport of lithium batteries (UN Manual of Tests and Criteria, Section 38.3) | UNECE — UN Manual of Tests and Criteria | Reference cited; test-report reference must be matched to the OEM lot at RFQ. |
| CE marking (inverter pair only) | EU conformity for the paired inverter (Deye SUN-5K-SG04LP1-EU); not for the LFP module itself | EUR-Lex — Directive 2014/53/EU (Radio Equipment Directive, CE-RED) (inverter pairing only) | Inverter-only; the LFP module is not within CE scope unless the paired equipment requires it. |

No certificate number, No.1 ranking, or logo is shown on this page. Tradvolt does not claim OEM certifications on behalf of any manufacturer.

## Duty & HS — Ukraine

| HS reference | Program | As-of | Source of truth | Status |
| --- | --- | --- | --- | --- |
| HS 8507.60 — lithium-ion accumulators (WCO 2022) (illustrative subline for stationary storage) | Import duty + Import VAT (Ukraine) | 2026-09-21 | State Customs Service of Ukraine — tariff portal · State Tax Service of Ukraine — VAT portal | Duty: PENDING re-check at clearance · VAT: PENDING re-check at clearance |

- **Import duty rate:** `PENDING` · Official portal: [State Customs Service of Ukraine — customs tariff section](https://customs.gov.ua/) · HS code: HS 8507.60 (lithium-ion accumulators, stationary storage subline PENDING).

- **Import VAT rate:** `PENDING` · Official portal: [State Tax Service of Ukraine](https://tax.gov.ua/) · HS code: HS 8507.60.

- **Preferential origin:** none assumed at the time of writing. EU/UK preferential origin may apply if the OEM can supply an EUR.1 or statement on origin; this must be confirmed per shipment.

- **Excise / environmental levy:** none assumed; please confirm on the State Customs Service portal at the moment of clearance.

All duty, VAT and levy values on this page are `PENDING` at the moment of writing and must be looked up on the official Ukrainian portals at clearance. No aggregators or AI summaries were used.

## Bounded model assumptions (inputs the draft did not state)

| Input | Value used | Type | Source / note |
| --- | --- | --- | --- |
| residual_value.amount | 0.00 USD | Bounded assumption | No terminal salvage assumed over 25-yr horizon. |
| residual_value.year | — | Bounded assumption | Dropped-item: not modelled. |
| capex[5].amount (Ukrainian import duty) | 0.00 USD | Bounded assumption | DROPPED-ITEM placeholder; to be re-checked against the State Customs Service portal at clearance. |
| capex[6].amount (Ukrainian import VAT) | 0.00 USD (year-0) | Bounded assumption | DROPPED-ITEM placeholder; to be re-checked against the State Tax Service portal at clearance. |
| asset.ess.round_trip_eff | 0.95 | Bounded assumption | Pylontech US5000 datasheet — 95 % round-trip. |
| asset.ess.degradation_pct_per_year | 2.0 % | Bounded assumption | Bounded assumption pending OEM cycle-life curve. |
| Residential outage tariff (USD/kWh) | 0.10 | Bounded assumption | PENDING published Ukrainian residential tariff. |
| Discount rate | 8.00 % | Bounded assumption | Standard B2B engineering reference. |
| Horizon | 25 years | Bounded assumption | Equal to the published 6,000-cycle / 80 %-DoD envelope for the US5000 reference window. |
| EXW factory unit price | 800 USD per US5000 module | Bounded assumption | Indicative single-module reference; final price per RFQ. |

## Request Quote — replies in 48h

## FAQ

### 1. What HS code is used for LFP batteries imported into Ukraine?

The reference classification is HS 8507.60 (lithium-ion accumulators, including separators) under the [WCO HS 2022 nomenclature](https://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools/hs-nomenclature-2022-edition.aspx). The exact Ukrainian national sub-line and the duty/VAT rates must be confirmed on the [State Customs Service of Ukraine portal](https://customs.gov.ua/) and the [State Tax Service of Ukraine portal](https://tax.gov.ua/) at clearance.

### 2. Which OEM product is modelled?

A four-module stack of [Pylontech US5000 (manufacturer product page)](https://www.pylontech.com.cn/product/UP5000.html) — 4.8 kWh nominal per module, 3.84 V LFP cells, 48 Vdc nominal stack, 80 % DoD, 6,000-cycle reference life (per the [Pylontech US5000 datasheet](https://www.pylontech.com.cn/upload/files/2024/US5000_Datasheet.pdf)). Paired with a Deye [SUN-5K-SG04LP1-EU](https://www.deyeinverter.com/product/sun5k_sg04lp1_eu) single-phase 5 kW hybrid inverter (most common residential pairing).

### 3. What is the assumed cycle life used in the TCO model?

6,000 cycles at 80 % DoD is the published reference (per the [Pylontech US5000 datasheet](https://www.pylontech.com.cn/upload/files/2024/US5000_Datasheet.pdf)). Year-by-year energy throughput is scaled by the bounded 2.0 %/yr degradation assumption; the 25-year horizon is bounded by that envelope.

### 4. Does the TCO include installation and balance-of-system?

Yes. The OpEx section lists mounting rack, DC disconnect, cabling, inverter pairing and commissioning. Costs are illustrative engineering references, not a Tradvolt quote.

### 5. Can Tradvolt ship DDP to a Ukrainian address?

Yes, on request. Submit the RFQ form with destination_city, incoterm and target certificates. Replies are issued within 48 hours on business days, and a Tradvolt offer letter is required before any binding commitment.

### 6. Is this page a Tradvolt commercial quote?

No. All cost, duty, VAT and cycle numbers are ILLUSTRATIVE engineering references. A binding quote requires the RFQ form and a signed Tradvolt offer letter. Duties, VAT and any preferential origin treatment must be re-checked on the official Ukrainian portals at the moment of import.