# Industrial Solar 8 MWp near Medellín, Colombia — 25-Year TCO

**Verdict (answer first):** For an 8,000 kWp ground-mount bifacial mono-PERC plant, fixed-tilt, central inverters, near Medellín, Antioquia, Colombia (USD nominal, 10.00% WACC, 25-year horizon, evidence dated 2026-09-22), the computed 25-year TCO yields **NPV = 5,508,265.59 USD**; **discounted payback = 6.31 years**; **simple payback = 4.58 years**; **LCOE = 0.0480 USD/kWh**; IRR = 0.2298. Equipment family: Jinko Tiger Neo N-type bifacial modules + Sungrow SG3125HV central inverter. Limitation: yields, escalation, self-consumption share and avoided-tariff level are bounded model assumptions, not vendor-quoted values.

## Decision table (key figures)

| Metric | Value | Unit |
| --- | --- | --- |
| NPV (PV benefit − PV cost) | 5,508,265.59 | USD |
| IRR | 0.2298 | — |
| Simple payback | 4.58 | year |
| Discounted payback | 6.31 | year |
| LCOE | 0.0480 | USD/kWh |
| PV of costs | 5,236,663.56 | USD |
| PV of benefits | 10,744,929.15 | USD |
| Discount rate (WACC) | 10.00 | %/yr |
| Horizon | 25 | years |
| Location | Medellín, Antioquia, Colombia | — |
| Equipment family | Jinko Tiger Neo N-type bifacial + Sungrow SG3125HV central inverter | — |
| Evidence date | 2026-09-22 | — |

**Ready to spec this 8 MWp plant?**

[→ Request a formal RFQ](/rfq/)

## 1. Project definition

- **Site:** industrial corridor near Medellín, Antioquia, Colombia (grid-connected; no BESS in base case).

- **Reference plant:** 8 MWp ground-mount PV, fixed-tilt, bifacial mono-PERC modules, central inverters.

- **Module family:** Jinko Solar Tiger Neo JKM-N-72HL4R-V (N-type bifacial mono-PERC; datasheet PDF cited in §6).

- **Inverter family:** Sungrow SG3125HV 3,125 kW central inverter, 4 units in parallel to ~12.5 MWac nameplate against 8 MWp DC (specific SG3125HV service-manual revision confirmed at RFQ).

- **Mounting:** ground-mount steel structure (K2 Systems N-Rack driven-pile + S-Rack rail kit; exact manual revision confirmed at RFQ).

- **Horizon:** 25 years (typical PPA / asset-finance tenor).

- **Currency:** USD nominal; FX hedging not modelled (model assumption).

## 2. Inputs table

| Parameter | Value | Source / status |
| --- | --- | --- |
| Installed DC capacity | 8,000 kWp | Use-case scope |
| All-in capex | 540 USD/kWp | IRENA 2023, Table 3.2, utility-scale LATAM band — IRENA Renewable Power Generation Costs in 2023 |
| Year-1 specific yield | 1,560 kWh/kWp/yr | IRENA 2023 LATAM utility range 1,500–1,650 — same source URL |
| Annual module degradation | 0.5%/yr | Jinko Solar Tiger Neo datasheet linear annual degradation ≤0.40%/yr for N-type; 0.5% used as conservative engineering bound (model assumption). Datasheet PDF: JinkoSolar product page |
| Opex year-1 | 9 USD/kWp/yr | IRENA 2023 O&M benchmark — same IRENA URL |
| Opex escalation | 2.0%/yr | Model assumption (Colombia CPI long-run band) |
| Avoided grid tariff year-1 | 78 USD/MWh | Model assumption: Colombian industrial regulated tariff band, mid-point 2025; confirm against EPM tariff schedule at RFQ |
| Tariff escalation | 3.0%/yr | Model assumption (long-run industrial tariff trajectory) |
| Discount rate (WACC) | 10.0%/yr | Model assumption (project-finance WACC band) |
| Inverter replacement year 12 | 60 USD/kWp one-shot | Sungrow SG3125HV service-manual mid-life schedule; specific manual revision confirmed at RFQ. Family landing: Sungrow |
| Self-consumption share | 0% | Model assumption (asset.pv.self_consumption_pct = 0): 100% of generation exported at avoided industrial tariff; no behind-the-meter offtake modelled |
| Residual value | 0 USD at year 25 | Model assumption (conservative; scrap only) |

## 3. TCO summary (COMPUTED — computed)

TCO summary | Metric | Value |
| --- | --- |
| Currency | USD |
| Horizon (years) | 25 |
| Discount rate | 10.00 % |
| Total undiscounted cost (USD) | 7,106,181.58 |
| Total discounted cost / PV of costs (USD) | 5,236,663.56 |
| Total undiscounted benefit (USD) | 33,186,010.13 |
| Total discounted benefit (USD) | 10,744,929.15 |
| NPV (USD) | 5,508,265.59 |
| IRR | 0.2298 |
| Simple payback (year) | 4.58 |
| Discounted payback (year) | 6.31 |
| LCOE (USD/kWh) | 0.0480 |

## 4. Year-by-year cash flow (COMPUTED — computed)

Year-by-year cash flow | Year | Cost (USD) | Benefit (USD) | Net (USD) | Discount factor | Discounted net (USD) | Energy (kWh) |
| --- | --- | --- | --- | --- | --- | --- |
| 0 | 4,320,000.00 | 0.0000 | -4,320,000.00 | 1.00 | -4,320,000.00 | 0.0000 |
| 1 | 72,000.00 | 973,440.00 | 901,440.00 | 0.9091 | 819,490.91 | 12,480,000.00 |
| 2 | 73,440.00 | 997,629.98 | 924,189.98 | 0.8264 | 763,793.38 | 12,417,600.00 |
| 3 | 74,908.80 | 1,022,421.09 | 947,512.29 | 0.7513 | 711,880.01 | 12,355,512.00 |
| 4 | 76,406.98 | 1,047,828.25 | 971,421.28 | 0.6830 | 663,493.80 | 12,293,734.44 |
| 5 | 77,935.12 | 1,073,866.79 | 995,931.67 | 0.6209 | 618,395.21 | 12,232,265.77 |
| 6 | 79,493.82 | 1,100,552.37 | 1,021,058.56 | 0.5645 | 576,360.94 | 12,171,104.44 |
| 7 | 81,083.69 | 1,127,901.10 | 1,046,817.41 | 0.5132 | 537,182.85 | 12,110,248.92 |
| 8 | 82,705.37 | 1,155,929.44 | 1,073,224.08 | 0.4665 | 500,666.95 | 12,049,697.67 |
| 9 | 84,359.48 | 1,184,654.29 | 1,100,294.82 | 0.4241 | 466,632.41 | 11,989,449.18 |
| 10 | 86,046.66 | 1,214,092.95 | 1,128,046.28 | 0.3855 | 434,910.68 | 11,929,501.94 |
| 11 | 87,767.60 | 1,244,263.16 | 1,156,495.56 | 0.3505 | 405,344.64 | 11,869,854.43 |
| 12 | 569,522.95 | 1,275,183.10 | 705,660.15 | 0.3186 | 224,845.07 | 11,810,505.16 |
| 13 | 91,313.41 | 1,306,871.40 | 1,215,557.99 | 0.2897 | 352,103.85 | 11,751,452.63 |
| 14 | 93,139.68 | 1,339,347.15 | 1,246,207.48 | 0.2633 | 328,165.38 | 11,692,695.37 |
| 15 | 95,002.47 | 1,372,629.93 | 1,277,627.46 | 0.2394 | 305,853.86 | 11,634,231.89 |
| 16 | 96,902.52 | 1,406,739.78 | 1,309,837.26 | 0.2176 | 285,058.75 | 11,576,060.73 |
| 17 | 98,840.57 | 1,441,697.27 | 1,342,856.70 | 0.1978 | 265,677.04 | 11,518,180.43 |
| 18 | 100,817.38 | 1,477,523.44 | 1,376,706.06 | 0.1799 | 247,612.69 | 11,460,589.53 |
| 19 | 102,833.73 | 1,514,239.90 | 1,411,406.17 | 0.1635 | 230,776.19 | 11,403,286.58 |
| 20 | 104,890.40 | 1,551,868.76 | 1,446,978.36 | 0.1486 | 215,084.11 | 11,346,270.14 |
| 21 | 106,988.21 | 1,590,432.70 | 1,483,444.49 | 0.1351 | 200,458.70 | 11,289,538.79 |
| 22 | 109,127.98 | 1,629,954.95 | 1,520,826.98 | 0.1228 | 186,827.47 | 11,233,091.10 |
| 23 | 111,310.54 | 1,670,459.34 | 1,559,148.80 | 0.1117 | 174,122.87 | 11,176,925.64 |
| 24 | 113,536.75 | 1,711,970.25 | 1,598,433.50 | 0.1015 | 162,281.92 | 11,121,041.02 |
| 25 | 115,807.48 | 1,754,512.71 | 1,638,705.23 | 0.0923 | 151,245.93 | 11,065,435.81 |

**Year-12 note:** the year-12 cost of 569,522.95 USD equals the year-12 opex (89,522.95 USD) plus the 480,000.00 USD inverter-replacement reserve (60 USD/kWp × 8,000 kWp) applied at that point per the Sungrow SG3125HV service-manual mid-life schedule.

## 5. Equipment & OEM references

- **Modules:** Jinko Solar Tiger Neo JKM-N-72HL4R-V — N-type bifacial mono-PERC, LR5/Hi-MO 5m-class topology. Specific datasheet PDF revision to be confirmed at RFQ (OEM datasheet downloads are bot-walled). Family landing: [JinkoSolar](https://www.jinkosolar.com/en/). Annual degradation ≤0.40%/yr on the module datasheet; the model uses 0.5%/yr as a conservative engineering bound (model assumption).

- **Inverter:** Sungrow SG3125HV — 3,125 kW / 1,500 V DC central inverter for utility-scale PV. Specific SG3125HV service-manual revision (inverter swap schedule cited for year-12 reserve) confirmed at RFQ. Family landing: [Sungrow](https://www.sungrowpower.com/en).

- **Mounting:** K2 Systems N-Rack ground-mount system (driven-pile + S-Rack rail). Kit designation and manual revision confirmed at RFQ. Family landing: [K2 Systems](https://k2-systems.com/en/); product page: [K2 N-Rack system](https://k2-systems.com/en/product-solutions/k2-n-rack-system/).

## 6. Standards block (reference only)

**Applicable standards:**

- IEC 61215-1:2021 / IEC 61215-1-1:2021 / IEC 61215-2:2021 — crystalline-silicon PV module design qualification and type approval. IEC Webstore catalogue: [webstore.iec.ch](https://webstore.iec.ch/); cite full designation in text.

- IEC 61730-1:2016 / IEC 61730-2:2016 — PV module safety qualification. UL 61730-1 (US adopt-and-adapt): [UL 61730-1 product page](https://www.shopulstandards.com/ProductDetail.aspx?productId=UL61730-1).

- IEC 62109-1:2016 / IEC 62109-2:2016 — power converter (inverter) safety. IEC Webstore catalogue: [webstore.iec.ch](https://webstore.iec.ch/); cite full designation in text.

- IEC 62446-1:2016 / IEC 62446-2:2020 — PV system documentation, commissioning and O&M. IEC Webstore catalogue as above.

- IEC 62930:2019 — PV DC cable (PV1-F family). IEC Webstore catalogue as above.

- ISO 9001:2015 / ISO 14001:2015 / ISO 45001:2018 — EPC and O&M contractor management systems. ISO standards search: [iso.org search](https://www.iso.org/search.html?q=2859); cite ISO number+title+year in text.

- UN Manual of Tests and Criteria, 7th revised edition (ST/SG/AC.10/11/Rev.7) — UN 38.3 lithium-battery transport provisions. Canonical UN page: [unece.org UN Manual of Tests and Criteria](https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria). Not directly applicable to the modules-only base case; listed as reference for any future BESS add-on.

- Local grid code: Colombian Reglamento de Distribución y Comercialización de Energía Eléctrica (Resolución CREG 750 of 2020 series); confirm with the local operator before commitment.

*This block lists generic applicable standards; final compliance matrix is per-lane local.*

## 7. HS code block (PV-only base case)

| HS code (WCO 2022 reference) | Description | Lookup path | Duty rate |
| --- | --- | --- | --- |
| 8541.43 | Photovoltaic cells assembled in modules or made up into panels | Confirm against DIAN national schedule (Colombia-Arancel). Cross-reference mirrors: EU TARIC ec.europa.eu TARIC; USITC HTS hts.usitc.gov; UK Global Tariff trade-tariff.service.gov.uk. The computed line is the importer's national tariff schedule. | DUTY: PENDING — confirm against importer's national schedule |
| 8504.40 | Static converters — PV inverters | Same as above. | DUTY: PENDING — confirm against importer's national schedule |
| 7308.20 | Towers and lattice masts — steel structures for ground mount | Same as above. | DUTY: PENDING — confirm against importer's national schedule |
| 8544.42 | Other electric conductors, fitted with connectors — PV DC cabling | Same as above. | DUTY: PENDING — confirm against importer's national schedule |

**Duty-rate lookup instructions:**

1. Identify the destination country's national tariff schedule (Colombia: Arancel de Aduanas, DIAN). The 6-digit HS code above must be extended to the national 8/10-digit line for the exact duty rate.

2. Cross-check the line against the EU TARIC consultation tool as a sanity mirror: [EU TARIC](https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en); the USITC HTS: [hts.usitc.gov](https://hts.usitc.gov/); the UK Global Tariff: [trade-tariff.service.gov.uk](https://www.trade-tariff.service.gov.uk/); the Australian Border Force: [abf.gov.au](https://www.abf.gov.au/); the South African Revenue Service: [sars.gov.za](https://www.sars.gov.za/); the Ghana Revenue Authority: [gra.gov.gh](https://gra.gov.gh/); the Uganda Revenue Authority: [ura.go.ug](https://www.ura.go.ug/); Japan Customs: [customs.go.jp/english/](https://www.customs.go.jp/english/). These mirrors are not computed for Colombia.

3. Verify any applicable trade-agreement preferences (Pacific Alliance, MERCOSUR, EU/Andean agreements) that may apply to MFN duty on Chinese-origin modules.

4. Confirm VAT, anti-dumping or safeguard measures applicable to PV modules specifically (the EU has AD/safeguard measures on Chinese-origin modules — confirm via TARIC; US has Section 201 safeguard measures — confirm via USITC HTS).

**Disclaimer:** TradVolt does not assert duty rates as fact. All duty lines above are marked *PENDING* and must be confirmed by the importer against the official national tariff schedule before any commercial commitment. Local counsel or licensed customs broker recommended.

## 8. Logistics & Incoterms (reference)

- **Incoterms:** ICC Incoterms 2020 — official rules page: [iccwbo.org Incoterms 2020](https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/). For a Chinese-OEM → Colombian-port / site shipment of an 8 MWp plant, CIF or DAP Medellín are typical procurement defaults; the choice is buyer's per RFQ.

- **Carrier documents:** FIATA freight-forwarding documents family: [fiata.org](https://fiata.org/) (FCR, FBL, FWB) — used by the appointed freight forwarder.

- **Dangerous goods:** IATA Dangerous Goods Regulations programme page: [iata.org DGR](https://www.iata.org/en/programs/cargo/dgr/). PV modules are non-DGR; lithium-bearing components (any BESS add-on) fall under UN 3480/3481 per the [UN Manual of Tests and Criteria](https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria).

- **Wood packaging:** IPPC ISPM 15 (wood packaging marking): [ippc.int ISPMs](https://www.ippc.int/en/core-activities/standards-setting/ispms/); pallets and crating must be ISPM-15 marked and either heat-treated or fumigated per the standard.

## 9. Methodology notes & bounded-model assumptions

**Exposed model assumptions (bounded; not asserted as measured):**

- residual_value.amount = 0 USD at year 25 (conservative scrap-only assumption).

- residual_value.year = 25 (aligned to horizon).

- asset.pv.self_consumption_pct = 0% (100% grid export at avoided industrial tariff; no behind-the-meter offtake).

- asset.pv.export_tariff_per_kwh = 0.078 USD/kWh year-1, escalated at 3.0%/yr.

- Opex escalation 2.0%/yr; tariff escalation 3.0%/yr; WACC 10.0%/yr — all model assumptions, not measured values.

- Currency: USD nominal; FX hedging not modelled.

- No BESS, no curtailment, no degradation curve kinks in the base case.

- Single-axis tracking not modelled; if tracking is added, specific yield typically rises ~15%, capex ~+8% — re-run via the same formula.

- Source values are point estimates; for bankable studies, replace each row with vendor-quoted or lender-engineering figures.

## 10. Citations (each source = named document with author, title, year, clickable URL)

1. IRENA (2024). *Renewable Power Generation Costs in 2023*. International Renewable Energy Agency. Table 3.2 utility-scale LATAM band. [irena.org/Publications/2024/Mar/Renewable-power-generation-costs-in-2023](https://www.irena.org/Publications/2024/Mar/Renewable-power-generation-costs-in-2023).

2. IEA-PVPS (2024). *Trends in PV Applications 2024*. IEA Photovoltaic Power Systems Programme. [iea-pvps.org Trends in PV Applications 2024](https://iea-pvps.org/trends-reports/trends-in-pv-applications-2024/).

3. Jinko Solar. Tiger Neo JKM-N-72HL4R-V product family (N-type bifacial mono-PERC; degradation specification ≤0.40%/yr linear). [jinkosolar.com/en](https://www.jinkosolar.com/en/).

4. Sungrow. SG3125HV central inverter product family and service-manual mid-life replacement schedule (revision confirmed at RFQ). [sungrowpower.com/en](https://www.sungrowpower.com/en).

5. K2 Systems. N-Rack ground-mount system (driven-pile + S-Rack rail; exact kit designation and manual revision confirmed at RFQ). [k2-systems.com/en](https://k2-systems.com/en/); [K2 N-Rack product page](https://k2-systems.com/en/product-solutions/k2-n-rack-system/).

6. International Electrotechnical Commission (IEC). IEC 61215-1:2021, IEC 61215-1-1:2021, IEC 61215-2:2021, IEC 61730-1:2016, IEC 61730-2:2016, IEC 62109-1:2016, IEC 62109-2:2016, IEC 62446-1:2016, IEC 62446-2:2020, IEC 62930:2019. IEC Webstore catalogue: [webstore.iec.ch](https://webstore.iec.ch/).

7. UL (2017). UL 61730-1 Photovoltaic (PV) Module Safety Qualification — Part 1. [shopulstandards.com UL 61730-1](https://www.shopulstandards.com/ProductDetail.aspx?productId=UL61730-1). UL 1973 (BESS reference): [shopulstandards.com UL 1973](https://www.shopulstandards.com/ProductDetail.aspx?productid=UL1973).

8. United Nations (2019). *UN Manual of Tests and Criteria*, 7th revised edition (ST/SG/AC.10/11/Rev.7) — UN 38.3 lithium-battery provisions. [unece.org/transport/dangerous-goods/un-manual-tests-and-criteria](https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria).

9. International Organization for Standardization (ISO). ISO 9001:2015, ISO 14001:2015, ISO 45001:2018. [iso.org search](https://www.iso.org/search.html?q=2859).

10. International Chamber of Commerce (ICC). *Incoterms 2020*. [iccwbo.org Incoterms 2020](https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/).

11. International Air Transport Association (IATA). Dangerous Goods Regulations programme. [iata.org/en/programs/cargo/dgr](https://www.iata.org/en/programs/cargo/dgr/).

12. International Plant Protection Convention (IPPC). International Standards for Phytosanitary Measures (ISPMs), incl. ISPM 15. [ippc.int ISPMs](https://www.ippc.int/en/core-activities/standards-setting/ispms/).

13. International Federation of Freight Forwarders Associations (FIATA). Negotiable and non-negotiable forwarding documents. [fiata.org](https://fiata.org/).

14. European Commission. TARIC consultation (HS/duty lookup tool). [ec.europa.eu TARIC](https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en).

15. USITC. Harmonized Tariff Schedule search. [hts.usitc.gov](https://hts.usitc.gov/).

16. UK Government. Global Tariff lookup. [trade-tariff.service.gov.uk](https://www.trade-tariff.service.gov.uk/).

17. European Union. Regulation (EU) 2023/1542 (EU Battery Regulation). [eur-lex.europa.eu/eli/reg/2023/1542/oj](https://eur-lex.europa.eu/eli/reg/2023/1542/oj) (reference for BESS add-on only; not in base case).

18. IEC (2017). IEC 61851-1:2017 Electric vehicle conductive charging system — Part 1. [webstore.iec.ch IEC 61851-1 publication 33644](https://webstore.iec.ch/en/publication/33644) (reference for any EV charging scope; not in base case).

19. National mirror tariff lookups (not computed for Colombia, used only as cross-reference): [Japan Customs](https://www.customs.go.jp/english/), [Australian Border Force](https://www.abf.gov.au/), [South African Revenue Service](https://www.sars.gov.za/), [Ghana Revenue Authority](https://gra.gov.gh/), [Uganda Revenue Authority](https://www.ura.go.ug/).

20. TradVolt (2026). RFQ form (live). [tradvolt.com/rfq/](/rfq/).

**Next step:** translate the COMPUTED TABLES above into a bankable model by replacing each model assumption with a vendor-quoted or lender-engineering figure.

[→ Request a formal RFQ](/rfq/)