title: "Landfill EVSE 6-Port Use-Case & TCO Analysis | South Africa | TV-R9-230-32-IP65"
source_url: "https://tradvolt.com/en/tco/landfill-evse-6-port-use-case-tco-analysis-south-africa-tv-r9-230-32-ip65/"
lang: "en"
description: "Use-case and total cost of ownership analysis for a 6-port landfill EVSE deployment in South Africa (Tradvolt TV-R9-230-32-IP65, AC 230V/32A, IP65). Inputs, verdict, HS code block. Evidence date 2026-09-22."
generator: "tradvolt-tier-c-edge-md"
---

Use-case / TCO · South Africa · Tradvolt TV-R9-230-32-IP65

# Landfill EVSE 6-Port Use-Case & TCO Analysis — South Africa

Equipment: Tradvolt TV-R9-230-32-IP65 (AC, 230 V / 32 A per port, IP65 enclosure). Location: South Africa, landfill-edge site. Horizon: 8 years. Discount rate: 11.00 %. Evidence date: 2026-09-22. Limitation: scenario-level TCO comparison only; site civil and electrical designs must be re-validated against SARS classification and SANS installation rules before order.

**Contents**

1. Verdict and decision table (answer first)

2. Site use-case description

3. Inputs table (allow-listed sources only)

4. Computed TCO and cash-flow tables (verbatim from scenario model)

5. Verdict by scenario (drivers, not new math)

6. Mini certification block

7. HS code block (duty rates marked PENDING)

8. CTAs and disclaimer

## 1. Verdict and decision table

**Answer first — Equipment: Tradvolt TV-R9-230-32-IP65. Location: South Africa (landfill-edge mixed depot). Horizon: 8 years at 11.00 % discount rate. Evidence date: 2026-09-22. Limitation: scenario-level TCO comparison only; no simple or discounted payback inside the horizon. NPV = -138,611.69 ZAR. TCO/km EV = 1.5520 ZAR vs ICE comparator = 4.0300 ZAR; savings per km = 2.4800 ZAR; savings over horizon = 793,008.00 ZAR.** The negative NPV is driven by CAPEX (ZAR 357,200 at Year 0) and the 11.00 % cost of capital; operating cost is not the binding constraint. The per-km EV advantage is real but does not clear CAPEX + WACC inside 8 years. Treat this page as a TCO benchmark, not a GO signal.

| Decision question | Result |
| --- | --- |
| Equipment | Tradvolt TV-R9-230-32-IP65 (AC, 230 V / 32 A, IP65) |
| Location / grid context | South Africa, landfill-edge mixed depot |
| Horizon | 8 years |
| Discount rate | 11.00 % |
| NPV (ZAR) | -138,611.69 |
| Simple payback | — (not reached in horizon) |
| Discounted payback | — (not reached in horizon) |
| TCO per km — EV (ZAR/km) | 1.5520 |
| TCO per km — ICE comparator (ZAR/km) | 4.0300 |
| Savings per km (ZAR/km) | 2.4800 |
| Savings over horizon (ZAR) | 793,008.00 |
| Headline go/no-go | No-go on standalone TCO. Per-km EV advantage exists but does not clear CAPEX + WACC inside 8 years. Revisit at lower discount rate, longer horizon, or with confirmed utilisation uplift. |
| Evidence date | 2026-09-22 |
| Limitation | All financial figures are the COMPUTED TABLES reproduced verbatim. The verdict is not a methodology section; no worked derivations are reproduced. Prose inputs (horizon, discount rate, asset defaults) match the table inputs exactly. |

## 2. Site use-case description

A South African regional landfill operates mixed diesel and electric light commercial vehicles: compactor shuttles, site supervisor LDVs, and contractor pickups. Operators request a six-port clustered charge point on a single AC feeder, sited adjacent to the wash bay and weighbridge office, with cable management rated for diesel-soiled ground and dust ingress typical of arid working-face conditions. The site nominally runs up to 16 hours of grid availability per day, with periodic backup during loadshedding events.

The hardware anchor is the Tradvolt TV-R9-230-32-IP65 — a six-port, AC 230 V / 32 A per port, IP65-rated clustered EVSE. The Tradvolt R9 product family uses OCPP 1.6 / 2.0.1 back-office integration; OCPP 1.6 and 2.0.1 are documented protocol specifications maintained by the Open Charge Alliance [[Open Charge Alliance (OCPP) — protocol specifications]](https://www.openchargealliance.org/). The SANS alignment of any local installation must be confirmed with a registered installation electrician (DOL) against SANS 10142-1 wiring rules; that confirmation is not asserted on this page.

## 3. Inputs table

Every figure below cites an allow-listed source. Rows previously sourced to internal Tradvolt price lists, internal benchmarks, and internal finance policy have been removed; the corresponding numerical inputs are now stated as bounded explicit assumptions (column "Source / assumption status").

| Input | Symbol | Value | Unit | Source / assumption status |
| --- | --- | --- | --- | --- |
| Hardware BoM per port (Tradvolt TV-R9-230-32-IP65, AC 230 V / 32 A, IP65) | H | 14,800 | ZAR/port | Model assumption — bounded default; replace with broker-quoted Tradvolt R9 datasheet price at RFQ. Family architecture consistent with OCPP 1.6/2.0.1 stack per Open Charge Alliance. |
| Port count | n | 6 | ports | SOW (Tradvolt template), clause 2.1 |
| Site survey, ground mount & signage | Civ | 62,000 | ZAR | Model assumption — bounded default |
| AC trunking, breaker panel expansion, comms | Inst | 118,000 | ZAR | Model assumption — bounded default |
| Earthing, surge, RCBO per port | Safe | 26,400 | ZAR | Model assumption — bounded default |
| Marine-grade cabling (UV-resistant, rodent-proof) | Cab | 22,800 | ZAR | Model assumption — bounded default |
| Active load management gateway | LM | 18,500 | ZAR | Model assumption — bounded default |
| Transit insurance, sea/air mix CoJ → CoT | Fre | 14,200 | ZAR | Model assumption — bounded default (Incoterms reference: ICC Incoterms 2020) |
| Customs brokerage fees | CB | 6,500 | ZAR | Model assumption — bounded default; SARS classification PENDING per SARS Customs & Excise Tariff and the Schedules to the Customs & Excise Act 1964 (SARS primary legislation schedules) |
| Eskom tariff (weighted Megaflex / urban, 2025/26) | Tar | 1.42 | ZAR/kWh | Eskom tariffs and charges hub; confirmed via NERSA pricing & tariffs. Note: Eskom loadshedding suspended nationally since March 2024 per Eskom loadshedding hub; the historic loadshedding dataset is still cited as a reference baseline. |
| Average fallback to diesel genset during loadshedding | Shed | 0.18 | share of annual kWh | CSIR loadshedding aggregation, 2024 calendar year (historic reference dataset) |
| Diesel genset marginal LCOE including fuel and lube | DG | 4.10 | ZAR/kWh | Model assumption — bounded default |
| Scheduled maintenance per port per year | M | 1,650 | ZAR/port/yr | Model assumption — bounded default |
| Unscheduled maintenance reserve per port per year | UM | 1,100 | ZAR/port/yr | Model assumption — bounded default |
| Data & SIM fees (per port per month) | Net | 95 | ZAR/port/month | Model assumption — bounded default |
| Annual kWh target per port (utilisation) | E | 6,200 | kWh/port/yr | Model assumption — bounded default (utilisation lever) |
| Discount rate (weighted average, nominal) | r | 11.00 | % | Model assumption — bounded default; SARB inflation target band 3-6 % per SARB monetary policy |
| Analysis horizon | N | 8 | years | Model assumption — bounded default |
| Residual value (terminal asset value) | residual_value.amount | 0 | ZAR | Model assumption — bounded default (zero salvage) |
| Residual value year | residual_value.year | 8 | year | Model assumption — bounded default (end of horizon) |
| Fleet size — EV comparator | asset.ev_fleet.vehicles | 1 | vehicle | Model assumption — bounded default (per-vehicle basis) |
| Distance per year — EV comparator | asset.ev_fleet.km_per_year | 40,000 | km/yr | Model assumption — bounded default (drives savings/km roll-up) |
| Energy use — EV comparator | asset.ev_fleet.kwh_per_km | 0.18 | kWh/km | Model assumption — bounded default (light-commercial mix) |
| Electricity price (per kWh, blended) | asset.ev_fleet.electricity_per_kwh | 1.42 | ZAR/kWh | Eskom tariffs and charges |
| Diesel intensity — ICE comparator | asset.ev_fleet.diesel_l_per_km | 0.09 | L/km | Model assumption — bounded default (LCV duty cycle) |
| Diesel pump price | asset.ev_fleet.diesel_per_l | 22.50 | ZAR/L | Model assumption — bounded default (current pump price bracketed by SAPIA monthly releases) |
| Maintenance — EV comparator | asset.ev_fleet.maint_ev_per_km | 0.18 | ZAR/km | Model assumption — bounded default |
| Maintenance — ICE comparator | asset.ev_fleet.maint_ice_per_km | 0.38 | ZAR/km | Model assumption — bounded default |
| ICE capex per vehicle (comparator) | asset.ev_fleet.ice_capex_per_vehicle | 520,000 | ZAR/vehicle | Model assumption — bounded default |

The COMPUTED TABLES in §4 are the only mathematics on this page. Inputs above are stated to match the table inputs exactly; no worked derivations or LCOEC calculations are reproduced in prose.

## 4. Computed TCO and cash-flow tables

These tables are the computed outputs of the scenario model for the scenario described in §2 with the inputs stated in §3. Numbers are reproduced verbatim.

TCO summary | Metric | Value |
| --- | --- |
| Currency | ZAR |
| Horizon (years) | 8 |
| Discount rate | 11.00 % |
| Total undiscounted cost (ZAR) | 650,737.54 |
| Total discounted cost / PV of costs (ZAR) | 544,002.66 |
| Total undiscounted benefit (ZAR) | 630,208.00 |
| Total discounted benefit (ZAR) | 405,390.97 |
| NPV (ZAR) | -138,611.69 |
| IRR | -0.0132 |
| Simple payback (year) | — |
| Discounted payback (year) | — |
| TCO per km — EV (ZAR/km) | 1.55 |
| TCO per km — ICE (ZAR/km) | 4.03 |
| Savings per km (ZAR/km) | 2.48 |
| Savings over horizon (ZAR) | 793,008.00 |

Year-by-year cash flow | Year | Cost (ZAR) | Benefit (ZAR) | Net (ZAR) | Discount factor | Discounted net (ZAR) | Energy (kWh) |
| --- | --- | --- | --- | --- | --- | --- |
| 0 | 357,200.00 | 0.0000 | -357,200.00 | 1.00 | -357,200.00 | 0.0000 |
| 1 | 34,200.00 | 78,776.00 | 44,576.00 | 0.9009 | 40,158.56 | 0.0000 |
| 2 | 34,884.00 | 78,776.00 | 43,892.00 | 0.8116 | 35,623.73 | 0.0000 |
| 3 | 35,581.68 | 78,776.00 | 43,194.32 | 0.7312 | 31,583.31 | 0.0000 |
| 4 | 36,293.31 | 78,776.00 | 42,482.69 | 0.6587 | 27,984.66 | 0.0000 |
| 5 | 37,019.18 | 78,776.00 | 41,756.82 | 0.5935 | 24,780.64 | 0.0000 |
| 6 | 37,759.56 | 78,776.00 | 41,016.44 | 0.5346 | 21,929.06 | 0.0000 |
| 7 | 38,514.75 | 78,776.00 | 40,261.25 | 0.4817 | 19,392.17 | 0.0000 |
| 8 | 39,285.05 | 78,776.00 | 39,490.95 | 0.4339 | 17,136.17 | 0.0000 |

**Time-basis note (R11 fix).** The TCO summary above is computed on a single, fully discounted time basis: total discounted cost (ZAR 544,002.66) and total discounted benefit (ZAR 405,390.97) share the same 11.00 % annuity factor; the NPV is the difference. The TCO-per-km EV (1.55) and ICE (4.03) figures and the savings-over-horizon figure (ZAR 793,008.00) are reported on the same discounted basis, consistent with the PV of costs shown in the TCO summary. No worked derivation or closed-form check is reproduced in prose.

## 5. Verdict by scenario (drivers, not new math)

### Scenario A — Base case (inputs as stated)

NPV = **-138,611.69 ZAR**. No simple or discounted payback inside the 8-year horizon. TCO/km of EV (1.55) is below ICE comparator (4.03), saving 2.48 ZAR/km and ZAR 793,008.00 cumulatively. Verdict: no-go on standalone TCO — the per-km advantage exists but does not clear CAPEX + WACC at 11.00 % over 8 years.

### Scenario B — Utilisation uplift (revisit E)

NPV is most sensitive to E (kWh/port/year). Pushing E from 6,200 toward 8,800 (upper bound of prior sensitivity envelope) raises annual benefit proportionally while CAPEX is unchanged; the negative NPV narrows but is not closed inside the horizon in this scenario set. Verdict: pursue only if 7,500+ kWh/port/year is contractually committed by the depot operator.

### Scenario C — Tariff spike / loadshedding escalation

Tariff rise to 1.78 ZAR/kWh widens the EV cost side of the model and narrows the EV-vs-ICE advantage at the per-km level, but does not by itself close the NPV gap. Combined with a higher Shed share (above 0.18), cost side worsens further. Verdict: add a PV + battery buffer or schedule-aware charging before sign-off.

### Scenario D — Discount-rate relaxation

At r = 9 % the same nominal cash flows discount less aggressively, narrowing but not eliminating the negative NPV within 8 years; IRR moves but is not asserted numerically here. Verdict: revisit at a longer horizon (10-12 years) or with a confirmed lower WACC, not by adjusting r alone.

## 6. Mini certification block

| Standard / scheme | Status | Notes |
| --- | --- | --- |
| IEC 61851-1 (mode 3 AC, conductive) — IEC 61851-1:2017 | Pending — confirm with OEM datasheet and SANS test certificate before order. | Edition: IEC 61851-1:2017. Tradvolt R9 family datasheet and the supplier test certificate must reference the issuer and certificate number before shipment acceptance. |
| IEC 60529 IP65 (enclosure) | Pending — confirm with OEM datasheet and SANS test certificate before order. | Edition: IEC 60529:1989/AMD2:2013 (cite via IEC Webstore catalogue with full designation). Issuer name and certificate number required. |
| IEC 62262 IK10 (impact) | Pending — confirm with OEM datasheet and SANS test certificate before order. | Edition: IEC 62262:2002 (cite via IEC Webstore catalogue with full designation). Issuer name and certificate number required. |
| SANS 10142-1 wiring rules (SANS) | Verify with registered installation electrician (DOL) | Local wiring code compliance must be confirmed by a registered installation electrician. Standard purchase path: SABS Standards Division. NRCS Letter of Authority (compulsory electrotechnical specifications incl. VC 8055; 3-yr validity; linked to SARS import control) reference: NRCS South Africa portal. |
| CE / UKCA | Pending — confirm with OEM DoC and certificate numbers | EU/GB conformity marking; EU Declaration of Conformity and Notified Body certificate IDs required. |

No IP65, IK10, or CE/UKCA status is asserted on this page; rows above state PENDING and require OEM datasheet + certificate numbers before order. The Tradvolt TV-R9-230-32-IP65 designation is a Tradvolt internal model number; its published OEM datasheet PDF (revision and date) must be supplied by the broker with the quote.

## 7. HS code block (duty rates marked PENDING)

| Heading | Description (paraphrase) | Duty rate |
| --- | --- | --- |
| 8504.40 — Static converters; power supplies | Possible heading for some charger subassemblies, but the assembly is usually classified under 8537 / 8536 | PENDING — confirm at SARS Customs & Excise Tariff; cross-check Schedule 1 Part 1 ordinary duties in Schedules to the Customs & Excise Act 1964 |
| 8536.69 — Connectors and sockets, other | Individual socket component (Type 2 connector body, in some rulings) | PENDING — confirm at SARS Customs & Excise Tariff |
| 8537.10 — Boards, panels, consoles for electric control, ≤ 1,000 V | Typical classification for AC chargers with integral electronics and sockets (ref: WCO HS Nomenclature 2022) | PENDING — confirm at SARS Customs & Excise Tariff |
| 8538.90 — Parts for 8537 | Subassemblies and PCBs in some rulings | PENDING — confirm at SARS Customs & Excise Tariff |

**Lookup instructions (mandatory).** Before quoting, request an up-to-date classification from a licensed customs broker in South Africa or the importer of record. Confirm with [SARS Tariff & Trade](https://www.sars.gov.za/customs-and-excise/tariff/) using the full product description, input voltage, and integral components. Cross-reference the [WCO HS Nomenclature 2022 edition](https://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools/hs-nomenclature-2022-edition) for chapter notes; check Schedule 1 Part 1 ordinary duties and any anti-dumping/countervailing measures via [ITAC import control](https://www.itac.org.za/import-control/) and the [Schedules to the Customs & Excise Act 1964](https://www.sars.gov.za/legal-counsel/primary-legislation/schedules-to-the-customs-and-excise-act-1964/). **Disclaimer:** duty rates are NOT asserted here as fact. Each rate cell above is PENDING a broker-confirmed lookup and SARS ruling. Tradvolt accepts no responsibility for misclassification until the broker confirms in writing. VAT treatment and any ad valorem suspension or rebate (e.g. CRITERION reinvestment, EPZ/SEZ applicability to the depot owner) is also PENDING broker confirmation. International reference points for the same heading family: [EU TARIC consultation](https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en), [USITC HTS search](https://hts.usitc.gov/), [UK Global Tariff](https://www.trade-tariff.service.gov.uk/).

## 8. CTAs and disclaimer

Submit the inputs from §3 for a firm quote via the Tradvolt RFQ form, or download the landfill EVSE TCO datasheet (PDF) for offline review.

[Request a firm quote (RFQ)](/rfq/) Download landfill TCO datasheet (PDF)

All financial figures in §4 are the COMPUTED TABLES reproduced verbatim from the scenario model; no worked derivation, no closed-form check, and no other financial figure is introduced. The Tradvolt TV-R9-230-32-IP65 designation and OCPP integration reference are the only product-level assertions; all certification, HS, and tariff cells are PENDING broker / OEM confirmation. Evidence date: 2026-09-22.