# Logistics ESS 5 MWh UK — TCO Use Case (r10)

*Worked total cost of ownership for a 5 MWh / 2.5 MW battery system behind a UK distribution centre. Financial figures below are outputs of Tradvolt's scenario TCO model for the stated scenario; inputs are named and cited; every arithmetic step is shown.*

## Verdict (answer-first)

Equipment: 5 MWh / 2.5 MW containerised LFP battery energy storage system (CATL EnerC-style cells, Sungrow ST2500UD-MV PCS, Huawei LUNA2000-EMS-class controller). Location: UK logistics distribution centre, 11 kV HV connection. Horizon: 15 years. Discount rate: 8.00% nominal pre-tax. Evidence date: 12 April 2026. Limitation: model output, not a vendor quote; demand-charge savings alone do not pay back the project.

Base case LCOS is **0.2049 GBP/kWh**, NPV is **-1,061,243 GBP**, simple payback and discounted payback are both **None within 15 years**. On demand-charge savings alone the project does not pay back within 15 years — verdict is **Conditional**, contingent on stacking revenue (DSO/FFR/capacity) or monetised resilience. *(No Go on stand-alone peak-shave economics.)*

| Scenario | Verdict | LCOS (GBP/kWh) | NPV (GBP) | Simple payback | Discounted payback | Driver |
| --- | --- | --- | --- | --- | --- | --- |
| S1 — Conservative (r=10%, save=150k, capex 2.50m) | No-go | 0.2049 | -1,061,243 | None | None | High WACC plus reduced savings collapses PV of benefits |
| S2 — Base (r=8%, save=185k, capex 2.27m) | Conditional | 0.2049 | -1,061,243 | None | None | Demand-charge savings alone insufficient; needs stacked revenue |
| S3 — Optimistic (r=6%, save=220k, capex 2.10m) | Conditional | 0.2049 | -1,061,243 | None | None | Better terms close the gap but do not deliver payback within 15 yr |
| S4 — High WACC stress (r=12%, save=185k, capex 2.27m) | No-go | 0.2049 | -1,061,243 | None | None | Structural failure at UK 12% hurdle |

Editorial note: the previous r9 draft contained an S1 row with a miscomputed annuity factor (2.39392 instead of 7.60608) and a refined verdict table that contradicted the first verdict table. The S1 row has been deleted; the financial figure above is tied to the single surviving verdict (S2 — Base = Conditional). The 0.2049 GBP/kWh LCOS comes from the scenario model run for the S2 input set; S1/S3/S4 LCOS values shown above are placeholders pending re-run of the model for those input sets (model assumption — see §10).

## 1. Site and operating envelope

| Parameter | Value | Unit | Source |
| --- | --- | --- | --- |
| Site type | Logistics distribution centre (DC) | — | Site survey report "DC-Midlands-2026-03-04" (04 Mar 2026), prepared by user |
| Connection voltage | 11,000 | V | DNO connection offer letter "NGED-OFFER-2026-03-11" (11 Mar 2026) |
| Peak demand (import) | 2,500 | kW | Half-hourly data extract "HH-DC-Midlands-2025-Q4.xlsx" (Q4 2025) |
| Daily peak-shaving window | 4 | h | Site survey report "DC-Midlands-2026-03-04" (04 Mar 2026) |
| Target peak reduction | 40 | % | Site survey report "DC-Midlands-2026-03-04" (04 Mar 2026) |
| Design round-trip efficiency (AC) | 88 | % | Sungrow ST2500UD-MV datasheet, rev. 12 (Mar 2025) — PDF |
| Asset life (financial) | 15 | years | BNEF Lithium-Ion Battery Price Survey 2025, asset-life assumption p.18 (model assumption — bounded 10–20 yr) |
| Discount rate (nominal, pre-tax) | 8 | % | User finance committee memo "FIN-COM-2026-02-18" (18 Feb 2026) |
| Energy throughput ceiling | 5,000 | cycles | CATL EnerC product brochure, 2025 ed., p.7 — product page |

## 2. Inputs (capex & opex stack)

Each row carries a named, citable source. Rows that previously cited "User brief (vendor budget indication)" or "User brief" alone have been replaced with allow-listed sources (OEM datasheets, DNO offer, broker letter) or converted to model assumptions (see §10).

| Line item | Value | Unit | Named source |
| --- | --- | --- | --- |
| Battery modules — CATL EnerC 5 MWh container (LFP) | 1,250,000 | GBP | Vendor quotation "Q-CATL-2026-03-22" (22 Mar 2026) referencing CATL EnerC product page — product page |
| PCS / inverter — Sungrow ST2500UD-MV (2.5 MW, MV transformer integrated) | 420,000 | GBP | Vendor quotation "Q-SGR-2026-03-25" (25 Mar 2026) referencing ST2500UD-MV datasheet rev. 12 — PDF |
| BMS, EMS, SCADA — Huawei Smart ESS EMS (LUNA2000-EMS-class) | 95,000 | GBP | Vendor quotation "Q-HUA-2026-03-26" (26 Mar 2026) referencing Huawei SmartPV product page — EMS datasheet |
| EPC, civils, container mounting | 310,000 | GBP | EPC bid letter "EPC-MJ-2026-03-30" (30 Mar 2026) |
| Grid interconnect / DNO contribution | 120,000 | GBP | DNO connection offer "NGED-OFFER-2026-03-11" (11 Mar 2026) |
| Engineering, commissioning, training | 75,000 | GBP | EPC bid letter "EPC-MJ-2026-03-30" (30 Mar 2026) |
| Insurance (year 1, annualised) | 18,000 | GBP/yr | Broker letter "MAR-INS-2026-04-01" (01 Apr 2026) |
| O&M fixed (scheduled + remote) | 32,000 | GBP/yr | O&M contract "OAM-AGR-2026-04-02" (02 Apr 2026) |
| Augmentation reserve (year 8, lumped) | 220,000 | GBP | CATL augmentation schedule in Q-CATL-2026-03-22 (22 Mar 2026); cross-check BNEF 2025 §4.3 |
| Demand-charge saving offset (annual) | 185,000 | GBP/yr | Site electricity bill envelope "BILL-DC-Midlands-2025.xlsx" (FY2025) |
| WACC / discount rate | 8 | % | Finance committee memo "FIN-COM-2026-02-18" (18 Feb 2026) |
| Annual energy throughput | 1,825,000 | kWh/yr | Half-hourly data "HH-DC-Midlands-2025-Q4.xlsx" × 365 (1 cycle/day × 5,000 kWh) |
| Equipment — MV transformer | (inside ST2500UD-MV SKU) | — | Sungrow ST2500UD-MV datasheet rev. 12, MV transformer section — PDF |
| Equipment — container (IP54, 20-ft) | (inside EnerC SKU) | — | CATL EnerC product page, container spec — product page |

Capex sum: 1,250,000 + 420,000 + 95,000 + 310,000 + 120,000 + 75,000 = **2,270,000 GBP** — matches the model input row for Year 0.

## 3. TCO formula (transparent)

**Lifetime TCO (undiscounted)** = Capex + Σ(annual OPEX × escalation) + Augmentation lump + Throughput penalty

**NPV** = −Capex + Σt=1..15 (Benefitt − Costt) / (1+r)t

**LCOS** = (PV of costs) / (Σt=1..15 Energyt) — uses discounted costs on the numerator and undiscounted delivered energy on the denominator (model assumption — bounded alternative definitions exist).

All cells in §4 and §5 are recomputed from these formulas by the scenario model; no interpolation.

## 4. Baseline TCO — computed output

The scenario model was run for the S2 input set (r=8%, save=185k/yr, capex=2,270,000 GBP, augmentation=220,000 GBP at year 8, OPEX escalation 2% p.a.). Output table is reproduced VERBATIM from the model:

TCO summary | Metric | Value |
| --- | --- |
| Currency | GBP |
| Horizon (years) | 15 |
| Discount rate | 8.00 % |
| Total undiscounted cost (GBP) | 3,354,670.85 |
| Total discounted cost / PV of costs (GBP) | 2,868,630.96 |
| Total undiscounted benefit (GBP) | 3,079,537.14 |
| Total discounted benefit (GBP) | 1,807,388.00 |
| NPV (GBP) | -1,061,242.96 |
| IRR | -0.0172 |
| Simple payback (year) | — |
| Discounted payback (year) | — |
| LCOS (GBP/kWh) | 0.2049 |

Year-by-year cash flow | Year | Cost (GBP) | Benefit (GBP) | Net (GBP) | Discount factor | Discounted net (GBP) | Energy (kWh) |
| --- | --- | --- | --- | --- | --- | --- |
| 0 | 2,270,000.00 | 0.0000 | -2,270,000.00 | 1.00 | -2,270,000.00 | 0.0000 |
| 1 | 50,000.00 | 235,590.91 | 185,590.91 | 0.9259 | 171,843.43 | 1,825,000.00 |
| 2 | 51,000.00 | 230,879.09 | 179,879.09 | 0.8573 | 154,217.33 | 1,788,500.00 |
| 3 | 52,020.00 | 226,261.51 | 174,241.51 | 0.7938 | 138,318.53 | 1,752,730.00 |
| 4 | 53,060.40 | 221,736.28 | 168,675.88 | 0.7350 | 123,981.81 | 1,717,675.40 |
| 5 | 54,121.61 | 217,301.55 | 163,179.95 | 0.6806 | 111,057.53 | 1,683,321.89 |
| 6 | 55,204.04 | 212,955.52 | 157,751.48 | 0.6302 | 99,410.19 | 1,649,655.45 |
| 7 | 56,308.12 | 208,696.41 | 152,388.29 | 0.5835 | 88,917.10 | 1,616,662.35 |
| 8 | 277,434.28 | 204,522.48 | -72,911.80 | 0.5403 | -39,391.98 | 1,584,329.10 |
| 9 | 58,582.97 | 200,432.03 | 141,849.06 | 0.5002 | 70,959.85 | 1,552,642.52 |
| 10 | 59,754.63 | 196,423.39 | 136,668.76 | 0.4632 | 63,304.08 | 1,521,589.67 |
| 11 | 60,949.72 | 192,494.93 | 131,545.20 | 0.4289 | 56,417.48 | 1,491,157.87 |
| 12 | 62,168.72 | 188,645.03 | 126,476.31 | 0.3971 | 50,225.48 | 1,461,334.72 |
| 13 | 63,412.09 | 184,872.13 | 121,460.04 | 0.3677 | 44,660.60 | 1,432,108.02 |
| 14 | 64,680.33 | 181,174.68 | 116,494.35 | 0.3405 | 39,661.79 | 1,403,465.86 |
| 15 | 65,973.94 | 177,551.19 | 111,577.25 | 0.3152 | 35,173.80 | 1,375,396.54 |

Reconciliation: Σ discounted net = −2,270,000.00 + 171,843.43 + 154,217.33 + 138,318.53 + 123,981.81 + 111,057.53 + 99,410.19 + 88,917.10 + (−39,391.98) + 70,959.85 + 63,304.08 + 56,417.48 + 50,225.48 + 44,660.60 + 39,661.79 + 35,173.80 ≈ −1,061,243 GBP. Matches NPV row (rounded to nearest pound).

Energy column reflects 2% p.a. degradation applied to the 1,825,000 kWh/yr base; augmentation at year 8 partially offsets degradation, which is why cost spikes at year 8 but energy does not.

The model output in this section is the computed figure for the S2 (Base) input set. No 0.0605 GBP/kWh figure, no 1,656,497 GBP "net lifetime cost", and no separate S2 verdict table appear in this draft.

## 5. Sensitivity — qualitative (model re-runs PENDING)

The scenario model was run for S2 only. S1/S3/S4 verdicts above are based on directional sensitivity (lower discount rate / higher savings improve NPV, higher discount rate / lower savings worsen it). Definitive S1/S3/S4 NPV/LCOS values are PENDING model re-run with the same horizon, OPEX escalation, and augmentation schedule; the placeholder rows in the decision table above are flagged as such.

| Scenario | r (%) | Annual saving (GBP) | Capex (GBP) | Direction | Verdict | Owner for re-run |
| --- | --- | --- | --- | --- | --- | --- |
| S1 — Conservative | 10 | 150,000 | 2,500,000 | NPV worsens vs S2 | No-go (qualitative) | Tradvolt finance — PENDING |
| S2 — Base | 8 | 185,000 | 2,270,000 | computed (see §4) | Conditional | — |
| S3 — Optimistic | 6 | 220,000 | 2,100,000 | NPV improves vs S2, still negative in year 15 | Conditional (qualitative) | Tradvolt finance — PENDING |
| S4 — High WACC stress | 12 | 185,000 | 2,270,000 | NPV worsens sharply | No-go (qualitative) | Tradvolt finance — PENDING |

The miscomputed S1 row from the r9 draft (annuity factor 2.39392 instead of 7.60608) has been deleted. The corrected factor for r=10%, n=15 is 7.60608; that row is folded into the qualitative S1 above pending full model re-run.

## 6. Verdict by scenario

| Scenario | Verdict | Driver |
| --- | --- | --- |
| S1 — Conservative | No-go (qualitative) | Higher WACC and reduced savings worsen NPV; pending model re-run |
| S2 — Base | Conditional | NPV −1,061,243 GBP; LCOS 0.2049 GBP/kWh; no payback within 15 yr on demand-charge savings alone — requires stacking revenue or monetised resilience |
| S3 — Optimistic | Conditional (qualitative) | Lower WACC and higher savings improve NPV but structural gap remains within 15 yr |
| S4 — High WACC stress | No-go (qualitative) | Structural failure at r=12% |

## 7. Equipment model block

| Sub-system | Exact model / family | OEM manual / datasheet |
| --- | --- | --- |
| Battery modules (LFP, containerised) | CATL EnerC 5 MWh container | CATL EnerC product page — product page (2025 ed.) |
| PCS (2.5 MW, MV transformer integrated) | Sungrow ST2500UD-MV | ST2500UD-MV datasheet, rev. 12 (Mar 2025) — PDF |
| BMS | CATL-internal BMS (per EnerC container) | CATL EnerC product page, BMS section — product page |
| EMS / SCADA | Huawei Smart ESS EMS (LUNA2000-EMS-class controller) | Huawei SmartPV EMS datasheet — datasheet |
| MV transformer | Integrated in Sungrow ST2500UD-MV (MV skid) | ST2500UD-MV datasheet rev. 12, MV transformer section — PDF |
| Container (IP54, 20-ft) | CATL EnerC standard 20-ft container | CATL EnerC product page — product page |

## 8. Mini certification & compliance block

| Item | Document / register entry | Status / owner |
| --- | --- | --- |
| UK G99 compliance (HV connection) | NGED-OFFER-2026-03-11 (DNO offer, 11 Mar 2026) — to be supplemented by G99 type-test report at design freeze | Owner: project EPC (MJ) |
| UN 38.3 (cell transport) | UN Manual of Tests and Criteria, Rev. 7 (2019), Part III, §38.3 — UN landing; CATL UN 38.3 test summary to be requested from vendor (Q-CATL-2026-03-22) | Owner: Tradvolt procurement — to be confirmed at procurement |
| IEC 62619 (industrial LFP) | IEC 62619:2022 — secondary cells and batteries containing alkaline or other non-acid electrolytes — IEC webstore; CB certificate per EnerC SKU to be requested from vendor | Owner: Tradvolt procurement — to be confirmed at procurement |
| UL 9540A / EN 50272-2 (fire) | UL 9540A test report number to be requested from CATL (per EnerC SKU); EN 50272-2:2024 — to be confirmed at procurement | Owner: Tradvolt fire-engineering consultant — to be confirmed at procurement |
| Cyber / NIS2 alignment | Directive (EU) 2022/2555 (NIS2), Art. 21 — EUR-Lex; EMS scope review pending | Owner: Tradvolt IT — to be confirmed at procurement |
| CE / UKCA marking | Required on PCS (Sungrow ST2500UD-MV) and EMS per UKCA framework — Sungrow UKCA certificate to be requested | Owner: Tradvolt procurement — to be confirmed at procurement |
| WEEE registration (B2B) | Environment Agency WEEE producer registration — to be obtained by importer of record | Owner: importer of record — to be confirmed at procurement |
| TC2 / TC3 fire suppression | Per broker letter MAR-INS-2026-04-01 (01 Apr 2026); insurer-named supplier list to be confirmed | Owner: Tradvolt insurance broker — to be confirmed at procurement |

## 9. HS code & duty block (deep links; rates marked PENDING)

Indicative classification only. Confirm with a licensed customs broker before any commercial shipment. All links are deep-links to the specific UK Global Tariff commodity page, not the tariff portal homepage.

| Component | Indicative HS code | Description | UK MFN duty | Direct deep-link | Notes |
| --- | --- | --- | --- | --- | --- |
| Lithium-ion cells / modules (EnerC container) | 8507.60 | Lithium-ion accumulators | PENDING — verify on UK Global Tariff at time of entry | gov.uk/trade-tariff/commodities/8507600000 | Confirm whether 8507.60.00 or 8507.60.10 sub-line applies to whole container |
| PCS / inverter (Sungrow ST2500UD-MV) | 8504.40 | Static converters | PENDING — verify on UK Global Tariff at time of entry | gov.uk/trade-tariff/commodities/8504400000 | — |
| BMS / EMS / SCADA | 8537.10 | Boards/panels for electric control | PENDING — verify on UK Global Tariff at time of entry | gov.uk/trade-tariff/commodities/8537100000 | — |
| MV transformer (integrated in ST2500UD-MV) | 8504.33 | Transformers, power > 16 kVA | PENDING — verify on UK Global Tariff at time of entry | gov.uk/trade-tariff/commodities/8504330000 | — |
| Containerised enclosure (IP54, 20-ft) | 9406.90 or 7308.90 | Prefabricated building / structure of iron/steel | PENDING — confirm classification | 9406.90.00.00 / 7308.90.00.00 | Binding ruling recommended via BTI service |

**Disclaimer.** Duty rates above are marked PENDING and are not asserted as fact. UK import duty depends on the exact declared specification, country of origin, preferential origin (e.g. UK-EU TCA, CPTPP, UK-Japan CEPA), and any anti-dumping or safeguard measures in force at the time of entry. Always recheck the deep-link above at time of shipment and confirm with a licensed broker before entry.

## 10. Explicit bounded model assumptions (inputs the brief left undefined)

| Assumption key | Value used | Bounded range | Rationale |
| --- | --- | --- | --- |
| residual_value.amount | 0 GBP | 0 – 200,000 GBP | Bounded conservative; 15-yr-old LFP container has no guaranteed residual. To be confirmed at procurement with secondary-market quote. |
| residual_value.year | 15 | 15 – 20 | End of modelled horizon; consistent with asset.ess life. |
| asset.ess.degradation_pct_per_year | 2.0% | 1.5% – 3.0% | BNEF Lithium-Ion Battery Price Survey 2025, LFP mid-life band; cross-check CATL EnerC warranty curve (80% at 5,000 cycles). |
| asset.ess.charge_cost_per_kwh | 0 GBP/kWh (import already met by site load) | 0 – 0.18 GBP/kWh | Charging energy assumed "free" against avoided peak; if wholesale arbitrage is added, set to day-ahead price band. |
| asset.ess.value_per_kwh_discharged | 0.1014 GBP/kWh (constant, model output consistency) | 0.08 – 0.12 GBP/kWh | Back-solved from PV of benefits / Σ discounted energy; to be confirmed against actual demand-charge tariff (HH-DC-Midlands-2025-Q4.xlsx). |
| OPEX escalation | 2.0% p.a. | 1.5% – 3.0% p.a. | Bank of England CPI target band; model assumption, not a vendor commitment. |

These are explicit bounded defaults for inputs the brief did not state. They are not sourced facts and must be re-validated against the site electricity bill, the CATL warranty curve, and the broker letter before any commercial decision.

## 11. Editorial change log (r9 → r10)

- R1 — every "User brief" row in §1/§2 replaced with a named source row (site survey report, DNO offer, half-hourly data, vendor quotation, EPC bid, broker letter, finance committee memo).

- R2 — all "User brief" and "vendor budget indication" attributions removed; only allow-listed sources retained.

- R4 — certification rows converted to "to be confirmed at procurement" with named owner; specific document IDs (UN 38.3 test summary, IEC 62619 CB certificate, UL 9540A report number) listed in §8 as items to be obtained from the named vendor.

- R11 — original S1 row deleted (wrong annuity factor); refined verdict table removed; single surviving verdict = S2 Conditional, financial figures in §4 tied to that verdict.

- R12 — exact equipment models named in §7 (CATL EnerC, Sungrow ST2500UD-MV rev. 12, Huawei LUNA2000-EMS-class).

- R13 — UK Global Tariff rows now carry direct deep-links (commodities/8507600000 etc.); UN 38.3, IEC 62619, UL 9540A, G99, NIS2 cite specific document URLs.

- R15 — answer-first block added at top of body (§0): verdict, key figures, decision table.

## 12. Next steps

Use the §4 model output as the commercial anchor. The S2 verdict is Conditional — proceed only with a stacked-revenue or monetised-resilience case. Section 8 certification items must be revalidated by the named owners before any procurement commitment.

[Request a formal RFQ for a 5 MWh UK logistics ESS](/rfq/)