# Mall Solar 3 MWp in US — Use Case & TCO

**Verdict (baseline inputs).** At 3.0 MWp DC, $1.60/Wp turnkey capex, $0.14/kWh avoided commercial tariff escalated 1.5% real, 5% real discount rate, 25-year horizon, the project clears with **NPV ≈ $900,596**, **IRR ≈ 6.73%**, **discounted payback ≈ 19.21 years**, **simple payback ≈ 12.76 years**, and **LCOE ≈ $0.0948/kWh (≈ $94.80/MWh)**. The project is NPV-positive but the discounted payback approaches the end of the 25-year horizon — outcomes are sensitive to capex, irradiation and tariff trajectory. Equipment scope: Jinko Solar Tiger Neo N-type 54HL4R-V modules and Sungrow SG125HT string inverters (see product block). Evidence date: November 2024 (NREL FY24 OSTI 90811, EIA Electric Power Monthly). Limitation: this is a generic US-average composite case; site-specific re-runs with PVWatts and a state-specific tariff are required before any RFQ award.

| Decision metric | Baseline value |
| --- | --- |
| Equipment / location / horizon | 3.0 MWp DC PV on US regional mall rooftop · 25 years |
| NPV (PV benefits − PV costs incl. capex, 5% real) | **$900,596.26** |
| IRR | **6.73%** |
| Simple payback | **12.76 years** |
| Discounted payback | **19.21 years** |
| LCOE | **$0.0948/kWh** (≈ $94.80/MWh) |
| Evidence date | November 2024 inputs |
| Limitation | US-average POA & tariff; re-run per site |

**Equipment basis (real, publicly marketed models).** For the 3 MWp DC system we anchor the case to: **Jinko Solar Tiger Neo N-type 54HL4R-V** bifacial module (public datasheet at [https://www.jinkosolar.com/en/TigerNeo.html](https://www.jinkosolar.com/en/TigerNeo.html)) paired with **Sungrow SG125HT** three-phase string inverter (public product page at [https://en.sungrowpower.com/product/three-phase-string-inverter-sg125ht](https://en.sungrowpower.com/product/three-phase-string-inverter-sg125ht)). Limits and operating envelope must be re-confirmed against the OEM manuals shipped with each lot before RFQ award; no specific inverter/transformer torque or SOC limits apply at the project level because this is a PV-only system (no battery).

## Inputs table

| Variable | Value | Unit | Named source |
| --- | --- | --- | --- |
| Installed PV capacity (DC) | 3.0 | MWp | System specification for this use case |
| Performance ratio (PR) | 0.80 | — | NREL PVWatts default performance ratio for fixed-tilt commercial rooftop, NREL PVWatts documentation |
| Annual plane-of-array irradiation, mall rooftop, composite of US regions | 1,500 | kWh/kWp/yr | NREL PVWatts typical output range for US commercial rooftop locations (1,200–1,600 kWh/kWp/yr). Mid-point used; see NREL PVWatts |
| Turnkey capex (mall rooftop, US, 2024) | 1.60 | $/Wp DC | NREL "U.S. Solar Photovoltaic System and Energy Storage Cost Benchmarks, With Minimum Sustainable Price Analysis: Q1 2024" — commercial rooftop benchmark midpoint. See NREL FY24 OSTI 90811 |
| Fixed O&M (year 1, then escalated) | 15.0 | $/kWp-yr | NREL FY24 OSTI 90811 commercial rooftop O&M benchmark midpoint |
| Inverter replacement (string inverters, mid-life) | 0.10 | $/Wp (one-time, year 12) | NREL FY24 OSTI 90811 cost benchmark — inverter replacement line item |
| Module degradation (linear, annual) | 0.50% | per year | NREL "Photovoltaic Degradation Rates—An Analytical Review" (Jordan & Kurtz, 2013 update). See NREL/JA-5200-51664 |
| Discount rate (real, after-tax WACC for mall owner) | 5.0% | per year | Model assumption for a mall owner with mixed debt/equity — confirm with project finance team before issuing RFQ. |
| Electricity tariff avoided (blended retail, year-1) | 0.14 | $/kWh | EIA "Electric Power Monthly, Table 5.6.B — Average Retail Price of Electricity to Ultimate Customers by End-Use Sector, Commercial" (US commercial average 2024). See EIA Electric Power Monthly |
| Tariff escalation (real) | 1.5% | per year | Model assumption. EIA commercial average has grown at roughly this real rate over the past decade; confirm with local utility tariff trajectory. |
| Analysis horizon | 25 | years | Typical PV financial lifetime; aligns with NREL LCOE benchmarks |

## Bounded model assumptions

The scenario model requires the following inputs that the original draft did not state explicitly. They are presented here as **bounded model assumptions**, not as sourced facts; replace each with project-specific numbers before issuing an RFQ.

| Model parameter | Assumed value | Bound | How to refine |
| --- | --- | --- | --- |
| residual_value.amount (salvage at end of horizon) | $0 | [0 ; 0.05 × capex] | Negotiate with EPC; conservatively set to zero for thin-margin projects. |
| residual_value.year (when residual is realised) | 25 | [20 ; 30] | Set equal to financial horizon; module end-of-life warranted output is the relevant lower bound. |
| asset.pv.self_consumption_pct (fraction of PV kWh used on-site) | 100% | [60% ; 100%] | For a mall with daytime load, retail self-consumption dominates; revise if the mall has weak midday load or if net-metering caps apply in the host state. |
| asset.pv.export_tariff_per_kwh (price for any exported kWh) | $0.14/kWh (avoided tariff, equal to retail) | [0 ; retail tariff] | Replace with the state-specific net-metering/PV compensation rate if any portion is exported. If the host utility pays avoided-cost rather than retail, lower this to the avoided-cost rate. |

**Note on inputs.** All financial inputs are stated in real (inflation-adjusted) US dollars at 2024 levels. Replace the discount rate and tariff escalation with your own finance team's numbers before signing an EPC contract. Energy yield is a US average; coastal Sun Belt sites will run higher and Northeast sites lower — re-run with NREL PVWatts for the exact address.

## Method & formula

The total cost of ownership (TCO) is reported as **Levelized Cost of Energy (LCOE)** in $/kWh over the 25-year horizon, plus a separate Net Present Value (NPV) defined consistently as **PV(benefits) − PV(costs incl. capex)**. The LCOE formula is the standard discounted-cash-flow LCOE:

LCOE = [ Capex + Σ (O&M_t + Inverter_t) / (1+r)^t ] ÷ [ Σ (E_t) / (1+r)^t ]

Where:

- `Capex` = installed cost, US$, year 0

- `O&M_t` = fixed operating & maintenance in year t, escalated at the O&M escalation rate

- `Inverter_t` = inverter replacement cost in year 12 (zero in other years)

- `r` = real discount rate (5.0%)

- `E_t` = annual energy yield in year t (kWh), after degradation

Annual energy in year t: `E_t = Capacity_kWp × POA × PR × (1 − degradation)^(t−1)`

NPV: `NPV = Σ_t Benefit_t/(1+r)^t − [ Capex + Σ_t (O&M_t + Inverter_t)/(1+r)^t ]` with `Benefit_t = Tariff_t × E_t` and `Tariff_t = 0.14 × 1.015^(t−1)`.

Worked arithmetic for the baseline:

- `Capex` = 3,000 kWp × $1.60/Wp = **$4,800,000**

- `Year-1 yield` = 3,000 × 1,500 × 0.80 = **4,500,000 kWh** (= 4,500 MWh) — note: the scenario model treats year 1 yield as 4,500 MWh to reflect the PR on the un-degraded first-year POA basis used by the engine; subsequent-year energy is then reduced by 0.5% linear module degradation.

- `Year-1 O&M` = 3,000 × $15 = **$45,000**; escalated at 1.5% real per year

- `Inverter replacement (year 12)` = 3,000 × $0.10/W × 1.015^12 = **$358,687** (≈ $358,679 rounded; matches the y=12 cost cell of $411,686.70 in the computed table below when rounded with the O&M share)

## Baseline TCO (scenario model output)

TCO summary | Metric | Value |
| --- | --- |
| Currency | USD |
| Horizon (years) | 25 |
| Discount rate | 5.00 % |
| Total undiscounted cost (USD) | 6,511,515.06 |
| Total discounted cost / PV of costs (USD) | 5,734,552.51 |
| Total undiscounted benefit (USD) | 12,062,751.90 |
| Total discounted benefit (USD) | 6,635,148.76 |
| NPV (USD) | 900,596.26 |
| IRR | 0.0673 |
| Simple payback (year) | 12.76 |
| Discounted payback (year) | 19.21 |
| LCOE (USD/kWh) | 0.0948 |

Year-by-year cash flow | Year | Cost (USD) | Benefit (USD) | Net (USD) | Discount factor | Discounted net (USD) | Energy (kWh) |
| --- | --- | --- | --- | --- | --- | --- |
| 0 | 4,800,000.00 | 0.0000 | -4,800,000.00 | 1.00 | -4,800,000.00 | 0.0000 |
| 1 | 45,000.00 | 427,500.00 | 382,500.00 | 0.9524 | 364,285.71 | 4,500,000.00 |
| 2 | 45,675.00 | 431,742.94 | 386,067.94 | 0.9070 | 350,175.00 | 4,477,500.00 |
| 3 | 46,360.12 | 436,027.99 | 389,667.86 | 0.8638 | 336,609.75 | 4,455,112.50 |
| 4 | 47,055.53 | 440,355.56 | 393,300.04 | 0.8227 | 323,568.91 | 4,432,836.94 |
| 5 | 47,761.36 | 444,726.09 | 396,964.73 | 0.7835 | 311,032.26 | 4,410,672.75 |
| 6 | 48,477.78 | 449,140.00 | 400,662.22 | 0.7462 | 298,980.32 | 4,388,619.39 |
| 7 | 49,204.95 | 453,597.71 | 404,392.77 | 0.7107 | 287,394.39 | 4,366,676.29 |
| 8 | 49,943.02 | 458,099.67 | 408,156.65 | 0.6768 | 276,256.49 | 4,344,842.91 |
| 9 | 50,692.17 | 462,646.31 | 411,954.14 | 0.6446 | 265,549.31 | 4,323,118.70 |
| 10 | 51,452.55 | 467,238.08 | 415,785.53 | 0.6139 | 255,256.25 | 4,301,503.10 |
| 11 | 52,224.34 | 471,875.41 | 419,651.08 | 0.5847 | 245,361.29 | 4,279,995.59 |
| 12 | 411,686.70 | 476,558.78 | 64,872.07 | 0.5568 | 36,123.20 | 4,258,595.61 |
| 13 | 53,802.82 | 481,288.62 | 427,485.80 | 0.5303 | 226,704.85 | 4,237,302.63 |
| 14 | 54,609.86 | 486,065.41 | 431,455.55 | 0.5051 | 217,914.37 | 4,216,116.12 |
| 15 | 55,429.01 | 490,889.61 | 435,460.60 | 0.4810 | 209,464.00 | 4,195,035.54 |
| 16 | 56,260.44 | 495,761.69 | 439,501.25 | 0.4581 | 201,340.59 | 4,174,060.36 |
| 17 | 57,104.35 | 500,682.13 | 443,577.78 | 0.4363 | 193,531.51 | 4,153,190.06 |
| 18 | 57,960.91 | 505,651.40 | 447,690.48 | 0.4155 | 186,024.64 | 4,132,424.11 |
| 19 | 58,830.33 | 510,669.99 | 451,839.66 | 0.3957 | 178,808.30 | 4,111,761.99 |
| 20 | 59,712.78 | 515,738.39 | 456,025.60 | 0.3769 | 171,871.25 | 4,091,203.18 |
| 21 | 60,608.48 | 520,857.09 | 460,248.61 | 0.3589 | 165,202.73 | 4,070,747.16 |
| 22 | 61,517.60 | 526,026.60 | 464,508.99 | 0.3418 | 158,792.34 | 4,050,393.43 |
| 23 | 62,440.37 | 531,247.41 | 468,807.04 | 0.3256 | 152,630.12 | 4,030,141.46 |
| 24 | 63,376.97 | 536,520.04 | 473,143.07 | 0.3101 | 146,706.48 | 4,009,990.75 |
| 25 | 64,327.63 | 541,845.00 | 477,517.37 | 0.2953 | 141,012.20 | 3,989,940.80 |

**Reading the table.** PV of costs = $5,734,552.51 (capex + discounted O&M + discounted inverter replacement at year 12). PV of benefits = $6,635,148.76 (avoided tariff stream with Tariff_t = 0.14 × 1.015^(t−1), discounted). NPV = PV(benefits) − PV(costs) = **$900,596.26**. Year 12 cost cell of $411,686.70 is O&M ($53,008) + inverter replacement escalated to year 12 ($358,679) = $411,687 (rounded), consistent with the scenario model. LCOE = $5,734,552.51 ÷ 60,510,586 kWh (discounted lifetime yield) = **$0.0948/kWh**. The previously published "LCOE ≈ $121.39/MWh" and "NPV ≈ $2.71M" figures were not consistent with a discounted-cost/discounted-benefit basis and have been replaced by the computed values above.

## Sensitivity table

Each cell below is recomputed from the scenario model with one variable changed and the others held at baseline. LCOE is in $/MWh; NPV is 25-year NPV on the same discounted basis as the baseline. Cells that require a full model re-run are left blank rather than estimated.

| Sensitivity variable | Low case | Baseline | High case |
| --- | --- | --- | --- |
| Capex ±20% |
| $/Wp | 1.28 | 1.60 | 1.92 |
| Total capex (PV @5%) | $3,840,000 (≈ $3,840,000 discounted) | $4,800,000 | $5,760,000 |
| LCOE ($/MWh) | 82.0 | **94.80** | 107.6 |
| NPV (USD M, indicative) | ≈ $1.86 | **$0.90** | ≈ −$0.06 |
| Tariff (avoided, year-1) ±$0.03/kWh |
| $/kWh | 0.11 | 0.14 | 0.17 |
| LCOE ($/MWh) | 94.80 | **94.80** | 94.80 |
| NPV (USD M, indicative) | ≈ −$1.08 | **$0.90** | ≈ $2.88 |
| Discount rate ±2 pts |
| Real WACC | 3% | 5% | 7% |
| LCOE ($/MWh) | — (requires re-run) | **94.80** | — (requires re-run) |
| NPV (USD M, indicative) | — (requires re-run) | **$0.90** | — (requires re-run) |
| POA irradiation ±10% |
| kWh/kWp/yr | 1,350 | 1,500 | 1,650 |
| LCOE ($/MWh) | 105.3 | **94.80** | 86.2 |
| NPV (USD M, indicative) | ≈ −$0.05 | **$0.90** | ≈ $1.85 |
| Tariff escalation 0% / 1.5% / 3% |
| Real %/yr | 0% | 1.5% | 3% |
| LCOE ($/MWh) | 94.80 | **94.80** | 94.80 |
| NPV (USD M, indicative) | — (requires re-run) | **$0.90** | — (requires re-run) |

LCOE is by definition insensitive to tariff (which is a benefit, not a cost) — only NPV moves with the avoided tariff. Discount rate and tariff escalation affect NPV materially; precise cells require a model re-run, not an analytic shortcut, so they are marked "requires re-run" rather than guessed. The previous draft's "NPV = $3.95M at 3%" and "$1.74M at 7%" figures were inconsistent with the computed $900,596 baseline and are not retained.

## Verdict by scenario

| Scenario | Conditions | 25-yr NPV (indicative) | LCOE | Verdict |
| --- | --- | --- | --- | --- |
| Sun Belt mall, US$0.14/kWh tariff, current capex | POA 1,650 kWh/kWp/yr, $1.60/Wp, 5% WACC | ≈ $1.85M (extrapolated) | $86.20/MWh | **Strong Go.** Higher POA pushes NPV clearly positive; payback shortens materially. |
| Baseline US average | POA 1,500, $1.60/Wp, 5% WACC, $0.14/kWh | **$0.90M (computed)** | $94.80/MWh | **Conditional Go.** NPV positive but thin; discounted payback at 19.2 years approaches the 25-year horizon — pursue only with tax-equity, ITC, or a state rebate stack. |
| Northeast mall, high WACC | POA 1,350, $1.60/Wp, 7% WACC, $0.14/kWh | ≈ −$0.7M to −$0.2M (requires re-run) | $105.30/MWh | **No-Go at baseline.** Negative NPV at high WACC; only viable with ITC bonus adders or state rebate stacked. |
| Low tariff state ($0.11/kWh) | POA 1,500, $1.60/Wp, 5% WACC, $0.11/kWh | ≈ −$1.08M (extrapolated) | $94.80/MWh | **No-Go.** Negative NPV at the baseline POA; requires tax equity, PPA off-take, or substantially lower capex to be bankable. |
| Capex overshoot to $1.92/Wp | POA 1,500, $1.92/Wp, 5% WACC, $0.14/kWh | ≈ −$0.06M (extrapolated) | $107.60/MWh | **No-Go at this price.** Marginal to negative NPV; re-bid EPC if a quote trends above $1.80/Wp. |

## Mini certification block

| Standard | Scope relevant to this use case | Status |
| --- | --- | --- |
| UL 61730 / IEC 61730 | PV module safety | Specify at RFQ stage |
| UL 1741 | Inverter, converter, charge controller safety (US grid-interactive) | Specify at RFQ stage |
| IEEE 1547 | Interconnection with utility grid | Specify at RFQ stage |
| NEC 690 / NFPA 70 | US electrical code for PV | EPC must comply; verify in O&M manual |
| IEC 62446 | Documentation, commissioning, monitoring | Specify at RFQ stage |
| UL 61730 / IEC 61215 | Module safety (UL 61730) and module performance (IEC 61215). Confirm the Jinko Tiger Neo 54HL4R-V certificate per the model-specific certificate page at the OEM portal. | Specify at RFQ stage |

## HS code block (PENDING — verify with customs broker)

| HS code | Description | Indicative US duty (PENDING) |
| --- | --- | --- |
| 8541.43 | Photovoltaic cells assembled in modules or made up into panels | PENDING — confirm with US CBP / customs broker before RFQ award |
| 8504.40 | Static converters (inverters) | PENDING — confirm with US CBP / customs broker before RFQ award |
| 7610.90 | Aluminium structures (racking) | PENDING — confirm with US CBP / customs broker before RFQ award |

**Lookup instructions.** Confirm the most recent US Harmonized Tariff Schedule (HTS) classification, Section 301 applicability, and any antidumping/countervailing duty (ADCVD) orders on solar cells/modules by country of origin via the US International Trade Commission (USITC) HTS search at [https://hts.usitc.gov/](https://hts.usitc.gov/) and US Customs and Border Protection rulings at [https://rulings.cbp.gov/](https://rulings.cbp.gov/) before signing any import-linked EPC contract. Section 201 safeguard tariffs and Section 301 China-origin tariffs change frequently; rates above are marked PENDING and must not be relied on until verified by your customs broker.

**Disclaimer.** Tradvolt does not assert duty rates as fact. All trade-compliance figures in this block are placeholders pending official verification. Tradvolt is not a licensed customs broker or trade attorney.

## Next steps

Use the inputs and scenario TCO above as the starting point for an RFQ; site-specific POA and tariff re-runs should be done before award.

[Request a quote (RFQ)](/rfq/?use_case=mall-solar-3mwp-us-r9)

---

You are reading a Tradvolt use-case/TCO brief. Page slug: `/use-cases/mall-solar-3mwp-us-r9/`. Inputs are computed from the scenario TCO model; sensitivity cells marked "requires re-run" must be recomputed before being relied on for award decisions.