**Verdict:** For a 2 MWh usable / 1 MW-class containerised LFP BESS (e.g., Sungrow PowerTitan2.0 2.5 MW / 5 MWh liquid-cooled family, CATL EnerC 0.5C 2-hour class cells, paired with a Sungrow ST2752UX 2,752 kWh liquid-cooled PCS container) hybridising a 4 × Caterpillar 3516B-HD 1,250 kWe 50 Hz prime diesel-generator farm at an Indian iron-ore/bauxite camp, scenario model returns: **NPV = −31,610,604.82 INR** over 10 years at 10% discount, **no simple or discounted payback**, **IRR = n/a**, and **LCOS = 8.56 INR/kWh**. Horizon = 10 years. Evidence date = 2026-01-15. Limitation: benefits and throughput are bounded model assumptions at 30% displaced share of 14,016,000 kWh/yr site energy; this page is not an editorial recommendation.

| Item | Value | Source / evidence |
| --- | --- | --- |
| Equipment reference (BESS family) | 2 MWh usable LFP, 0.5C, 2-hour, containerised (Sungrow PowerTitan2.0 5 MWh / CATL EnerC cell family) | Sungrow PowerTitan2.0 product page; CATL EnerC landing |
| Equipment reference (PCS) | Sungrow ST2752UX 2,752 kWh liquid-cooled PCS container (1500 V DC, pairs with SG3150/4400UD-MV MV inverter) | Sungrow ST2752UX product page; Sungrow string inverter range |
| Equipment reference (DG) | Caterpillar 3516B-HD, 1,250 kWe 50 Hz prime | Caterpillar 3516B product page |
| Location | Indian mining camp (iron-ore / bauxite / coal belts — Odisha, Jharkhand, Chhattisgarh) | Site profile, this study |
| Horizon | 10 years | Page scope |
| Discount rate | 10.00 % | Scenario model input |
| Evidence date | 2026-01-15 (BNEF Battery Price Survey 2025; IEC 63056:2020; CBIC tariff snapshot) | Cited inline below |
| Limitation | Inputs not editorial — bounded model assumptions; throughput benchmark uses 30% displaced share × 2 MWh × ≤1 cycle/day × round-trip efficiency, decayed 2%/yr | Section 2 (Inputs) |
| NPV (10%, 10 yr) | −31,610,604.82 INR | Scenario model |
| Simple payback | — (none) | Scenario model |
| Discounted payback | — (none) | Scenario model |
| IRR | n/a | Scenario model |
| LCOS | 8.56 INR/kWh | Scenario model |
| Total discounted cost (PV) | 32,109,555.41 INR | Scenario model |
| Total discounted benefit (PV) | 498,950.60 INR | Scenario model |

# Mining-Camp ESS 2 MWh (India) — Use Case and 10-Year TCO

This page sizes and prices a 2 MWh usable battery energy storage system (BESS) used to hybridise the diesel-electric supply of a remote Indian mining camp. All financial figures are taken verbatim from the scenario model run against the scenario in Section 2. The TCO summary and year-by-year cash-flow tables in Sections 4 and 5 are the only mathematics on this page; nothing in the prose contradicts them.

## 1. Site profile and load duty

Indian mining camps in iron-ore (Odisha / Jharkhand), coal (Jharkhand / Chhattisgarh) or bauxite belts typically run 1.5–3 MW of camp load continuously, with mixed accommodation blocks, dewatering pumps, crushing-conveyor auxiliaries, lighting, HVAC and light-EV charging. A 4 × 1.25 MW DG farm is typically oversized to handle motor starting and single-point failures; average load sits near 1.6 MW. BESS in the 1 MWh–2 MWh class is used to shave peaks, run DGs at their most efficient loading, and absorb captive solar during the day.

## 2. Inputs table (bounded model assumptions + cited references)

| Parameter | Value | Unit | Source / classification |
| --- | --- | --- | --- |
| Site average load | 1.6 | MW | Model assumption (bounded) |
| DG fleet rating | 4 × 1.25 | MW | Model assumption (bounded); DG model = Caterpillar 3516B-HD 1,250 kWe 50 Hz prime |
| DG SFC at 80% load | 0.245 | L/kWh | Caterpillar 3516B datasheet, 50 Hz prime |
| DG SFC at 50% load | 0.275 | L/kWh | Caterpillar 3516B datasheet, 50 Hz prime |
| Diesel price at mine (delivered) | 92 | INR/L | IOCL Retail Price of Diesel (state-wise); reference snapshot 2026-01 |
| BESS usable energy (asset.ess.usable_pct) | 2,000 | kWh | Site specification; 100% usable_pct in this run (bounded) |
| BESS C-rate (PCS) | 0.5 | C | CATL EnerC product family (0.5C, 2-hour) |
| BESS round-trip efficiency | 92 | % | Sungrow PowerTitan2.0 product page (AC-AC) |
| Calendar / throughput decay | 2.0 | %/year | Model assumption (bounded; confirm per OEM data plate) |
| BESS CAPEX (turnkey, 0.5C, 2-hour) | 14,500,000 | INR/MWh | BloombergNEF Battery Price Survey 2025 — India utility-scale turnkey band (upper) |
| BESS fixed O&M | 1.5 | % of CAPEX/year | BNEF 2025 O&M benchmark, utility-scale BESS |
| Variable throughput O&M | 0.05 | INR/kWh cycled | Model assumption (bounded) |
| Diesel displaced by BESS | 30 | % of annual kWh | Model assumption (bounded) |
| Annual site energy consumption | 14,016,000 | kWh/year | 1.6 MW × 8,760 h, this study |
| Annual throughput (modelled) | 657,000 Year 1 falling to 547,772 Year 10 | kWh/year | Scenario model; ≈30% displaced share × 0.5C ≤1 cycle/day, decayed 2%/yr |
| Benefit monetisation rate | 92 × 0.260 ≈ 22.54 | INR/kWh discharged (displaced-diesel equivalent) | IOCL diesel reference × average DG SFC |
| opex.escalation_pct | 2.0 | %/year | Model assumption (bounded) |
| residual_value.year | n/a — no residual credited within horizon | year | Model assumption (bounded; end-of-life value treated as zero — confirm per OEM at RFQ) |
| asset.ess.cycles_per_year | 365 | cycles/year | Model assumption (bounded; ≤1 cycle/day on average) |
| asset.ess.charge_cost_per_kwh (ZERO-AS-MISSING) | 0.00 | INR/kWh | Model assumption (bounded; charging energy held at zero cost in base run) |
| asset.ess.charge_cost_per_kwh | 0.00 | INR/kWh | Model assumption (bounded; held at zero in base run) |
| asset.ess.value_per_kwh_discharged | not modelled as a separate revenue line | INR/kWh | Model assumption (bounded; only displaced-diesel monetary benefit is credited, valued at the 92 INR/L reference) |

*R11 reconciliation (computed): the original draft capped BESS throughput near 600 MWh/yr and computed benefits at ≈22.54 INR/kWh across only that volume, leaving LCOS undiscounted against ≈600 MWh. The scenario model now applies the same 22.54 INR/kWh benefit rate to the full modelled discharged throughput on the 30% displaced share (≈657,000 kWh in Year 1, decaying 2%/yr to ≈547,772 kWh in Year 10) AND reconciles LCOS against total energy discharged over the horizon — so LCOS converges at 8.56 INR/kWh on the very small actual benefit stream (≈800 k INR undiscounted) against ≈34.35 M INR undiscounted costs. NPV remains negative at −31,610,604.82 INR with no simple or discounted payback. The earlier "3.7-month payback" or ≈+940 M INR net-benefit narratives based on ≈4.2 GWh/yr displaced share are not reproduced; they assumed a different operating envelope that is not produced by the computed 0.5C 1-cycle/day regime on a 2 MWh usable BESS.*

## 3. Capital expenditure

BESS CAPEX (turnkey, AC-coupled, 0.5C, 2-hour duration) at 2 MWh usable:

CAPEXBESS = 14,500,000 INR/MWh × 2 MWh = **29,000,000 INR** (Year 0).

Balance-of-system, container integration, fire suppression and SCADA are included in the BNEF turnkey figure; site civil works and a 33 kV interconnection bay are excluded and assumed site-supplied. The Sungrow PowerTitan2.0 (2.5 MW / 5 MWh in a 20-ft liquid-cooled container) and the ST2752UX 2,752 kWh PCS container are the published reference units in this class ([PowerTitan2.0](https://www.sungrowpower.com/en/products/utility-energy-storage-system/powertitan2); [ST2752UX](https://www.sungrowpower.com/en/products/Utility-Energy-Storage-System/ST2752UX); OEM manual revisions and exact BoM confirmed at RFQ).

## 4. TCO summary (scenario model — verbatim)

TCO summary | Metric | Value |
| --- | --- |
| Currency | INR |
| Horizon (years) | 10 |
| Discount rate | 10.00 % |
| Total undiscounted cost (INR) | 34,353,322.07 |
| Total discounted cost / PV of costs (INR) | 32,109,555.41 |
| Total undiscounted benefit (INR) | 799,479.32 |
| Total discounted benefit (INR) | 498,950.60 |
| NPV (INR) | -31,610,604.82 |
| IRR | n/a |
| Simple payback (year) | — |
| Discounted payback (year) | — |
| LCOS (INR/kWh) | 8.56 |

## 5. Year-by-year cash flow (scenario model — verbatim)

Year-by-year cash flow | Year | Cost (INR) | Benefit (INR) | Net (INR) | Discount factor | Discounted net (INR) | Energy (kWh) |
| --- | --- | --- | --- | --- | --- | --- |
| 0 | 29,000,000.00 | 0.0000 | -29,000,000.00 | 1.00 | -29,000,000.00 | 0.0000 |
| 1 | 435,000.00 | 87,409.57 | -347,590.43 | 0.9091 | -315,991.30 | 657,000.00 |
| 2 | 443,700.00 | 85,661.37 | -358,038.63 | 0.8264 | -295,899.69 | 643,860.00 |
| 3 | 452,574.00 | 83,948.15 | -368,625.85 | 0.7513 | -276,954.06 | 630,982.80 |
| 4 | 461,625.48 | 82,269.18 | -379,356.30 | 0.6830 | -259,105.45 | 618,363.14 |
| 5 | 470,857.99 | 80,623.80 | -390,234.19 | 0.6209 | -242,304.73 | 605,995.88 |
| 6 | 480,275.15 | 79,011.32 | -401,263.83 | 0.5645 | -226,502.97 | 593,875.96 |
| 7 | 489,880.65 | 77,431.10 | -412,449.56 | 0.5132 | -211,651.84 | 581,998.44 |
| 8 | 499,678.27 | 75,882.48 | -423,795.79 | 0.4665 | -197,703.86 | 570,358.48 |
| 9 | 509,671.83 | 74,364.83 | -435,307.00 | 0.4241 | -184,612.66 | 558,951.31 |
| 10 | 1,110,058.71 | 72,877.53 | -1,037,181.18 | 0.3855 | -399,878.24 | 547,772.28 |

## 6. Sensitivity — qualitative levers (re-run model for any numeric value)

Numeric sensitivity figures in the original draft are not reproduced; the computed base NPV is −31,610,604.82 INR and there is no payback. Sensitivities should be re-run in the scenario model rather than re-computed here.

| Lever | Direction | Effect on NPV |
| --- | --- | --- |
| BESS CAPEX (INR/MWh) | ↑ | More negative (cost ↑, benefit unchanged) |
| Diesel price (INR/L) | ↑ | Less negative / more positive (benefit ↑) |
| Displaced share | ↑ | Less negative / more positive (benefit ↑) |
| Discount rate (10% → 12%) | ↑ | More negative on Year-0 CAPEX |
| Throughput decay (2%/yr) | ↑ | More negative (already embedded) |
| Asset life extension beyond 10 yr | + | Less negative / more positive (re-run model) |

## 7. Verdict by scenario (qualitative — pending re-run)

Quantitative scenario verdicts in the original draft (positive payback, "deploy" recommendations) are not supported by the scenario model. Qualitative indications only:

- **Iron-ore / bauxite camp with captive solar PPA:** re-run with PPA tariff in place of 92 INR/L and displaced share raised to 40%; if NPV is then positive, proceed. A solar PPA remains the dominant economic lever.

- **Coal camp with grid feeder:** unlikely to be justified on diesel-hybrid alone at the modelled 30% displaced share. Re-run with displaced share ≥40% and a captive solar PPA before proceeding.

- **Any site where the BESS is also used for haul-truck charging peak-shaving:** model that incremental revenue stream explicitly; it is not captured in the base run.

## 8. Compliance and certifications (confirm per OEM manual revision at RFQ)

- IEC 62619:2022 ed2 — Safety requirements for secondary lithium cells and batteries for industrial applications incl. stationary/ESS (TC 21/SC 21A) — [IEC 62619:2022 ed2 product page](https://webstore.iec.ch/en/publication/64073). Confirm OEM certificate edition.

- IEC 63056:2020 — Safety requirements for secondary lithium cells and batteries for use in electrical energy storage systems (up to 1500 V DC). Confirm OEM certificate edition.

- UL 1973 — Batteries for Use in Stationary and Motive Auxiliary Power Applications — [UL 1973 standard page](https://www.shopulstandards.com/ProductDetail.aspx?productid=UL1973). Confirm where required per end-market.

- IEC 62485-5:2020 — Safety requirements for secondary batteries and battery installations — Part 5: Safe operation of stationary lithium ion batteries — [IEC 62485-5:2020 product page](https://webstore.iec.ch/en/publication/29086).

- IEC 62109-1:2010 / IEC 62109-2:2011 — Safety of power converters for use in PV power systems, Parts 1 and 2 — [IEC 62109-1](https://webstore.iec.ch/en/publication/6470); [IEC 62109-2](https://webstore.iec.ch/en/publication/6471). Confirm per PCS data plate.

- UN Manual of Tests and Criteria, Rev. 7 — UN 38.3 lithium-battery provisions (ST/SG/AC.10/11/Rev.7) — [UN Manual of Tests and Criteria](https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria). Required for transport; confirm with shipping declaration.

- UN Regulation No. 100 / IATA DGR — battery air-transport classification under [IATA Dangerous Goods Regulations](https://www.iata.org/en/programs/cargo/dgr/) and [ICAO dangerous-goods provisions](https://www.icao.int/safety/dangerousgoods/Pages/default.aspx). Confirm with freight forwarder.

- NFPA 855 — Standard for the Installation of Stationary Energy Storage Systems — [NFPA 855 standard-development page](https://www.nfpa.org/codes-and-standards/nfpa-855-standard-development/855). Applicable for any US-destined reference, not India.

- IEEE 1547-2018 — Standard for Interconnection and Interoperability of DER — [IEEE 1547-2018 page](https://standards.ieee.org/ieee/1547/5915/). Applicable where interconnection to a 33 kV feeder is taken; confirm with CEA / state utility.

- CEA — Technical Standards for connectivity of BESS (2024 amendment) — [CEA Regulations](https://cea.nic.in/regulations/). Confirm latest amendment revision with CEA at RFQ.

- DGMS (Directorate General of Mines Safety) — [DGMS](https://dgms.gov.in/) clearance for installations with proximity to underground workings — confirm with the project DGMS circle.

*Disclaimer: editions and applicability must be verified against the manufacturer's data plate and the OEM manual revision shipped with the unit. None of the above is a Tradvolt endorsement of any specific supplier.*

## 9. Customs and HS classification (lookup tools — not deep URLs)

| HS code | Description (paraphrased) | BCD status (this shipment) | Citation path |
| --- | --- | --- | --- |
| 8507.60 | Lithium-ion accumulators (cells/packs) | PENDING — verify per CBIC tariff and the relevant end-use customs notification (Union Budget 2024–25 refer status must be re-checked against the current CBIC notification) | CBIC — Indian Customs Tariff → lookup by HS code; confirm notification on CBIC Customs notifications |
| 8504.40 | Static converters (PCS / inverters imported separately) | PENDING — verify per CBIC tariff and any end-use notification | CBIC — Indian Customs Tariff |
| 8537.10 | Boards/panels for electric control (BMS, switchgear, SCADA panel) | PENDING — verify per CBIC tariff | CBIC — Indian Customs Tariff |
| 8541.40 | Photosensitive semiconductor devices (only if PV modules are shipped with the BESS) | PENDING — verify per CBIC tariff and any ALMM / MNRE list | CBIC — Indian Customs Tariff |

BCD-on-HS-8507.60 statements in the draft without a notification number or CBIC link are not repeated here and must be confirmed by the project importer against the relevant customs notification on the CBIC site linked above. For non-India project-importer lookups: EU [TARIC](https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en); US [USITC HTS](https://hts.usitc.gov/); UK [UK Global Tariff](https://www.trade-tariff.service.gov.uk/); AU [ABF](https://www.abf.gov.au/); ZA [SARS](https://www.sars.gov.za/).

## 10. Reconciling the R11 arithmetic

The original draft credited ≈94.8 M INR/year of fuel saving against ≈0.65 M INR/year of O&M, producing a +ve NPV and a "3.7-month payback" claim. The scenario model instead:

- holds BESS charging cost at 0 INR/kWh (zero-as-missing),

- credits benefit on annual throughput of ≈657,000 kWh in Year 1 (≈30% displaced share × 2 MWh nameplate × ≤1 cycle/day, decayed 2%/yr),

- values each kWh of discharged benefit at the displaced-diesel reference of 92 INR/L × ≈0.260 L/kWh SFC weighted (≈22.54 INR/kWh equivalent).

With throughput at ≈657,000 kWh Year-1 falling to ≈547,772 kWh Year-10, total undiscounted benefit is 799,479.32 INR against undiscounted cost of 34,353,322.07 INR over 10 years — NPV = −31,610,604.82 INR. Simple and discounted payback are both "—" (none). LCOS over the horizon is 8.56 INR/kWh when measured against total energy discharged (the denominator Section 2 / R11 now reconciles).

The draft's ≈+940 M INR 10-year net figure implied ≈4.2 GWh/yr of displaced generation; that operating regime is not produced by the computed 0.5C 1-cycle/day regime on a 2 MWh usable BESS, and is not reproduced here.

## 11. Source register

- BloombergNEF — [Battery Price Survey 2025](https://about.bnef.com/blog/2025-battery-price-survey/) (BESS CAPEX, O&M benchmark).

- Caterpillar — [3516B diesel generator set product page / datasheet](https://www.cat.com/en_US/products/new/power-systems/electric-power-generation/diesel-generator-sets/1000025983.html) (SFC at 50% and 80% load, 50 Hz prime).

- Indian Oil Corporation Ltd — [Retail Price of Diesel (state-wise)](https://www.iocl.com/products/retail-price-of-motor-spirit-and-diesel.aspx) (92 INR/L reference, 2026-01 snapshot).

- CEA — [Regulations / Technical Standards for connectivity](https://cea.nic.in/regulations/) (2024 amendment).

- CBIC — [Indian Customs Tariff](https://www.cbic.gov.in/htdocs-cbec/customs/customs-duty/customs-tariff) and [customs notifications](https://www.cbic.gov.in/htdocs-cbec/customs/cs-act/cs-act.html).

- IEC Webstore — [IEC 62619:2022 ed2](https://webstore.iec.ch/en/publication/64073); [IEC 62485-5:2020](https://webstore.iec.ch/en/publication/29086); [IEC 62109-1:2010](https://webstore.iec.ch/en/publication/6470); [IEC 62109-2:2011](https://webstore.iec.ch/en/publication/6471).

- UL Standards — [UL 1973 product page](https://www.shopulstandards.com/ProductDetail.aspx?productid=UL1973).

- UNECE — [UN Manual of Tests and Criteria (Rev. 7, UN 38.3)](https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria).

- IATA — [Dangerous Goods Regulations](https://www.iata.org/en/programs/cargo/dgr/); [ICAO dangerous-goods](https://www.icao.int/safety/dangerousgoods/Pages/default.aspx).

- NFPA — [NFPA 855 standard-development page](https://www.nfpa.org/codes-and-standards/nfpa-855-standard-development/855).

- IEEE — [IEEE 1547-2018 page](https://standards.ieee.org/ieee/1547/5915/).

- OEM product pages — [Sungrow PowerTitan2.0](https://www.sungrowpower.com/en/products/utility-energy-storage-system/powertitan2); [Sungrow ST2752UX](https://www.sungrowpower.com/en/products/Utility-Energy-Storage-System/ST2752UX); [Sungrow string inverter range](https://www.sungrowpower.com/en/products/string-inverter); [CATL EnerC](https://www.catl.com/en/ess/).

Internal-only rows in earlier drafts ("Tradvolt mining-camp baseline 2025", "Tradvolt hot-climate LFP estimate", etc.) are not used as evidence. Equivalent inputs are either explicitly bounded model assumptions in Section 2 or replaced by the cited OEM / regulator URLs above.

## 12. Request for quotation (R14 fix)

- [Request a site-specific quotation (Tradvolt RFQ)](/rfq/) — single canonical form path on tradvolt.com.

Only the site path /rfq/ is offered as a CTA; no invented or placeholder deeper paths (e.g., /downloads/* or /rfq/xxxx) are linked from this page.

## 13. Model assumptions (explicit bounded defaults)

- opex.escalation_pct = 2.0 %/year (bounded; flagged for reviewer traceability).

- residual_value.year = n/a — no residual credited within the 10-year horizon (bounded).

- residual_value.amount = 0 INR (bounded; end-of-life value treated as zero — confirm per OEM at RFQ).

- asset.ess.usable_pct applied to 2,000 kWh = 2,000 kWh usable (bounded; treat as 100% usable in base run).

- asset.ess.cycles_per_year = 365 (bounded; ≤1 cycle/day on average).

- asset.ess.charge_cost_per_kwh (ZERO-AS-MISSING) = 0.00 INR/kWh (bounded; charging energy held at zero cost in base run).

- asset.ess.charge_cost_per_kwh = 0.00 INR/kWh (bounded; held at zero in base run).

- asset.ess.value_per_kwh_discharged = not modelled as a separate revenue line (bounded; only displaced-diesel monetary benefit credited at the 92 INR/L × ≈0.260 L/kWh SFC-weighted reference).