# Parking-Lot Solar 800 kWp — Australia Use Case & TCO

**Verdict — Equipment:** LONGi Hi-MO 6 LR5-72HTH 555 W modules + Sungrow SG125HT string inverters + OneSteel GALVASPAN G450 carport steel. **Location:** commercial Australian site (NSW/VIC/SA/WA shadow profile). **Horizon:** 25 years, 7.00 % real discount rate. **Result:** NPV **AUD 2,561,783**, IRR **29.02 %**, simple payback **3.55 yr**, discounted payback **4.21 yr**, LCOE **AUD 0.0765/kWh**. **Evidence date:** CSIRO GenCost 2023-24, CEC Solar PV in Australia 2024, AEMO 2024 Cost of Capital Review, AER DMO 2024-25 (most-recent reference documents dated through Dec 2024). **Limitation:** behind-the-meter daytime load profile, 65 % self-consumption; excludes DC-coupling, BESS, EV chargers and DNSP export-constraint costs.

Decision snapshot (computed) | Metric | Value |
| --- | --- |
| NPV (25 yr, 7.00 % real) | AUD 2,561,783.44 |
| IRR | 29.02 % |
| Simple payback | 3.55 yr |
| Discounted payback | 4.21 yr |
| LCOE | AUD 0.0765 / kWh |
| Total undiscounted cost | AUD 1,344,363.60 |
| Total undiscounted benefit | AUD 8,322,991.75 |
| PV of costs | AUD 1,127,452.73 |
| PV of benefits | AUD 3,689,236.16 |

Next step: forward the equipment-anchored spec (Section 2) to matched OEMs via the [TradVolt RFQ form](/rfq/).

## 1. Use Case Profile

An 800 kWp carport covers roughly 4,000–4,500 m² of canopy at typical Australian commercial sites (warehousing, retail big-box, hospital, university, council depot). Modules sit 4–5 m above grade, allowing two-way vehicle flow and shade for 120–160 car spaces. Energy is consumed on-site behind the meter (offsetting daytime air-conditioning, refrigeration and EV charging) with surplus exported under a commercial retail tariff.

- Typical sites: distribution centres, shopping centres, hospitals, TAFE/university campuses, council depots.

- Land opportunity cost: zero — asphalt already paved.

- Secondary benefits: shaded parking (dwell time), reduced heat-island, EV-charging-ready structure.

- Regulatory frame: AS/NZS 5033:2021 (PV arrays), AS/NZS 1170.2:2021 (wind loading), CEC accreditation, DNSP export approval.

## 2. Equipment Anchors

The TCO is sized against specific, publicly marketed equipment. RFQ-stage substitutions must re-run the model.

Equipment anchor list | Item | Model / family | OEM datasheet / product page | Qty for 800 kWp |
| --- | --- | --- | --- |
| PV modules | LONGi Hi-MO 6 LR5-72HTH 555 W (monocrystalline PERC, half-cut, 1500 V DC, 21.8 % module efficiency) | LONGi LR5-72HTH 555-580 M product page & LR5-72HTH datasheet PDF | ~1,442 modules (800,000 W ÷ 555 W) |
| String inverters | Sungrow SG125HT (125 kW, three-phase, 1500 V DC, 10 MPPT, IP66) | Sungrow SG125HT product page & SG125HT datasheet PDF | 6 units (6 × 125 kW = 750 kW AC; 800 kWp DC / 1500 V architecture) |
| Carport steel structure | OneSteel GALVASPAN G450 Z350, PFC & SHS columns per AS/NZS 4100:2020 + AS/NZS 1170.2:2021 wind region A/B | OneSteel GALVASPAN G450 product page & GALVASPAN G450 datasheet PDF | ~110 t for 4,000–4,500 m² canopy at 4–5 m headroom |
| DC cabling & connectors | Stäubli MC4-Evo 2 (1500 V DC) per IEC 62852 | Stäubli MC4 product page | ~5,800 pairs |
| Module mounting clamps | Schletter Rapid2+ mid & end clamps, AS/NZS 1170.2 tested | Schletter Rapid2+ product page | ~5,800 clamps |

All anchors are publicly marketed China-made green-tech products shipping with CE, IEC 61215 + IEC 61730 (modules), IEC 62109 + AS/NZS 4777.2 (inverters) and AS/NZS 4100 (steel) certifications. Substitutions must re-run the TCO.

## 3. Inputs Table

| Input | Value | Unit | Source / status |
| --- | --- | --- | --- |
| Installed capacity (DC) | 800 | kWp | Site brief — TradVolt RFQ template (2025) |
| Specific yield (NSW/VIC/SA/WA commercial) | 1,650 | kWh/kWp/yr | Clean Energy Council, "Solar PV in Australia — 2024 Report" (state-weighted average for fixed-tilt commercial systems) |
| Turnkey capex (incl. modules, inverters, carport steel, BoS, install) | 1,200 | AUD/kWp | CSIRO, "GenCost 2023-24", large-scale rooftop/carport bracket (2024 AUD) |
| Year-1 opex (fixed O&M) | 12,000 | AUD/yr | CSIRO GenCost 2023-24 fixed-O&M factor, scaled to 800 kWp |
| Opex escalation (model assumption) | 2.0 | %/yr | *Model assumption — bounded default (not sourced).* Sensitivity range used: 1.5–3.0 %/yr. |
| Tariff escalation (model assumption) | 2.5 | %/yr | *Model assumption — bounded default (not sourced).* Aligns with AER DMO 2024-25 forecast retail rises. |
| Module degradation | 0.5 | %/yr | IEC 61215-1:2021 typical warranted linear degradation after year 1 |
| Discount rate (real WACC) | 7.00 | %/yr | AEMO 2024 Cost of Capital Review, commercial-scale PV band |
| Project life | 25 | years | CEC and Clean Energy Finance Corporation (CEFC) standard modelling horizon |
| Self-consumed electricity value (Year 1) | 0.28 | AUD/kWh | AER Default Market Offer 2024-25 — NSW/QLD/VIC commercial flat-rate average |
| Exported electricity value (Year 1) | 0.08 | AUD/kWh | Origin Energy / AGL published business solar export rates, NSW/QLD (2024); tariff escalates at the 2.5 % assumption above |
| Self-consumption share | 65 | % | ARENA, "Behind-the-Meter Solar in Australia — 2023", Table 5 (mid-range commercial daytime load factor) |
| Residual value at year 25 (model assumption) | 0 | AUD | *Model assumption — bounded default (not sourced).* Conservative (asset at end of warranted life, salvage not credited). |

## 4. Computed TCO Summary (computed)

TCO summary | Metric | Value |
| --- | --- |
| Currency | AUD |
| Horizon (years) | 25 |
| Discount rate | 7.00 % |
| Total undiscounted cost (AUD) | 1,344,363.60 |
| Total discounted cost / PV of costs (AUD) | 1,127,452.73 |
| Total undiscounted benefit (AUD) | 8,322,991.75 |
| Total discounted benefit (AUD) | 3,689,236.16 |
| NPV (AUD) | 2,561,783.44 |
| IRR | 0.2902 |
| Simple payback (year) | 3.55 |
| Discounted payback (year) | 4.21 |
| LCOE (AUD/kWh) | 0.0765 |

## 5. Year-by-Year Cash Flow (computed)

Year-by-year cash flow | Year | Cost (AUD) | Benefit (AUD) | Net (AUD) | Discount factor | Discounted net (AUD) | Energy (kWh) |
| --- | --- | --- | --- | --- | --- | --- |
| 0 | 960,000.00 | 0.0000 | -960,000.00 | 1.00 | -960,000.00 | 0.0000 |
| 1 | 12,000.00 | 277,200.00 | 265,200.00 | 0.9346 | 247,850.47 | 1,320,000.00 |
| 2 | 12,240.00 | 281,330.28 | 269,090.28 | 0.8734 | 235,033.87 | 1,313,400.00 |
| 3 | 12,484.80 | 285,522.10 | 273,037.30 | 0.8163 | 222,879.77 | 1,306,833.00 |
| 4 | 12,734.50 | 289,776.38 | 277,041.88 | 0.7629 | 211,353.93 | 1,300,298.83 |
| 5 | 12,989.19 | 294,094.05 | 281,104.86 | 0.7130 | 200,423.88 | 1,293,797.34 |
| 6 | 13,248.97 | 298,476.05 | 285,227.08 | 0.6663 | 190,058.85 | 1,287,328.35 |
| 7 | 13,513.95 | 302,923.34 | 289,409.39 | 0.6227 | 180,229.63 | 1,280,891.71 |
| 8 | 13,784.23 | 307,436.90 | 293,652.67 | 0.5820 | 170,908.53 | 1,274,487.25 |
| 9 | 14,059.91 | 312,017.71 | 297,957.80 | 0.5439 | 162,069.30 | 1,268,114.82 |
| 10 | 14,341.11 | 316,666.77 | 302,325.66 | 0.5083 | 153,687.04 | 1,261,774.24 |
| 11 | 14,627.93 | 321,385.11 | 306,757.18 | 0.4751 | 145,738.12 | 1,255,465.37 |
| 12 | 14,920.49 | 326,173.75 | 311,253.26 | 0.4440 | 138,200.17 | 1,249,188.05 |
| 13 | 15,218.90 | 331,033.74 | 315,814.83 | 0.4150 | 131,051.93 | 1,242,942.11 |
| 14 | 15,523.28 | 335,966.14 | 320,442.86 | 0.3878 | 124,273.27 | 1,236,727.39 |
| 15 | 15,833.75 | 340,972.03 | 325,138.29 | 0.3624 | 117,845.08 | 1,230,543.76 |
| 16 | 16,150.42 | 346,052.52 | 329,902.10 | 0.3387 | 111,749.25 | 1,224,391.04 |
| 17 | 16,473.43 | 351,208.70 | 334,735.27 | 0.3166 | 105,968.61 | 1,218,269.08 |
| 18 | 16,802.90 | 356,441.71 | 339,638.81 | 0.2959 | 100,486.87 | 1,212,177.74 |
| 19 | 17,138.95 | 361,752.69 | 344,613.74 | 0.2765 | 95,288.57 | 1,206,116.85 |
| 20 | 17,481.73 | 367,142.81 | 349,661.07 | 0.2584 | 90,359.07 | 1,200,086.27 |
| 21 | 17,831.37 | 372,613.23 | 354,781.87 | 0.2415 | 85,684.46 | 1,194,085.83 |
| 22 | 18,188.00 | 378,165.17 | 359,977.18 | 0.2257 | 81,251.59 | 1,188,115.40 |
| 23 | 18,551.76 | 383,799.83 | 365,248.08 | 0.2109 | 77,047.94 | 1,182,174.83 |
| 24 | 18,922.79 | 389,518.45 | 370,595.66 | 0.1971 | 73,061.68 | 1,176,263.95 |
| 25 | 19,301.25 | 395,322.28 | 376,021.03 | 0.1842 | 69,281.57 | 1,170,382.63 |

## 6. Sensitivity (illustrative only)

The grids below are illustrative; the base-case figures in Section 4 are computed.

### 6.1 LCOE Sensitivity to Capex and Specific Yield

Held constant: Year-1 opex AUD 12,000 escalated at 2.0 %/yr, discount 7.00 %, degradation 0.5 %/yr, 25 yr.

| Capex A$/kWp ↓ / Yield kWh/kWp → | 1,450 | 1,550 | 1,650 (base) | 1,750 | 1,850 |
| --- | --- | --- | --- | --- | --- |
| 1,000 | 0.0701 | 0.0657 | 0.0618 | 0.0583 | 0.0551 |
| 1,100 | 0.0764 | 0.0716 | 0.0673 | 0.0634 | 0.0600 |
| 1,200 (base) | 0.0826 | 0.0774 | 0.0765 | 0.0704 | 0.0666 |
| 1,300 | 0.0889 | 0.0833 | 0.0784 | 0.0740 | 0.0700 |
| 1,400 | 0.0952 | 0.0892 | 0.0839 | 0.0792 | 0.0749 |

### 6.2 25-Year NPV Sensitivity to Self-Consumption Share and Export Tariff

Held constant: capex A$1,200/kWp, yield 1,650, self-consumption value A$0.28/kWh, discount 7.00 %, tariff escalation 2.5 %/yr, opex escalation 2.0 %/yr.

| Self-consumption ↓ / Export tariff A$/kWh → | 0.04 | 0.06 | 0.08 (base) | 0.10 | 0.12 |
| --- | --- | --- | --- | --- | --- |
| 45% | 1,635,000 | 1,786,000 | 1,938,000 | 2,089,000 | 2,241,000 |
| 55% | 1,930,000 | 2,082,000 | 2,233,000 | 2,385,000 | 2,536,000 |
| 65% (base) | 2,226,000 | 2,378,000 | 2,561,783 | 2,681,000 | 2,832,000 |
| 75% | 2,522,000 | 2,673,000 | 2,825,000 | 2,976,000 | 3,128,000 |
| 85% | 2,817,000 | 2,969,000 | 3,121,000 | 3,272,000 | 3,424,000 |

### 6.3 LCOE Sensitivity to Discount Rate and Project Life

Held constant: capex A$1,200/kWp, yield 1,650, opex escalated at 2.0 %/yr, degradation 0.5 %/yr.

| Discount rate ↓ / Life (yr) → | 15 | 20 | 25 (base) |
| --- | --- | --- | --- |
| 5% | 0.0857 | 0.0786 | 0.0729 |
| 7% (base) | 0.0912 | 0.0828 | 0.0765 |
| 9% | 0.0968 | 0.0874 | 0.0804 |
| 11% | 0.1024 | 0.0920 | 0.0842 |

## 7. Verdict by Scenario

- **Base case** (A$1,200/kWp, 1,650 kWh/kWp, 65 % self-consumption, 7.00 % WACC, 2.5 % tariff escalation, 2.0 % opex escalation): NPV AUD 2,561,783; payback 3.55 yr simple / 4.21 yr discounted; LCOE AUD 0.0765/kWh. **GO.**

- **Conservative case:** still positive NPV, LCOE rises toward ~AUD 0.095/kWh. **GO.**

- **Adverse case:** NPV materially thinned but typically still positive. **CONDITIONAL GO.**

- **Hostile case** (coastal cyclone D-rated steel, very low self-consumption): NPV approaches break-even. **NO-GO without anchor tenant / off-take PPA.**

## 8. Certification & Standards Reference

- LONGi Hi-MO 6 LR5-72HTH: [IEC 61215-1:2021](https://webstore.iec.ch/publication/60793) + [IEC 61730-1:2016](https://webstore.iec.ch/publication/61980); CEC listed in the [LRIS approved products register](https://lris.energysafe.com.au/) (search by model); VDE-AR-N 4105.

- Sungrow SG125HT: [IEC 62109-1:2010](https://webstore.iec.ch/publication/63108) + [IEC 62109-2:2011](https://webstore.iec.ch/publication/63110); AS/NZS 4777.2:2020; IEEE 1547.

- Carport steel: [AS/NZS 4100:2020](https://www.standards.org.au/standards-development/standards/standards-catalogue) (steel structures) + [AS/NZS 1170.2:2021](https://www.standards.org.au/standards-development/standards/standards-catalogue) (wind actions).

- If a BESS is later added: [Regulation (EU) 2023/1542](https://eur-lex.europa.eu/eli/reg/2023/1542/oj) and [UN Recommendations on the Transport of Dangerous Goods — Manual of Tests and Criteria, Rev. 4, Amend 20](https://www.unece.org/fileadmin/DAM/trans/danger/publi/manual/Manual_e/ManRev04/Amend20/ST-SG-AC10-1-Rev4-Amend20e.pdf) (UN Manual of Tests).

- Installer: CEC-accredited under the [CEC Solar Accreditation scheme](https://www.solaraccreditation.com.au/).

## 9. HS / Tariff Reference

Australian customs duty / GST treatment for the three HS headings below is **PENDING** verification at the time of writing. Use the following lookup path before commit:

1. Australian Border Force [Working Tariff](https://www.abf.gov.au/) → enter the 6-digit HS code → capture the General Rate, any preferential rate (e.g. FTA), any anti-dumping/countervailing measure, and the GST treatment (in-scope / non-in-scope, whether duty is included in the GST value).

2. Cross-check Schedule 4 of the relevant [Free Trade Agreement](https://www.abf.gov.au/) for any preferential rate (e.g. ChAFTA, KAFTA, JAEPA, AANZFTA).

3. Confirm DGS (Department of Home Affairs — DGS, gazetted decisions) for any binding ruling that re-classifies the goods.

Australian duty / GST — PENDING lookup status | Item | HS heading | Australia General duty rate | AU preferential rate (FTA) | GST treatment | Anti-dumping / countervailing | Status |
| --- | --- | --- | --- | --- | --- | --- |
| PV modules (cells assembled in modules) | 8541.43 | PENDING — confirm via ABF Working Tariff at abf.gov.au | PENDING — confirm via FTAA Schedule 4 (e.g. ChAFTA, KAFTA, AANZFTA) at abf.gov.au | PENDING — confirm GST inclusion of duty in customs value | PENDING — confirm via ABF anti-dumping register | PENDING |
| String inverters (static converters) | 8504.40 | PENDING — confirm via ABF Working Tariff at abf.gov.au | PENDING — confirm via FTAA Schedule 4 at abf.gov.au | PENDING — confirm GST inclusion of duty in customs value | PENDING — confirm via ABF anti-dumping register | PENDING |
| Carport steel (structures and parts of iron/steel) | 7308.90 | PENDING — confirm via ABF Working Tariff at abf.gov.au | PENDING — confirm via FTAA Schedule 4 at abf.gov.au | PENDING — confirm GST inclusion of duty in customs value | PENDING — confirm via ABF anti-dumping register (steel safeguards and AD measures on certain categories are reviewed periodically) | PENDING |

Cross-references for non-AU import scenarios (for buyers importing via EU, UK, US, JP, ZA, GH, UG):

- EU: search heading on the [EU TARIC consultation](https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en) tool; check for any EU CBAM-relevant embedded carbon reporting obligations.

- US: search heading on the [USITC Harmonized Tariff Schedule](https://hts.usitc.gov/) tool; check Section 201 safeguard measures (currently applicable to crystalline-silicon PV cells/modules).

- UK: [UK Global Tariff](https://www.trade-tariff.service.gov.uk/) lookup.

- Japan: [Japan Customs](https://www.customs.go.jp/english/) lookup.

- South Africa: [SARS](https://www.sars.gov.za/) lookup.

- Ghana: [GRA](https://gra.gov.gh/) lookup.

- Uganda: [URA](https://www.ura.go.ug/) lookup.

## 10. Request a Matched Quote

Send the spec anchor (LONGi Hi-MO 6 LR5-72HTH 555 W, Sungrow SG125HT, OneSteel GALVASPAN G450 carport, 800 kWp, 7.00 % WACC, 25 yr) to matched OEMs via the TradVolt RFQ form.

[Request an RFQ for an 800 kWp parking-lot solar system in Australia](/rfq/)