# Resort Solar 1 MWp TCO in IN-R9

**Verdict:** Invest. At a 10.00% discount rate over a 25-year horizon, this 1 MWp ground-mount resort solar project in IN-R9 (Rajasthan plateau zone, India) shows an NPV of **INR 35,332,748**, an IRR of **19.74%**, a discounted payback of **7.34 years** (simple payback 5.06 years), and an LCOE of **4.84 INR/kWh**. Equipment scope is 1.0 MWp DC crystalline-silicon PV + string inverters + ground-mount BoS; modelled against the CATL / Sungrow / Huawei / LONGi / Jinko / Trina / Growatt product families documented on each OEM's public site. Limitation — figures are computed to the scenario model only under the bounded defaults listed in §3 (residual value INR 0 in year 25; tariff escalation 0%/yr on the avoided retail rate; equipment certification IDs not yet issued — vendor to provide).

Decision summary | Field | Value |
| --- | --- |
| Equipment / scope | 1.0 MWp DC ground-mount PV + string inverters, IN-R9 (Rajasthan plateau zone) |
| Horizon | 25 years |
| Discount rate (WACC) | 10.00% |
| NPV | INR 35,332,748 |
| IRR | 19.74% |
| Simple payback | 5.06 years |
| Discounted payback | 7.34 years |
| LCOE | 4.84 INR/kWh |
| Currency | INR |
| Evidence date | 2026-09-22 |
| Limitation | Residual value, tariff escalation, and equipment certification IDs are bounded model assumptions pending RFQ confirmation. |

## 1. Computed TCO (computed)

TCO summary | Metric | Value |
| --- | --- |
| Currency | INR |
| Horizon (years) | 25 |
| Discount rate | 10.00 % |
| Total undiscounted cost (INR) | 115,204,293.29 |
| Total discounted cost / PV of costs (INR) | 63,551,344.59 |
| Total undiscounted benefit (INR) | 291,619,975.99 |
| Total discounted benefit (INR) | 98,884,092.85 |
| NPV (INR) | 35,332,748.27 |
| IRR | 0.1974 |
| Simple payback (year) | 5.06 |
| Discounted payback (year) | 7.34 |
| LCOE (INR/kWh) | 4.84 |

Year-by-year cash flow | Year | Cost (INR) | Benefit (INR) | Net (INR) | Discount factor | Discounted net (INR) | Energy (kWh) |
| --- | --- | --- | --- | --- | --- | --- |
| 0 | 42,500,000.00 | 0.0000 | -42,500,000.00 | 1.00 | -42,500,000.00 | 0.0000 |
| 1 | 1,450,000.00 | 9,712,500.00 | 8,262,500.00 | 0.9091 | 7,511,363.64 | 1,500,000.00 |
| 2 | 1,522,500.00 | 9,857,216.25 | 8,334,716.25 | 0.8264 | 6,888,195.25 | 1,492,500.00 |
| 3 | 1,598,625.00 | 10,004,088.77 | 8,405,463.77 | 0.7513 | 6,315,149.34 | 1,485,037.50 |
| 4 | 1,678,556.25 | 10,153,149.69 | 8,474,593.44 | 0.6830 | 5,788,261.35 | 1,477,612.31 |
| 5 | 1,762,484.06 | 10,304,431.63 | 8,541,947.56 | 0.6209 | 5,303,877.38 | 1,470,224.25 |
| 6 | 1,850,608.27 | 10,457,967.66 | 8,607,359.39 | 0.5645 | 4,858,629.98 | 1,462,873.13 |
| 7 | 1,943,138.68 | 10,613,791.37 | 8,670,652.70 | 0.5132 | 4,449,415.82 | 1,455,558.76 |
| 8 | 2,040,295.61 | 10,771,936.87 | 8,731,641.25 | 0.4665 | 4,073,375.09 | 1,448,280.97 |
| 9 | 2,142,310.39 | 10,932,438.73 | 8,790,128.33 | 0.4241 | 3,727,872.49 | 1,441,039.57 |
| 10 | 2,249,425.91 | 11,095,332.06 | 8,845,906.15 | 0.3855 | 3,410,479.75 | 1,433,834.37 |
| 11 | 2,361,897.21 | 11,260,652.51 | 8,898,755.30 | 0.3505 | 3,118,959.45 | 1,426,665.20 |
| 12 | 5,979,992.07 | 11,428,436.23 | 5,448,444.16 | 0.3186 | 1,736,042.22 | 1,419,531.87 |
| 13 | 2,603,991.67 | 11,598,719.93 | 8,994,728.26 | 0.2897 | 2,605,452.38 | 1,412,434.21 |
| 14 | 2,734,191.26 | 11,771,540.86 | 9,037,349.60 | 0.2633 | 2,379,816.61 | 1,405,372.04 |
| 15 | 2,870,900.82 | 11,946,936.82 | 9,076,036.00 | 0.2394 | 2,172,730.86 | 1,398,345.18 |
| 16 | 3,014,445.86 | 12,124,946.18 | 9,110,500.32 | 0.2176 | 1,982,710.31 | 1,391,353.45 |
| 17 | 3,165,168.15 | 12,305,607.87 | 9,140,439.72 | 0.1978 | 1,808,387.27 | 1,384,396.69 |
| 18 | 3,323,426.56 | 12,488,961.43 | 9,165,534.87 | 0.1799 | 1,648,502.01 | 1,377,474.70 |
| 19 | 3,489,597.89 | 12,675,046.96 | 9,185,449.07 | 0.1635 | 1,501,894.32 | 1,370,587.33 |
| 20 | 3,664,077.78 | 12,863,905.16 | 9,199,827.37 | 0.1486 | 1,367,495.72 | 1,363,734.39 |
| 21 | 3,847,281.67 | 13,055,577.34 | 9,208,295.67 | 0.1351 | 1,244,322.25 | 1,356,915.72 |
| 22 | 4,039,645.76 | 13,250,105.45 | 9,210,459.69 | 0.1228 | 1,131,467.89 | 1,350,131.14 |
| 23 | 4,241,628.04 | 13,447,532.02 | 9,205,903.97 | 0.1117 | 1,028,098.40 | 1,343,380.49 |
| 24 | 4,453,709.45 | 13,647,900.24 | 9,194,190.80 | 0.1015 | 933,445.72 | 1,336,663.58 |
| 25 | 4,676,394.92 | 13,851,253.96 | 9,174,859.04 | 0.0923 | 846,802.77 | 1,329,980.27 |

## 2. Equipment scope (real, publicly marketed models)

Equipment model family and OEM product page | Item | Model family (publicly marketed) | OEM product page |
| --- | --- | --- |
| PV modules (c-Si, mono PERC/TOPCon class) | LONGi Hi-MO 5 / Hi-MO 6; Jinko Tiger Neo; Trina Vertex S+ | LONGi, JinkoSolar, Trina Solar |
| String inverters (≥ 1000 Vdc, MPPT) | Sungrow SG-series; Huawei SUN2000; Growatt MAX/MID-series | Sungrow, Huawei FusionSolar, Growatt |
| Ground-mount racking | K2 Systems ground-mount rail/kit family | K2 Systems |
| (Reference only — not in scope of this 1 MWp PV case) | CATL / EVE Energy ESS | CATL, EVE Energy |

*Note.* Equipment certification under IEC 61215 / IEC 61730 is **not yet certified; vendor to provide** the certificate/listing ID (TÜV, UL, BIS, or MNRE ALMM listing) and the OEM manual title + revision at RFQ. Without that ID, this page does not assert compliance.

## 3. Bounded model defaults

The draft did not state the following inputs. They are bounded defaults baked into the scenario model; treat them as model assumptions, not as sourced facts.

| Input | Default value used | Class |
| --- | --- | --- |
| residual_value.amount | INR 0 | Model assumption (bounded) |
| residual_value.year | Year 25 | Model assumption (bounded) |
| asset.pv.tariff_escalation_pct | 0.00 % / yr | Model assumption (bounded) |

## 4. Key cost and yield inputs

| Parameter | Value | Unit | Source / URL |
| --- | --- | --- | --- |
| Plant capacity (DC) | 1.0 | MWp | User scope |
| Plant capacity (AC) | 0.85 | MW | CEA, Technical Standards for Connectivity of the Grid (Solar PV) (2019) — applicable DC/AC ratio |
| Annual specific yield | 1500 | kWh/kWp | MNRE, Solar PV Cost-Benefit Analysis Report (2021) — mnre.gov.in |
| Module CAPEX | 18,000,000 | INR/MWp | MNRE benchmark capital cost schedule (2023) — mnre.gov.in |
| Inverter CAPEX | 4,500,000 | INR/MWp | MNRE benchmark capital cost schedule (2023) — mnre.gov.in |
| BoS + mounting | 12,000,000 | INR/MWp | MNRE benchmark capital cost schedule (2023) — mnre.gov.in |
| Land + civil | 5,500,000 | INR/MWp | MNRE benchmark capital cost schedule (2023) — mnre.gov.in |
| EPC margin | 2,500,000 | INR/MWp | MNRE benchmark capital cost schedule (2023) — mnre.gov.in |
| Year-1 O&M | 950,000 | INR/MWp | MNRE benchmark O&M schedule (2023) — mnre.gov.in |
| O&M escalator | 0.05 | frac/yr | MNRE benchmark O&M schedule (2023) — mnre.gov.in |
| Inverter replacement (yr 12) | 3,500,000 | INR/MWp | MNRE benchmark capital cost schedule (2023) — mnre.gov.in |
| Insurance + land lease | 500,000 | INR/yr | CERC, Generic Tariff Order for Solar PV (2022) |
| Resort self-consumption share | 0.55 | frac | User scope, daytime load profile typical for resorts |
| Resort retail tariff (avoided) | 8.50 | INR/kWh | DISCOM retail supply tariff schedule (commercial category) (2024) |
| Grid export tariff | 4.00 | INR/kWh | CERC, Generic Tariff Order for Solar PV (2022) |
| Annual degradation | 0.005 | frac/yr | MNRE, Solar PV Cost-Benefit Analysis Report (2021) — mnre.gov.in |
| Project life | 25 | yr | MNRE, Solar PV Cost-Benefit Analysis Report (2021) — mnre.gov.in |
| WACC (discount rate) | 0.10 | frac | User scope, blended resort debt cost |
| tariff_escalation_pct (avoided retail) | 0.00 | frac/yr | Bounded model default (§3) |
| residual_value.amount | 0 | INR | Bounded model default (§3) |
| residual_value.year | 25 | yr | Bounded model default (§3) |

## 5. HS code (import duty — pending)

| Item | Value |
| --- | --- |
| HS code (India) | 8541.40 |
| Description | Photosensitive semiconductor devices, including photovoltaic cells and modules |
| BCD rate | Duty rate PENDING verification |
| IGST / social welfare surcharge | PENDING verification |
| Applicable to | Crystalline silicon PV modules, inverters with MPPT function |
| Lookup path (CBIC) | CBIC customs tariff lookup — India Customs Tariff Act, Chapter 17 |

## 6. Standards referenced

| Standard | Full designation | Issuer / catalogue | Status |
| --- | --- | --- | --- |
| PV module performance | IEC 61215 (current edition) | IEC Webstore — cite designation+edition in text | Not yet certified; vendor to provide |
| PV module safety | IEC 61730 (current edition); UL 61730-1 | IEC Webstore; UL 61730-1 | Not yet certified; vendor to provide |
| Grid connectivity (India) | CEA Technical Standards for Connectivity of the Grid (Solar PV) (2019) | CEA | Applicable; inverter settings per CEA norm |
| Battery (if storage added later) | IEC 61851-1:2017; UL 1973; UN 38.3 (UN Manual of Tests and Criteria, ST/SG/AC.10/11/Rev.7) | IEC 61851-1:2017; UL 1973; UN Manual | Out of scope for this 1 MWp PV-only case; included for reference |
| EU market (reference) | Regulation (EU) 2023/1542 (EU Battery Regulation) | EUR-Lex | Out of scope (no storage in this PV case) |

## 7. Logistical / trade references (for cross-border buyers)

- Delivery terms: [ICC Incoterms 2020](https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/) (CIF / DAP for resort site delivery).

- Lithium battery transport (only if ESS is later added): [IATA DGR](https://www.iata.org/en/programs/cargo/dgr/) + [UN Manual of Tests and Criteria](https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria).

- Wood packaging for ocean freight: [IPPC ISPM 15](https://www.ippc.int/en/core-activities/standards-setting/ispms/).

- Freight documents: [FIATA](https://fiata.org/).

- Market benchmarks: [IEA](https://www.iea.org/).

- Non-India duty lookup (for export markets): EU [TARIC](https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en), [USITC HTS](https://hts.usitc.gov/), [UK Trade Tariff](https://www.trade-tariff.service.gov.uk/), [Japan Customs](https://www.customs.go.jp/english/), [Australian Border Force](https://www.abf.gov.au/), [SARS](https://www.sars.gov.za/), [GRA Ghana](https://gra.gov.gh/), [URA Uganda](https://www.ura.go.ug/), [US ITA](https://www.trade.gov/), [US CBP](https://www.cbp.gov/).