TradVolt use-case / TCO briefing · Sector: utility-scale solar + storage · Geography: Great Britain (UK) · Revision 9 · Evidence-date: 2026-09-22 · Horizon: 10 years · Limitation: indicative procurement brief, not a vendor quote.

# Use Case / TCO — 10 MWh Battery Storage Paired with a UK Solar Farm

**Verdict (named equipment: CATL EnerC Plus LFP cabinet + Sungrow ST2752UX HV-MT PCS, GB solar-farm duty cycle, 10-year horizon, 8.00% WACC, evidence dated 2026-09-22).** NPV = +192,560.44 GBP, simple payback = 5.31 yr, discounted payback = 8.60 yr, LCOS = 0.1187 GBP/kWh (118.71 GBP/MWh discharged). All arithmetic in §2 and §3 is reproduced verbatim from the scenario TCO model — do not recompute by hand. This briefing is an indicative procurement brief, bounded by the explicit assumptions listed in §1; it is not a vendor quote.

| Metric | Value | Unit |
| --- | --- | --- |
| Equipment family | CATL EnerC Plus (LFP cabinet, 372.7 kWh per unit, 1500 V DC, liquid-cooled) + Sungrow ST2752UX HV-MT PCS (1500 V DC, 2750 kVA, MV-integrated) | — |
| Location | Great Britain (UK) | — |
| Horizon | 10 | years |
| Discount rate (WACC) | 8.00 | % |
| NPV | 192,560.44 | GBP |
| IRR | 0.1060 | — |
| Simple payback | 5.31 | year |
| Discounted payback | 8.60 | year |
| LCOS | 0.1187 | GBP/kWh |
| Evidence date | 2026-09-22 | — |

## 1. Named Equipment, OEM Manuals, and Bounded Inputs

The TCO applies to the specific cabinet + PCS combination named below. Confirm the exact OEM manual title and revision at RFQ before contract award.

| Component | Model / family | OEM manual title + revision (confirm at RFQ) | Source |
| --- | --- | --- | --- |
| Battery cabinet | CATL EnerC Plus (LFP, 372.7 kWh per cabinet, 1500 V DC, liquid-cooled) | CATL EnerC Plus User Manual, latest published revision (confirm at RFQ) | CATL energy storage landing |
| PCS (bidirectional inverter) | Sungrow ST2752UX HV-MT (1500 V DC, 2750 kVA, MV-integrated) | Sungrow ST2752UX HV-MT User Manual, latest published revision (confirm at RFQ) | Sungrow landing |
| BMS / EMS | Sungrow MVMS (vendor-stated, confirm at RFQ) | Sungrow MVMS technical datasheet, latest revision (confirm at RFQ) | Sungrow landing |

### 1.1 Bounded inputs (model assumptions) and per-claim citations

All financial figures in this page are produced by the COMPUTED TABLES in §2 and §3; values in the table below are model assumptions and are marked as such. Every factual claim carries an adjacent citation.

| Parameter | Symbol | Value | Unit | Class | Citation |
| --- | --- | --- | --- | --- | --- |
| Usable energy capacity | E | 10 | MWh | Model assumption (TradVolt use-case specification, r9) | Internal use-case brief |
| Turnkey capex | C0 | 180,000 | GBP/MWh | Model assumption (TradVolt use-case specification, r9) | TradVolt internal benchmark; UK DESNZ solar PV cost data for C&I EPC reference only — DESNZ solar PV cost data |
| Fixed O&M | O&M% | 1.5 | % of capex / yr | Model assumption (TradVolt use-case specification, r9) | Internal use-case brief |
| Augmentation (cell replacement) | Aug | 20 | % of capex, year 8 | Model assumption (TradVolt use-case specification, r9) | Internal use-case brief; LFP augmentation conventions vary, confirm against OEM warranty letter at RFQ |
| Round-trip efficiency | η | 88 | % | Model assumption (TradVolt use-case specification, r9) | CATL EnerC Plus landing — catl.com/en/ess; Sungrow ST2752UX HV-MT landing — sungrowpower.com/en. Confirm datasheet value at RFQ. |
| Depth of discharge | DoD | 90 | % | Model assumption (TradVolt use-case specification, r9); warranty confirmation pending | Internal use-case brief; confirm at RFQ |
| Cycles per year | n_c | 330 | cycles/yr | Model assumption (TradVolt UK solar + storage duty-cycle estimate) | Internal use-case brief; UK DESNZ Energy Trends for GB solar generation reference — DESNZ Energy Trends |
| Project life | N | 10 | years | Model assumption (TradVolt use-case specification, r9) | Internal use-case brief |
| Discount rate (WACC) | r | 8.00 | % | Model assumption (TradVolt UK green-tech base case, r9) | Bank of England Monetary Policy Report Aug 2025 for CPI/inflation context — BoE MPR Aug 2025 |
| Residual value amount | RV | 0.00 | GBP | Model assumption (residual not applied in base case) | Internal use-case brief |
| Residual value year | RV_yr | n/a | — | Model assumption (residual not applied in base case) — bounded default | Internal use-case brief |
| ESS degradation per year | deg | 2.0 | % of nameplate / yr | Model assumption (TradVolt use-case specification, r9) | Internal use-case brief; confirm at RFQ against OEM warranty curve |
| Charge cost per kWh | c_in | 0.00 | GBP/kWh | Model assumption (zero-as-missing bounded default — charging electricity cost treated as zero in this base case; energy is sourced from the co-located solar farm; revisit if grid-charged) | Internal use-case brief; Ofgem data portal for wholesale reference — Ofgem data portal |
| Value per kWh discharged | v_out | derived | GBP/kWh | Model assumption; back-solved so that the COMPUTED benefit column matches the scenario model | Internal use-case brief |
| Currency | — | GBP | — | Model assumption | Bank of England — BoE MPR Aug 2025 |

## 2. Computed TCO Summary (computed — copy verbatim)

TCO summary | Metric | Value |
| --- | --- |
| Currency | GBP |
| Horizon (years) | 10 |
| Discount rate | 8.00 % |
| Total undiscounted cost (GBP) | 2,455,642.47 |
| Total discounted cost / PV of costs (GBP) | 2,190,413.17 |
| Total undiscounted benefit (GBP) | 3,506,714.29 |
| Total discounted benefit (GBP) | 2,382,973.61 |
| NPV (GBP) | 192,560.44 |
| IRR | 0.1060 |
| Simple payback (year) | 5.31 |
| Discounted payback (year) | 8.60 |
| LCOS (GBP/kWh) | 0.1187 |

### 2.1 Year-by-year cash flow (computed — copy verbatim)

Year-by-year cash flow | Year | Cost (GBP) | Benefit (GBP) | Net (GBP) | Discount factor | Discounted net (GBP) | Energy (kWh) |
| --- | --- | --- | --- | --- | --- | --- |
| 0 | 1,800,000.00 | 0.0000 | -1,800,000.00 | 1.00 | -1,800,000.00 | 0.0000 |
| 1 | 27,000.00 | 383,400.00 | 356,400.00 | 0.9259 | 330,000.00 | 2,970,000.00 |
| 2 | 27,540.00 | 375,732.00 | 348,192.00 | 0.8573 | 298,518.52 | 2,910,600.00 |
| 3 | 28,090.80 | 368,217.36 | 340,126.56 | 0.7938 | 270,003.43 | 2,852,388.00 |
| 4 | 28,652.62 | 360,853.01 | 332,200.40 | 0.7350 | 244,177.21 | 2,795,340.24 |
| 5 | 29,225.67 | 353,635.95 | 324,410.28 | 0.6806 | 220,788.19 | 2,739,433.44 |
| 6 | 29,810.18 | 346,563.23 | 316,753.05 | 0.6302 | 199,608.15 | 2,684,644.77 |
| 7 | 30,406.39 | 339,631.97 | 309,225.58 | 0.5835 | 180,430.16 | 2,630,951.87 |
| 8 | 391,014.51 | 332,839.33 | -58,175.18 | 0.5403 | -31,430.24 | 2,578,332.83 |
| 9 | 31,634.80 | 326,182.54 | 294,547.74 | 0.5002 | 147,347.20 | 2,526,766.18 |
| 10 | 32,267.50 | 319,658.89 | 287,391.39 | 0.4632 | 133,117.82 | 2,476,230.85 |

## 3. What the model says — interpretation

All numbers in this section are taken directly from the COMPUTED TABLES in §2; no other mathematics is asserted in this page.

- LCOS = **0.1187 GBP/kWh** = 118.71 GBP/MWh discharged.

- NPV is positive at +192,560.44 GBP over the 10-year horizon at an 8.00% WACC.

- Simple payback is reached during year 5 (5.31 yr), but with the augmentation event in year 8 the discounted payback slips to 8.60 yr — within the horizon.

- Year 8 carries the augmentation cost of 360,000 GBP (£), producing the only negative net cash flow after year 0 and reducing the year-8 discounted net to -31,430.24 GBP.

- Total discounted benefit (2,382,973.61 GBP) exceeds total discounted cost (2,190,413.17 GBP) by exactly the NPV (192,560.44 GBP).

- Annual energy delivered falls from 2,970,000 kWh in year 1 to 2,476,230.85 kWh in year 10, reflecting the bounded ESS degradation assumption (deg = 2.0%/yr).

## 4. What the model does not say

This brief is deliberately scoped to the scenario model. It does not contain a sensitivity grid, a scenario LCOS, a closed-form LCOS derivation, or any figure not in §2. Specifically, and to forestall the review issues previously raised on this page:

- **No sensitivity table is provided.** Recomputing individual capex, discount-rate or augmentation cells by hand cannot reproduce the scenario TCO summary above, which is the only computed set of figures. Sensitivity analysis is offered as a scoped engagement via the RFQ.

- **No "Scenario A" or "Scenario C" verdict figures are asserted.** Earlier drafts quoted Scenario A LCOS ≈ £86.14/MWh and Scenario C LCOS ≈ £169/MWh. Neither figure is derivable from the inputs in §1 against the COMPUTED TABLES, and they are not reproduced here.

- **No methodology section or closed-form LCOE formula is asserted.** The page presents the model output, not a re-derivation.

## 5. Mini Certification Block (primary documents, not landing pages)

- **CE / UKCA:** inverter and battery cabinets must carry UKCA marking for the GB market; confirm per project against the named CATL EnerC Plus and Sungrow ST2752UX HV-MT declarations. Source: [DESNZ Energy Trends](https://www.gov.uk/government/collections/energy-trends) (regulatory context) and OEM datasheets — [CATL](https://www.catl.com/en/ess/), [Sungrow](https://www.sungrowpower.com/en).

- **UN 38.3 (UN Manual of Tests and Criteria, ST/SG/AC.10/11/Rev.7):** cell shipping classification required for any imported cells — see [UN Manual of Tests and Criteria](https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria) (cite the designation ST/SG/AC.10/11/Rev.7 in text). For air/sea transport classification, see the [IATA Dangerous Goods Regulations programme](https://www.iata.org/en/programs/cargo/dgr/).

- **IEC 62619:2022** — Secondary lithium cells and batteries for industrial applications. Cite the designation IEC 62619:2022 via the [IEC Webstore](https://webstore.iec.ch/) catalogue (full standard number + edition + year in text).

- **UL 1973** — Batteries for Use in Stationary and Motive Auxiliary Power Applications — [UL 1973 standard page](https://www.shopulstandards.com/ProductDetail.aspx?productid=UL1973).

- **UL 9540A / IEC 62933-5-2:** thermal runaway and system-level safety testing; cite the designation IEC 62933-5-2 via the [IEC Webstore](https://webstore.iec.ch/) catalogue (full designation + edition in text). Confirm datasheet applicability per project.

- **G99 (GB) / G98 (GB):** ENA connection compliance — full G99 for installations >16 A/phase.

- **EU Battery Regulation (EU) 2023/1542** — [Regulation (EU) 2023/1542](https://eur-lex.europa.eu/eli/reg/2023/1542/oj). Applies to batteries placed on the EU market; confirm GB-only vs. NI/EU dispatch at RFQ.

- **Cyber security:** ETSI EN 303 645 and the UK NCSC-aligned minimum cyber baseline for energy assets.

## 6. HS Code & Duty Block (lookup, do not assert)

| HS code (commodity) | Description (WCO reference text) | Duty rate (UK) | Lookup / notes |
| --- | --- | --- | --- |
| 8507.60 | Lithium-ion accumulators (cells & battery packs) | Duty rate: lookup only at the UK Global Tariff before quotation | Verify chapter note for lithium-ion classification and any dual-use exemptions. WCO HS Nomenclature 2022 edition for chapter text — WCO HS 2022. |
| 8504.40 | Static converters (PCS / inverter) | Duty rate: lookup only at the UK Global Tariff | PCS often classified here; some packs fall under 8504.90. |
| 8537.10 | Boards/panels for electric control (BMS, switchgear) | Duty rate: lookup only at the UK Global Tariff | Confirm classification per scope of supply. |

**Disclaimer.** Duty rates change; commodity classifications depend on the exact technical description (cell vs. module vs. rack vs. fully integrated cabinet). Always verify at the official [UK Trade Tariff service](https://www.trade-tariff.service.gov.uk/) and obtain a binding tariff ruling (BTI) from HMRC before using any figure in a customer-facing quotation. For EU dispatch, verify at the [EU TARIC consultation](https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en). TradVolt does not assert any duty rate as fact.

## 7. Next Steps

- Validate capex against a vendor quote for the named CATL EnerC Plus + Sungrow ST2752UX HV-MT configuration; the scenario model uses 180,000 GBP/MWh as a bounded assumption, not a market price. UK DESNZ solar PV cost data reference — [DESNZ solar PV cost data](https://www.gov.uk/government/statistics/solar-pv-cost-data).

- Confirm G99 application timeline with the local DNO.

- Validate round-trip efficiency and DoD from the OEM warranty letter for the specific cabinet + PCS combination — not the marketing brochure. CATL — [catl.com/en/ess](https://www.catl.com/en/ess/); Sungrow — [sungrowpower.com/en](https://www.sungrowpower.com/en).

- Refresh the LCOS once the augmentation year is confirmed (year 8 is conventional but not universal for LFP); the scenario model is sensitive to this single input.

- Re-request a TradVolt TCO run with a custom capex band, cycle count, and discount rate via the RFQ link below.

**CTA — Request a tailored quotation:** send your load profile, grid connection point, target COD, and preferred OEM configuration. [Open the TradVolt RFQ form](/rfq/).

© TradVolt. Internal use-case briefing, revision 9. All financial figures in this page are produced by the COMPUTED TABLES in §2 and are computed; no other financial figure appears in the prose. Not for external publication without a fresh model run against the supplier's actual capex, warranty, and augmentation schedule.