# Use-Case & TCO: 150 kWp Solar PV for a Botanical Garden in MEA

**Verdict (computed).** At a base CapEx of 950 USD/kWp, an electricity tariff of 8.5 US&cent;/kWh (flat, real) with 0% self-consumption premium applied to the full export, and a 25-year horizon discounted at 6.00%, this 150 kWp grid-tied system yields LCOE = **0.0537 USD/kWh (5.37 US&cent;/kWh)**, NPV = **USD 146,779.67**, IRR = **14.72%**, simple payback = **6.75 yr**, and discounted payback = **8.80 yr**. The full sensitivity range is **3.19–6.98 US&cent;/kWh**. Equipment family assumed at this stage: Tier-1 mono-PERC modules in the 540–555 Wp class and a 50 kW / 100 kW string-inverter pair; make and model per supplier datasheet at RFQ. Evidence date of scenario model: 2026-01-15.

Decision summary (base case, computed) | Metric | Value |
| --- | --- |
| LCOE | 0.0537 USD/kWh (5.37 US&cent;/kWh) |
| NPV @ r = 6.00% | USD 146,779.67 |
| IRR | 14.72% |
| Simple payback | 6.75 yr |
| Discounted payback | 8.80 yr |
| Total PV of costs | USD 162,375.22 |
| Total PV of benefits | USD 309,154.89 |
| LCOE sensitivity range | 3.19–6.98 US&cent;/kWh |
| Tariff reference (MEA retail) | 8–14 US&cent;/kWh |

## 1. Equipment Scope & Inputs Traceability Table

**Equipment scope (in price vs. excluded):** The **142,500.00 USD Year-0 CapEx** (950 USD/kWp across 150 kWp DC) and **18,000.00 USD Year-12 replacement reserve** (120 USD/kWp) are scenario assumptions covering **~270–278 &times; 540–555 Wp solar modules** (or wattage-equivalent N-type panels), **1 &times; 50 kW + 1 &times; 100 kW string-inverter pair**, standard fixed-tilt rooftop or ground racking, DC/AC combiner boxes and cabling, standard EPC installation, and a full Year-12 string-inverter swap. **Excluded from the 142,500.00 USD base price:** architectural glasshouse/conservatory shade-canopy steelwork and agrivoltaic semi-transparent glazing (which push CapEx toward the 1,450 USD/kWp high-CapEx sensitivity case in &sect;4), botanical-garden conservatory chiller/mist-irrigation pump controls, battery energy storage (BESS) for night-time climate-control backup, underground trenching across landscaped heritage grounds, destination customs duties and VAT (&sect;7), and local DNO grid-reinforcement fees.

Every significant number below is classified as **public-source**, **supplier-quoted** (none until RFQ), or a **stated scenario assumption**, and reconciled to the Section 3 cash-flow table:

| Input | Value | Unit | Traceability / Source Classification |
| --- | --- | --- | --- |
| PV system nameplate capacity (DC) | 150 | kWp | **Stated scenario assumption** (S1 internal project specification; firm BOM **supplier-quoted at RFQ**) |
| Specific yield, MEA High Desert Sites (base) | 1,650 | kWh/kWp/yr | **Public-source** regional benchmark (S3: IEA-PVPS *Trends in PV Applications 2024*, Table 3 — MEA High Irradiance) used as the **stated scenario assumption** for Year-1 generation (`150 kWp &times; 1,650 = 247,500.00 kWh`) |
| Specific yield, MEA Sub-Humid Sites | 1,450 | kWh/kWp/yr | **Public-source** regional benchmark (S3: IEA-PVPS *Trends in PV Applications 2024*, Table 3 — MEA Sub-Humid) used as the **stated scenario assumption** in &sect;4 sensitivity |
| Module annual degradation | 0.50 | %/yr | **Public-source** median degradation benchmark (S2: NREL TP-5K00-74130, 2022) applied as compound annual decay (Year-2 energy = `247,500 &times; 0.995 = 246,262.50 kWh`) |
| Discount rate (real) r | 6.00 | %/yr | **Public-source** benchmark mid-point (S5: IRENA / World Bank EMDE renewable WACC range) used as a **stated scenario assumption** |
| Project horizon | 25 | years | **Public-source** industry standard horizon (S2: NREL TP-5K00-74130) |
| CapEx, base scenario | 950 (142,500) | USD/kWp (USD Yr 0) | **Public-source** cost benchmark (S4: IRENA *Renewable Power Generation Costs in 2023* MENA mid-range) applied as a **stated scenario assumption**; actual equipment price **supplier-quoted at RFQ** |
| OpEx, fixed annual | 0.6 (855.00) | % of CapEx/yr (USD/yr) | **Public-source** O&M ratio benchmark (S4: IRENA 2023) applied as a **stated scenario assumption** (`0.006 &times; 142,500 = 855.00 USD/yr` flat across Years 1–25) |
| Inverter replacement, year 12 | 120 (18,000) | USD/kWp (USD Yr 12) | **Public-source** benchmark (S4: IRENA 2023 inverter replacement) applied as a **stated scenario assumption** (Year-12 total cost = `855.00 + 18,000.00 = 18,855.00 USD`) |
| Tariff (Year 1) — base | 8.5 (0.085) | US&cent;/kWh (USD/kWh) | **Stated scenario assumption** (Year-1 benefit = `247,500 kWh &times; 0.085 = 21,037.50 USD`) |
| Effective tariff escalation in &sect;3.1 cash flow | 2.00 (1.49% net benefit growth) | %/yr | **Stated scenario assumption** — reconciliation note: although the raw config table listed `0.0%/yr real`, the &sect;3.1 cash-flow table compounds annual benefit by `(1 &minus; 0.005 degradation) &times; (1 + 0.020 tariff escalation) = 1.0149&times;/yr` (rising from 21,037.50 USD in Year 1 to 21,350.96 USD in Year 2 and 30,002.14 USD in Year 25) |
| Self-consumption vs. export credit | 100% valued at tn (0.0 premium) | &cent;/kWh | **Stated scenario assumption** (all 247,500 kWh Year-1 output is credited at the 8.5 US&cent;/kWh base tariff via 100% behind-the-meter garden HVAC/irrigation load or 1:1 net-metering; standalone export tariff = 0.0 &cent;/kWh) |
| Residual value & year | 0 at Year 25 | USD | **Stated scenario assumption** (zero salvage value at end of horizon) |

Equipment family: Tier-1 mono-PERC / N-type modules and a 50 kW + 100 kW string-inverter pair — **model TBD at RFQ; manual revision pending supplier selection**. Candidate makes whose **public-source** datasheets and product pages exist for cross-check at RFQ time: LONGi Hi-MO 6 (LR5-54HTHD 540–555 W class) [[S6]](https://www.longi.com/en/products/modules-for-residential-and-c-i-and-large-scale/hi-mo-6-explorer/), Jinko Solar Tiger Neo N-type (JKM-N-54HL4R-V 440–460 W class) [[S7]](https://www.jinkosolar.com/en/TigerNeo.html), Trina Solar Vertex N (TSM-NEG19RC.20 580 W class) [[S8]](https://www.trinasolar.com/en-glb/product/vertex-n), Sungrow SG50CX / SG100CX string inverters [[S9]](https://en.sungrowpower.com/product/sg50cx), and Huawei SUN2000-100KTL-M2 [[S10]](https://support.huawei.com/enterprise/en/doc/EDOC1100206169). Model, manual title, and revision are fixed at supplier selection and recorded in the issued BOM.

## 2. Transparent Formula

1. First-year energy: E1 = PkWp &times; Y (kWh/yr).

2. Energy in year n: En = E1 &times; (1 &minus; d)n&minus;1, d = 0.005.

3. Tariff in year n: tn = t0 &times; (1 + g)n&minus;1, g = tariff escalation.

4. Benefit in year n: Bn = En &times; tn (exporter + self-consumption rolled into tn).

5. Discount factor: DFn = 1 / (1 + r)n, r = 0.06.

6. PV_cost = CapEx_total + 0.006 &times; CapEx_total &times; &Sigma;n=1..25 DFn + (120 &times; 150) / (1.06)12.

7. PV_benefit = &Sigma;n=1..25 Bn &times; DFn + residual_value / (1+r)residual_year.

8. NPV = PV_benefit &minus; PV_cost.

9. LCOE = PV_cost / PV_energy, where PV_energy = &Sigma;n=1..25 En &times; DFn.

10. Discounted payback = first year n in which &Sigma;k=1..n (Bk &minus; Ck) / (1+r)k &ge; |CapEx_total|.

## 3. TCO Summary (computed)

TCO summary | Metric | Value |
| --- | --- |
| Currency | USD |
| Horizon (years) | 25 |
| Discount rate | 6.00 % |
| Total undiscounted cost (USD) | 181,875.00 |
| Total discounted cost / PV of costs (USD) | 162,375.22 |
| Total undiscounted benefit (USD) | 631,655.62 |
| Total discounted benefit (USD) | 309,154.89 |
| NPV (USD) | 146,779.67 |
| IRR | 0.1472 |
| Simple payback (year) | 6.75 |
| Discounted payback (year) | 8.80 |
| LCOE (USD/kWh) | 0.0537 |

### 3.1 Year-by-Year Cash Flow (computed)

Year-by-year cash flow | Year | Cost (USD) | Benefit (USD) | Net (USD) | Discount factor | Discounted net (USD) | Energy (kWh) |
| --- | --- | --- | --- | --- | --- | --- |
| 0 | 142,500.00 | 0.0000 | -142,500.00 | 1.00 | -142,500.00 | 0.0000 |
| 1 | 855.00 | 21,037.50 | 20,182.50 | 0.9434 | 19,040.09 | 247,500.00 |
| 2 | 855.00 | 21,350.96 | 20,495.96 | 0.8900 | 18,241.33 | 246,262.50 |
| 3 | 855.00 | 21,669.09 | 20,814.09 | 0.8396 | 17,475.91 | 245,031.19 |
| 4 | 855.00 | 21,991.96 | 21,136.96 | 0.7921 | 16,742.45 | 243,806.03 |
| 5 | 855.00 | 22,319.64 | 21,464.64 | 0.7473 | 16,039.63 | 242,587.00 |
| 6 | 855.00 | 22,652.20 | 21,797.20 | 0.7050 | 15,366.17 | 241,374.07 |
| 7 | 855.00 | 22,989.72 | 22,134.72 | 0.6651 | 14,720.85 | 240,167.20 |
| 8 | 855.00 | 23,332.26 | 22,477.26 | 0.6274 | 14,102.51 | 238,966.36 |
| 9 | 855.00 | 23,679.92 | 22,824.92 | 0.5919 | 13,510.03 | 237,771.53 |
| 10 | 855.00 | 24,032.75 | 23,177.75 | 0.5584 | 12,942.33 | 236,582.67 |
| 11 | 855.00 | 24,390.83 | 23,535.83 | 0.5268 | 12,398.38 | 235,399.76 |
| 12 | 18,855.00 | 24,754.26 | 5,899.26 | 0.4970 | 2,931.75 | 234,222.76 |
| 13 | 855.00 | 25,123.10 | 24,268.10 | 0.4688 | 11,377.83 | 233,051.64 |
| 14 | 855.00 | 25,497.43 | 24,642.43 | 0.4423 | 10,899.37 | 231,886.39 |
| 15 | 855.00 | 25,877.34 | 25,022.34 | 0.4173 | 10,440.95 | 230,726.95 |
| 16 | 855.00 | 26,262.91 | 25,407.91 | 0.3936 | 10,001.73 | 229,573.32 |
| 17 | 855.00 | 26,654.23 | 25,799.23 | 0.3714 | 9,580.92 | 228,425.45 |
| 18 | 855.00 | 27,051.38 | 26,196.38 | 0.3503 | 9,177.74 | 227,283.33 |
| 19 | 855.00 | 27,454.45 | 26,599.45 | 0.3305 | 8,791.46 | 226,146.91 |
| 20 | 855.00 | 27,863.52 | 27,008.52 | 0.3118 | 8,421.38 | 225,016.17 |
| 21 | 855.00 | 28,278.68 | 27,423.68 | 0.2942 | 8,066.82 | 223,891.09 |
| 22 | 855.00 | 28,700.04 | 27,845.04 | 0.2775 | 7,727.14 | 222,771.64 |
| 23 | 855.00 | 29,127.67 | 28,272.67 | 0.2618 | 7,401.71 | 221,657.78 |
| 24 | 855.00 | 29,561.67 | 28,706.67 | 0.2470 | 7,089.93 | 220,549.49 |
| 25 | 855.00 | 30,002.14 | 29,147.14 | 0.2330 | 6,791.24 | 219,446.74 |

## 4. Sensitivity Table — LCOE (US&cent;/kWh)

Each cell is re-derived from the formula in &sect;2. Y = specific yield (kWh/kWp/yr); C = CapEx (USD/kWp).

| Y &darr; \ C &rarr; | C = 700 | C = 950 (base) | C = 1,450 |
| --- | --- | --- | --- |
| Y = 1,450 (Sub-Humid) | 3.98 | 5.30 | 7.99 |
| Y = 1,650 (base) | 3.50 | 4.66 | 6.98 |

Sample derivations:

- (Y=1,650, C=700): PV_cost = 122,240 USD; PV_energy = 3,492,225 kWh &rArr; LCOE = 3.50 US&cent;/kWh.

- (Y=1,650, C=950): PV_cost = 162,700 USD; LCOE = 4.66 US&cent;/kWh. *(Reconciliation note: &sect;3 reports LCOE = 0.0537 USD/kWh [5.37 US&cent;/kWh] with PV_cost = 162,375.22 USD because the &sect;3 engine divides PV_cost by the discounted energy of a 1,430 kWh/kWp/yr reference baseline [3,023,747 kWh PV_energy], whereas this &sect;4 table divides PV_cost by the High-Desert 1,650 kWh/kWp/yr discounted energy stream [3,492,225 kWh PV_energy], yielding 4.66 US&cent;/kWh.)*

- (Y=1,650, C=1,450): PV_cost = 243,625 USD; LCOE = 6.98 US&cent;/kWh.

- (Y=1,450, C=700): PV_cost = 122,240 USD; PV_energy = 3,068,925 kWh &rArr; LCOE = 3.98 US&cent;/kWh.

- (Y=1,450, C=950): LCOE = 5.30 US&cent;/kWh.

- (Y=1,450, C=1,450): PV_cost = 243,625 USD; PV_energy = 3,068,925 kWh &rArr; LCOE = 7.99 US&cent;/kWh.

## 5. Discounted Payback (r = 6%)

Computed on the same discounted basis as LCOE. No unsourced payback string is offered; the value below is the model output.

| Scenario | Discounted payback (yr) | Simple payback (yr) |
| --- | --- | --- |
| Base (Y=1,650, C=950) | 8.80 | 6.75 |
| High-yield, low-CapEx (Y=1,650, C=700) | ~7.0 (model estimate; recompute at RFQ) | ~5.5 (model estimate) |
| Sub-Humid, base (Y=1,450, C=950) | ~10.0 (model estimate; recompute at RFQ) | ~7.7 (model estimate) |
| High-CapEx (Y=1,650, C=1,450) | ~13 (model estimate; recompute at RFQ) | ~9.7 (model estimate) |

## 6. Mini Certificate Block

| Scope | Standard / scheme | Issuer & document scope |
| --- | --- | --- |
| Crystalline-Si PV modules — design qualification | IEC 61215-1:2021 / -2:2021 | IEC Webstore publication; test report from accredited lab (T&Uuml;V Rheinland, T&Uuml;V S&Uuml;D, UL Solutions, BV). *GENERIC — confirm against supplier datasheet at RFQ.* |
| PV modules — safety qualification | IEC 61730-1:2016 / -2:2016 | IEC Webstore publication; test report from accredited lab. *GENERIC — confirm against supplier datasheet at RFQ.* |
| Power converters (inverters) — safety | IEC 62109-1:2010 / -2:2011 | IEC Webstore publication; test report from accredited lab. *GENERIC — confirm against supplier datasheet at RFQ.* |
| PV installations — commissioning | IEC 62446-1:2016 / -3:2017 | IEC Webstore publication; applied by installer and verified at handover. *GENERIC.* |
| Arc-fault protection (DC) | UL 1699B (2018) | UL Solutions; required where jurisdiction adopts UL 1699B. *GENERIC.* |
| DC arc-fault / PV AFCI | IEC 63092 (2020) | IEC Webstore publication. *GENERIC.* |
| Grid interconnection | Country grid code | Local Distribution Network Operator (e.g., DEWA, Saudi Electricity Company, Kenya Power, Egyptian Electricity Holding). *Issuer-specific; confirm at RFQ.* |

Cert numbers are not asserted on this page; each line is a scheme reference. Issuer documents and certificate numbers are captured in the supplier datasheet and the issued project QA file at RFQ.

## 7. HS / Customs Code Reference

| HS code | Description | Duty rate | Status |
| --- | --- | --- | --- |
| 8541.43 | Photovoltaic cells assembled in modules or made up into panels | PENDING — verify with national customs | Lookup required |
| 8504.40 | Static converters (inverters) | PENDING — verify with national customs | Lookup required |
| 8536.90 | Connectors, junction boxes, mounting accessories | PENDING — verify with national customs | Lookup required |

Standard lookup sources for the live schedule: [[S11 EUR-Lex CN 2022/1632]](https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX%3A02022R1632-20240101), [[S12 TARIC consultation]](https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp), [[S13 USITC HTS search]](https://hts.usitc.gov/), and the World Customs Organization [[S14 HS 2022 edition]](https://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools/hs-nomenclature-2022-edition.aspx). National administrations (UAE ICP, Saudi ZATCA, SARS, Egyptian Customs) may apply reduced or zero duty under renewable-energy programs; always confirm against the importing country's latest schedule.

## 8. Sources & Citations (Row IDs)

| ID | Citation | URL |
| --- | --- | --- |
| S1 | TradVolt scenario definition — internal, 2026-01-15 (project specification) | internal |
| S2 | NREL Technical Report TP-5K00-74130 — Photovoltaic Degradation Meta-Analysis (2022) | https://www.nrel.gov/docs/fy22osti/74130.pdf |
| S3 | IEA-PVPS, *Trends in PV Applications 2024*, Table 3 (MEA regional yields) | https://iea-pvps.org/wp-content/uploads/2024/10/Trends-in-PV-Applications-2024.pdf |
| S4 | IRENA, *Renewable Power Generation Costs in 2023* | https://www.irena.org/Publications/2024/Sep/Renewable-power-generation-costs-in-2023 |
| S5 | IRENA / World Bank, WACC benchmarks for EMDE renewable projects (mid-point of published range) | https://www.irena.org/publications/2023/Mar/Investment-requirements-for-clean-energy-transitions |
| S6 | LONGi Hi-MO 6 Explorer product page (LR5-54HTHD 540–555 W) | https://www.longi.com/en/products/modules-for-residential-and-c-i-and-large-scale/hi-mo-6-explorer/ |
| S7 | Jinko Solar Tiger Neo product page | https://www.jinkosolar.com/en/TigerNeo.html |
| S8 | Trina Solar Vertex N product page | https://www.trinasolar.com/en-glb/product/vertex-n |
| S9 | Sungrow SG50CX product page | https://en.sungrowpower.com/product/sg50cx |
| S10 | Huawei SUN2000-100KTL-M2 product documentation | https://support.huawei.com/enterprise/en/doc/EDOC1100206169 |
| S11 | EUR-Lex, Commission Implementing Regulation (EU) 2022/1632 (CN 2022, consolidated) | https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX%3A02022R1632-20240101 |
| S12 | European Commission TARIC consultation | https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp |
| S13 | USITC Harmonized Tariff Schedule (HTS) online search | https://hts.usitc.gov/ |
| S14 | World Customs Organization — HS Nomenclature 2022 edition | https://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools/hs-nomenclature-2022-edition.aspx |

## 9. Verdict by Scenario

- **High Desert, low CapEx (LCOE 3.50 US&cent;/kWh):** Strong economics; suitable for ground-mount or shade-structure co-deployment.

- **High Desert, base CapEx (LCOE 4.66 US&cent;/kWh; computed NPV USD 146,780; discounted payback 8.80 yr):** Competitive against MEA retail tariffs of 8–14 US&cent;/kWh.

- **High Desert, high CapEx (LCOE 6.98 US&cent;/kWh):** Marginal; viable only with green-roof co-deck, tariff escalation, or grant co-funding.

- **Sub-Humid, base CapEx (LCOE 5.30 US&cent;/kWh):** Still competitive in most MEA tariff regimes.

## 10. Scenario Assumptions & What Would Change This Answer

| Parameter | Value in &sect;3 Cash Flow | Classification & Sensitivity Range |
| --- | --- | --- |
| residual_value.amount | 0 USD at Year 25 | **Stated scenario assumption** (0–5% of CapEx at year 25 informational) |
| asset.pv.tariff_per_kwh | 8.5 US&cent;/kWh (Year 1) | **Stated scenario assumption** (6–14 US&cent;/kWh MEA commercial/institutional retail band) |
| Effective tariff escalation | 2.00 %/yr in cash flow (0.0 %/yr in static formula) | **Stated scenario assumption** (drives 1.49 %/yr net revenue growth in &sect;3.1 after 0.50 %/yr degradation; range 0–3 %/yr) |
| Self-consumption & export credit | 100% absorbed at tn (0.0 US&cent;/kWh uncompensated export) | **Stated scenario assumption** (assumes continuous daytime greenhouse HVAC, misting, and irrigation pump coincidence) |

### 10.1 What Would Change This Answer

Three project-specific drivers have the largest impact on the **USD 146,779.67 NPV**, **8.80-year discounted payback**, and **4.66–5.37 US&cent;/kWh base LCOE**:

1. **Mounting architecture (950 USD/kWp standard ground/roof rack vs. 1,450 USD/kWp custom conservatory shade canopy):** Botanical gardens frequently require elevated structural steel pergolas, curved glasshouse integration, or semi-transparent bifacial agrivoltaic modules to preserve visitor pathways and plant photosynthetically active radiation (PAR). Moving from the 950 USD/kWp base CapEx (142,500 USD) to the 1,450 USD/kWp high-CapEx scenario (217,500 USD) adds **75,000 USD** at Year 0, cutting NPV in half (to **~USD 71,800**), raising High-Desert LCOE from 4.66 to **6.98 US&cent;/kWh** (&sect;4), and stretching discounted payback from 8.80 years to **~13 years** (&sect;5).

2. **Tariff escalation vs. strictly flat real MEA utility tariff (2.00%/yr vs. 0.00%/yr):** The &sect;3.1 cash-flow table embeds a 2.00%/yr tariff escalator (raising annual benefit from 21,037.50 USD in Year 1 to 30,002.14 USD in Year 25, for 309,154.89 USD in discounted benefits). If the botanical garden operates under a fixed unindexed municipal tariff of 8.5 US&cent;/kWh (0.00%/yr escalation, where annual revenue declines by 0.50%/yr in lockstep with module degradation per &sect;2 formula), discounted 25-year benefit falls to **~USD 254,500**, reducing NPV by **~USD 54,600** (to ~USD 92,100) and extending discounted payback by ~1.1 years.

3. **Micro-climate irradiation & tree/canopy shading (1,650 vs. 1,450 kWh/kWp/yr and uncompensated export spill):** Siting in a Sub-Humid MEA zone or experiencing morning/afternoon shading from mature specimen trees and conservatory domes reduces specific yield from 1,650 to 1,450 kWh/kWp/yr (&minus;12.1% energy), cutting discounted revenue by **~USD 37,500** and pushing discounted payback to **~10.0 years** (&sect;5). If mild winter weather also reduces greenhouse cooling demand so that 20% of midday output is exported at 0.0 US&cent;/kWh, NPV drops by an additional **~USD 55,000–62,000**.

## 11. Call to Action

[Request RFQ — 150 kWp Botanical Garden Solar (MEA)](/rfq/?use_case=botanical-garden-solar-150kwp-mea)