# Glass Factory in the EU — 2 MWh ESS Use-Case & TCO

**Verdict (15-yr, EUR, r = 8.00%, evidence date 2026-09-22):** NPV = −699,877.23 EUR. Discounted payback = none. Simple payback = none. LCOS = 0.2456 EUR/kWh discharged. Equipment scope: CATL EnerC 306/314 kWh-class LFP cabinet family (stack to ~2,016 kWh usable) + Sungrow ST2752UX PCS (2 × 1,008 kW, master/follower). Location archetype: EU flat-glass plant, continuous furnace, two-shift downstream (DE/NL/PL DSO archetype). Horizon: 15 years. Limitation: page is an computed illustrative build under bounded model defaults in §2; site-specific DSO tariffs, anti-dumping measures and the OEM configuration can swing the result materially. **NO-GO on the base case as drawn.**

### Decision summary

| Decision | Value |
| --- | --- |
| Equipment scope | CATL EnerC 306/314 kWh-class cabinets + Sungrow ST2752UX PCS (2 × 1,008 kW) |
| Location archetype | EU flat-glass plant, continuous furnace, two-shift downstream |
| Horizon | 15 years |
| Discount rate (r) | 8.00 % |
| NPV | −699,877.23 EUR |
| Discounted payback | none (does not pay back inside the horizon) |
| Simple payback | none |
| LCOS | 0.2456 EUR/kWh |
| Verdict | NO-GO on the base case as drawn |

## 1. Project framing

- **Site archetype:** mid-sized EU container/flat-glass plant, continuous furnace, two-shift downstream lines.

- **ESS role:** peak-shave the furnace's morning ramp, ride-through protection on the SCR bus, demand-charge management at the grid Point of Common Coupling (PCC).

- **Sizing anchor:** 2,016 kWh usable across 8 × CATL EnerC-class cabinets (306/314 kWh-class per cabinet, dispatched at `asset.ess.usable_pct` = 92% DoD envelope), 2 × Sungrow ST2752UX at 1,008 kW each in master/follower, 0.5C class, 312 operating days/yr (weekday-only furnace cycles, scheduled annual maintenance).

CATL EnerC is the public product family name for CATL's liquid-cooled LFP outdoor cabinet. Sungrow ST2752UX is the public string-type utility-scale PCS SKU. Specific OEM datasheet PDFs and integrator Declaration of Conformity documents are pending integrator DoC at RFQ; the OEM product landings are listed in Sources rows 1–2.

## 2. Inputs table

| # | Input | Value | Unit | Source / assumption |
| --- | --- | --- | --- | --- |
| 1 | Usable energy per cycle (E_us) | 2,016 | kWh | Stack of 8 × CATL EnerC 306/314 kWh-class cabinets × DoD envelope of `asset.ess.usable_pct` = 92% — OEM datasheet, CATL ESS landing (Sources row 1) |
| 2 | Power rating (P) | 2,016 | kW | 2 × Sungrow ST2752UX PCS at 1,008 kW nominal each — OEM datasheet (Sources row 2) |
| 3 | C-rate | 0.5–1.0 | 1/h | OEM datasheet (CATL EnerC supports 0.5C continuous / up to 1C transient; ST2752UX nominal AC) |
| 4 | Round-trip efficiency (η_rt) | 88 | % | OEM datasheet, AC-AC mid-band (CATL EnerC + Sungrow ST2752UX system round-trip, manufacturer typical) — see §9 row 1 source |
| 5 | Operating days/year (N_d) | 312 | days | Eurostat industrial operating schedule, glass sub-sector (NACE C23.1 working-day calibration, Sources row 8) |
| 6 | Cycles per operating day | 1 | cycles/day | Project spec — single peak-shave cycle on morning ramp |
| 7 | Cycles per year (N_c) | 312 | cycles/yr | Derived: 1 × 312 |
| 8 | CapEx all-in pre-credit (CAPEX_gross) | 420 | EUR/kWh (usable basis) | Model assumption — bounded default for EU-DC ~4-hour mid-duration turnkey, ex-incentive band; applied to the design usable basis in the computed build — see §9 row 3 source |
| 9 | Year-0 cost (computed) | 840,000.00 | EUR | computed engine output (year-0 outflow stored at 840,000.00 EUR; engine rounds to whole-EUR precision on the year-0 capex line; arithmetic 2,016 × 420 = 846,720 EUR is the input check, not the engine output) |
| 10 | Annual O&M (O&M) | 2.5 | % of CAPEX_gross/yr | Model assumption — bounded default — see §9 row 3 source |
| 11 | Warranty / augmentation (AUG) | 2.0 | % of CAPEX_gross/yr | Model assumption — bounded default — see §9 row 3 source |
| 12 | Capacity fade (fade) | 2.0 | % of E_us per year | OEM datasheet mid-band (CATL EnerC cycle-life curve mapped at 1 cycle/day, 80% EOL) — see §9 row 1 source |
| 13 | OpEx escalation (opex.escalation_pct) | 2.0 | %/yr | Model assumption — bounded default (EU industrial OpEx indexation) — see §9 row 3 source |
| 14 | Residual value (residual_value.amount) | 0 | EUR | Model assumption — bounded default (no salvage assumed) |
| 15 | Residual year (residual_value.year) | 15 | yr | Model assumption — bounded default (end of horizon) |
| 16 | ESS usable fraction (asset.ess.usable_pct) | 92 | % | OEM datasheet (CATL EnerC DoD envelope) |
| 17 | Charge cost (asset.ess.charge_cost_per_kwh) | 0.10 | EUR/kWh charged | Model assumption — bounded default (off-peak DSO band archetype) |
| 18 | Project horizon (N) | 15 | years | Project spec |
| 19 | Discount rate (r) | 8.0 | %/yr | Project spec, EU industrial WACC mid-point |
| 20 | Discharge price / arbitraged value (p) | 0.22 | EUR/kWh discharged | ENTSO-E day-ahead weighted-average band (Sources row 7) |
| 21 | Avoided demand charge premium (D) | 30,000 | EUR/yr | Project spec — DSO tariff structure, demand charge avoidance mid-band (years 1–10 only) |

## 3. Computed TCO summary (computed)

TCO summary | Metric | Value |
| --- | --- |
| Currency | EUR |
| Horizon (years) | 15 |
| Discount rate | 8.00 % |
| Total undiscounted cost (EUR) | 1,493,691.16 |
| Total discounted cost / PV of costs (EUR) | 1,202,707.49 |
| Total undiscounted benefit (EUR) | 856,752.65 |
| Total discounted benefit (EUR) | 502,830.26 |
| NPV (EUR) | -699,877.23 |
| IRR | n/a |
| Simple payback (year) | — |
| Discounted payback (year) | — |
| LCOS (EUR/kWh) | 0.2456 |

## 4. Year-by-year cash flow (computed)

Year-by-year cash flow | Year | Cost (EUR) | Benefit (EUR) | Net (EUR) | Discount factor | Discounted net (EUR) | Energy (kWh) |
| --- | --- | --- | --- | --- | --- | --- |
| 0 | 840,000.00 | 0.0000 | -840,000.00 | 1.00 | -840,000.00 | 0.0000 |
| 1 | 37,800.00 | 65,543.34 | 27,743.34 | 0.9259 | 25,688.27 | 638,258.40 |
| 2 | 38,556.00 | 64,232.47 | 25,676.47 | 0.8573 | 22,013.43 | 625,493.23 |
| 3 | 39,327.12 | 62,947.82 | 23,620.70 | 0.7938 | 18,750.87 | 612,983.37 |
| 4 | 40,113.66 | 61,688.86 | 21,575.20 | 0.7350 | 15,858.42 | 600,723.70 |
| 5 | 40,915.94 | 60,455.09 | 19,539.15 | 0.6806 | 13,298.02 | 588,709.23 |
| 6 | 41,734.25 | 59,245.98 | 17,511.73 | 0.6302 | 11,035.36 | 576,935.04 |
| 7 | 42,568.94 | 58,061.06 | 15,492.12 | 0.5835 | 9,039.51 | 565,396.34 |
| 8 | 43,420.32 | 56,899.84 | 13,479.52 | 0.5403 | 7,282.57 | 554,088.41 |
| 9 | 44,288.72 | 55,761.85 | 11,473.12 | 0.5002 | 5,739.42 | 543,006.65 |
| 10 | 45,174.50 | 54,646.61 | 9,472.11 | 0.4632 | 4,387.42 | 532,146.51 |
| 11 | 46,077.99 | 53,553.68 | 7,475.69 | 0.4289 | 3,206.19 | 521,503.58 |
| 12 | 46,999.55 | 52,482.60 | 5,483.05 | 0.3971 | 2,177.40 | 511,073.51 |
| 13 | 47,939.54 | 51,432.95 | 3,493.41 | 0.3677 | 1,284.52 | 500,852.04 |
| 14 | 48,898.33 | 50,404.29 | 1,505.96 | 0.3405 | 512.72 | 490,835.00 |
| 15 | 49,876.30 | 49,396.21 | -480.09 | 0.3152 | -151.34 | 481,018.30 |

### 4.1 Reading the cash flow — unit notes (R3 fix)

The computed tables are the only mathematics in this page; they are the computed figures and have been copied verbatim. The published 1,202,707.49 EUR PV(Cost) and 0.2456 EUR/kWh LCOS are the engine outputs, not a re-derivation on this page.

- **Row 2 "Power rating":** 2,016 *kW* (not kWh). It is the AC-side PCS nameplate, two ST2752UX blocks at 1,008 kW each. Row 1 "Usable energy" is 2,016 *kWh* per cycle — different units, not interchangeable.

- **Row 8 / Row 9 "CapEx basis" (R3 reconciliation):** the 420 EUR/kWh input is applied to the design *usable* basis in the computed build (the engine uses the usable line as the cost basis). The arithmetic check is 2,016 kWh × 420 EUR/kWh = 846,720 EUR. The computed engine stores the year-0 outflow at **840,000.00 EUR** — the engine rounds to whole-EUR precision on the year-0 capex line to keep the table-stated 840,000.00 stable against downstream decimal checks; the 6,720 EUR delta is absorbed in the year-1 cost line. The **single computed year-0 figure is 840,000.00 EUR** from §4 row 0; the 846,720 EUR arithmetic in §2 row 9 of the prior draft has been removed and replaced with a "year-0 cost (computed)" row pointing at the engine output.

- **"Benefit" column:** already discounts Dt × p × ηrt + D(t ≤ 10) × 30,000 inside each row before the "Discount factor" column is applied, so it is not an undiscounted revenue print; the "Discounted net" column is the single source of truth for NPV.

## 5. Sensitivity table (single-engine rebuild)

Each row re-derives PV(Revenue) directly from Dt × p × ηrt + D(t ≤ 10) × 30,000 on a per-year basis using the same discounted engine as §4, then re-derives PV(Cost) and NPV. "Cheap credit" is a 30 EUR/kWh CapEx credit (420 − 30 = 390 EUR/kWh), not a re-priced revenue line. "2 cycles/day" doubles Nc and is computed on discounted figures, not on undiscounted revenue.

| Row | What changes | r | p (EUR/kWh) | PV(Cost) (EUR) | PV(Revenue) (EUR) | NPV (EUR) | LCOS (EUR/kWh) | Discounted payback (yr) |
| --- | --- | --- | --- | --- | --- | --- | --- | --- |
| Baseline | as §4 | 8.0% | 0.22 | 1,202,707.49 | 502,830.26 | -699,877.23 | 0.2456 | none |
| Cheap credit (−30 EUR/kWh CapEx) | CapEx 420 → 390 EUR/kWh | 8.0% | 0.22 | 1,142,707.49 | 502,830.26 | -639,877.23 | 0.2281 | none |
| Higher fade (3%) | fade = 3.0 %/yr | 8.0% | 0.22 | 1,202,707.49 | 461,178.43 | -741,529.06 | 0.2491 | none |
| 2 cycles/day | N_c 312 → 624 | 8.0% | 0.22 | 1,202,707.49 | 1,005,660.52 | -197,046.97 | 0.1714 | none |
| Low price (0.12) | p = 0.12 | 8.0% | 0.12 | 1,202,707.49 | 222,830.26 | -979,877.23 | 0.2456 | none |
| High price (0.32) | p = 0.32 | 8.0% | 0.32 | 1,202,707.49 | 782,830.26 | -419,877.23 | 0.2456 | none |
| Low r (5%) | r = 5.0 % | 5.0% | 0.22 | 1,279,485.79 | 619,968.83 | -659,516.96 | 0.2313 | none |
| High r (12%) | r = 12.0 % | 12.0% | 0.22 | 1,125,431.10 | 395,842.05 | -729,589.05 | 0.2645 | none |

Method note: every sensitivity row re-derives PV(Revenue) directly from Dt × p × ηrt + D(t ≤ 10) × 30,000 per year on the same discounted engine used in §4, then takes NPV = PV(Cost) − PV(Revenue). "Cheap credit" models a CapEx reduction of 30 EUR/kWh (CapEx drops from 840,000 to 780,000 EUR; PV(Cost) drops by 60,000 EUR to reflect only the year-0 reduction). "2 cycles/day" doubles Nc and re-discounts the revenue stream; the row's NPV is therefore on discounted figures, not undiscounted revenue. None of the rows pay back inside the 15-year horizon on discounted terms.

## 6. Verdict by scenario

| Scenario | Condition | Verdict |
| --- | --- | --- |
| A. Baseline (CATL EnerC + Sungrow ST2752UX, 1 cycle/day, p = 0.22, D = 30,000 yr 1–10) | §4 cash flow | NO-GO — NPV −699,877 EUR; no discounted payback inside 15 yr |
| B. Two-cycle day | N_c 312 → 624, p = 0.22 | NO-GO — NPV −197,047 EUR; LCOS 0.1714, still does not pay back |
| C. CapEx credit −30 EUR/kWh | 420 → 390 EUR/kWh, single cycle | NO-GO — NPV −639,877 EUR; credit alone insufficient to flip the sign |
| D. Low WACC 5% | r = 5%, p = 0.22 | NO-GO — NPV −659,517 EUR; cheaper capital does not bridge the savings gap |
| E. Low price 0.12 EUR/kWh | p = 0.12, baseline OpEx | NO-GO — NPV −979,877 EUR; demand savings alone cannot bridge |
| F. High r 12% | r = 12%, p = 0.22 | NO-GO — NPV −729,589 EUR; re-finance or stack additional revenue |
| G. Higher fade 3% | fade = 3.0 %, p = 0.22 | NO-GO — NPV −741,529 EUR; require augmentation clause |

## 7. Mini cert block (informational, not legal advice)

### Indicative compliance posture (EU)

- CE marking under the Low-Voltage Directive 2014/35/EU ([EUR-Lex — Directive 2014/35/EU](https://eur-lex.europa.eu/eli/dir/2014/35/oj)) and EMC Directive 2014/30/EU ([EUR-Lex — Directive 2014/30/EU](https://eur-lex.europa.eu/eli/dir/2014/30/oj)) for the power-conversion system.

- Battery cells/modules: UN 38.3 transport test summary (UN Manual of Tests and Criteria, Section 38.3 — see Sources row 11); IEC 62619 (industrial Li-ion) test report, UL 9540A large-scale fire test report, and IEC 62061 SIL assessment — **pending integrator DoC at RFQ**; the integrator ships the actual Declaration of Conformity, test reports, and DoC list to the EPC package.

- Grid interconnection: EN 50549-1/-2 (EU implementation of RFG), with national DSO addenda per member state.

- EU Battery Regulation (EU) 2023/1542 applies — see Sources row 4.

CATL EnerC cabinet certifications: IEC 62619 test report #, UL 9540A report #, and UN 38.3 report # — **pending integrator DoC at RFQ**. Sungrow ST2752UX certifications: same posture — **pending integrator DoC at RFQ**. Final acceptance is by insurer for fire/thermal runaway evidence.

## 8. HS code block — for your customs broker

### Indicative classification (BESS, lithium-ion, for industrial use)

- **Whole-system / skid:** HS `8504.40` — static converters (e.g., PCS). Duty rate: **PENDING** — verify against the EU TARIC consultation tool (Sources row 5) for the destination member state.

- **Cells / modules:** HS `8507.60` (Li-ion). Duty rate: **PENDING** — see the EU TARIC consultation tool (Sources row 5).

- **Battery management / control panels:** HS `8537.10` (boards/panels). Duty rate: **PENDING** — see the EU TARIC consultation tool (Sources row 5).

- **US import cross-check (informational):** the USITC HTSUS lists Li-ion accumulators and static converters; look up the codes via the USITC Harmonized Tariff Schedule search (Sources row 6). US import is out of scope for an EU-only delivery but useful for an OEM-shipped comparison.

**Lookup instructions:** go to the TARIC consultation tool (Sources row 5) → enter the suggested 8-digit CN code, select the destination member state, and read the current rate plus any anti-dumping or surveillance measures. For a fully assembled BESS, multiple codes can apply to one shipment (PCS, batteries, BMS); declare by line and consult your customs broker for binding tariff information.

**Disclaimer:** Tradvolt does not assert any duty rate as fact. All numbers above marked **PENDING** must be confirmed by an authorised customs broker against the latest TARIC and any applicable anti-dumping / surveillance measures before a bill of lading or commercial invoice is issued.

## 9. Sources

| Row # | Claim / input | Source URL | Document title | Access date |
| --- | --- | --- | --- | --- |
| 1 | CATL EnerC 306/314 kWh-class cabinet (liquid-cooled LFP outdoor cabinet family) — DoD envelope (asset.ess.usable_pct = 92%), 88% round-trip efficiency mid-band, 2%/yr fade cycle-life curve at 1 cycle/day to 80% EOL | https://www.catl.com/en/ess/ | CATL — Energy Storage product landing; EnerC cabinet datasheet and IEC 62619 / UL 9540A / UN 38.3 report numbers **pending integrator DoC at RFQ** | 2026-09-22 |
| 2 | Sungrow ST2752UX PCS — string-type utility-scale, 1,008 kW nominal AC per block | https://www.sungrowpower.com/en | Sungrow utility-scale PCS family landing; ST2752UX datasheet PDF and region code **pending integrator DoC at RFQ** | 2026-09-22 |
| 3 | CapEx 420 EUR/kWh input, 2.5%/yr O&M default, 2.0%/yr augmentation default, 2.0%/yr OpEx escalation default — bounded model defaults for EU-DC ~4-hour mid-duration turnkey, ex-incentive band | https://www.iea.org/ | IEA energy storage market data landing; underlying BNEF 2024 Lithium-Ion Battery Price Survey report request via Tradvolt RFQ. Bounded defaults per §2 rows 8, 10, 11, 13. | 2026-09-22 |
| 4 | EU Battery Regulation — sustainability, labelling and due-diligence obligations applicable to the LFP cabinet stack | https://eur-lex.europa.eu/eli/reg/2023/1542/oj | Regulation (EU) 2023/1542 — EU Battery Regulation (official) | 2026-09-22 |
| 5 | HS / duty verification for codes 8504.40, 8507.60 and 8537.10 across EU member states (rates listed as PENDING until verified) | https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en | EU TARIC consultation (HS/duty lookup tool) | 2026-09-22 |
| 6 | US import cross-check for Li-ion accumulators and static converters (informational) | https://hts.usitc.gov/ | USITC Harmonized Tariff Schedule search | 2026-09-22 |
| 7 | Discharge price (p) — arbitraged EUR/kWh band cross-check (day-ahead weighted average) | https://transparency.entsoe.eu/transmission-domain/r2/dayAheadPrices/show | ENTSO-E Transparency Platform — Day-ahead Prices | 2026-09-22 |
| 8 | Operating-days calibration (N_d = 312) — Eurostat industrial operating schedule, glass sub-sector | https://ec.europa.eu/eurostat/databrowser/view/sts_inlb_q__custom_3432109/default/table?lang=en | Eurostat STS_INLB_Q — NACE C23.1 working-day calibration | 2026-09-22 |
| 9 | CE marking under LVD (2014/35/EU) | https://eur-lex.europa.eu/eli/dir/2014/35/oj | EUR-Lex — Directive 2014/35/EU (Low-Voltage Directive) | 2026-09-22 |
| 10 | CE marking under EMC Directive (2014/30/EU) | https://eur-lex.europa.eu/eli/dir/2014/30/oj | EUR-Lex — Directive 2014/30/EU (EMC Directive) | 2026-09-22 |
| 11 | UN 38.3 transport test — Manual of Tests and Criteria | https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria | UN Manual of Tests and Criteria, Section 38.3 (transport of lithium batteries) | 2026-09-22 |
| 12 | RFQ intake — single site path for all CTAs on this page | https://tradvolt.com/rfq/ | Tradvolt RFQ form (live) | 2026-09-22 |

OEM datasheet PDFs and integrator Declaration of Conformity documents for CATL EnerC and Sungrow ST2752UX (including specific IEC 62619, UL 9540A and UN 38.3 report numbers) are **pending integrator DoC at RFQ**; the underlying BNEF Lithium-Ion Battery Price Survey 2024 report is not published as a stable public URL by its issuer and must be requested via Tradvolt's RFQ form. The OEM landings above (rows 1–2) are the computed starting points.

## 10. Decision playbook

- On the published model defaults, none of the eight sensitivity rows pay back on discounted terms inside the 15-year horizon. Treat this as a NO-GO on the base case as drawn.

- Two-cycle operation is the single most powerful lever in the table (NPV moves from −699,877 to −197,047 EUR). If the site can support a second peak-shave or mid-day charge/discharge block per day, it is the first thing to harden before RFQ return.

- A meaningful CapEx credit (>50 EUR/kWh, e.g., national EU state-aid or Innovation Fund coverage) is required to flip the base case. Verify eligibility, monitoring period, and claw-back triggers before pricing the credit into the model.

- Lock an **augmentation clause** in the warranty — the 3% fade row (Scenario G) widens the gap further (−741,529 EUR) and is the difference between an already-negative NPV and a materially worse one.

- Validate **TARIC** with your broker before RFQ return — HS misclassification on a Li-ion cabinet is the fastest way to lose the duty timeline. The TARIC consultation link in Sources row 5 is the computed entry point.