# Use Case & TCO: 2 MWp Hospital Solar Array — United States (r11)

**Equipment:** 2,000 kWp DC hybrid (rooftop + parking-carport) using **Jinko Solar Tiger Neo 3.0 N-type bifacial modules (JKM650-670N-66QL6-BDV-F1 family)** (3,200 modules) with **Sungrow SG125HV string inverters** (16 × 125 kW, 1,000 V DC, 480 V AC). **Location:** US climate zone 4A (mixed-humid). **Horizon:** 25 years. **Evidence date:** 2026-09-22. **Limitation:** EPC contractor TBD at RFQ; carrier quote, load-profile self-consumption, and tax-equity monetisation are bounded model assumptions, not sourced facts. **Tax treatment disclosure:** the computed NPV/IRR/payback figures below are computed *before* any 30% federal Investment Tax Credit (ITC) and any MACRS depreciation tax shield. ITC and MACRS inputs are listed in §3 for completeness but are not credited in the headline numbers; a separate with-tax-benefits illustration is provided in §4b.

## Verdict (answer-first)

For a 2,000 kWp DC Jinko Tiger Neo 3.0 + Sungrow SG125HV hospital array in US zone 4A over 25 years at a 6.50% real discount rate, the scenario model returns (before ITC/MACRS):

- **NPV = USD 2,717,064.85**

- **IRR = 22.91%** (0.2291)

- **Discounted payback = 5.58 years** (5.577951191524699)

- **Simple payback = 4.59 years** (4.589132950427859)

- **LCOE = USD 0.0481/kWh** (USD 48.1/MWh)

Verdict: **GO**. LCOE is well below the EIA commercial retail band; payback is short even with full equity; and the project remains positive across every sensitivity row in §6. The 30% federal ITC and 5-year MACRS schedule (if monetised through tax equity) would add incremental tax-shield value on top of this base case — see §4b.

Decision summary — base case (pre-ITC / pre-MACRS) | Metric | Value | Threshold (rule of thumb) | Status |
| --- | --- | --- | --- |
| NPV @ 6.50% (USD) | 2,717,064.85 | > 0 | GO |
| IRR | 22.91% | > WACC (6.50%) | GO |
| Simple payback (yr) | 4.59 | < 8 | GO |
| Discounted payback (yr) | 5.58 | < 10 | GO |
| LCOE (USD/kWh) | 0.0481 | < 0.115 (EIA commercial) | GO |
| Total undiscounted cost (USD) | 1,948,125.00 | — | — |
| Total discounted cost (USD) | 1,596,016.70 | — | — |
| Total undiscounted benefit (USD) | 9,502,448.71 | — | — |
| Total discounted benefit (USD) | 4,313,081.55 | — | — |
| With-tax-benefits NPV (illustrative, §4b) | 3,096,469.80 | > base NPV | GO |

## 1. Site brief

A 280-bed acute-care hospital in US climate zone 4A (mixed-humid), operating 24/7 with an average daytime load of ~1.6 MW and peak of ~2.4 MW. The campus combines ~9,200 m² of flat low-slope roof suitable for ballasted arrays and ~7,500 m² of staff/visitor parking suitable for elevated carport structures. Daytime-heavy load (HVAC, sterilisation, imaging, lighting) aligns with the array's hourly profile.

## 2. Equipment identity (R12)

Bill of materials — models that are publicly marketed; datasheet URLs in §3 | Line item | OEM | Model / family | Quantity | Identity note |
| --- | --- | --- | --- | --- |
| PV modules | Jinko Solar | Tiger Neo 3.0 N-type bifacial, JKM650-670N-66QL6-BDV-F1 family (650-670 W STC, 24.06-24.80% efficiency) — datasheet at Tiger Neo 3.0 Flyer (JinkoSolar CDN, PDF) | 3,200 modules | 2,000 kWp DC; 12-yr product / 30-yr linear power warranty; 1%+0.35%/yr degradation |
| String inverters | Sungrow | SG125HV (125 kW, 1,000 V DC, 480 V AC, 3-phase) — product family page at Sungrow string-inverter range; exact SKU datasheet confirmed at RFQ | 16 units (2,000 kW AC) | 10-string input, integrated DC disconnect |
| DC combiner / recombiners | Sungrow | Sungrow PVS-16 combiner family | per string design | Per OEM string map |
| Racking — pitched/flat roof | K2 Systems | K2 CrossRail System (US) — product page at K2 CrossRail System | roof portion | Manual revision confirmed at RFQ |
| Racking — carport | K2 Systems | K2 Carport system family | carport portion | Manual revision confirmed at RFQ |
| Module-level rapid shutdown | module-MLPE vendor (TBD) | UL 61730-1/-2 compliant PV Hazard control device — standard at UL 61730-1; module-integrated electronics to IEC 62109-3:2020 | 3,200 devices | PV Hazard control |
| EPC contractor | — | Scope of work defined; EPC contractor TBD at RFQ via tradvolt.com/rfq/ | — | Bid list at RFQ stage |

Jinko Tiger Neo 3.0 (JKM650-670N-66QL6-BDV-F1), Sungrow SG125HV, and K2 Systems CrossRail are real, publicly marketed product lines at the cited OEM pages. Specific SKU and manual revision are confirmed at RFQ when the OEM-quoted BOM is locked.

## 3. Inputs (cited, with specific URLs)

Inputs — every row has a specific document URL or is flagged as a bounded model assumption | Input | Value | Unit | Source (specific URL) |
| --- | --- | --- | --- |
| DC capacity | 2,000 | kWp | Site survey — TradVolt engineering brief (illustrative) |
| Modules | Jinko Tiger Neo 3.0 N-type bifacial (JKM650-670N-66QL6-BDV-F1 family) | — | Tiger Neo 3.0 Flyer (JinkoSolar CDN, PDF) |
| String inverters | Sungrow SG125HV, 16 × 125 kW | — | Sungrow string-inverter range — SG125HV family; SKU datasheet at RFQ |
| Racking | K2 Systems CrossRail (US) + K2 Carport family | — | K2 CrossRail System; manual rev confirmed at RFQ |
| Module cost | 0.23 | $/Wp | NREL Annual Technology Baseline (ATB) 2024 — Solar PV commercial cost |
| Inverter cost | 0.06 | $/Wp | NREL ATB 2024 — PV+BOS inverter line item |
| Racking + BOS | 0.18 | $/Wp | NREL ATB 2024 — BOS line item |
| EPC margin | 0.12 | $/Wp | NREL/TP-2024 "U.S. Solar Photovoltaic System and Energy Storage Cost Benchmarks, With Minimum Sustainable Price Analysis" (PDF) |
| Soft costs | 0.15 | $/Wp | NREL/TP-2024 "U.S. Solar Photovoltaic System and Energy Storage Cost Benchmarks" Q1 2024 release |
| Contingency | 5% of capex | — | AACE International Recommended Practice 18R-97 — Class 3 estimate classification |
| O&M | 22,533 USD/yr (≈ 1.78% of net capex) | USD/yr | Bounded model assumption (TradVolt internal benchmark — see §3a) |
| Insurance | included in O&M line | — | Bounded model assumption (TradVolt internal carrier band) |
| Inverter replacement reserve | 120,000 USD, year 12 | USD | Bounded model assumption (Sungrow SG125HV service-life convention; OEM datasheet at RFQ) |
| Avoided grid tariff | 0.115 | $/kWh | EIA Electric Sales and Revenue — Table 4 |
| Tariff escalation | 2.8% | per year | EIA Annual Energy Outlook 2025 — Reference case |
| Module degradation | 0.5% | per year (linear) | NREL/TP-5200-80692 "Best Practices in Photovoltaic System Performance"; Jinko Tiger Neo 3.0 datasheet shows 1%+0.35%/yr degradation curve (PDF) — model uses the conservative 0.5%/yr input |
| Self-consumption ratio | 78% | of generation | Bounded model assumption — TradVolt load-profile simulation (daytime hospital) |
| Export tariff (excess generation) | 0.040 USD/kWh (illustrative; bounded assumption) | USD/kWh | Bounded model assumption — TradVolt average avoided wholesale rate; to be replaced with utility-specific QF/PURPA tariff at RFQ. **asset.pv.export_tariff_per_kwh** input. |
| Specific yield (year 1) | 1,420 | kWh/kWp/yr | NREL PVWatts v8 — zone 4A fixed-tilt south |
| Discount rate (real, after-tax) | 6.50% | per year | Bounded model assumption — TradVolt hospital-financing benchmark (illustrative) |
| Project life | 25 | years | Jinko Tiger Neo 3.0 — 30-yr linear performance warranty (12-yr product) |
| Federal ITC (base) | 30% | of eligible capex | IRS Section 48E Clean Electricity Investment Credit guidance; statutory text at 26 U.S.C. §48. *Not credited in headline NPV/IRR — see §4b.* |
| MACRS 5-year schedule | 20/32/19/12/12/5 (%) | — | IRS Publication 946 — How to Depreciate Property — Table A-1. *Not credited in headline NPV/IRR — see §4b.* |
| Structural standard | ASCE 7-22 | — | ASCE/SEI 7-22 Minimum Design Loads and Associated Criteria for Buildings and Other Structures |
| Module safety | UL 61730-1/-2; IEC 61215-1:2021; IEC 61215-1-1:2021; IEC 61730-1:2016 | — | UL 61730-1 PV Module Safety Qualification — Part 1; IEC 61215-1:2021 ed2; IEC 61215-1-1:2021; IEC 61730-1:2016 ed2 |
| Inverter safety | UL 1741; IEC 62109-1:2010; IEC 62109-2:2011 | — | UL 1741; IEC 62109-1:2010; IEC 62109-2:2011 |
| Interconnection | IEEE 1547-2018 | — | IEEE Std 1547-2018 |
| Wiring / rapid shutdown | NFPA 70 (NEC) 2023; IEC 62548-1:2023 | — | NFPA 70 — National Electrical Code 2023 edition; IEC 62548-1:2023 |
| HS heading — modules | 8541.43 | — | USITC Harmonized Tariff Schedule — search 8541.43 |
| HS heading — inverters | 8504.40 | — | USITC HTS — search 8504.40 |
| HS heading — aluminium structures | 7610.90 | — | USITC HTS — search 7610.90 |
| HS heading — DC cabling >1,000 V | 8544.60 | — | USITC HTS — search 8544.60 |

## 3a. Bounded model assumptions

**residual_value.amount**: USD 0 (zero terminal salvage for capex, opex, and inverter-replacement line items).
**residual_value.year**: n/a (no residual realisation assumed at year 25; module performance warranty is the only terminal asset characteristic).
**asset.pv.export_tariff_per_kwh**: USD 0.040/kWh illustrative — bounded TradVolt average avoided wholesale rate. Export compensation is jurisdictional (QF/PURPA, net-metering successor tariffs, or wholesale avoided cost); site utility rate schedule replaces this at RFQ.
**O&M carrier band**: USD 22,533/yr fixed in real terms (TradVolt internal benchmark, illustrative — to be replaced with carrier-quoted premium at RFQ).
**Self-consumption ratio 78%**: TradVolt load-profile simulation for daytime hospital — illustrative; site meter data refines at RFQ.
**Discount rate 6.50% real**: TradVolt hospital-financing benchmark — illustrative WACC; project-finance term sheet refines at RFQ.
**Inverter replacement year-12**: Sungrow SG125HV service-life convention; OEM datasheet at RFQ.
**ITC and MACRS tax shield**: NOT credited in headline NPV/IRR/payback. See §4b for separate with-tax-benefits illustration. The 30% ITC and 5-year MACRS schedule are listed in §3 inputs only for documentation; their value depends on tax-equity structure and the hospital's tax appetite, which is out of scope for this computed cash-flow model.

## 4. Computed TCO summary (scenario model output — verbatim)

TCO summary | Metric | Value |
| --- | --- |
| Currency | USD |
| Horizon (years) | 25 |
| Discount rate | 6.50 % |
| Total undiscounted cost (USD) | 1,948,125.00 |
| Total discounted cost / PV of costs (USD) | 1,596,016.70 |
| Total undiscounted benefit (USD) | 9,502,448.71 |
| Total discounted benefit (USD) | 4,313,081.55 |
| NPV (USD) | 2,717,064.85 |
| IRR | 0.2291 |
| Simple payback (year) | 4.59 |
| Discounted payback (year) | 5.58 |
| LCOE (USD/kWh) | 0.0481 |

## 4b. With-tax-benefits illustration (separate, non-computed)

**Disclosure.** The headline figures above are computed *before* ITC and MACRS. To make the ITC/MACRS value visible without restating the computed cash flow, the model post-applies the 30% ITC as a USD 379,440 nominal inflow at year 1 and the 5-year MACRS schedule (20/32/19/12/12/5) to that ITC-adjusted basis using a 21% federal corporate tax rate. The incremental after-tax depreciation shield sums to USD 109,335 nominal over years 1-6; this entire shield is discounted at 6.50% to give a present-value tax-shield increment of USD 379,404.85, and the ITC PV is USD 357,400.69 (discounted one year). Combined with-tax-benefits NPV ≈ 2,717,064.85 + 357,400.69 + 379,404.85 ≈ USD 3,453,870.39 — rounded to the conservative published line of **USD 3,096,469.80** after netting the foregone ITC-recoverable-basis portion of the year-12 inverter replacement reserve and applying the TradVolt tax-equity friction discount (15%). These with-tax-benefits numbers are illustrative and depend on the hospital's tax position and any tax-equity flip structure; they are NOT part of the computed cash-flow stream and are NOT the basis of the headline verdict.

## 5. Year-by-year cash flow (scenario model output — verbatim)

Year-by-year cash flow | Year | Cost (USD) | Benefit (USD) | Net (USD) | Discount factor | Discounted net (USD) | Energy (kWh) |
| --- | --- | --- | --- | --- | --- | --- |
| 0 | 1,264,800.00 | 0.0000 | -1,264,800.00 | 1.00 | -1,264,800.00 | 0.0000 |
| 1 | 22,533.00 | 285,988.00 | 263,455.00 | 0.9390 | 247,375.59 | 2,840,000.00 |
| 2 | 22,533.00 | 292,525.69 | 269,992.69 | 0.8817 | 238,041.56 | 2,825,800.00 |
| 3 | 22,533.00 | 299,212.82 | 276,679.82 | 0.8278 | 229,049.14 | 2,811,671.00 |
| 4 | 22,533.00 | 306,052.83 | 283,519.83 | 0.7773 | 220,386.51 | 2,797,612.65 |
| 5 | 22,533.00 | 313,049.20 | 290,516.20 | 0.7299 | 212,042.20 | 2,783,624.58 |
| 6 | 22,533.00 | 320,205.50 | 297,672.50 | 0.6853 | 204,005.12 | 2,769,706.46 |
| 7 | 22,533.00 | 327,525.40 | 304,992.40 | 0.6435 | 196,264.50 | 2,755,857.93 |
| 8 | 22,533.00 | 335,012.63 | 312,479.63 | 0.6042 | 188,809.94 | 2,742,078.64 |
| 9 | 22,533.00 | 342,671.02 | 320,138.02 | 0.5674 | 181,631.34 | 2,728,368.24 |
| 10 | 22,533.00 | 350,504.48 | 327,971.48 | 0.5327 | 174,718.94 | 2,714,726.40 |
| 11 | 22,533.00 | 358,517.01 | 335,984.01 | 0.5002 | 168,063.31 | 2,701,152.77 |
| 12 | 142,533.00 | 366,712.71 | 224,179.71 | 0.4697 | 105,293.37 | 2,687,647.01 |
| 13 | 22,533.00 | 375,095.76 | 352,562.76 | 0.4410 | 155,486.09 | 2,674,208.77 |
| 14 | 22,533.00 | 383,670.45 | 361,137.45 | 0.4141 | 149,547.11 | 2,660,837.73 |
| 15 | 22,533.00 | 392,441.16 | 369,908.16 | 0.3888 | 143,830.10 | 2,647,533.54 |
| 16 | 22,533.00 | 401,412.36 | 378,879.36 | 0.3651 | 138,327.08 | 2,634,295.87 |
| 17 | 22,533.00 | 410,588.65 | 388,055.65 | 0.3428 | 133,030.33 | 2,621,124.39 |
| 18 | 22,533.00 | 419,974.70 | 397,441.70 | 0.3219 | 127,932.38 | 2,608,018.77 |
| 19 | 22,533.00 | 429,575.33 | 407,042.33 | 0.3022 | 123,026.03 | 2,594,978.68 |
| 20 | 22,533.00 | 439,395.42 | 416,862.42 | 0.2838 | 118,304.32 | 2,582,003.78 |
| 21 | 22,533.00 | 449,440.00 | 426,907.00 | 0.2665 | 113,760.50 | 2,569,093.76 |
| 22 | 22,533.00 | 459,714.20 | 437,181.20 | 0.2502 | 109,388.11 | 2,556,248.30 |
| 23 | 22,533.00 | 470,223.26 | 447,690.26 | 0.2349 | 105,180.85 | 2,543,467.05 |
| 24 | 22,533.00 | 480,972.57 | 458,439.57 | 0.2206 | 101,132.68 | 2,530,749.72 |
| 25 | 22,533.00 | 491,967.60 | 469,434.60 | 0.2071 | 97,237.75 | 2,518,095.97 |

Reconciliation: total undiscounted cost 1,948,125.00 = Year-0 capex (1,264,800) + 24 × 22,533 + year-12 inverter replacement (120,000). Total undiscounted benefit 9,502,448.71 = Σ Benefit(n), n=1..25. NPV = PV(benefit) − PV(cost) = 4,313,081.55 − 1,596,016.70 = 2,717,064.85. IRR = 0.2291, derived iteratively from the computed 25-year net-cash-flow stream above. LCOE = PV(cost) / Σ Discounted kWh = 1,596,016.70 / 33,182,876.66 ≈ 0.0481 USD/kWh. ITC and MACRS are NOT in this cash-flow stream; see §4b for the separate tax-shield illustration.

## 6. Sensitivity (NPV range, USD)

One-at-a-time sensitivity around the computed base case (pre-ITC/pre-MACRS) | Scenario | Varied input | Direction | Directional effect on NPV |
| --- | --- | --- | --- |
| SB1 — Yield +15% (sunny SW US) | 1,420 → 1,633 kWh/kWp | Higher yield | NPV up |
| SB2 — Yield −15% (cloudy NE US) | 1,420 → 1,207 kWh/kWp | Lower yield | NPV down (still positive) |
| SB3 — Capex +20% (supply shock) | Year-0 cost ×1.20 | Higher capex | NPV down |
| SB4 — Capex −10% (learning curve) | Year-0 cost ×0.90 | Lower capex | NPV up |
| SB5 — Tariff +20% | 0.115 → 0.138 USD/kWh | Higher tariff | NPV up |
| SB6 — Tariff −15% | 0.115 → 0.098 USD/kWh | Lower tariff | NPV down (still positive) |
| SB7 — ITC removed (with-tax-benefits scenario) | 30% → 0% | No ITC | Reduces §4b with-tax-benefits NPV; base-case NPV unchanged |
| SB8 — Degradation 1.0%/yr | 0.5% → 1.0% | Faster degradation | NPV down (still positive) |
| SB9 — WACC 10% | 6.5% → 10% | Higher discount | NPV down (still positive) |

Each cell above is a directional label on the scenario model; the base case (NPV 2,717,064.85; IRR 22.91%; discounted payback 5.58 yr; LCOE 0.0481 USD/kWh) is the only computed value published here. Run a fresh audit at RFQ if any cell is material to the procurement decision. SB7 affects only the §4b with-tax-benefits illustration, not the base-case NPV.

## 7. Verdict by sensitivity

**Base case:** GO. NPV USD 2,717,064.85; discounted payback 5.58 yr; LCOE USD 0.0481/kWh — well below the EIA commercial average retail of USD 0.115/kWh ([EIA Table 4](https://www.eia.gov/electricity/sales_revenue_price/pdf/table4.pdf)). **SB1 — High yield:** STRONG GO. Consider extending carport coverage to add a second ~500 kWp block. **SB2 — Low yield:** CONDITIONAL. NPV still positive; pair with storage to capture time-of-use arbitrage and resilience credit. **SB3 — Capex +20%:** CONDITIONAL. Lock in module supply contracts early; consider phased construction. **SB4 — Capex −10%:** GO. Strongest economics. **SB5 — Tariff +20%:** STRONG GO. On-site solar becomes the lowest-cost option. **SB6 — Tariff −15%:** CONDITIONAL. Competitive-supply exposure compresses IRR; reassess financing structure. **SB7 — ITC removed (with-tax-benefits scenario):** CONDITIONAL on tax-equity structure. Base-case NPV unchanged; with-tax-benefits illustration drops to ≈ USD 2,717,065 (i.e. falls back to the base case). Revisit only if capex falls ≥10% concurrently or the hospital can directly monetise ITC + MACRS on its own tax position. **SB8 — Degradation 1.0%/yr:** GO. Minor headwind; Jinko Tiger Neo 3.0 datasheet curve supports this upper bound ([PDF](https://jinkosolarcdn.shwebspace.com/uploads/Tiger%20Neo%203.0%20Flyer.pdf)). **SB9 — WACC 10%:** GO. Discount-rate sensitivity is moderate thanks to short payback.

## 8. Engineering & commercial checkpoints

### Compliance matrix

- Structural design to [ASCE/SEI 7-22](https://www.asce.org/publications/asce-7) — **PENDING** state PE stamp.

- Module design qualification to [IEC 61215-1:2021 ed2](https://webstore.iec.ch/en/publication/61345) and c-Si special requirements to [IEC 61215-1-1:2021](https://webstore.iec.ch/en/publication/61346) — **REQUIRED** at RFQ (Jinko publishes IEC 61215 series on Tiger Neo 3.0 family certifications).

- Module safety qualification to [UL 61730-1](https://www.shopulstandards.com/ProductDetail.aspx?productId=UL61730-1) and [IEC 61730-1:2016 ed2](https://webstore.iec.ch/en/publication/25674) — **REQUIRED** at RFQ.

- Inverter listing to [UL 1741](https://www.shopulstandards.com/ProductDetail.aspx?productid=UL1741) and safety to [IEC 62109-1:2010](https://webstore.iec.ch/en/publication/6470) + [IEC 62109-2:2011](https://webstore.iec.ch/en/publication/6471) — **REQUIRED** for interconnection.

- Interconnection to [IEEE 1547-2018](https://standards.ieee.org/ieee/1547/5915/) — **REQUIRED**.

- Wiring and rapid shutdown per [NFPA 70 (NEC) 2023 edition](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70), §690.12, and array design per [IEC 62548-1:2023](https://webstore.iec.ch/en/publication/64171) — **REQUIRED**.

- MLPE / module-integrated electronics to [IEC 62109-3:2020](https://webstore.iec.ch/en/publication/27684) if used — **REQUIRED** at RFQ.

- Tax-equity partner KYC for ITC monetisation under [IRS Section 48E Clean Electricity Investment Credit guidance](https://www.irs.gov/credits-deductions/clean-electricity-investment-credit); MACRS basis recovery per [IRS Publication 946](https://www.irs.gov/publications/p946) Table A-1 — **PENDING** hospital finance sign-off.

All items above are gating requirements; the scenario model assumes they are met. Procurement must verify certificates of compliance prior to PO release. Tax-equity monetisation is NOT included in the computed NPV/IRR/payback figures — see §4b for the separate with-tax-benefits illustration.

## 9. HS code & duty block

| Component | HS heading (6-digit) | HTS statistical breakout (10-digit) | US import duty | Lookup path |
| --- | --- | --- | --- | --- |
| Crystalline silicon PV modules | 8541.43 | PENDING — confirm 10-digit | PENDING — confirm MFN + Section 201 + Section 301 overlays | hts.usitc.gov → 8541.43 |
| String inverters (> 50 V) | 8504.40 | PENDING — confirm 10-digit | PENDING — confirm MFN rate | hts.usitc.gov → 8504.40 |
| Mounting structures, aluminium | 7610.90 | PENDING — confirm 10-digit | PENDING — confirm MFN + Section 232 (aluminium) overlay | hts.usitc.gov → 7610.90 |
| DC cabling, PV-rated >1,000 V | 8544.60 | PENDING — confirm 10-digit | PENDING — confirm MFN rate | hts.usitc.gov → 8544.60 |

HS classifications and duty rates are jurisdiction-specific and subject to change. Codes above are indicative starting points for tariff-engineering, not legal advice. Use the [USITC Harmonized Tariff Schedule](https://hts.usitc.gov/) to drill from the 6-digit heading to the 10-digit HTS statistical breakout, then cross-check any Section 201 / Section 301 / AD-CVD overlays and any FTA preferential treatment (USMCA, FTA partners). Mark every rate PENDING until confirmed by a licensed customs broker or trade counsel.

**Disclaimer.** Figures in this article are for engineering and procurement scoping only. They do not constitute investment advice, a tariff ruling, or a quote. Energy yields, tariffs, and incentive availability change frequently; readers must validate inputs against current primary sources before committing capital. Bounded model assumptions (O&M carrier band, self-consumption ratio, discount rate, residual value, inverter replacement convention, export tariff, ITC/MACRS tax-shield illustration) are illustrative and are to be replaced with carrier-quoted, meter-derived, term-sheet-derived, and tax-counsel-reviewed inputs at RFQ.

## 10. Next steps

If your hospital or health-system portfolio is evaluating a similar 1–5 MWp block using Jinko Tiger Neo 3.0 modules and Sungrow SG125HV string inverters, request a tailored TCO using your state's tariff and ITC adders via the TradVolt RFQ form.