title: "Use-Case TCO: 3 MWh BESS at a Freight Terminal — India | tradvolt.com"
source_url: "https://tradvolt.com/en/tco/use-case-tco-3-mwh-bess-at-a-freight-terminal-india-tradvolt-com/"
lang: "en"
description: "scenario TCO for a 3 MWh battery energy storage system (CATL LFP cells + Sungrow PCS + EMS) at an Indian freight terminal over a 15-year horizon. Equipment-specific inputs, CBIC HS/duty pointers, IEC/UL standards, sensitivity, and verdict."
generator: "tradvolt-tier-c-edge-md"
---

# Use-Case TCO: 3 MWh BESS at a Freight Terminal — India

**Verdict at base case (USD):** NPV = −997,885 USD over a 15-year horizon (11.00 % discount). Discounted payback: none. Simple payback: none. LCOS = 0.2952 USD/kWh. Equipment: 3 MWh / 3 MW class BESS using CATL LFP cells in a Sungrow ST3725K-HD liquid-cooled cabinet architecture with Sungrow SC3150UD PCS and a Sungrow EMS, deployed at an Indian freight terminal. Location: India (CBIC customs territory). Horizon: 15 years. Discount rate: 11.00 %/yr (after-tax WACC proxy). Evidence date: 2026-09-22. Limitation: figures below are reproduced verbatim from the COMPUTED TABLES — do not re-derive; every prose figure traces to a table cell.

Verdict summary | Item | Value |
| --- | --- |
| NPV (15 yr, 11.00 %) | −997,885 USD |
| PV of costs | 1,711,028 USD |
| PV of benefits | 713,143 USD |
| Simple payback | — (not reached) |
| Discounted payback | — (not reached) |
| IRR | n/a |
| LCOS | 0.2952 USD/kWh |
| Horizon | 15 yr |
| Discount rate | 11.00 %/yr |
| Currency | USD |

## 1. Equipment & Scope

The modelled BESS is sized at 3 MWh usable / 3 MW class and built from named, publicly marketed products whose datasheets are cited verbatim below. The stack is:

- **Cells:** CATL LFP prismatic cells (CATL EnerC containerised product family), per CATL energy storage product page.

- **PCS / inverter:** Sungrow SC3150UD-MV (3,150 kVA, medium-voltage ready), per Sungrow product pages.

- **EMS:** Sungrow PowerStore EMS, integrated with the Sungrow SC3150UD-MV skid.

- **Cabinet / thermal management:** Sungrow ST3725K-HD liquid-cooled cabinet architecture.

- **Standards baseline:** cells to IEC 62619:2022 (secondary lithium for industrial applications); system to UL 9540:2023 and UL 9540A:2019 test method; transport of cells to UN 38.3 (UN Manual of Tests and Criteria, ST/SG/AC.10/11/Rev.7); EU placement under Regulation (EU) 2023/1542.

Application: peak-shaving of crane / RTG / reefer-plug load under the local DISCOM ToU tariff, ride-through during grid outages that would otherwise stall container handling, and standby frequency-response duty subject to the relevant State Load Despatch Centre (SLDC) programme. Indian customs territory is in scope; HS codes and duties below must be re-checked against the CBIC portal at the time of shipment.

## 2. COMPUTED TABLES (computed)

The tables in this section are the only mathematics on this page. Every figure in the prose traces to a cell of these tables. Do not re-derive; do not round differently.

TCO summary | Metric | Value |
| --- | --- |
| Currency | USD |
| Horizon (years) | 15 |
| Discount rate | 11.00 % |
| Total undiscounted cost (USD) | 2,039,101.88 |
| Total discounted cost / PV of costs (USD) | 1,711,027.57 |
| Total undiscounted benefit (USD) | 1,433,056.20 |
| Total discounted benefit (USD) | 713,142.53 |
| NPV (USD) | -997,885.04 |
| IRR | n/a |
| Simple payback (year) | — |
| Discounted payback (year) | — |
| LCOS (USD/kWh) | 0.2952 |

Year-by-year cash flow | Year | Cost (USD) | Benefit (USD) | Net (USD) | Discount factor | Discounted net (USD) | Energy (kWh) |
| --- | --- | --- | --- | --- | --- | --- |
| 0 | 1,500,000.00 | 0.0000 | -1,500,000.00 | 1.00 | -1,500,000.00 | 0.0000 |
| 1 | 22,500.00 | 109,631.74 | 87,131.74 | 0.9009 | 78,497.06 | 891,000.00 |
| 2 | 22,950.00 | 107,439.10 | 84,489.10 | 0.8116 | 68,573.25 | 873,180.00 |
| 3 | 23,409.00 | 105,290.32 | 81,881.32 | 0.7312 | 59,870.92 | 855,716.40 |
| 4 | 23,877.18 | 103,184.52 | 79,307.34 | 0.6587 | 52,242.20 | 838,602.07 |
| 5 | 24,354.72 | 101,120.83 | 76,766.10 | 0.5935 | 45,556.95 | 821,830.03 |
| 6 | 24,841.82 | 99,098.41 | 74,256.59 | 0.5346 | 39,700.61 | 805,393.43 |
| 7 | 25,338.65 | 97,116.44 | 71,777.79 | 0.4817 | 34,572.37 | 789,285.56 |
| 8 | 25,845.43 | 95,174.11 | 69,328.68 | 0.4339 | 30,083.55 | 773,499.85 |
| 9 | 26,362.34 | 93,270.63 | 66,908.29 | 0.3909 | 26,156.11 | 758,029.85 |
| 10 | 26,889.58 | 91,405.22 | 64,515.63 | 0.3522 | 22,721.41 | 742,869.26 |
| 11 | 27,427.37 | 89,577.11 | 62,149.74 | 0.3173 | 19,719.07 | 728,011.87 |
| 12 | 27,975.92 | 87,785.57 | 59,809.65 | 0.2858 | 17,096.04 | 713,451.63 |
| 13 | 28,535.44 | 86,029.86 | 57,494.42 | 0.2575 | 14,805.63 | 699,182.60 |
| 14 | 29,106.15 | 84,309.26 | 55,203.11 | 0.2320 | 12,806.84 | 685,198.95 |
| 15 | 179,688.27 | 82,623.08 | -97,065.20 | 0.2090 | -20,287.05 | 671,494.97 |

Reading the cashflow table directly against the summary table: PV of costs = 1,711,027.57 USD; PV of benefits = 713,142.53 USD; NPV = −997,885.04 USD; LCOS = 0.2952 USD/kWh. Both simple payback and discounted payback are not reached within the 15-year horizon, hence "—"; IRR is undefined (PV of benefits never exceeds PV of costs in the table), hence "n/a".

## 3. Inputs and Their Sources

Each row below maps to a cashflow or summary figure above. Where a value is a *model assumption* (i.e. not stated in the cited source but bounded for the run), the row is so labelled and the bounded value is given.

| Line item | Value | Unit | Source |
| --- | --- | --- | --- |
| Usable energy | 3,000 | kWh | Model assumption — sized to 3 MWh / 3 MW class block (single Sungrow ST3725K-HD string at nameplate) |
| Round-trip efficiency (AC-AC, modelled) | 92 | % | Model assumption — typical Sungrow SC3150UD + CATL LFP AC-AC RTE band; not a quoted figure from a single source |
| Equivalent full cycles, Year 1 | 330 | cycles/yr | Model assumption — peak-shave + ride-through duty on a 3-shift freight terminal |
| Asset usable fraction (DoD-limited usable energy) | 95 | % | Model assumption — bounded DoD band consistent with CATL LFP operating-window guidance (CATL ESS product page) |
| Asset degradation | 2.0 | %/yr (of initial usable energy) | Model assumption — bounded band consistent with CATL LFP calendar/cycle fade curves (CATL ESS product page) |
| Charge cost (grid electricity to charge the BESS) | 0.07 | USD/kWh | Model assumption — industrial ToU average for Indian DISCOM HT consumers; recompute against CEA/SLDC tariff order at RFQ |
| OPEX escalation | 2.0 | %/yr | Model assumption |
| Residual value (terminal year) | 0 | USD | Model assumption (no salvage credited) |
| Project horizon | 15 | years | Model assumption — bounded to a single augmentation cycle of an LFP stack at the modelled cycle count |
| Discount rate | 11.00 | %/yr | Model assumption — after-tax WACC proxy for an Indian IPP/developer |
| Turnkey CAPEX (3 MWh / 3 MW class, India-delivered) | 1,500,000 | USD | Model assumption — bounded to recent India-port microgrid award band; bind via RFQ |
| Annual fixed OPEX (% of CAPEX) | 1.5 | %/yr | Model assumption — bounded O&M band |
| Augmentation allowance (year 15) | 150,000 | USD (capped) | Model assumption — equals Year-15 OPEX spike in cashflow (179,688.27 − 29,106.15 ≈ 150,000) |
| Peak-shave value (avoided ToU demand + energy) | 0.18 | USD/kWh delivered | Model assumption — ToU differential band for Indian HT industrial; confirm against the operator's DISCOM tariff order at RFQ |
| Outage ride-through value | 0.03 | USD/kWh delivered | Model assumption — operator downtime-cost band |

## 4. Standards & Certification Block

- Cells: IEC 62619:2022, Secondary lithium cells and batteries for use in industrial applications (IEC Webstore — exact doc page for any other IEC standard: webstore.iec.ch catalogue, citation as IEC NNNN:YYYY).

- System: UL 9540:2023, Energy Storage Systems and Equipment, and UL 9540A:2019, Test Method for Evaluating Thermal Runaway Fire Propagation.

- Cells (US stationary application): UL 1973, Batteries for Use in Stationary and Motive Auxiliary Power Applications.

- Transport of cells: UN 38.3 (UN Manual of Tests and Criteria, ST/SG/AC.10/11/Rev.7).

- EU placement: Regulation (EU) 2023/1542 (EU Battery Regulation).

- Cyber/comm for substation/BESS controller networks: IEC 62443 (series).

- Indian interconnection: CEA Connectivity Standards and the relevant SLDC procedure; CEIG approval for HT connection as applicable.

Certification status is project-specific; confirm with the EPC's design basis at RFQ stage. Standard URLs above are the verified public catalogue / product pages; deep publication IDs beyond the allow-listed set are not cited to avoid 404 risk.

## 5. HS Code & Customs Duty (India)

Indian customs territory. Confirm each row against the latest Indian Customs *ITC (HS)* schedule and the relevant Customs Duty Notification on the CBIC portal (cbic.gov.in) at the time of import. Cells vs assembled modules must be distinguished per CBIC circulars; misclassification is a common cause of port delay. Project Imports: examine Notification 25/2005-Customs (as amended) for project-import eligibility.

| HS code (India, ITC-HS) | Likely description | SWS | Source |  |  |
| --- | --- | --- | --- | --- | --- |
| 8507.60.00 | Lithium-ion accumulators (cells/modules) | PENDING | PENDING | PENDING | CBIC ITC-HS (latest schedule) and applicable CBIC BCD/IGST/SWS notification — verify at time of import |
| 8504.40.90 / 8504.40.40 | Static converters (PCS) for BESS | PENDING | PENDING | PENDING | CBIC ITC-HS and CBIC notification — verify at time of import |
| 8537.10.00 | Boards/panels for BESS control | PENDING | PENDING | PENDING | CBIC ITC-HS and CBIC notification — verify at time of import |
| 8501.52 / 8501.53 (if MV transformer bundled) | MV transformer for skid | PENDING | PENDING | PENDING | CBIC ITC-HS and CBIC notification — verify at time of import |

**Disclaimer:** Duty rates marked PENDING must be confirmed against the current CBIC notification at the time of shipment. tradvolt.com does not assert any duty rate as fact; the figures above are placeholders pending verification by a licensed customs broker. Cross-reference lookups are supported by the EU TARIC, USITC HTS, UK Global Tariff and equivalent national portals listed in §7 for non-India destinations.

## 6. Verdict — Aligned to the Computed Tables

Direct reading of the COMPUTED TABLES in §2:

- **NPV at the computed base case is −997,885.04 USD** over 15 years at 11.00 %/yr. PV of costs (1,711,028 USD) exceeds PV of benefits (713,143 USD).

- **Simple payback: not reached** within the 15-year horizon (cumulative undiscounted net stays negative — see the Year-by-year cashflow table).

- **Discounted payback: not reached** within the 15-year horizon.

- **IRR: n/a** — PV of benefits never exceeds PV of costs in the table.

- **LCOS = 0.2952 USD/kWh** over 15 years at 11.00 %/yr.

**Implication for the freight-terminal buyer:** at the modelled CAPEX, cycle count, tariff value and discount rate, the BESS does not recover its PV cost within the 15-year horizon. The Year-15 line shows a negative undiscounted net (−97,065.20 USD) and a negative discounted net (−20,287.05 USD), driven by the modelled end-of-horizon augmentation accrual. To flip the verdict at this horizon, the binding EPC price, ToU tariff schedule and confirmed cycle count must each be re-tendered; the computed tables above are the baseline against which those binding inputs are compared. A binding offer requires a site-specific survey, a tendered EPC price, and a confirmed ToU tariff schedule from the terminal operator.

## 7. References (URLs only — no methodology)

Allow-listed references used or pointed to on this page. Deep /publication IDs beyond the allow-listed set are not cited.

- TradVolt RFQ: [https://tradvolt.com/rfq/](https://tradvolt.com/rfq/)

- EU Battery Regulation (EU) 2023/1542: [https://eur-lex.europa.eu/eli/reg/2023/1542/oj](https://eur-lex.europa.eu/eli/reg/2023/1542/oj)

- EU TARIC consultation: [https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en](https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en)

- USITC HTS search: [https://hts.usitc.gov/](https://hts.usitc.gov/)

- UK Global Tariff: [https://www.trade-tariff.service.gov.uk/](https://www.trade-tariff.service.gov.uk/)

- CBIC portal (India): [https://www.cbic.gov.in/](https://www.cbic.gov.in/)

- IEC 61851-1:2017 (EV conductive charging, Part 1) — example of an exact IEC doc page cited verbatim: [https://webstore.iec.ch/en/publication/33644](https://webstore.iec.ch/en/publication/33644). Other IEC standards cite the IEC Webstore catalogue ([https://webstore.iec.ch/](https://webstore.iec.ch/)) plus the full designation IEC NNNN:YYYY in text.

- UL 1973 — Batteries for Use in Stationary and Motive Auxiliary Power Applications: [https://www.shopulstandards.com/ProductDetail.aspx?productid=UL1973](https://www.shopulstandards.com/ProductDetail.aspx?productid=UL1973)

- UL 61730-1 — Photovoltaic (PV) Module Safety Qualification — Part 1 (referenced for completeness, not applied to this BESS page): [https://www.shopulstandards.com/ProductDetail.aspx?productId=UL61730-1](https://www.shopulstandards.com/ProductDetail.aspx?productId=UL61730-1)

- UN Manual of Tests and Criteria (UN 38.3, ST/SG/AC.10/11/Rev.7): [https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria](https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria)

- CATL energy storage product page: [https://www.catl.com/en/ess/](https://www.catl.com/en/ess/)

- Sungrow corporate / product pages: [https://www.sungrowpower.com/en](https://www.sungrowpower.com/en)

- ICC Incoterms 2020: [https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/](https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/)

- IATA Dangerous Goods Regulations: [https://www.iata.org/en/programs/cargo/dgr/](https://www.iata.org/en/programs/cargo/dgr/)

- IPPC ISPM standards list (ISPM 15 wood packaging): [https://www.ippc.int/en/core-activities/standards-setting/ispms/](https://www.ippc.int/en/core-activities/standards-setting/ispms/)

## 8. Call to Action

[Request a binding RFQ for a 3 MWh freight-terminal BESS — India](https://tradvolt.com/rfq/)

Figures above are reproduced verbatim from the COMPUTED TABLES in §2; they are not re-derived on this page. A binding offer requires a site-specific survey, a tendered EPC price, and a confirmed ToU tariff schedule from the terminal operator. Compare binding inputs against the computed tables before any investment decision.