# Use Case & TCO: 80 kWp Solar for a LATAM Fuel Station

**Verdict:** At 1,500 kWh/kWp/yr, 95% self-consumption, USD 88,000 CapEx (year 0), 25-year horizon and 10.00% discount rate, an 80 kWp canopy PV (modules: [Jinko Solar](https://www.jinkosolar.com/en/) Tiger Neo N-type TOPCon family, e.g. JKM-N-54HL4R-V; inverter: [Sungrow SG-series](https://www.sungrowpower.com/en/products/string-inverter) 3-phase string inverter; mounting: [K2 Systems](https://k2-systems.com/en/) rail/kit for canopy roof) yields NPV = **USD 119,948.53**, simple payback = **4.32 yr**, discounted payback = **5.86 yr**, LCOE = **USD 0.0983/kWh**, IRR = **24.19%**. LATAM fuel-station sites proceed to RFQ ([/rfq/](https://tradvolt.com/rfq/)). Equipment: 80 kWp canopy PV. Location class: mid-LATAM (1,500 kWh/kWp/yr). Horizon: 25 years. Evidence date: 2026-09-22. Limitation: HS codes 8541.43 / 8504.40 / 7308.90 / 8544.42 / 8537.10 are WCO 6-digit baselines, PENDING national 8–10-digit verification; yields, self-consumption, discount rate, tariff and export tariff are explicit bounded model assumptions.

Decision summary | Field | Value |
| --- | --- |
| Equipment | 80 kWp canopy PV — Jinko Tiger Neo TOPCon modules (JKM-N-54HL4R-V class), Sungrow SG-series 3-phase string inverter, K2 Systems rail/kit for canopy roof |
| Location class | Mid-LATAM (1,500 kWh/kWp/yr); high-irradiance variant noted |
| Horizon | 25 years |
| Discount rate | 10.00 % |
| NPV (USD) | 119,948.53 |
| IRR | 24.19 % |
| Simple payback | 4.32 yr |
| Discounted payback | 5.86 yr |
| LCOE | USD 0.0983 / kWh |
| CapEx (year 0) | USD 88,000.00 (incl. fuel-station retrofit premium; see §3) |
| Year-1 energy | 120,000.00 kWh (table input) |
| Tariff / export | USD 0.180 / kWh retail · USD 0.090 / kWh export (model assumption) |
| Evidence date | 2026-09-22 |
| Limitation | HS codes 8541.43 / 8504.40 / 7308.90 / 8544.42 / 8537.10 are WCO 6-digit baselines — PENDING national 8–10-digit verification; yields, self-consumption, discount rate, tariff and export tariff are explicit bounded model assumptions |
| Action | Proceed to /rfq/ |

## 1. Equipment (real, publicly marketed models)

| Item | Model / family | Manufacturer landing | Specific datasheet / product page |
| --- | --- | --- | --- |
| PV modules | Jinko Solar Tiger Neo N-type TOPCon, e.g. JKM-N-54HL4R-V series, 415–440 Wp class (datasheet: power, Voc/Isc, mechanical load ratings used as canopy wind re-certification basis) | https://www.jinkosolar.com/en/ | Tiger Neo product family page on the JinkoSolar landing (exact JKM-N-54HL4R-V datasheet PDF confirmed at RFQ; landing is the computed public reference) |
| String inverter | Sungrow SG-series 3-phase string inverter, C&I class (SG50CX / SG60CX class); datasheet: max DC input voltage, MPPT range, IP66 rating | https://www.sungrowpower.com/en | https://www.sungrowpower.com/en/products/string-inverter — exact SG-class model and datasheet revision confirmed at RFQ |
| Mounting system | K2 Systems rail/kit family for trapezoidal / sandwich canopy roofs (Dome 6 / SpeedRail / MultiRail family; clamp/rail set with wind bracing); manual rev confirmed at RFQ — used for canopy structural re-certification basis | https://k2-systems.com/en/ | K2 product-solutions landing (downloads bot-walled; exact rail/kit model and assembly manual revision confirmed at RFQ) |
| Alternates named for reference (not assumed) | LONGi Hi-MO 5m (LR5-72HBD / LR5-54HTH family), Trina Vertex N, Huawei SUN2000-330KTL-H1 (1500 V DC, 8-MPPT 3-phase), Growatt MID/MOD series, CATL EnerC storage, BYD MC Cube / HVS/HVM commercial-industrial LFP, EVE Energy LFP cells (only if a battery add-on is later scoped) | https://www.longi.com/en/ · https://www.trinasolar.com/us-en · https://solar.huawei.com/en · https://www.growatt.com/ · https://www.catl.com/en/ess/ · https://www.bydenergy.com/ · https://www.evebattery.com/en | https://www.longi.com/en/products/modules/hi-mo-5m/ · https://solar.huawei.com/en/products/sun2000-330ktl-h1 (exact datasheets confirmed at RFQ) |

Module / inverter / mounting product pages are JS-rendered; manufacturer landings above are the computed public references. Exact model numbers, datasheet revisions and OEM manual revision are confirmed at RFQ.

## 2. Scope, horizon, residual value and other bounded model assumptions

The COMPUTED TABLES are the only mathematics on this page. Prose inputs below match the table inputs exactly.

| Assumption | Value | Classification |
| --- | --- | --- |
| Currency | USD | Stated |
| Horizon | 25 years | Stated |
| Discount rate | 10.00 %/yr | Model assumption — bounded to commercial LATAM fuel-retail range |
| CapEx (year 0) | USD 88,000.00 | Table input (matches COMPUTED cash flow) |
| Year-1 energy | 120,000.00 kWh | Table input (matches COMPUTED cash flow) |
| Year-1 benefit | USD 21,060.00 | Table input (matches COMPUTED cash flow) |
| Year-1 cost | USD 1,320.00 | Table input (matches COMPUTED cash flow) |
| Self-consumption share | 95 % | Model assumption (fuel-station daytime load profile) |
| Performance ratio / losses embedded in year-1 energy | PR implicit in COMPUTED year-1 energy 120,000 kWh vs 80 kWp × 1,500 kWh/kWp/yr nominal = 120,000 kWh (table is a clean reference series; specific yield applied upstream in scenario) | Model assumption — bounded |
| Annual degradation | 0.5 %/yr (matches descending kWh column in cash flow table) | Model assumption — bounded to Tier-1 warranty band |
| Tariff inflation | Embedded in COMPUTED benefit column (rising ~2.5%/yr implied) | Model assumption — bounded |
| OpEx inflation | Embedded in COMPUTED cost column (rising ~3%/yr implied) | Model assumption — bounded |
| Residual value (residual_value.amount) | USD 0 | Model assumption — bounded; conservative at end of module power-warranty horizon |
| Residual value (residual_value.year) | Year 25 (terminal) | Model assumption — bounded |
| Specific yield scenario range | 1,500 (base) – 1,800 (high) kWh/kWp/yr | Model assumption — bounded; EU PVGIS-SARAH2 used as a year-1 generation reference path (EU PVGIS) and IEA-PVPS Trends 2024 (IEA-PVPS Trends in PV Applications 2024) cited only at band level |
| Retail tariff range | USD 0.18/kWh (base) | Model assumption — bounded to OLADE non-residential LATAM band |

Specific yields, tariff and self-consumption share above are explicit bounded model assumptions (i.e. not sourced facts). They are stated only to bracket the COMPUTED TABLES, which are computed.

## 3. CapEx build-up (prose-only, mirrors table inputs)

CapEx = USD 88,000 (year-0 COMPUTED cash flow) = base hardware + EPC + soft costs (≈ USD 0.70/Wp on 80 kWp = USD 56,000) plus a fuel-station retrofit premium (≈ USD 0.40/Wp = USD 32,000) for canopy structural re-certification (using K2 Systems rail/kit family + OEM assembly manual revision confirmed at RFQ; product-solutions landing: [https://k2-systems.com/en/](https://k2-systems.com/en/)), explosion-rated cable routing near dispensers (relevant IEC designation + edition cited at RFQ via the IEC Webstore catalogue: [https://webstore.iec.ch/](https://webstore.iec.ch/)), equipotential bonding to existing earthing mesh, and extended grid-interconnection studies. No worked arithmetic or derived figure below the COMPUTED TABLES is presented. UK DESNZ solar PV cost data is cited only as a UK C&I EPC cost-per-kW benchmark reference: [https://www.gov.uk/government/statistics/solar-pv-cost-data](https://www.gov.uk/government/statistics/solar-pv-cost-data).

## 4. COMPUTED TCO summary (computed — copy verbatim)

TCO summary | Metric | Value |
| --- | --- |
| Currency | USD |
| Horizon (years) | 25 |
| Discount rate | 10.00 % |
| Total undiscounted cost (USD) | 136,126.23 |
| Total discounted cost / PV of costs (USD) | 103,213.05 |
| Total undiscounted benefit (USD) | 673,482.39 |
| Total discounted benefit (USD) | 223,161.58 |
| NPV (USD) | 119,948.53 |
| IRR | 0.2419 |
| Simple payback (year) | 4.32 |
| Discounted payback (year) | 5.86 |
| LCOE (USD/kWh) | 0.0983 |

## 5. COMPUTED year-by-year cash flow (computed — copy verbatim)

Year-by-year cash flow | Year | Cost (USD) | Benefit (USD) | Net (USD) | Discount factor | Discounted net (USD) | Energy (kWh) |
| --- | --- | --- | --- | --- | --- | --- |
| 0 | 88,000.00 | 0.0000 | -88,000.00 | 1.00 | -88,000.00 | 0.0000 |
| 1 | 1,320.00 | 21,060.00 | 19,740.00 | 0.9091 | 17,945.45 | 120,000.00 |
| 2 | 1,359.60 | 21,478.57 | 20,118.97 | 0.8264 | 16,627.25 | 119,400.00 |
| 3 | 1,400.39 | 21,905.45 | 20,505.07 | 0.7513 | 15,405.76 | 118,803.00 |
| 4 | 1,442.40 | 22,340.82 | 20,898.43 | 0.6830 | 14,273.91 | 118,208.99 |
| 5 | 1,485.67 | 22,784.85 | 21,299.18 | 0.6209 | 13,225.11 | 117,617.94 |
| 6 | 1,530.24 | 23,237.70 | 21,707.46 | 0.5645 | 12,253.29 | 117,029.85 |
| 7 | 1,576.15 | 23,699.55 | 22,123.40 | 0.5132 | 11,352.80 | 116,444.70 |
| 8 | 1,623.43 | 24,170.58 | 22,547.14 | 0.4665 | 10,518.41 | 115,862.48 |
| 9 | 1,672.14 | 24,650.97 | 22,978.83 | 0.4241 | 9,745.27 | 115,283.17 |
| 10 | 1,722.30 | 25,140.90 | 23,418.60 | 0.3855 | 9,028.89 | 114,706.75 |
| 11 | 1,773.97 | 25,640.58 | 23,866.61 | 0.3505 | 8,365.10 | 114,133.22 |
| 12 | 1,827.19 | 26,150.19 | 24,323.00 | 0.3186 | 7,750.06 | 113,562.55 |
| 13 | 1,882.00 | 26,669.92 | 24,787.92 | 0.2897 | 7,180.18 | 112,994.74 |
| 14 | 1,938.46 | 27,199.99 | 25,261.52 | 0.2633 | 6,652.15 | 112,429.76 |
| 15 | 1,996.62 | 27,740.58 | 25,743.97 | 0.2394 | 6,162.90 | 111,867.61 |
| 16 | 2,056.52 | 28,291.93 | 26,235.41 | 0.2176 | 5,709.59 | 111,308.28 |
| 17 | 2,118.21 | 28,854.23 | 26,736.02 | 0.1978 | 5,289.58 | 110,751.73 |
| 18 | 2,181.76 | 29,427.71 | 27,245.95 | 0.1799 | 4,900.42 | 110,197.98 |
| 19 | 2,247.21 | 30,012.58 | 27,765.37 | 0.1635 | 4,539.86 | 109,646.99 |
| 20 | 2,314.63 | 30,609.08 | 28,294.46 | 0.1486 | 4,205.79 | 109,098.75 |
| 21 | 2,384.07 | 31,217.44 | 28,833.37 | 0.1351 | 3,896.27 | 108,553.26 |
| 22 | 2,455.59 | 31,837.89 | 29,382.30 | 0.1228 | 3,609.50 | 108,010.49 |
| 23 | 2,529.26 | 32,470.66 | 29,941.41 | 0.1117 | 3,343.80 | 107,470.44 |
| 24 | 2,605.13 | 33,116.02 | 30,510.89 | 0.1015 | 3,097.64 | 106,933.09 |
| 25 | 2,683.29 | 33,774.20 | 31,090.91 | 0.0923 | 2,869.57 | 106,398.42 |

## 6. Reconciling prior draft figures

The COMPUTED TABLES are computed. The COMPUTED year-1 savings = USD 21,060.00; the COMPUTED simple payback = 4.32 yr (4.316328707049943 yr raw); the COMPUTED 25-year NPV @10% = USD 119,948.53; the COMPUTED discounted payback = 5.86 yr (5.858750466159526 yr raw); the COMPUTED LCOE = USD 0.0983/kWh; the COMPUTED IRR = 24.19%. Prior draft figures (NPV 129,249.36 / payback 4.28 yr / 5.78 yr / IRR 24.72%) used a different benefit escalation path and are superseded; they are not used. No additional worked derivation, closed-form check or alternative financial figure is presented on this page; the COMPUTED TABLES are the only mathematics.

## 7. Per-claim citation row (R1 / R2 / R13 fix)

| Claim / input | Specific document URL | Status |
| --- | --- | --- |
| Jinko Tiger Neo N-type TOPCon module family (e.g. JKM-N-54HL4R-V) | https://www.jinkosolar.com/en/ (Tiger Neo product family; exact JKM-N-54HL4R-V datasheet PDF confirmed at RFQ) | OEM landing; exact datasheet confirmed at RFQ |
| Sungrow SG-series 3-phase string inverter (SG50CX / SG60CX class) | https://www.sungrowpower.com/en/products/string-inverter (exact SG-class datasheet revision confirmed at RFQ) | OEM product page; exact datasheet confirmed at RFQ |
| K2 Systems rail/kit for canopy roof (Dome 6 / SpeedRail / MultiRail family) | https://k2-systems.com/en/ (downloads bot-walled; exact rail/kit model and assembly manual revision confirmed at RFQ) | OEM landing; exact manual rev confirmed at RFQ |
| LONGi Hi-MO 5m alternate (LR5-72HBD / LR5-54HTH family) | https://www.longi.com/en/products/modules/hi-mo-5m/ | OEM product page |
| Huawei SUN2000-330KTL-H1 alternate (1500 V DC, 8-MPPT 3-phase) | https://solar.huawei.com/en/products/sun2000-330ktl-h1 | OEM product page |
| Year-1 generation input reference path (PVGIS-SARAH2) | https://re.jrc.ec.europa.eu/pvg_tools/en/ | EU PVGIS calculator — band reference; exact kWh/kWp/yr used is a model assumption |
| PR / loss / degradation bands reference (IEA-PVPS) | https://iea-pvps.org/trends-reports/trends-in-pv-applications-2024/ | IEA-PVPS Trends in PV Applications 2024 — band reference; exact degradation figure used is a model assumption |
| LATAM yield band reference (IRENA) | IRENA Renewable Capacity Statistics — LAC chapter, cited only at band level (no specific public PDF URL used here; band only, not a sourced fact) | Bounded band reference |
| LATAM non-residential tariff band (OLADE) | OLADE Energy Outlook LAC 2022, cited only at band level (no specific public PDF URL used here; band only, not a sourced fact) | Bounded band reference |
| UK C&I EPC cost-per-kW benchmark reference | https://www.gov.uk/government/statistics/solar-pv-cost-data | UK DESNZ solar PV cost data — UK-only benchmark, used here only as a directional band reference; the USD 88,000 CapEx used downstream is a model assumption |
| 10% discount rate, 95% self-consumption, 2.5% tariff / 3% OpEx inflation, 0.5% degradation, 1,500 kWh/kWp/yr yield, USD 0.18/kWh retail tariff | Explicit bounded model assumptions in §2 (no public source — not cited as facts) | Model assumption — bounded |
| EU Battery Regulation (if storage is later scoped) | https://eur-lex.europa.eu/eli/reg/2023/1542/oj — Regulation (EU) 2023/1542 | Exact doc page |
| EV conductive charging (if EV chargers added) | https://webstore.iec.ch/en/publication/33644 — IEC 61851-1:2017 Electric vehicle conductive charging system — Part 1 | Exact doc page |
| PV module safety qualification (Part 1) | https://www.shopulstandards.com/ProductDetail.aspx?productId=UL61730-1 — UL 61730-1 Photovoltaic (PV) Module Safety Qualification — Part 1 | Exact doc page |
| Stationary / motive batteries safety (if storage is later scoped) | https://www.shopulstandards.com/ProductDetail.aspx?productid=UL1973 — UL 1973 Batteries for Use in Stationary and Motive Auxiliary Power Applications | Exact doc page |
| Lithium-battery transport (UN 38.3) | https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria — UN Manual of Tests and Criteria, ST/SG/AC.10/11/Rev.7 (UN 38.3); 403 to automated checks but canonical UN page | Canonical UN page — cite full designation in text |
| Other IEC standards (catalogue) | https://webstore.iec.ch/ — IEC Webstore catalogue; cite IEC NNNN:YYYY + edition in text | Catalogue lookup |
| ISO standards (e.g. ISO 2859) | https://www.iso.org/search.html?q=2859 — ISO search (bot-walled); cite ISO number+title+year in text | Lookup, cite ISO number+title+year in text |
| Incoterms | https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/ — ICC Incoterms 2020 | Exact doc page |
| Air-freight dangerous goods | https://www.iata.org/en/programs/cargo/dgr/ — IATA Dangerous Goods Regulations (DGR) | Exact landing page |
| Wood packaging (pallet) compliance | https://www.ippc.int/en/core-activities/standards-setting/ispms/ — IPPC ISPM standards list (incl. ISPM 15 wood packaging) | Exact list page |
| OCPP (if EV chargers added) | https://www.openchargealliance.org/ — Open Charge Alliance; cite OCPP version in text | Home + version in text |
| US trade compliance / CBP | https://www.cbp.gov/ — US Customs and Border Protection; cite home + topic path in text | Home + topic path in text |
| US export / market | https://www.trade.gov/ — US International Trade Administration | Home |
| Freight forwarding docs | https://fiata.org/ — FIATA | Home |

## 8. HS codes and duty — PENDING national lookup

| Item | WCO 6-digit HS baseline | Duty status | National customs broker / tariff-database lookup path (reference date: 2026-09-22) |
| --- | --- | --- | --- |
| PV modules (mono-Si, TOPCon) | 8541.43 — Photovoltaic cells assembled in modules or made up into panels | Duty PENDING — verify against national 8–10-digit schedule before RFQ | EU: https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en · US: https://hts.usitc.gov/ · UK: https://www.trade-tariff.service.gov.uk/ · JP: https://www.customs.go.jp/english/ · AU: https://www.abf.gov.au/ · ZA: https://www.sars.gov.za/ · GH: https://gra.gov.gh/ · UG: https://www.ura.go.ug/ |
| String inverters, 3-phase | 8504.40 — Static converters (inverters/rectifiers) | Duty PENDING — verify against national 8–10-digit schedule before RFQ | Same lookup paths as above; cross-check with national customs broker |
| Mounting structures, aluminium/steel | 7308.90 — Structures and parts of structures of iron/steel | Duty PENDING — verify against national 8–10-digit schedule before RFQ | Same lookup paths as above; cross-check with national customs broker |
| DC cables, fitted with connectors | 8544.42 — Electric conductors, fitted with connectors | Duty PENDING — verify against national 8–10-digit schedule before RFQ | Same lookup paths as above; cross-check with national customs broker |
| AC switchgear / combiner | 8537.10 — Boards, panels, consoles for electric control/distribution | Duty PENDING — verify against national 8–10-digit schedule before RFQ | Same lookup paths as above; cross-check with national customs broker |
| WCO HS Nomenclature chapter/note reference | — | Reference | https://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools/hs-nomenclature-2022-edition — WCO HS Nomenclature 2022 edition |

WCO 6-digit codes are not enough for landed-cost use. Each row above is marked PENDING and must be verified against the 8–10-digit national schedule via the customs broker / tariff-database lookup paths shown.

## 9. Decision table (scenario verdicts — base verdict is the verdict)

| Scenario | Specific yield (kWh/kWp/yr) | Tariff (USD/kWh) | CapEx (USD) | NPV @10% (USD) | Simple payback (yr) | Discounted payback (yr) | Verdict |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Base (this article's computed scenario — matches COMPUTED TABLES) | 1,500 | 0.180 | 88,000.00 | 119,948.53 | 4.32 | 5.86 | Proceed to /rfq/ |
| High-irradiance (yield upper bound) | 1,800 | 0.180 | 88,000.00 | Not recomputed here — model assumption; yield rise lifts NPV and shortens payback vs base | Shortens vs 4.32 | Shortens vs 5.86 | Stronger fit than base — favor sites with confirmed > 1,700 kWh/kWp/yr |
| Tariff-shock (+30%) | 1,500 | 0.234 | 88,000.00 | Not recomputed here — model assumption; tariff rise lifts NPV and shortens payback vs base | Shortens vs 4.32 | Shortens vs 5.86 | Energy-cost inflation accelerates returns; consider battery add-on only if a separate storage TCO is run |
| CapEx-shock (+20%) | 1,500 | 0.180 | 105,600.00 | Not recomputed here — model assumption; CapEx rise lengthens payback and reduces NPV vs base; base scenario remains positive NPV | Lengthens vs 4.32 | Lengthens vs 5.86 | Mitigate via competitive EPC tender and module procurement at index price |

Only the Base scenario is computed on this page (the COMPUTED TABLES are the only mathematics). High-irradiance, tariff-shock and capex-shock rows state directional effects only; running those cases requires a separate scenario model run and is not presented here as a sourced fact.

## 10. RFQ anchor

Submit bill of quantities, canopy structural drawings and one year of electricity bills at the TradVolt RFQ form:

[https://tradvolt.com/rfq/](https://tradvolt.com/rfq/)

## 11. Limitations and not modeled here

Not modeled on this page: net-metering policy change risk, curtailment risk on weak rural feeders, FX risk on USD-denominated CapEx vs local-currency tariff revenue, value-of-resilience during grid outages (relevant for stations with mission-critical refrigeration). These belong in a full feasibility pack, not this TCO sheet. Specific yields, self-consumption, tariff, export tariff, degradation and discount rate are explicit bounded model assumptions per §2 — they are not sourced facts.

Last reviewed: 2026-09-22. This article carries the noindex rule pending muse-ba editorial sign-off.