# C-Rate

**C-Rate** is the measure of the charge or discharge current of a battery relative to its nominal rated amp-hour capacity, where a 1C rate fully charges or discharges the nominal capacity in one hour (such as 280 A for a 280 Ah LFP cell), 0.5C takes two hours, and 0.33C takes three hours.

## How it is measured and specified

At the cell or module level, C-rate divides the applied current in amperes by the rated nominal capacity in amp-hours (`I / Cn`). For a standard 280 Ah prismatic lithium iron phosphate (LFP) cell widely used in Chinese stationary storage racks, a 1C rate equals 280 A (1-hour nominal duration), a 0.5C rate equals 140 A (2-hour duration), a 0.33C rate equals roughly 93 A (3-hour duration), and a 0.05C termination taper equals 14 A.

At the complete energy storage system level, C-rate expresses the ratio of rated Power Conversion System (PCS) kilowatt output to nominal battery pack kilowatt-hour capacity. Because internal resistive heating scales with the square of current (`I²R`), higher C-rates reduce instantaneous coulombic and [round-trip efficiency](/glossary/round-trip-efficiency/), increase cell internal temperature gradients, and accelerate cyclic capacity fade.

## How it matters when sourcing from China

When procuring LFP cells, rack modules, or containerized BESS from Chinese manufacturers, C-rate governs three critical engineering and commercial decisions across our [battery and storage TCO methodology](/methods/battery-tco/):

1. **PCS-to-Battery Duration Sizing:** Industrial buyers must match the system C-rate to their dispatch profile. For example, the [750 kWh / 250 kW EU bottling plant ESS TCO study](/en/tco/750-kwh-bottling-plant-ess-eu-tco-use-case-tradvolt-com/) specifies a 0.33C (3-hour duration) architecture so the storage cabinet can sustain peak load clipping across a five-hour afternoon tariff window, whereas high-power port or grid-support systems typically specify a 0.5C (2-hour) or 1C (1-hour) PCS-to-battery ratio.

2. **Pre-Shipment Factory Capacity Grading:** Chinese factory end-of-line (EOL) and pre-shipment tests must declare the exact C-rate used to measure amp-hour capacity, because testing at a lower C-rate yields an artificially higher capacity reading. In the [battery module EOL grading SOP for the China-to-Spain corridor](/en/guides/battery-module-eol-grading-sop-cnes-corridor-lfp-vertical-tradvolt/), 51.2 V 280 Ah LFP modules are charged at 0.5C (140 A) to 3.65 V/cell with a 0.05C (14 A) current taper, followed by a full 1C (280 A) constant-current discharge to 2.50 V/cell to grade actual delivered capacity. Similarly, the [battery pack capacity-retention test SOP for the China-to-Jamaica corridor](/en/guides/battery-pack-capacity-retention-test-process-sop-tradvolt/) (referencing CATL EnerC+ 306 Ah LFP packs) executes a 0.5C constant-current/constant-voltage charge to ≤0.05C taper and a 0.5C discharge at 25±2°C to confirm ≥95% capacity retention before export.

3. **Thermal Management and Warranty Validity:** Continuous operation above 0.5C generates substantial heat across cell terminals and aluminum busbars, typically requiring liquid-cooled cold plates (maintaining ≤3°C cell-to-cell delta-T) rather than forced-air HVAC cabinets, and requiring explicit OEM warranty coverage for 1C duty.

## What to confirm before procurement

- Confirm both continuous and peak pulse C-rate limits on the cell and rack datasheet, and ensure the BMS over-current protection thresholds match the PCS kilowatt rating.

- Check that the supplier's warranted [cycle life](/glossary/cycle-life/) is stated at the actual C-rate your project will run on site rather than a gentler laboratory test rate.

- Specify the exact charge and discharge C-rate (for example, 0.5C or 1C at 25±2°C) to be used during pre-shipment factory acceptance testing.