title: "Sungrow SG350HX vs Huawei SUN2000-330KTL-H1 vs Growatt MAX 350 KTL3-XL2 — 1500V Utility String Inverter Comparison | Tradvolt"
source_url: "https://tradvolt.com/guides/compare/sungrow-sg350hx-vs-huawei-sun2000-330ktl-h1-vs-growatt-max-350-ktl3-xl2/"
lang: "en"
description: "Side-by-side B2B engineering, MPPT architecture, ENA G99 / IEC 62109 compliance, and 25-year UK landed-cost TCO comparison of Sungrow SG350HX, Huawei SUN2000-330KTL-H1, and Growatt MAX 350 KTL3-XL2 1500V string inverters."
generator: "tradvolt-tier-c-edge-md"
---

[Tradvolt](/)

[Home](/) &rsaquo; [Guides](/guides/) &rsaquo; [Inverters](/guides/inverters/) &rsaquo; Sungrow SG350HX vs Huawei SUN2000-330KTL-H1 vs Growatt MAX 350 KTL3-XL2

# Sungrow SG350HX vs Huawei SUN2000-330KTL-H1 vs Growatt MAX 350 KTL3-XL2: 1500V String Inverter Comparison

## Procurement Verdict: Choosing Between 330–350 kW 1,500 V DC Three-Phase String Inverters

**Choose the Sungrow SG350HX (352 kVA @ 30°C / 320 kVA @ 40°C)** for large industrial rooftops and utility blocks requiring maximum MPPT granularity (**12 or 16 MPPTs, 2 strings/MPPT, 30 A or 40 A per MPPT**) and peak conversion efficiency of **99.02% (98.8% European efficiency)** with PLC/RS485 telemetry.

**Choose the Huawei SUN2000-330KTL-H1 (330 kW / 330 kVA rated at 40°C)** when ambient temperatures regularly reach 40°C without kVA derating, when pairing **4–5 strings per MPPT (up to 65 A per MPPT across 6 or 8 MPPTs)** on uniform ground-mount or flat-roof arrays, and when Huawei's **MBUS PLC** power-line communication eliminates separate RS485 signal trenching.

**Choose the Growatt MAX 350 KTL3-XL2 (350 kW / 350 kVA)** when rooftop structural weight or manual rigging limits favor the lightest chassis in the class (**~108 kg** vs **112 kg** for Huawei and **~116 kg** for Sungrow) while maintaining **15 MPPTs (2 strings/MPPT, 30 A–40 A/MPPT)** and **99.0% max / 98.8% Euro efficiency**. On a 25-year China-to-UK industrial rooftop TCO basis (420 kWp DC, 378,000 kWh/yr Year-1 yield, 8.00% WACC), the inverter + AC/DC BoS + ENA G99 protection sub-scope (**£31,800 CapEx, £1,100/yr OpEx, £7,200 yr-13 replacement**) clears a **0.7254-year simple payback**, **138% IRR**, **£378,763.57 NPV**, and **£0.0145/kWh LCOE**, whereas a full-plant CapEx band of **£1,050,000** with **£18,000/yr OpEx** sits right at break-even (**NPV -£1,492.01, IRR 7.99%, simple payback 12.09 years, LCOE £0.3299/kWh**).

**Importing 330–350 kW 1,500 V String Inverters from China?** Request an OEM datasheet-matched quotation with UKCA/CE, ENA G99, and HS 8504.40 tariff confirmation. [Request Quote — replies in 48h](/rfq/)

## 1. Side-by-Side 350 kW-Class Technical Specification Comparison

All three models are transformerless three-phase 1,500 V DC string inverters designed for utility-scale solar blocks and large industrial rooftops paired with 800 V AC step-up transformers or dedicated industrial LV/MV switchboards. The table below details the exact parameters from Tradvolt's UK plant rooftop TCO dossier and C&I procurement SOP.

Technical Specifications: Sungrow SG350HX vs Growatt MAX 350 KTL3-XL2 vs Huawei SUN2000-330KTL-H1       | Specification | Sungrow SG350HX | Growatt MAX 350 KTL3-XL2 | Huawei SUN2000-330KTL-H1 |
| --- | --- | --- | --- |
| **Manufacturer / Brand** | Sungrow Power Supply Co., Ltd. (SG Series) | Growatt New Energy (MAX Series) | Huawei Digital Power (FusionSolar) |
| **Rated AC Output Power / Apparent Power** | 350 kW class: **352 kVA @ 30°C / 320 kVA @ 40°C** | **350 kW / 350 kVA** | **330 kW / 330 kVA @ 40°C** (often paired to form a 350 kW AC equivalent block) |
| **Maximum DC Input Voltage** | **1,500 V DC** | **1,500 V DC** | **1,500 V DC** |
| **MPPT Operating Voltage Range** | **500–1,500 V DC** | **500–1,500 V DC** | **500–1,500 V DC** |
| **Number of Independent MPPTs** | **12 or 16 MPPT** (sub-variant dependent) | **15 MPPT** | **6 MPPT** (8-MPPT variant also listed in C&I SOP) |
| **Strings per MPPT & Max Current per MPPT** | **2 strings/MPPT; 30 A or 40 A per MPPT** | **2 strings/MPPT; 30 A–40 A per MPPT** | **4–5 strings/MPPT; up to 65 A per MPPT** |
| **Max Efficiency / European Efficiency** | **99.02% max / 98.8% Euro** | **99.0% max / 98.8% Euro** | **99.0% max / 98.8% Euro** |
| **Ingress Protection & Cooling** | **IP66; Smart Forced Air cooling** | **IP66; Smart Forced Air cooling** | **IP66; Smart Air cooling** |
| **Unit Weight** | **~116 kg** | **~108 kg** | **112 kg** |
| **Communication Interface** | **PLC / RS485** | **RS485 / PLC** | **MBUS (Power Line Communication)** |
| **Compliance & Safety Standards** | IEC 62109-1:2010, IEC 62109-2:2011, EN 50549-1/-2, VDE-AR-N 4105/4110, UKCA, ENA G99 (issue 1 amd 9, 2024), EN 61000-6-2/-6-4 | IEC 62109-1:2010, IEC 62109-2:2011, EN 50549-1/-2, VDE-AR-N 4105/4110, UKCA, ENA G99, EN 61000-6-2/-6-4 | IEC 62109-1:2010, IEC 62109-2:2011, EN 50549-1/-2, VDE-AR-N 4105/4110, UKCA, ENA G99, EN 61000-6-2/-6-4 |

## 2. 25-Year China-to-UK Plant Rooftop Landed Cost & TCO Comparison

In Tradvolt's China-to-UK 350 kW plant rooftop study (**420 kWp DC array at 1.2× DC/AC ratio, 900 kWh/kWp/yr PVGIS SARAH2 baseline yield = 378,000 kWh Year-1 generation degrading 0.5%/yr, 70% self-consumption at £0.30/kWh imported tariff and 30% exported under Ofgem Smart Export Guarantee at £0.075/kWh escalating 4.0%/yr, 25-year horizon, 8.00% WACC**), procurement teams can evaluate either the standalone inverter + electrical BoS package or the full turnkey plant CapEx band. Both accounting scopes are presented side-by-side below.

25-Year UK Industrial Rooftop TCO: Inverter + G99 BoS Scope vs Full Turnkey Plant Scope      | Cost / Financial Metric | Inverter + Electrical BoS + G99 Sub-Scope (350 kW Unit) | Full Plant Scenario Model Output (420 kWp DC / 350 kW AC) |
| --- | --- | --- |
| **Shortlisted Equipment** | Sungrow SG350HX / Growatt MAX 350 KTL3-XL2 / Huawei SUN2000-330KTL-H1 | Sungrow SG350HX / Growatt MAX 350 KTL3-XL2 / Huawei SUN2000-330KTL-H1 |
| **Year-0 Landed CapEx Breakdown** | **£31,800 total**: FOB China **£11,200** + ocean freight & customs **£2,150** + AC/DC BoS switches & cabling **£9,850** + ENA G99 protection & witness test **£8,600** | **£1,050,000.00** (illustrative full-plant Year-0 CapEx band; individual EXW, Felixstowe/Southampton freight, UKGT duty, and 20% VAT lines marked `PENDING — lookup`) |
| **Year-1 Annual OpEx** | **£1,100/yr** (preventive thermography, fan/SPD spares reserve, monitoring) | **£18,000.00/yr** escalating at **2.0%/yr** (reaching £28,951.87 in Year 25) |
| **Mid-Life Overhaul / Replacement** | Year-13 inverter replacement reserve: **£7,200** | Embedded in annual OpEx reserve; Year-25 residual value = **£0** |
| **Total Undiscounted Cost / PV of Costs (25 yr)** | Inverter sub-scope cost stream over 25 years | Undiscounted cost: **£1,626,545.40** / PV of costs: **£1,278,132.64** |
| **Total Undiscounted Benefit / PV of Benefits (25 yr)** | Year-1 gross electricity savings: **£87,885.00** | Undiscounted benefit: **£3,414,016.01** / PV of benefits: **£1,276,640.63** |
| **Net Present Value (NPV @ 8.00% WACC)** | **£378,763.57** | **-£1,492.01** (knife-edge break-even; £10k–£15k CapEx reduction turns NPV positive) |
| **Internal Rate of Return (IRR)** | **138%** | **7.99%** (0.0799, vs 8.00% hurdle rate) |
| **Simple Payback / Discounted Payback** | Simple payback: **0.7254 years** | Simple payback: **12.09 years** / Discounted payback: **not reached within 25 yr** |
| **Levelized Cost of Energy (LCOE)** | **£0.0145 / kWh** (inverter + BoS share) | **£0.3299 / kWh** (full-plant £1.05M CapEx scenario) |

## 3. When to Choose SG350HX vs SUN2000-330KTL-H1 vs MAX 350 KTL3-XL2

### 3.1 MPPT Granularity vs High-Current String Consolidation

- **Multi-MPPT Architecture (Sungrow SG350HX & Growatt MAX 350 KTL3-XL2):** The SG350HX provides **12 or 16 MPPTs** and the MAX 350 KTL3-XL2 provides **15 MPPTs**, each accepting **2 strings per MPPT** at **30 A to 40 A per MPPT**. Dedicating 1 MPPT to every 2 strings isolates partial shading on multi-pitched industrial roofs and supports high-current 182 mm / 210 mm TOPCon and HPBC modules (such as LONGi Hi-MO 7 or Jinko Tiger Neo 3.0 670 W).

- **Consolidated High-Current Architecture (Huawei SUN2000-330KTL-H1):** Huawei uses **6 MPPTs** (or **8 MPPTs**) with **4–5 strings per MPPT** and up to **65 A per MPPT**. On unshaded, uniform-tilt arrays, grouping 4–5 strings onto a 65 A tracker simplifies DC runs while Huawei's **MBUS PLC** sends telemetry over the AC power lines.

### 3.2 Thermal Derating (30°C vs 40°C) & Grid-Code Compliance

The **Sungrow SG350HX** is rated at **352 kVA @ 30°C** and derates to **320 kVA @ 40°C**, whereas the **Huawei SUN2000-330KTL-H1** holds its full **330 kW / 330 kVA rating at 40°C**. For UK and EU grid connections above 16 A per phase, all three models require test certificates for **IEC 62109-1:2010**, **IEC 62109-2:2011**, **EN 50549-1/-2**, **VDE-AR-N 4105/4110**, and **ENA Engineering Recommendation G99 (Issue 1, Amendment 9, 2024)**. Under WCO HS 2022 heading **8504.40**, UK Global Tariff and EU TARIC duty rates are marked `PENDING — lookup`, with UK import VAT at **20% of (CIF + duty)**.

## 4. Related Tradvolt TCO Dossiers & Engineering Guides

- [On-Grid Inverter 350 kW (Sungrow SG350HX / Growatt MAX 350 KTL3-XL2 / Huawei SUN2000-330KTL-H1) — CN → UK Plant Rooftop TCO & Landed Cost](/en/tco/on-grid-inverter-350-kw-sungrow-sg350hx-growatt-max-350-ktl3-xl2-huawei-sun2000-330ktl-h1-cn-uk-plant-rooftop-tco-landed-cost-tradvolt/)

- [Solar PV + Battery Storage C&I Procurement SOP — Vendor Shortlist & Compliance](/en/guides/solar-pv-ess-c-i-procurement-sop-tradvolt/)

- [Import On-Grid Inverter (Sungrow SG350HX) from China to New Zealand — Stadium Rooftop TCO](/en/tco/import-on-grid-inverter-sungrow-sg350hx-from-china-to-new-zealand-stadium-rooftop-tco-tradvolt/)

- [Import 350 kW On-Grid Inverter from China to Bahrain — Logistics-Rooftop TCO & Landed Cost](/en/tco/import-350-kw-on-grid-inverter-from-china-to-bahrain-logistics-rooftop-tco-landed-cost-tradvolt/)

- [Maintenance Process Guide: Inverter Reactive Power for CN→UK Corridor](/en/guides/maintenance-process-guide-inverter-reactive-power-for-cnuk-corridor-tradvolt/)