title: "Sungrow SG50CX, SG110CX, SG125HT & SG125HX vs Huawei SUN2000-100KTL-M2 — C&I String Inverter Comparison | Tradvolt"
source_url: "https://tradvolt.com/guides/compare/sungrow-sg50cx-sg125ht-vs-huawei-sun2000-100ktl-m2-c-and-i-string-inverters/"
lang: "en"
description: "B2B technical specification and landed-cost TCO comparison of 50–125 kW commercial and industrial (C&I) three-phase string inverters: Sungrow SG50CX, SG110CX, SG125HT, and SG125HX versus Huawei SUN2000-100KTL-M2."
generator: "tradvolt-tier-c-edge-md"
---

[Tradvolt](/)

[Home](/) &rsaquo; [Guides](/guides/) &rsaquo; [Inverters](/guides/inverters/) &rsaquo; Sungrow SG50CX / SG125HT / SG125HX vs Huawei SUN2000-100KTL-M2

# Sungrow SG50CX, SG125HT & SG125HX vs Huawei SUN2000-100KTL-M2: 50–125 kW C&I String Inverter Comparison

## Procurement Verdict: 1,100 V vs 1,500 V DC C&I String Inverters

**Choose the Huawei SUN2000-100KTL-M2 (100 kW, 1,100 V DC, 10 MPPTs, 98.8% @ 400 V, AFCI, PID recovery, IP66)** for 100–500 kWp commercial rooftops tying into 400 V AC switchboards. Paired with Jinko 550 W modules in a 180 kWp MEA pool array, 25-year TCO returns **CapEx $198,000 ($1,100/kWp)**, **OpEx $1,980/yr**, yr-13 overhaul **$14,400 ($80/kWp)**, **NPV $121,443.22**, **IRR 14.11%**, **simple payback 7.15 yr** (10.77 yr discounted), and **LCOE $0.0765/kWh**.

**Choose the Sungrow SG50CX (50 kW, 1,100 V DC, 5 MPPTs, 26 A/string) or SG110CX (110 kW, 9 MPPTs, 98.7%, IP66/C5)** for 50–110 kW retail roofs. In Finland's 10-yr mall TCO, SG50CX + BoS (**CapEx €5,026, OpEx €450/yr, yr-8 reserve €600**) achieves **0.7978 yr simple payback**, **€42,719.39 NPV**, and **€0.0277/kWh LCOE**.

**Choose the Sungrow SG125HT (125 kW, 1,500 V DC, 8 MPPTs) or SG125HX (125 kW, 1,500 V DC, 6 MPPTs)** for 1–5+ MWp industrial parks using 575 W–670 W modules. In a 3 MWp LatAm park, SG125HT delivers **CapEx $2,250,000 ($750/kWp; inverter line $210,000 / $70/kWp)**, **OpEx $45,000/yr** ($42,000/yr cashflow base), yr-12 re-string **$180,000 ($60/kWp)**, 25-yr **NPV $3,217,871.13**, **IRR 21.47%**, **simple payback 4.77 yr**, and **LCOE $0.0563/kWh**.

**Sourcing 50–125 kW C&I String Inverters from China?** Get a project-specific landed-cost quote with OEM datasheet revisions, CE/EN 50549 certificates, and HS 8504.40 tariff lookups. [Request Quote — replies in 48h](/rfq/)

## 1. Side-by-Side Technical Specification Comparison (50–125 kW C&I Class)

The table below compares the electrical ratings, DC voltage windows, MPPT configurations, protection features, and paired PV module architectures across the Sungrow CX/HT/HX series and the Huawei SUN2000-100KTL-M2 as documented in Tradvolt's C&I procurement SOP and regional TCO dossiers.

Technical Specifications: Sungrow SG50CX, SG110CX, SG125HT & SG125HX vs Huawei SUN2000-100KTL-M2        | Parameter | Sungrow SG50CX | Huawei SUN2000-100KTL-M2 | Sungrow SG110CX | Sungrow SG125HT / SG125HX |
| --- | --- | --- | --- | --- |
| **OEM Legal Entity** | Sungrow Power Supply Co., Ltd. (Hefei, CN) | Huawei Digital Power (FusionSolar) | Sungrow Power Supply Co., Ltd. | Sungrow Power Supply Co., Ltd. |
| **Rated AC Output Power** | **50 kW AC** nominal (3 × 230/400 V, 50 Hz) | **100 kW AC** three-phase (400 V class) | **110 kW AC** three-phase | **125 kW AC** class three-phase |
| **Max DC Input Voltage** | **1,100 V DC** | **1,100 V DC** | **1,100 V DC** | **1,500 V DC** |
| **MPPT Operating Range & Count** | **200–1,000 V DC; 5 MPPTs** (26 A max per string) | **10 MPPTs** (≤1,100 Vdc window per User Manual issue 12, 2024-06) | **9 MPPTs** | **SG125HT: 8 MPPTs** (Datasheet Rev. 1.4, 2024-09) / **SG125HX: 6 MPPTs** |
| **Peak Conversion Efficiency** | ≤0.7% THDi; confirm exact efficiency curve per SG50CX datasheet | **98.8% @ 400 V AC** | **98.7%** | 1,500 V DC high-efficiency C&I string topology (confirm per Rev. 1.4 datasheet at RFQ) |
| **Ingress Protection & Protection Features** | **IP66**; integrated DC switch; AFCI optional | **IP66**; integrated **AFCI** + built-in **PID recovery** | **IP66 / C5 anti-corrosion** | Industrial outdoor C&I enclosure; IEC 62109-1:2010 / IEC 62109-2:2011 compliant |
| **Reference PV Module Pairing in Corpus** | Commercial mall rooftop PV array (45,000 kWh/yr Year-1 output in Finland) | **Jinko Tiger Neo JKM550N-72HL4R-V** (550 Wp n-type TOPCon, 327 modules = 180 kWp) | C&I rooftop mono-PERC / TOPCon / HPBC modules | **SG125HT:** Jinko Tiger Neo **JKM575N-72HL4R-V** (575 W) on Schletter FIX-GRIP / **SG125HX:** **LONGi Hi-MO 9 670 W** HPBC 2.0 on K2 CrossRail |

## 2. Multi-Corridor Landed Cost & TCO Comparison (50 kW to 3 MWp C&I Deployments)

Tradvolt models C&I string inverter economics across four distinct regional corridors: a 50 kW inverter + electrical BoS import into Finland (**Sungrow SG50CX**), a 180 kWp Olympic pool complex in the Middle East & Africa (**2 × Huawei SUN2000-100KTL-M2**), a 3 MWp industrial park in Latin America (**24 × Sungrow SG125HT**), and a 1 MWp factory rooftop in Vietnam (**Sungrow SG125HX + LONGi Hi-MO 9 670 W**). Every CapEx line, OpEx driver, and computed financial metric is compared below.

Landed Cost, OpEx, and Computed TCO Outputs Across 50–125 kW C&I String Inverter Dossiers        | Metric / Cost Component | Sungrow SG50CX (CN → Finland Mall Rooftop, 50 kW) | Huawei SUN2000-100KTL-M2 (MEA Pool Hybrid, 180 kWp) | Sungrow SG125HT (LatAm Industrial Park, 3,000 kWp) | Sungrow SG125HX (CN → Vietnam Factory, 1,000 kWp) |
| --- | --- | --- | --- | --- |
| **Scope, Horizon & Discount Rate** | Inverter + electrical BoS share; **10 yr @ 6.00%** (EUR) | Turnkey 180 kWp PV/T system (2 × 100KTL-M2); **25 yr @ 8.00%** (USD) | Turnkey 3 MWp rooftop + carport PV; **25 yr @ 8.00% real** (USD) | 1,000 kWp factory rooftop benefits-only run; **25 yr @ 8.00%** (USD) |
| **Year-0 Landed CapEx Breakdown** | **€5,026.00** (summary: FOB €2,450 + freight/port €616 + AC/DC switches €760 + install €1,200; C1–C14 table: FOB €1,800, sea freight €220, insurance €6, broker €120, port €60, haulage €90, BoS €1,650, rapid shutdown €250, labour €650, DSO €180) | **$198,000.00** (**$1,100/kWp** turnkey MEA commercial benchmark across 180 kWp DC) | **$2,250,000.00** (**$750/kWp** total: modules $510k [$170/kWp], **SG125HT inverters $210,000 [$70/kWp]**, Schletter mounting $420k [$140/kWp], BoS $270k, EPC $390k, grid $180k, contingency $120k, dev $150k) | **$0.0000** in illustrative benefits-only scenario table (FOB, Cat Lai/Hai Phong freight, GDVC duty/VAT, and BoS marked `PENDING / RFQ input`) |
| **Annual OpEx & Escalation** | **€450.00/yr** steady state escalating 2.0%/yr (maint €180, iSolarCloud €60, spares €90, ins €70, DSO €50) | **$1,980.00/yr** Year-1 (≈1.0% of CapEx) escalating at **2.0%/yr** | **$45,000/yr** nominal / **$42,000.00/yr** Year-1 cashflow base (fixed O&M $27,000 [$9/kWp] + insurance $9,000 + cleaning $6,000) escalating 2.0%/yr | **$0.0000/yr** in illustrative benefits-only run (dry-clean 4–6 cycles/yr, spares, iSolarCloud, insurance quoted at RFQ) |
| **Mid-Life Inverter Overhaul / Reserve** | Year-8 replacement reserve: **€600** (Year-8 total cost = **€1,116.91**) | Year-13 inverter overhaul reserve: **$14,400 ($80/kWp)** (or smoothed in 2.0%/yr OpEx series) | Year-12 inverter re-string: **$180,000 ($60/kWp)** one-off (Year-12 total cost = **$232,221.72**) | Confirmed per SG125HX maintenance schedule at RFQ |
| **Year-1 Net Energy Generation** | **45,000.00 kWh** (degrading 0.50%/yr to 43,015.03 kWh in Yr 10) | **284,400.00 kWh** (1,580 kWh/kWp/yr specific yield, degrading 0.50%/yr to 252,164.26 kWh in Yr 25) | **4,950,000.00 kWh** (1,650 kWh/kWp/yr specific yield, degrading 0.50%/yr to 4,388,934.88 kWh in Yr 25) | **1,300,000.00 kWh** (1,300 kWh/kWp/yr specific yield, degrading 0.50%/yr to 1,152,649.56 kWh in Yr 25) |
| **Net Present Value (NPV)** | **€42,719.39** (PV benefits €51,714.19 − PV costs €8,994.80) | **$121,443.22** (PV benefits $344,537.81 − PV costs $223,094.59) | **$3,217,871.13** (PV benefits $6,071,661.11 − PV costs $2,853,789.98) | **$1,429,969.66** (benefits-only PV; undiscounted 25-yr benefit $3,477,458.58) |
| **IRR & Simple / Discounted Payback** | IRR: **1.26 (126%)**; Simple: **0.7978 yr**; Discounted: **0.8456 yr** | IRR: **14.11% (0.1411)**; Simple: **7.15 yr**; Discounted: **10.77 yr** | IRR: **21.47% (0.2147)**; Simple: **4.77 yr**; Discounted: **6.19 yr** | IRR: **n/a**; Simple / Discounted payback: **0.0000 yr** (cost numerator = 0) |
| **Levelized Cost of Energy (LCOE)** | **€0.0277 / kWh** (inverter + BoS share) | **$0.0765 / kWh** | **$0.0563 / kWh** (vs $0.115/kWh industrial PPA ceiling) | **$0.0000 / kWh** (vs $0.0948/kWh avoided Vietnam tariff) |

## 3. When to Choose SG50CX / SG125HT / SG125HX vs SUN2000-100KTL-M2

### 3.1 1,100 V DC Direct-to-400V AC Rooftops vs 1,500 V DC Industrial Feeders

- **1,100 V DC Architecture (Sungrow SG50CX, Sungrow SG110CX, Huawei SUN2000-100KTL-M2):** Built to connect directly to commercial **3 × 230/400 V, 50 Hz** switchboards where building fire codes cap rooftop DC voltage at ≤1,100 V DC. The **Huawei SUN2000-100KTL-M2 (100 kW)** provides **10 MPPTs**, **98.8% efficiency @ 400 V**, integrated **AFCI**, and **PID recovery**, while the **Sungrow SG110CX (110 kW)** offers **9 MPPTs** at **98.7% efficiency** and an **IP66 / C5** enclosure for coastal sites, and the **SG50CX (50 kW)** supplies **5 MPPTs (200–1,000 V, 26 A/string)**.

- **1,500 V DC Architecture (Sungrow SG125HT & SG125HX):** A **1,500 V DC** bus extends string length by ~50%, reducing DC cabling on 1–3 MWp industrial parks. The **SG125HT (8 MPPTs, Datasheet Rev. 1.4 2024-09)** pairs with **Jinko Tiger Neo JKM575N-72HL4R-V (575 W)** on Schletter FIX-GRIP mounts, while the **SG125HX (6 MPPTs)** pairs with **LONGi Hi-MO 9 670 W HPBC 2.0** back-contact modules on K2 CrossRail.

### 3.2 Compliance, Customs HS Codes & Mid-Life Overhaul Reserves

All models comply with **IEC 62109-1:2010**, **IEC 62109-2:2011**, **EN 50549-1/-2**, and **VDE-AR-N 4105/4110**. Inverters classify under HS **8504.40** (EU TARIC **8504.40.40** / USITC **8504.40.95**) and PV modules under **8541.43.00** (all duties marked `PENDING — lookup`). Financial models should reserve mid-life inverter overhauls: **€600 at Yr 8** (SG50CX), **$60/kWp ($180,000) at Yr 12** (SG125HT 3 MWp), and **$80/kWp ($14,400) at Yr 13** (SUN2000-100KTL-M2 180 kWp).

## 4. Related Tradvolt TCO Dossiers & Procurement Guides

- [Import Sungrow SG50CX (50 kW Three-Phase String Inverter) from China to Finland — Mall-Rooftop TCO & Landed Cost](/en/tco/import-sungrow-sg50cx-50-kw-three-phase-string-inverter-from-china-to-finland-mall-rooftop-tco-landed-cost-tradvolt/)

- [Swimming-Pool Solar 180 kWp (Jinko JKM550N-72HL4R-V + Huawei SUN2000-100KTL-M2) — MEA Use-Case TCO](/en/tco/swimming-pool-solar-180-kwp-jinko-jkm550n-72hl4r-v-huawei-sun2000-100ktl-mea-use-case-tco-tradvolt-com/)

- [Industrial-Park Solar 3 MWp (Jinko Tiger Neo + Sungrow SG125HT) — Latin America TCO Use Case](/en/tco/industrial-park-solar-3-mwp-jinko-tiger-neo-sungrow-sg125ht-latin-america-tco-use-case-tradvolt/)

- [Import LONGi Hi-MO 9 670W HPBC + Sungrow SG125HX from China to Vietnam — Factory Rooftop TCO](/en/tco/import-longi-hi-mo-9-670w-hpbc-sungrow-sg125hx-from-china-to-vietnam-factory-rooftop-tco-tradvolt/)

- [Solar PV + Battery Storage C&I Procurement SOP — Vendor Shortlist & Customs Lookup](/en/guides/solar-pv-ess-c-i-procurement-sop-tradvolt/)