# How landed cost is calculated

Landed cost is the total a buyer pays to have goods available at the point of use. It starts from the supplier price and adds every charge between the factory gate and delivery.

## Cost lines between price and delivery

| Stage | What belongs here |
| --- | --- |
| Supplier price | Goods value at the agreed Incoterm. The Incoterm decides which later lines are already included. |
| Export and freight | Inland transport to port, ocean or air freight, and marine insurance where taken. |
| Border | Duty and levies, VAT or equivalent, brokerage and port charges. The classification and rate depend on the goods and destination. |
| Destination | Inland haulage, unloading and any local Handling or inspection charge up to the delivery point. |

## What stays open until confirmed

Duty classification, the applicable rate and VAT treatment are frequently unresolved in a first-pass model. They are recorded as pending rather than assumed, because a single tariff line can move the delivered cost materially.

Depending on the equipment class and commercial invoice description, a shipment may fall under HS 8541.43.00 (photovoltaic modules), HS 8504.40 (static converters, string or hybrid inverters, and EVSE rectifiers), HS 8507.60 (lithium-ion accumulators), HS 8537.10 (switchgear and control panels), or HS 8544.42 (charging cables with connectors). Beyond the base customs duty, buyers must confirm destination-specific statutory levies, import VAT recoverability, dangerous-goods surcharges for Class 9 lithium-ion cargo (UN 3480 / UN 3481 under IMDG or IATA DGR), and IPPC ISPM 15 wood-packaging compliance.

## Worked example

The [Ghana solar import study](/en/tco/import-solar-panel-670w-from-china-to-ghana-ground-mount-use-case-tco-landed-cost-tradvolt/) walks a ground-mount module shipment through this sequence and labels which lines are sourced, which are scenario values, and which remain to be confirmed before purchase. Its figures are scenario estimates for that stated case, not a quotation.

In that China-to-Ghana study (1,500 Jinko Tiger Neo N-type 670 W modules forming a 1,005 kWp ground-mount array paired with Sungrow SG125/125HT or Huawei SUN2000-100KTL-M2 string inverters and K2 Systems racking), the Year-0 CapEx checklist traces FOB China module supply, 40'HC container ocean freight from Shanghai to Tema Port under ICC Incoterms 2020, marine insurance at a bounded 0.22% of CIF, Ghana Revenue Authority ITAS border assessment under HS 8541.43.00 (import duty, NHIL, GETFL, ECOWAS Levy, EXIM levy, special import levy, and VAT), Tema port handling and brokerage, and inland haulage to site. The computed run anchors total landed-and-installed Year-0 CapEx at 820,000 USD (~0.816 USD/Wp), yielding a 25-year NPV of 1,115,844.54 USD, an IRR of 20.72%, a simple payback of 4.98 years, a discounted payback of 6.55 years, and an LCOE of 0.0531 USD/kWh at an 8.00% discount rate.

## What this model does not tell you

It does not tell you the price you will be charged, whether your goods will be classified as you expect, or what your forwarder will quote. It shows the structure of the cost and which inputs you still have to obtain.

Where a scenario rolls the entire landed and installed stack into a single Year-0 CapEx anchor in the cash-flow engine, the line-by-line split between FOB equipment, freight, insurance, customs duty, port handling, balance of system, and EPC installation remains a procurement checklist that must be repriced against live supplier, forwarder, and customs-broker quotes at the RFQ stage.

## How this differs from the other classes

Landed cost stops at the delivery point. It answers what the goods cost to have in hand, and says nothing about what they will cost to run. The other three method pages start where this one ends.

In terms of the computation engine, landed cost establishes the Year-0 capital outlay (`capex` at `year: 0`) that enters the first row of the cash-flow table before any Year 1..N operating costs, degradation factors, replacement reserves, or energy benefits are calculated.

## Questions to put to a supplier

- Which Incoterm is the quoted price based on, and exactly which costs does it include?

- Which HS heading will be declared, and does the commercial invoice show it?

- Who is the importer of record, and is duty and VAT included in the figure quoted?

- What freight basis is assumed — full container, shared container, or air?

- Which charges at destination are excluded from the quote?

## The input most often left unverified

Tariff classification. A supplier quote normally states a price and an Incoterm; it rarely states the heading under which the goods will be declared. Because the rate follows the classification, an unverified heading is the single largest source of error in a landed-cost estimate — and it is the buyer, not the supplier, who carries that risk.

## Frequently asked questions

### What four cost stages sit between a Chinese supplier's quote and site delivery?

Landed cost starts from the supplier price and adds every charge between the factory gate and delivery across four stages: supplier price (goods value at the agreed Incoterm, which decides which later lines are already included); export and freight (inland transport to port, ocean or air freight, and marine insurance where taken); border (duty, levies, VAT or equivalent, brokerage, and port charges); and destination (inland haulage, unloading, and local handling or inspection up to delivery).

### Why does a landed-cost study leave tariff classification and duty rates open until shipment?

Duty classification, the applicable rate, and VAT treatment are frequently unresolved in a first-pass model because a supplier quote normally states a price and an Incoterm without stating the HS heading under which the goods will be declared. Since the tariff rate follows the classification and a single tariff line can move the delivered cost materially, studies record these lines as pending rather than assuming a rate, as the buyer carries that classification risk.

### How does a landed-cost study differ from a solar, battery, or EV charging TCO model?

Landed cost is the total a buyer pays to have goods available at the point of use, so a landed-cost study stops at the delivery point. It answers what the goods cost to have in hand after supplier price, freight, border clearance, and destination delivery, and says nothing about what those goods will cost to run, whereas the battery, solar PV, and EV charging TCO method pages start where landed cost ends.

### What five questions should an importer ask a Chinese supplier before accepting a quote?

Before purchase, a buyer should ask the supplier five questions: (1) which Incoterm the quoted price is based on and which costs it includes; (2) which HS heading will be declared and whether the commercial invoice shows it; (3) who is the importer of record and whether duty and VAT are included in the figure quoted; (4) whether the freight basis assumes a full container, shared container, or air; and (5) which destination charges are excluded.

### What does a landed-cost scenario model not replace during procurement?

A landed-cost scenario model does not tell a buyer the actual price that will be charged, whether the goods will be classified at customs as expected, or what a freight forwarder will quote. As shown in the Ghana solar import study, the figures are scenario estimates for a stated case rather than a quotation; the model shows the structure of the cost and which open inputs the buyer still has to obtain before purchase.