TradVolt › Process & SOP › Battery Pack Capacity-Retention Test — CN→JM
Standard Operating Procedure (SOP) for verifying capacity-retention of the CATL EnerC + (LFP-280) battery-pack family[1] supplied through the TradVolt EVSE vertical, covering the corridor from the port of export in China (CN) to Kingston, Jamaica (JM). Audience: B2B quality, service, and logistics teams. Equipment family: CATL EnerC + (LFP-280) — containerized LFP battery system (OEM product line: CATL EnerC +, datasheet identifier LFP-280, 280 Ah LFP cell building block).[1][12]
Verdict & Pass Criterion. For a sampled CATL EnerC + (LFP-280) pack, the accepted pass criterion is a measured State-of-Health (SoH) ≥ 95 % after a default 10-day storage phase at 25 ± 2 °C and 50 ± 5 % SOC, computed as SoH = (C₁ / C₀) × 100 against the IEC 62660-1:2018 baseline discharge.[3][2] Every sampled pack must additionally stay within the OEM end-of-discharge voltage of 2.5 V/cell (min) and below the upper charge limit of 3.65 V/cell, with a per-cell voltage spread ≤ 50 mV.[2] The default end-to-end timeline from Test Order acknowledgement to Pack Release is 17 working days; with CN→Kingston sea transit the total is 21 working days. Storage-system location: Kingston Freeport Terminal, Jamaica; evidence date: 2026-09-22; primary limitation: pack model (CATL EnerC + / LFP-280) and storage SOC set in the Test Order — deviation outside those limits requires explicit OEM and Lab sign-off.
| Item | Value | Source |
|---|---|---|
| Equipment family | CATL EnerC + (LFP-280) — Containerized LFP battery system | [1], [12] |
| OEM manual / reference | CATL EnerC + Product Manual, Rev. 2.3 (2024-08) | [2] |
| OEM end-of-discharge voltage (min) | 2.5 V/cell (LFP) | [2] |
| OEM upper charge voltage (max) | 3.65 V/cell | [2] |
| OEM recommended storage SOC | 50 ± 5 % | [2] |
| OEM storage temperature | −10 °C to 45 °C (25 ± 2 °C for baseline) | [2] |
| Cell-to-cell voltage spread limit | ≤ 50 mV at 100 % SOC | [2] |
| Cycle test standard | IEC 62660-1:2018 §7.1 reference discharge | [3] |
| Pass criterion (SoH) | ≥ 95 % vs. baseline C₀ after storage | [3] |
| Sample size | ISO 2859-1:1999 normal inspection, Level II, AQL 1.0 | [6] |
| End-to-end timeline | 17 working days test + up to 4 days CN→JM transit (21 total) | TradVolt corridor model (illustrative) |
| Location / destination port | Kingston Freeport Terminal, Jamaica (JM) | TradVolt consignment reference |
| Evidence date | 2026-09-22 | — |
This procedure applies to the CATL EnerC + (LFP-280) family[1][12] of containerized LFP battery packs supplied as part of EV charging-station energy-storage units, prepared for sea freight from China to Jamaica via Kingston Freeport Terminal. The test confirms that a pack retains the agreed minimum percentage of its rated capacity (state-of-health, SoH) after a defined storage interval, so that commissioning teams can sign off the storage subsystem on arrival.
Where the CATL EnerC + Product Manual, Rev. 2.3 (2024-08)[2] imposes a tighter limit than the IEC 62660-1:2018 reference procedure, the OEM manual takes precedence and the deviation is logged in the test report. Substituting a different pack family is out of scope of this SOP; only CATL EnerC + (LFP-280) is approved as a model assumption here until a separate OEM-specific SOP is published.
I_d and standard cycle conditions used here.[3]| Step # | Action | Owner | Input doc | Output doc | Done-when |
|---|---|---|---|---|---|
| 1 | Receive and register the capacity-retention test request, capturing CATL EnerC + pack serial numbers, target SoH threshold (≥ 95 %), and the destination port (Kingston, JM). | Service Coordinator | Client Test Request Form | Test Order (TR-{order_id}) | Test Order logged with linked serial list and acknowledged in writing. |
| 2 | Verify pre-shipment documentation against the inbound manifest: OEM Certificate of Conformity (CATL), MSDS, UN 38.3 test summary, and packing list. | Document Controller | OEM CoC, MSDS, UN 38.3 summary, Packing List | Doc-Check Sheet | All four documents present and match the manifest quantity; Doc-Check Sheet signed. |
| 3 | Select sample packs per ISO 2859-1:1999 normal inspection, General Inspection Level II, with an AQL of 1.0 for functional attributes; record serials.[6] | Quality Engineer | ISO 2859-1 sampling table | Sample Selection Sheet | Sampled serials recorded and chain-of-custody opened. |
| 4 | Acclimatise sample packs at 25 °C ± 2 °C for a minimum of 6 hours before the baseline cycle, per IEC 62660-1:2018 ambient conditions and CATL storage-temp envelope (−10 °C to 45 °C).[3][2] | Lab Technician | CATL EnerC + Product Manual Rev. 2.3 §4.2 (storage temp limits) | Acclimatisation Log | Pack surface temperature within 23–27 °C range, log time-stamped. |
| 5 | Run the baseline capacity cycle: CC charge to 3.65 V/cell per CATL profile, CV hold until ≤ 0.05 C, rest 30 minutes, then discharge at the rated constant current I_d to 2.5 V/cell per IEC 62660-1:2018 §7.1; record baseline capacity C₀ in Ah.[3][2] |
Lab Technician | CATL EnerC + Product Manual Rev. 2.3 §5 (charge profile); IEC 62660-1:2018 §7.1 | Cycle 1 Report (C₀) | C₀ value recorded with cycle time, ambient temp, and cycler channel ID. |
| 6 | Reset pack to the OEM-prescribed storage SOC of 50 % ± 5 % per CATL EnerC + Manual Rev. 2.3 §4.3, apply storage profile (default 25 °C, or 40 °C for accelerated ageing) for the defined interval.[2] | Lab Technician | Test Order; CATL EnerC + Product Manual Rev. 2.3 §4.3 | Storage Phase Log | Storage duration reached with OCV drift logged at defined checkpoints; cell-to-cell spread ≤ 50 mV. |
| 7 | Run the post-storage capacity cycle using the identical procedure as Step 5; record remaining capacity C₁ in Ah. | Lab Technician | CATL EnerC + Product Manual Rev. 2.3 §5; IEC 62660-1:2018 §7.1 | Cycle 2 Report (C₁) | C₁ value recorded; cycler raw data exported and archived. |
| 8 | Calculate State-of-Health: SoH (%) = (C₁ / C₀) × 100. Compare to the acceptance threshold stated in the Test Order (default ≥ 95 % for new EnerC + packs). | Quality Engineer | Cycle 1 Report, Cycle 2 Report | SoH Calculation Worksheet | SoH calculated for every sampled serial and compared to threshold. |
| 9 | Issue a Pass/Fail disposition per pack. Failures trigger a non-conformance report referencing the CATL parameter that was missed (e.g., 2.5 V/cell EOD or 50 mV cell spread). | Quality Engineer | SoH Calculation Worksheet, CATL Manual Rev. 2.3 | Disposition Note, NCR-{ncr_id} (if applicable) | Each serial has a recorded Pass or Fail with NCR reference for failures. |
| 10 | Hand over the released packs to the logistics team for export preparation, with shipment cleared only if all sampled packs have passed. | Service Coordinator | Disposition Note, Test Order | Release for Shipment Note | Release for Shipment Note signed; packs may proceed to CN export customs clearance. |
| 11 | Archive the full test dossier to the client folder; transmit signed PDF to client and consignee in JM (Kingston Freeport Terminal named as the typical consignee reference only). | Document Controller | All prior outputs | Archived Test Dossier (PDF) | Dossier accessible to client via the agreed document portal; receipt confirmed. |
The following mechanical limits apply whenever the EnerC + packs are moved, racked, or re-torqued at the lab or on arrival in Kingston:[2]
| Fastener / interface | Torque value | Source |
|---|---|---|
| Pack-to-rack M10 bolt | 35 N·m ± 3 N·m | CATL Manual Rev. 2.3 §6.1 |
| DC bus-bar M8 bolt | 18 N·m ± 2 N·m | CATL Manual Rev. 2.3 §6.2 |
| Pack grounding stud M6 | 8 N·m ± 1 N·m | CATL Manual Rev. 2.3 §6.3 |
The following files must accompany each test order. Filenames are literal templates; the bracketed tokens are replaced with the actual identifiers at issue time:
TR-{order_id}_Test_Order.pdfDoc-Check_Sheet_TR-{order_id}.xlsxSample_Selection_TR-{order_id}.xlsxAcclimatisation_Log_TR-{order_id}.csvCycle1_Report_TR-{order_id}.pdfStorage_Phase_Log_TR-{order_id}.csvCycle2_Report_TR-{order_id}.pdfSoH_Worksheet_TR-{order_id}.xlsxDisposition_TR-{order_id}.pdfNCR-{ncr_id}_TR-{order_id}.pdf (only if any pack fails)Release_for_Shipment_TR-{order_id}.pdfA pre-formatted starter pack matching the filenames above is available at: /assets/sop-checklist-battery-capacity-retention-test-cn-jm.pdf.
| Day | Activity | Dependency |
|---|---|---|
| Day 0 | Test Order received and acknowledged | — |
| Day 1 | Documentation check and ISO 2859-1:1999 sampling | Requires inbound docs from CN origin |
| Day 2 | Acclimatisation (≥ 6 h) and baseline cycle | Requires lab cycler and CATL charge profile from Manual Rev. 2.3 §5 |
| Day 3 | Storage phase begins | Requires pack reset to 50 ± 5 % SOC and chamber setpoint |
| Day 3 – Day 14 | Storage interval (configurable; default 10 days at 25 °C) | Requires climate-controlled chamber within CATL envelope |
| Day 15 | Post-storage cycle and SoH calculation | Requires storage phase completion |
| Day 16 | Disposition and NCR (if any) issued | Requires SoH worksheet |
| Day 17 | Release for shipment signed; archive closed | Requires disposition to be Pass for all sampled serials |
| Day 18 – Day 21 | CN export customs clearance and sea transit to Kingston (JM) | Requires shipping instruction and Jamaica Customs paperwork at arrival |
Default end-to-end duration from test-order acknowledgement to release for shipment: 17 working days. Total time including sea transit to Kingston Freeport Terminal: 21 working days (illustrative corridor model).
| Cost slot | Value | Status |
|---|---|---|
| Capacity-retention test setup fee (per test order) | indicative | Indicative; confirmed in quote |
| Cycler chamber time (per pack per day) | indicative | Indicative; depends on chamber availability |
| Lab technician hours | indicative | Indicative; confirmed on quotation |
| Report preparation and archival | indicative | Indicative |
All cost slots above are indicative. A binding quotation is provided with each RFQ response via /rfq/.
HS classification — battery packs for EVSE storage:
Official duty rates are sourced from the relevant national customs / tariff portals:
Disclaimer: HS classification depends on the exact cell chemistry, pack configuration, and intended use at the time of import. TradVolt does not guarantee a specific classification line and the line item must be confirmed against the official customs portal and, where required, a binding ruling (an Advance Ruling or equivalent) from Jamaica Customs before shipment. Duty and tax rates are subject to change; always re-check at the moment of declaration.
| Item | Value | Status |
|---|---|---|
| Recommended Incoterm (sample test order) | EXW CN factory → CIP Kingston (JM) | Suggested; confirmed in quotation per ICC Incoterms 2020[11] |
| Sea transit time CN → Kingston | UNCERTAIN | Subject to vessel schedule; not committed by TradVolt |
| Consignee reference (typical) | Kingston Freeport Terminal (placeholder) | Final consignee set by client on each shipment |
All raw cycler data, calculation worksheets, and signed PDFs are retained for a minimum of 7 years from the date of the Test Order. Retention period aligns with the typical warranty window of stationary lithium-ion installations and with applicable B2B contract terms.
https://www.catl.com/en/wp-content/uploads/sites/2/2024/09/EnerC-Plus-LFP-280-Datasheet-Rev-2.3-EN.pdf. Accessed 2026-09-22.https://www.catl.com/en/wp-content/uploads/sites/2/2024/08/EnerC-Plus-Product-Manual-Rev-2.3-EN.pdf. Accessed 2026-09-22.https://webstore.iec.ch/publication/61194. Accessed 2026-09-22.https://www.shopulstandards.com/ProductDetail.aspx?productId=UL1973_2_S_20220829. Accessed 2026-09-22.https://webstore.iec.ch/publication/33753. Accessed 2026-09-22.https://www.iso.org/standard/1140.html. Accessed 2026-09-22.https://unece.org/sites/default/files/2023-01/ST-SG-AC10-11-Rev7-Amend1-38.3e.pdf. Accessed 2026-09-22.https://www.jacustoms.gov.jm. Accessed 2026-09-22.http://english.customs.gov.cn. Accessed 2026-09-22.https://hts.usitc.gov/. Accessed 2026-09-22.https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/. Accessed 2026-09-22.https://www.catl.com/en/ess/. Accessed 2026-09-22.https://www.iata.org/en/programs/cargo/dgr/. Accessed 2026-09-22.https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en. Accessed 2026-09-22.https://fiata.org/. Accessed 2026-09-22.© TradVolt. This SOP is provided for informational purposes. Compliance with local regulations at the destination port remains the responsibility of the importer of record.