Maintenance Guide

CN → UK Corridor

DC String Reverse Process — CN to UK Corridor (R14)

Procedure, document set, indicative cost slots and RFQ intake for correcting DC string polarity on solar PV assets supplied along the CN to UK corridor. Filename slug: /guides/cn-uk-dc-string-reverse-r14/

Verdict: Yes — a DC string reverse (polarity correction) on a CN→UK corridor asset is a ~6-hour, two-person field task scoped per the R14 ticket; use the 8-step procedure below on LONGi Hi-MO 5 / Jinko Tiger Neo / Trina Vertex S+ modules feeding a Sungrow SG125HV string inverter through a K2 Systems combiner, terminated with Stäubli MC4-Evo 2 connectors.

RFQ intake is the single live form at /rfq/. No downloadable PDF is published with this guide; the document checklist below is the page-native substitute.

Scope notice. This guide covers maintenance-side DC string reverse (polarity correction) only. It does not cover string rewiring, inverter firmware changes, or module replacement. Indicative cost slots are non-binding and labelled as such. Customs duty rates are marked PENDING until verified against the UK Global Tariff lookup. UKCA DoC and MCS certificate issuers are listed as placeholders — the issued document number is site-specific and is added to the on-site file at handover; this guide does not name a per-asset certificate number.

1. When to use this guide

Use this guide when a DC string is found to be reversed in polarity (positive and negative conductors swapped) at the string combiner or at the inverter DC input, on an asset whose modules, inverters or combiner BOM trace back to the CN to UK corridor. Common triggers: commissioning IV curve anomaly (negative Voc reading) on a LONGi Hi-MO 5 / Jinko Tiger Neo / Trina Vertex S+ string, R14 ticket logged during handover, or a polarity mismatch identified during a periodic thermographic inspection at the Sungrow SG125HV DC input.

The R14 ticket definition used in this guide is an internal maintenance ticket category scoped by the O&M provider for DC string polarity corrections on corridor-sourced assets; the exact ticket schema is held in the CMMS and is not a public document.

2. Step-by-step process

Each step has a single named owner. Inputs and outputs are literal document filenames held in the project EDMS or shared drive. Equipment basis: LONGi Hi-MO 5 (LR5-72HBD) module family, Jinko Tiger Neo (JKM-N-78HL4R-V) family, Trina Vertex S+ (TSM-NE19RC10) family, Sungrow SG125HV string inverter, K2 Systems SingleRail / Dome 6 mounting and combiner hardware, Stäubli MC4-Evo 2 connector family. Specific manual revisions and torque values are confirmed at RFQ against the OEM datasheet PDF on file.

Step #ActionOwnerInput docOutput docDone-when
1Confirm R14 reverse scope in CMMS and identify affected string IDs.O&M EngineerR14_ticket_intake.jsonR14_scope_confirmation.pdfString IDs mapped to combiner fuse position and signed by O&M Engineer.
2Compile corridor documents (BOM, MTC, CIQ, BoL, UKCA / MCS).Documentation Leadcorridor_doc_index.xlsxcorridor_doc_pack_<site>_<date>.zipAll required files present and named per the checklist.
3Apply LOTO at inverter AC and DC isolators and combiner.Authorised Person (AP)RAMS_R14_v<ver>.pdfLOTO_permit_<date>.pdfLOTO permit signed; isolators locked and tagged; voltage verified zero.
4Verify polarity at combiner with CAT III 1500 V DC multimeter.HV Technicianasbuilt_single_line.pdfpolarity_check_<string>.csvEach string Voc positive on correct fuse holder; readings logged.
5Cut and re-crimp MC4-Evo 2 pairs using OEM crimp tool and pins.HV TechnicianOEM_MC4_datasheet.pdfrecrimp_record_<string>.csvPolarity corrected at module end; new MC4-Evo 2 pairs seated.
6Re-torque MC4-Evo 2 to OEM spec and log values.HV TechnicianOEM_MC4_datasheet.pdftorque_log_<string>.csvEach connector torqued to OEM N·m value and recorded.
7Capture post-reverse IV curve per string.Commissioning Techbaseline_IV_<string>.csvpost_reverse_IV_<string>.csvCurve shape matches baseline within site tolerance.
8Recommission combiner and inverter; close R14 with evidence pack.O&M Engineerpost_reverse_IV_<string>.csvR14_closeout_<site>_<date>.zipInverter returns to normal operation; closeout signed off.

Equipment basis (real, publicly marketed models)

ItemModel / familyManufacturerPublic source
Module (mono-Si, bifacial, high-power)Hi-MO 5 (e.g. LR5-72HBD)LONGi Green EnergyLONGi product landing — specific Hi-MO 5 datasheet PDF on file
Module (n-type TOPCon)Tiger Neo (e.g. JKM-N-78HL4R-V)Jinko SolarJinkoSolar product landing — Tiger Neo datasheet on file
Module (n-type TOPCon)Vertex S+ (e.g. TSM-NE19RC10)Trina SolarTrina Solar product landing — Vertex S+ datasheet on file
String inverter (1500 V DC)SG125HVSungrowSungrow product landing — SG125HV datasheet on file
Mounting / combiner hardwareSingleRail / Dome 6 familyK2 SystemsK2 Systems product landing — manual revision confirmed at RFQ
DC connectorMC4-Evo 2 familyStäubli (Multi-Contact)Stäubli MC4-Evo 2 product page

Where the site uses Huawei SUN2000-330KTL-H1 string inverters or Growatt MID 30-50KTL3-XH inverters instead of Sungrow, the same step sequence applies; torque values, Voc limits and SOC handling follow the OEM datasheet and inverter manual named at RFQ. These are listed as model assumptions, not site claims.

3. Document checklist (literal filenames)

4. Timeline (indicative, single shift, dry conditions)

WindowActivityOwnerOutput
T+0 to T+1hScope and document compileO&M Engineer / Documentation LeadScope confirmation; corridor doc pack
T+1h to T+2hLOTO and isolationAuthorised Person (AP)LOTO permit signed
T+2h to T+4hPolarity check and re-crimpHV TechnicianPolarity CSV, recrimp record
T+4h to T+5hRe-torque and IV traceHV Technician / Commissioning TechTorque log, post-reverse IV
T+5h to T+6hRecommission and closeoutO&M EngineerR14 closeout pack

Times are indicative for one trained pair under dry, daylight conditions. Add time for roof access, permit-to-work issuance, and weather contingency.

5. Indicative cost slots

Cost slots are indicative only and labelled as such. No firm prices are stated. UNCERTAIN rows have no currently named source and are placeholders for RFQ response.

SlotDescriptionIndicative rangeSource / status
MobilisationTravel, access, PPE checkIndicativeTradVolt RFQ intake at /rfq/; UNCERTAIN — quote-driven
Labour (2-person)AP + HV Technician, ~6hIndicativeSite rates; UNCERTAIN — quote-driven
MC4-Evo 2 crimp consumablesPairs, pins, bootsIndicativeStäubli MC4-Evo 2 datasheet; UNCERTAIN — quote-driven
IV trace and reportingPer-string trace + reportIndicativeService provider scope; UNCERTAIN
Documentation re-issueCorridor doc pack updateIndicativeInternal hours; UNCERTAIN

6. HS code and duty block

Spare parts and tooled consumables for a DC string reverse may be declared under headings relating to photovoltaic cells, boards, modules, or electrical connectors. Rates are marked PENDING until verified against the UK Global Tariff lookup at https://www.trade-tariff.service.gov.uk/.

HS code (candidate)DescriptionUK duty rateStatus
8541.43Photovoltaic cells, whether or not assembled in modules or made up into panelsPENDINGLookup required at UK Global Tariff
8544.42Other electric conductors, fitted with connectors — PV lead assembliesPENDINGLookup required at UK Global Tariff
8536.69Plugs and sockets — MC4 type connector bodiesPENDINGLookup required at UK Global Tariff

Verify exact classification and rate on the UK Global Tariff lookup before declaring. Rates may vary under preferential origin treatment where the supplier has a verified statement on origin.

7. Health, safety and competence

  1. Work must be carried out by personnel competent for DC work at the system maximum DC voltage (up to 1500 V DC for the Sungrow SG125HV string basis), in line with site RAMS and the BS 7671 IET Wiring Regulations for any LV AC interaction at the inverter.
  2. PPE must meet the site standard, which references the IEC 61730 module-safety qualification framework (IEC webstore catalogue for related standards, e.g. IEC 61851-1:2017 for adjacent EV charging scope; cite IEC 61730-1 / IEC 61730-2 module-safety parts by full designation in the site RAMS).
  3. Live DC work is prohibited; isolation and LOTO are mandatory at the inverter, combiner and DC isolator.
  4. Tools and connectors used must match OEM datasheet specifications; MC4-Evo 2 torque values are taken from the Stäubli MC4-Evo 2 datasheet.

Note: IEC 60950 is withdrawn (superseded by IEC 62368-1) and is not cited as a PPE source for DC PV work in this guide. Module electrical safety is governed by IEC 61730-1 and IEC 61730-2.

8. Frequently asked questions

What is an R14 ticket in this context?
An internal maintenance ticket category used by the O&M provider to log DC string polarity corrections on corridor-sourced assets. The exact ticket schema is held in the CMMS and is not a public document; it is classified in this guide as a model assumption.
Does a string reverse always require module-side re-termination?
Not always. Where the polarity error is at the combiner landing only, correction can be made at the combiner. Where module leads are reversed at the LONGi Hi-MO 5 / Jinko Tiger Neo / Trina Vertex S+ MC4-Evo 2 output, re-termination at the module MC4-Evo 2 is required.
Will a polarity reverse affect inverter warranty?
OEM inverter warranties (Sungrow SG125HV and equivalent Huawei / Growatt families) generally treat polarity correction as a recoverable maintenance event provided it is logged with evidence (IV trace, torque log, photos). Confirm with the specific OEM manual named at RFQ; inverter SOC handling during the outage follows the OEM datasheet.
Can the same guide be used for AC wiring corrections?
No. AC corrections are a different scope with different isolation rules (BS 7671 IET Wiring Regulations apply) and should follow the site AC switching procedure.
How is the corridor proven for a string?
By tracing the affected modules or combiner back through the BOM, MTC, CIQ and bill of lading to the CN to UK shipment.

9. Next steps

Send a structured RFQ to TradVolt at the /rfq/ intake with the corridor documents attached. This page is the printable checklist substitute; no separate PDF is published.