EVSE Emergency-Stop & RCD Test Procedure — Corridor CN→FJ

Document type: Process / SOP  |  Scope: Vertical solar BoS, EV charging infrastructure  |  Revision: 1.0

Purpose

This procedure defines how Tradvolt field technicians verify the emergency-stop (E-stop) circuit and residual current device (RCD) protection on Electric Vehicle Supply Equipment (EVSE) that has cleared the China→Fiji import corridor and is being commissioned at a solar Balance-of-System site. [Claim: The objective is functional verification, not energisation of live EV load. | Src: IEC 61851-1 | URL: https://webstore.iec.ch/publication/26091 | accessed 2026-09-21] [Claim: RCD behaviour follows IEC 61008-1 for residual current operated circuit-breakers. | Src: IEC 61008-1 | URL: https://webstore.iec.ch/publication/26206 | accessed 2026-09-21]

Scope

Applies to AC EVSE units (Mode 3, up to 32 A) supplied through the CN→FJ sea-freight corridor under Incoterms 2020 CFR or DAP Suva/Lautoka. [Claim: Ocean carrier responsibilities under CFR cease once goods pass the ship’s rail at the port of loading. | Src: ICC Incoterms 2020 | URL: https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/ | accessed 2026-09-21] [Claim: Sea-freight export documentation for China is processed via the PRC customs single-window platform. | Src: China Customs | URL: http://english.customs.gov.cn/ | accessed 2026-09-21]

Allow-listed References

Prerequisites

[Claim: A valid OEM service manual must be present at the test station before any E-stop actuation. | Src: OEM service manuals (varies by unit) | URL: per-unit datasheet pack supplied with shipment | accessed 2026-09-21] [Claim: Personal protective equipment shall include insulated gloves rated for the installation voltage class. | Src: IEC 60364-7-722 | URL: https://webstore.iec.ch/publication/25998 | accessed 2026-09-21] [Claim: Acceptance sampling on incoming inspection lots follows ISO 2859-1 general inspection Level II. | Src: ISO 2859-1 | URL: https://www.iso.org/standard/114072.html | accessed 2026-09-21]

Procedure

Step #ActionOwnerInput docOutput docDone-when
1 Receive work order, site pack, and OEM datasheet from project coordinator Site Supervisor WT-01 Work Order WS-01 Acknowledgement Slip Acknowledgement slip countersigned and filed
2 Verify OEM service manual revision, type-test certificate, and E-stop circuit diagram Commissioning Engineer OEM Service Manual, Type-Test Certificate VR-01 Verification Record All three documents match serial number on nameplate
3 Isolate the EVSE at the upstream AC isolator and apply lock-out tag-out (LOTO) Electrician (LOTO-authorised) LM-01 LOTO Permit LM-01 LOTO Permit (signed) Lock and tag confirmed by second person; voltage absence verified with a two-pole tester
4 Mechanically inspect the E-stop button: palm-pressure actuation, latching, and release Electrician OEM Service Manual MI-01 Mechanical Inspection Form Button latches on press, releases on twist/pull per OEM datasheet
5 Perform RCD trip-time test at 1×IΔn (no trip) and 5×IΔn (trip ≤ 40 ms for 30 mA type) Commissioning Engineer OEM Service Manual, IEC 61008-1 RC-01 RCD Test Record Measured trip time recorded; passes if ≤ 40 ms at 5×IΔn
6 Measure earth-fault loop impedance (Ze) at the charging connector Commissioning Engineer LM-01 LOTO Permit, IEC 60364-7-722 EL-01 Earth-Loop Record Ze recorded in ohms; complies with the disconnection time in IEC 60364-4-41
7 Restore supply via LOTO removal sequence, confirm pilot signal and interlock with the vehicle inlet Commissioning Engineer LM-01 LOTO Permit (cleared) IC-01 Interlock Verification No-load pilot signal detected; E-stop press removes pilot within 100 ms
8 Complete acceptance form with serial number, date, two signatures, and calibration IDs of test instruments Site Supervisor VR-01, RC-01, EL-01, IC-01 AF-01 Acceptance Form AF-01 fully populated and signed by Engineer and Supervisor
9 Update the asset register, attach scanned AF-01, and notify the logistics desk for cargo-handover closure Logistics Coordinator AF-01 (scanned) AR-01 Asset Register entry Asset register entry saved with revision tag and timestamp
10 Archive the signed AF-01 and test records per the records-retention schedule Document Controller AF-01, RC-01, EL-01, IC-01 Archive index entry Records indexed in the document management system with retention flag

[Claim: LOTO is applied before any mechanical or electrical test on the E-stop circuit. | Src: IEC 60364-7-722 | URL: https://webstore.iec.ch/publication/25998 | accessed 2026-09-21] [Claim: A 30 mA RCD shall trip within 40 ms at 5×IΔn. | Src: IEC 61008-1 | URL: https://webstore.iec.ch/publication/26206 | accessed 2026-09-21] [Claim: Maximum disconnection time for AC final circuits is defined by IEC 60364-4-41. | Src: IEC 60364-4-41 | URL: https://webstore.iec.ch/publication/14921 | accessed 2026-09-21]

Document Checklist

Download SOP document pack (.zip)

Timeline & Dependencies

PhaseActivityDepends onIndicative duration
Pre-shipment (CN)Factory acceptance test, doc pouch preparationOEM production releaseUNCERTAIN — per OEM
Sea freightCN port loading to FJ port discharge (CFR)Booking confirmedUNCERTAIN — carrier schedule
Customs (FJ)FRCS lodgement, Bio-security, TIN verificationPre-lodgement docsUNCERTAIN — FRCS SLA
Inland transportPort to solar BoS site, Suva/LautokaCustoms release1–2 days (indicative)
CommissioningExecute Steps 1–10 of the procedureArrival on site, LOTO ready~8 hours (indicative)
RecordsArchive AF-01 and register updateStep 9 completeSame day (indicative)

[Claim: The carrier’s CFR obligation ends when the goods are on board the vessel at the named port of shipment. | Src: ICC Incoterms 2020 | URL: https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/ | accessed 2026-09-21] [Claim: Multimodal transport between Fiji ports and inland sites is documented under the FIATA multimodal bill of lading. | Src: FIATA | URL: https://fiata.org/ | accessed 2026-09-21]

Indicative Cost Slots

Cost lineValueStatus
OEM test kit calibrationUNCERTAIN — quoted per unit
Sea freight (CN→FJ), 20’/40’ containerUNCERTAIN — carrier market
FRCS duty and VATPENDING — lookupIndicative — see Duty block
Site commissioning labourIndicative — per site scope
Spare E-stop button / RCD moduleIndicative — OEM list price

Duty / HS Code Block

[Claim: Static converters for EV supply equipment are commonly classified under HS heading 8504.40 of the WCO Harmonised System. | Src: WCO Harmonised System | URL: https://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools/hs-nomenclature-2022-edition.aspx | accessed 2026-09-21] [Claim: The Fiji-specific duty rate is published by the Fiji Revenue & Customs Service Tariff portal and must be looked up against the current edition. | Src: Fiji Revenue & Customs Service | URL: https://www.frcs.org.fj/our-services/taxes-duties/tariff/ | accessed 2026-09-21]

ItemSuggested HS headingDuty / VAT rate (FJ)Source
EVSE static converter / power unit 8504.40 (PENDING — lookup at 6-digit level against current Fiji tariff) PENDING — lookup on FRCS Tariff portal FRCS Tariff portal (official)
Spare RCD module (residual current operated) 8536 (PENDING — lookup sub-heading) PENDING — lookup on FRCS Tariff portal FRCS Tariff portal (official)
E-stop push-button (industrial) 8536.50 (PENDING — lookup sub-heading) PENDING — lookup on FRCS Tariff portal FRCS Tariff portal (official)

Disclaimer: HS classifications and duty/VAT rates above are flagged “PENDING — lookup” and must be confirmed against the current FRCS Tariff edition and any applicable concession orders before shipment. Tradvolt does not warrant the rate and recommends importer verification.