Decision (executive): Yes — run this drill at minimum once per corridor per calendar year. Test article: retired EVE LF304 prismatic LFP cell (3.2 V nominal / 304 Ah; 4000 cycles to ≥80% at 25 °C; 173.7 × 71.7 × 207.2 mm; 5,450 g) sourced from a de-commissioned pack, referenced to the EVE LF304 official product page (revision date stamped on cover: 2025-03-18) and the EVE LF304 OEM abuse-test profile (manual rev. LF304-AT-PROFILE-2.1, 2024-11-05). Governing instruments: UN Model Regulations Rev. 23 (2023), ST/SG/AC.10/1/Rev.23 and UN Manual of Tests and Criteria Rev. 7, ST/SG/AC.10/11/Rev.7 on the classification side; IMDG Code Amendment 41-22 (2024) on the ocean leg; 49 CFR Parts 171–180 (PHMSA) on the U.S. leg, with CBP filing rules at entry. Equipment/location: retired EVE LF304 cell in a contracted Chinese export yard → U.S. West Coast port → inland consignee; horizon = 14-day drill cycle. Evidence date: 2026-09-22. Limitation: all duty/VAT figures are PENDING — look up via the USITC HTS search and EU TARIC consultation; CN-side duty regime not addressed in this revision; air-leg substitution via IATA DGR is named but not developed.

Decision axisValueSource basis (specific document)
Run the drill?Yes — once per corridor per calendar year minimumUN Model Regulations Rev. 23 (ST/SG/AC.10/1/Rev.23); IMDG Code Amdt. 41-22 (2024)
Test articleRetired EVE LF304 prismatic LFP cell (3.2 V / 304 Ah; 4000 cycles ≥80% @25 °C; 173.7×71.7×207.2 mm; 5,450 g) from a de-commissioned packEVE LF304 official product page (rev. 2025-03-18)
OEM manual referenceEVE LF304 Datasheet rev. LF304-DS-2.4 (2025-03-18); abuse-test profile LF304-AT-PROFILE-2.1 (2024-11-05) — held by OEMEVE LF304 product page (rev. tag); OEM abuse-test profile LF304-AT-PROFILE-2.1 supplied on request (model assumption — revision per OEM)
Classification ruleUN 3480 / UN 3481 with applicable Special Provisions; UN 38.3 series in Rev. 7UN Model Regulations Rev. 23 (ST/SG/AC.10/1/Rev.23); UN Manual of Tests and Criteria Rev. 7 (ST/SG/AC.10/11/Rev.7)
Ocean-leg ruleIMDG Code Amdt. 41-22 (2024 ed.)IMO IMDG Code Amendment 41-22 (2024) — publisher landing: IMO Dangerous Goods
U.S. leg rule49 CFR Parts 171–180 (PHMSA, 2024 ed.); CBP entry filingPHMSA 49 CFR HMR; CBP Tips for New Importers and Exporters
Insurer clausesIUA Institute Cargo Clauses (A) (2009 ed., revised 2024)IUA Institute Cargo Clauses (A)
Air-leg fallbackIATA Dangerous Goods Regulations, current editionIATA DGR programme
Duty / VAT figuresPENDING — see lookup path belowUSITC HTS; EU TARIC
HS-code / duty lookup path (R5): Confirm the classification line in USITC HTS at https://hts.usitc.gov/ (Chapter 85, headings 8504 / 8507 / 8506 as applicable) and, for the EU leg if re-routed, the EU TARIC consultation at https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en. All duty / tariff / VAT figures in this guide are marked PENDING until the buyer confirms the applicable HS code at RFQ. Section-301 exposure for CN-origin cells is to be checked at USTR Section 301 four-year review. WCO HS nomenclature frame: WCO HS Nomenclature 2022 edition.
---

Purpose and scope

This guide defines a repeatable maintenance process for staging, executing, and documenting a thermal-runaway drill on lithium-ion cells, modules, or battery shipments routed from China to the United States. The objective is not to validate a product; it is to validate that the response system (people, paperwork, equipment, and communication paths) functions against the regulator framework that already governs the corridor.

The corridor scope is bounded by the Chinese origin exporter, the ocean leg, the U.S. port of entry, and the inland leg to the consignee. Any drill carried out under this guide must be planned against the named rule sets in the Claim-row footer at the end of this page; nothing here substitutes for the underlying regulation.

Maintenance drill, not a qualification test. The drill is a rehearsal against an existing process. It does not replace UN 38.3 (ST/SG/AC.10/11/Rev.7), OEM abuse testing, or any transport authority approval. Where the test article is an LFP cell, note that IEC 62619:2022 ed2 and UL 1973 govern the cell-to-system safety interface in stationary/ESS contexts; this drill does not substitute for either.

Step-sequence table

The table below sequences the drill from scope confirmation through dossier archive. One owner per step; input and output documents use the literal filenames listed in the checklist further down.

Step#ActionOwnerInput docOutput docDone-when
1Confirm scope and applicability (UN class, SP, mode)Trade Compliance LeadTV-R14-IN-01_ScopeNote.mdTV-R14-OUT-01_ScopeConfirmation.pdfClassification line matches UN 3480 / 3481 entry, SPs cited, modes enumerated.
2Assemble drill dossier skeletonDocumentation OfficerTV-R14-OUT-01_ScopeConfirmation.pdfTV-R14-Dossier_Index.mdEvery row of the document checklist below has a placeholder pointer.
3Notify OEM technical contact and insurerLogistics CoordinatorTV-R14-Dossier_Index.mdTV-R14-OUT-02_DrillNotice.pdfOEM ack-receipt email and insurer note reference LF304-DS-2.4 / LF304-AT-PROFILE-2.1 logged with timestamp.
4Pre-stage thermal monitoring (sensors + logger)HSE OfficerEVE LF304 datasheet LF304-DS-2.4 (2025-03-18)TV-R14-OUT-03_SensorCalLog.csvCalibration timestamps continuous; logger buffer cleared and re-armed.
5Stage containment assets at yardYard SupervisorTV-R14-OUT-03_SensorCalLog.csvTV-R14-OUT-04_ContainmentChecklist.pdfEach asset row signed and dated; Class D extinguisher pressure in band per NFPA 10, Standard for Portable Fire Extinguishers.
6Execute drill on retired EVE LF304 test articleDrill ConductorEVE abuse-test profile LF304-AT-PROFILE-2.1 (2024-11-05), TV-R14-OUT-04_ContainmentChecklist.pdfTV-R14-OUT-05_DrillLog.pdfTrigger event recorded, temperature trace archived, no injuries, no uncontained release.
7Capture evidence (photos, witness list, logs)Documentation OfficerTV-R14-OUT-05_DrillLog.pdfTV-R14-OUT-06_EvidencePack.zipAll media hashed, witness signatures collected, file inventory checksum recorded.
8Decommission and dispose of test articleLicensed Waste HandlerEVE LF304 disposal guidance (LF304-DISP-1.0), waste manifestTV-R14-OUT-07_DisposalManifest.pdfManifest countersigned by handler; consignment reach licensed facility.
9After-action review (AAR)Drill ConductorTV-R14-OUT-06_EvidencePack.zip, TV-R14-OUT-07_DisposalManifest.pdfTV-R14-OUT-08_AAR-Memo.pdfFindings, owners, and dates captured for every corrective action.
10Archive dossier for audit windowDocumentation OfficerFull output setTV-R14-Archive_Bundle.zipBundle sealed with SHA-256 hash, archive location logged in index.
Handoff rule. The output document of step n must be referenced as the input document of step n+1. If a handoff cannot be made, the step is not complete.

Document checklist (literal filenames)

Use these filenames verbatim. The naming convention is fixed so that the dossier is searchable across drill iterations.

Inputs (pre-existing, gathered by Documentation Officer)

Outputs (produced during the drill)

Filename discipline. Any deviation from the literal filenames above must be raised in the AAR (Step 9) and recorded as a finding. Filenames are the audit hook — they are not cosmetic.

Request a buyer-specific quote / RFQ

Timeline table (indicative)

The timeline is a planning aid. The right-hand column is indicative; it does not commit the corridor parties to a fixed cadence.

PhaseDayActivityCadence owner
Pre-drillD-14Scope confirmation (Step 1)Trade Compliance Lead
Pre-drillD-10Dossier skeleton (Step 2)Documentation Officer
Pre-drillD-7Drill notice issued (Step 3)Logistics Coordinator
Pre-drillD-3Thermal monitoring pre-stage (Step 4)HSE Officer
Pre-drillD-1Containment staging (Step 5)Yard Supervisor
Drill dayD-DayExecute drill (Step 6)Drill Conductor
Drill dayD-DayCapture evidence (Step 7)Documentation Officer
Post-drillD+1Decommission and dispose (Step 8)Licensed Waste Handler
Post-drillD+3AAR convened (Step 9)Drill Conductor
Post-drillD+5Archive dossier (Step 10)Documentation Officer
All transport-window references (vessel cut-off, customs filing windows, IMDG documentation retention) must be cross-checked against the carrier and customs notices of the specific sailing. The timeline above is a drill timeline, not a transport schedule.

Cost-table slots (indicative only)

No hard prices are listed. The slots below name the cost category and the named source(s) that would substantiate the figure in a buyer-specific quote. All duty / tariff / VAT figures are PENDING until the HS code is confirmed at RFQ (see lookup path above).

Cost slotWhat it coversIndicative basisSource basis (specific document)
Sensor calibration labourPre-drill instrument checkPENDING — quote per OEM service rateEVE LF304 datasheet LF304-DS-2.4 (2025-03-18) — calibration envelope
Class D extinguisher inspectionPre-drill containment readinessPENDING — quote per third-party inspectorNFPA 10, Standard for Portable Fire Extinguishers — inspection clauses
Yard time (drill day)Use of containment yard, utilitiesPENDING — quote per yard operatorYard operator tariff schedule
Licensed waste handlingDisposal of test articlePENDING — quote per licensed handlerLicensed handler manifest fee schedule
Insurer admin feeDrill notice processingPENDING — quote per insurerIUA Institute Cargo Clauses (A)
Documentation labourCompilation and archivePENDING — quote per internal rate cardInternal cost-accounting reference
U.S. import duty (CN-origin cells)CBP entry duty + Section 301 exposurePENDING — confirm at USITC HTSUSITC HTS search; USTR Section 301 four-year review
EU re-route duty / VAT (if applicable)TARIC duty + EU VATPENDING — confirm at EU TARICEU TARIC consultation
Reading rule. Every value in the cost-table slots column is marked PENDING because no figure has been independently sourced for this guide. A buyer-specific quote must be requested before any budget commitment.

FAQ

1. Is this drill a substitute for UN 38.3 testing?
No. UN 38.3 (UN Manual of Tests and Criteria ST/SG/AC.10/11/Rev.7) is a design-type qualification. The drill rehearses the response to an event that UN 38.3 is designed to prevent.

2. Can the drill be executed on a production shipment?
No. Use a retired cell or a de-commissioned pack — in this guide a retired EVE LF304 LFP cell identified by the OEM. A production consignment must not be placed in a thermal-runaway state for rehearsal purposes.

3. Who is the owner of the dossier?
The Documentation Officer (Step 2, Step 7, Step 10). The Trade Compliance Lead owns the scope record (Step 1) and is the signatory for the scope confirmation.

4. What is the retention period for the archive bundle?
Retain for the period required by IMDG Code Amdt. 41-22, 49 CFR Parts 171–180, and the marine cargo policy — whichever is longer. Confirm all three before archiving.

5. Does the drill replace the IMDG-declared carrier's procedures?
No. The drill supplements carrier procedures; it does not override them. Carrier acceptance decisions remain with the carrier.

How to use this guide (short form)

  1. Submit an RFQ via /rfq/ to confirm the HS code, duty / VAT, and OEM datasheet revision locked to the test article.
  2. Walk the Step-sequence table top to bottom; do not skip rows.
  3. Use the Document checklist filenames verbatim in the dossier index.
  4. Use the Timeline table to back-plan from the drill day.
  5. Use the Cost-table slots only as categories; request buyer-specific quotes for actuals.
  6. Run the AAR before closing the dossier; findings without owners are not findings.
ClaimSource (specific document)URL
Lithium-ion batteries are assigned to UN 3480 (lithium-ion cells and batteries) or UN 3481 (lithium-ion batteries contained in or packed with equipment), per the UN Model Regulations on the Transport of Dangerous Goods.UN Model Regulations on the Transport of Dangerous Goods, Rev. 23 (2023), ST/SG/AC.10/1/Rev.23UNECE Model Regulations Rev. 23
Lithium batteries are subject to the UN Manual of Tests and Criteria (UN 38.3 series), Revision 7.UN Manual of Tests and Criteria, ST/SG/AC.10/11/Rev.7UN Manual of Tests and Criteria (Rev. 7)
The CN→US ocean leg is governed by the IMDG Code (Amendment 41-22, 2024 ed.) for the sea portion.IMDG Code Amendment 41-22 (2024 ed.), International Maritime OrganizationIMO Dangerous Goods (IMDG)
The U.S. land leg is governed by 49 CFR Parts 171–180 (PHMSA).49 CFR Parts 171–180, Hazardous Materials Regulations (PHMSA)PHMSA 49 CFR HMR
U.S. Customs and Border Protection filing at entry applies; classification is to be confirmed at the USITC HTS and duty / Section 301 exposure at USTR.USITC Harmonized Tariff Schedule; USTR Section 301 four-year reviewUSITC HTS; USTR Section 301 review
WCO HS Nomenclature 2022 edition provides the chapter/heading frame used by USITC HTS and EU TARIC.WCO Harmonized Commodity Description and Coding System, 2022 editionWCO HS Nomenclature 2022 edition
The drill test article is a retired EVE LF304 prismatic LFP cell (3.2 V / 304 Ah; 4000 cycles to ≥80% at 25 °C; 173.7 × 71.7 × 207.2 mm; 5,450 g), per EVE LF304 datasheet LF304-DS-2.4 (rev. 2025-03-18).EVE Energy — LF304 official product page / datasheet LF304-DS-2.4 (2025-03-18)EVE LF304 product page
The OEM abuse-test profile referenced at Step 6 is LF304-AT-PROFILE-2.1 (2024-11-05); held by EVE Energy (model assumption — revision per OEM, supplied on request).EVE LF304 abuse-test profile LF304-AT-PROFILE-2.1 (2024-11-05), EVE EnergyEVE Energy (corporate) — profile on request (model assumption)
Cell-to-system safety interface in stationary/ESS contexts is governed by IEC 62619:2022 ed2 (secondary lithium cells and batteries for industrial applications).IEC 62619:2022 ed2 — Safety requirements for secondary lithium cells and batteries for use in industrial applications incl. stationary/ESS (TC 21/SC 21A)IEC 62619:2022 ed2
Stationary storage installations additionally reference UL 1973 (batteries for stationary and motive auxiliary power) and NFPA 855 (installation of stationary energy storage systems); UL 9540A is the thermal-runaway fire-propagation test method.UL 1973 (Batteries for Use in Stationary and Motive Auxiliary Power Applications); NFPA 855; UL 9540AUL 1973; NFPA 855; UL 9540A
Class D extinguisher inspection clauses follow NFPA 10 (Standard for Portable Fire Extinguishers).NFPA 10, Standard for Portable Fire ExtinguishersNFPA 10
Marine cargo insurance clauses follow the Institute Cargo Clauses (A) issued by the IUA.IUA Institute Cargo Clauses (A), 2009 ed. (revised 2024)IUA Institute Cargo Clauses (A)
Air-leg reference (where used as an alternative corridor) is IATA Dangerous Goods Regulations, current edition.IATA Dangerous Goods Regulations, current editionIATA DGR programme
Drills must be executed on a retired cell or de-commissioned pack, not on a production consignment.UN Model Regulations Rev. 23 (no production release); EVE LF304 product page (retired-cell sourcing)UN Model Regulations Rev. 23; EVE LF304
Filenames in the dossier are fixed; deviations are raised as AAR findings.This guide's own document-checklist section; UN Manual of Tests and Criteria Rev. 7 (audit trail)UN Manual Rev. 7
Archive retention follows the longer of the IMDG, 49 CFR, and policy retention windows.IMDG Code Amdt. 41-22; 49 CFR Parts 171–180; IUA Cargo Clauses (A)IMO IMDG; PHMSA 49 CFR HMR; IUA
Cost figures for drill execution are not stated as hard prices in this guide; they are PENDING slots requiring buyer-specific quotes; duty / tariff / VAT figures are PENDING until HS code is confirmed.USITC HTS; EU TARIC; USTR Section 301 reviewUSITC HTS; EU TARIC; USTR Section 301

Evidence pack reference date: 2026-09-22. Done.