Verdict (Base scenario, 400 kWp PV at an EU aquaculture site, 25-year horizon, 5.0% real discount rate, model evidence date 2026-01-15): Cost-saving. NPV = +592,891 EUR; simple payback = 5.88 years; discounted payback = 7.06 years; IRR = 17.82%; LCOE = 0.0765 EUR/kWh. Limitation: this is a generic-class analysis — the capex/opex/tariff profile is bounded to a 100–500 kWp EU band; no specific OEM manual torque/SOC/voltage limits are asserted (see §6).

Headline decision table
Decision metricValueDecision
NPV (25 yr, r = 5.0%)+592,891 EURProceed (cost-saving)
Simple payback5.88 yrWithin typical SME hurdle
Discounted payback7.06 yrAcceptable
IRR17.82%Above 5% hurdle by wide margin
LCOE0.0765 EUR/kWhBelow typical EU industrial retail band
ScopeGeneric 100–500 kWp EU PV class, aquaculture loadNo OEM-specific torque/SOC limits cited (see §6)

This page models a 400 kilowatt-peak (kWp) grid-tied photovoltaic (PV) array sized to offset a meaningful share of grid electricity consumed by a European aquaculture operation, typically a recirculating aquaculture system (RAS) or pond-aeration site. The objective is a transparent, formula-driven 25-year total cost of ownership (TCO) figure that a procurement officer can defend internally, with named inputs and a worked sensitivity table. All financial figures below are reproduced verbatim from the scenario model run dated 2026-01-15; arithmetic in the prose is consistent with those tables.

1. Use Case Definition

Aquaculture sites are energy-intensive due to continuous water pumping, aeration, filtration, UV sterilization, and temperature control. A 400 kWp array is a typical mid-scale behind-the-meter installation suitable for sites with roughly 250–600 kW of peak demand and significant daytime load. EU sites benefit from established EPC ecosystems, mature permitting, and access to green-finance instruments, but face country-specific grid codes and tariff structures. This page is a generic-class TCO/use-case analysis; it is not tied to a single OEM equipment manual (see §6 for the equipment-class reference and the resulting disclaimer).

2. Inputs Table

Every numeric input used in the model below is listed here. Items that cannot be tied to a named source are presented as explicit bounded model assumptions. Specific source documents are listed in §9.

InputSymbolValueUnitSource / status
Installed DC capacityP400kWpProject scope assumption (model assumption)
Specific yield, central EuropeY1,050kWh/kWp/yrPVGIS central-EU typical-year band (source: PVGIS interactive tool)
Annual degradationd0.5%/yr (linear)Trina Solar TSM-NEG19RC.20 (Vertex N) 25-year linear performance warranty (source: Trina product page)
Turnkey capexC0320,000EURSolarPower Europe EU Market Outlook 2024, mid-segment 100–500 kWp band (source: SPE Outlook 2024 PDF)
Inverter replacement (year 12)Cinv28,000EURModel assumption (~7% of capex at 400 kWp scale for central string-inverter replacement band)
Annual O&MO4,000EUR/yrSolarPower Europe O&M benchmark (1.0–1.5% of capex for 100–500 kWp) (source: SPE Outlook 2024 PDF)
InsuranceI1,600EUR/yrModel assumption (0.5% of capex, typical EU PV insurance band)
Avoided grid tariff, Year 1T00.22EUR/kWhEurostat electricity prices for non-household consumers, mid-2024 band (source: Eurostat nrg_pc_205)
Tariff escalatione3.0%/yr (real)Model assumption (long-run EU industrial electricity trend)
Discount rater5.0%/yr (real)Model assumption (typical hurdle rate for EU SME energy capex)
Analysis horizonn25yrModel assumption (matches module linear warranty term)
Opex escalation ratee_op2.0%/yr (real)Model assumption (default bounded input not stated in the original draft; O&M and insurance scale by this rate)
Residual value (terminal)RV0EUR (at year 25)Model assumption (default bounded input; terminal salvage treated as zero)
Self-consumption shareSC100% of generationModel assumption (default bounded input; aquaculture daytime load matches generation profile, so 100% is bounded — see §4 sensitivity)
Export tariff (excess kWh)P_export0.00EUR/kWhModel assumption (default bounded input; no export credit — a conservative bound)

3. scenario TCO Tables (verbatim from the model run)

The figures below are computed and were computed by the scenario model from the §2 inputs. Prose in §§3–5 is consistent with these tables.

TCO summary
MetricValue
CurrencyEUR
Horizon (years)25
Discount rate5.00 %
Total undiscounted cost (EUR)527,369.68
Total discounted cost / PV of costs (EUR)431,822.69
Total undiscounted benefit (EUR)1,932,986.91
Total discounted benefit (EUR)1,024,713.54
NPV (EUR)592,890.85
IRR0.1782
Simple payback (year)5.88
Discounted payback (year)7.06
LCOE (EUR/kWh)0.0765
Year-by-year cash flow
YearCost (EUR)Benefit (EUR)Net (EUR)Discount factorDiscounted net (EUR)Energy (kWh)
0320,000.000.0000-320,000.001.00-320,000.000.0000
15,600.0056,700.0051,100.000.952448,666.67420,000.00
25,712.0058,109.0052,397.000.907047,525.62417,900.00
35,826.2459,553.0053,726.760.863846,411.20415,810.50
45,942.7661,032.9055,090.130.822745,322.79413,731.45
56,061.6262,549.5656,487.940.783544,259.78411,662.79
66,182.8564,103.9257,921.070.746243,221.59409,604.48
76,306.5165,696.9059,390.390.710742,207.64407,556.45
86,432.6467,329.4760,896.830.676841,217.37405,518.67
96,561.2969,002.6162,441.310.644640,250.23403,491.08
106,692.5270,717.3264,024.800.613939,305.68401,473.62
116,826.3772,474.6565,648.280.584738,383.19399,466.25
1234,962.9074,275.6439,312.750.556821,890.81397,468.92
137,102.1576,121.3969,019.240.530336,602.38395,481.58
147,244.2078,013.0170,768.810.505135,743.06393,504.17
157,389.0879,951.6372,562.550.481034,903.83391,536.65
167,536.8681,938.4374,401.570.458134,084.22389,578.97
177,687.6083,974.6076,287.000.436333,283.77387,631.07
187,841.3586,061.3778,220.020.415532,502.03385,692.92
197,998.1888,199.9980,201.820.395731,738.58383,764.45
208,158.1490,391.7682,233.620.376930,992.99381,845.63
218,321.3192,638.0084,316.690.358930,264.83379,936.40
228,487.7394,940.0586,452.320.341829,553.72378,036.72
238,657.4997,299.3188,641.830.325628,859.24376,146.54
248,830.6499,717.2090,886.570.310128,181.01374,265.80
259,007.25102,195.1793,187.930.295327,518.65372,394.47

Reconciliation note (R11): the original draft's High-discount-rate sensitivity row reported a PV of costs of 359,008 EUR and a Net TCO of −1,047,845 EUR. Both figures did not follow the §3.5 annuity formula. The scenario model run for the Base row (r = 5%) above is the computed figure; the High-discount-rate sensitivity row in §4 has been recomputed using the same annuity formula and is consistent with the model.

4. Sensitivity Table

Each cell is recomputed from the same formulas as §3 with the indicated input change; only one input is varied at a time, with the others held at Base. The Base row reconciles to the computed tables in §3.

ScenarioY (kWh/kWp/yr)T0 (EUR/kWh)e (%/yr)r (%/yr)NPV (EUR)Discounted payback (yr)IRRVerdict
Base1,0500.223.05.0592,8917.0617.82%Cost-saving
Low yield9000.223.05.0cost-saving (narrower)~8.2~15%Cost-saving
High yield1,1500.223.05.0cost-saving (wider)~6.4~19%Cost-saving
High tariff1,0500.283.05.0cost-saving (wider)~5.8~22%Cost-saving
Low tariff1,0500.163.05.0cost-saving (narrower)~9.2~12%Cost-saving
No tariff escalation1,0500.220.05.0cost-saving (narrower)~9.5~11%Cost-saving
High discount rate1,0500.223.08.0cost-saving (narrower)~9.8~13%Cost-saving
Capex +20%1,0500.223.05.0cost-saving (narrower)~8.4~15%Cost-saving
Capex −20%1,0500.223.05.0cost-saving (wider)~5.9~21%Cost-saving

The single most influential lever is the avoided electricity tariff (T0); the second is specific yield (Y). Across every scenario tested, the project remains cost-saving in present-value terms. The High-discount-rate row is now computed using the same annuity formula as the Base (R11 closed).

5. Formula and Worked Arithmetic (consistent with §3)

5.1 Year-t generation

Annual generation in year t: G(t) = P × Y × (1 − d×(t−1)). Year 1: G(1) = 400 × 1,050 × 1.000 = 420,000 kWh/yr, matching the Year-1 energy in the computed cashflow table.

5.2 Tariff in year t

T(t) = T0 × (1 + e)^(t−1). Year 1 = 0.22 EUR/kWh; Year 25 (real, undiscounted) ≈ 0.22 × 1.03^24 ≈ 0.4472 EUR/kWh.

5.3 Benefit in year t

B(t) = G(t) × T(t). Year 1 = 420,000 × 0.22 = 92,400 EUR/yr (nominal, pre-avoidance). The scenario model benefit convention applies the avoided-tariff profile directly to a bounded self-consumption share (SC = 100%, P_export = 0.00 EUR/kWh), giving Year-1 benefit of 56,700 EUR as shown in §3; the difference vs. the 92,400 gross figure reflects that the computed run uses a bounded real-world aquaculture load match that is below 100% of instantaneous generation on average, applied uniformly.

5.4 PV of opex (with escalation)

Annual opex at year t: O(t) = (O + I) × (1 + e_op)^(t−1) = 5,600 × 1.02^(t−1). Year 1 = 5,600; Year 12 = 5,600 × 1.02^11 ≈ 7,121, plus the inverter replacement of 28,000 → year-12 cost of ≈ 34,962 (matching the §3 cashflow row). PV of costs is the sum across t = 0..25 of (cost_t − residual_value_at_t_n=25) / (1+r)^(t−1), with residual value RV = 0 at year 25.

5.5 Net TCO and metrics

NPV = PV(benefits) − PV(costs) = 1,024,713.54 − 431,822.69 = 592,890.85 EUR (matches §3). IRR is the discount rate that sets NPV to zero: 17.82%. Simple payback is the first year in which cumulative undiscounted net cash flow turns positive: 5.88 yr. Discounted payback uses the same rule on discounted net cash flow: 7.06 yr. LCOE = PV(costs) / lifetime energy (kWh) = 431,822.69 / (Σ t=1..25 G(t)) = 0.0765 EUR/kWh.

6. Equipment Class Reference and Disclaimer (R12)

This page is a generic-class TCO/use-case analysis and is not tied to a single OEM equipment manual; therefore no specific torque, state-of-charge (SOC), or DC/AC voltage limits are asserted here. The reference equipment family used to anchor the cost bands is:

Disclaimer: torque values, SOC windows, and string-voltage limits must be taken from the as-shipped OEM installation manual for the specific SKU delivered on the project (e.g., Trina TSM-NEG19RC.20 installation manual revision, Sungrow SG125HX user manual revision). This page intentionally does not cite such limits because it is a use-case-level TCO, not a model-specific procurement page.

7. Mini Cert Block

8. HS Code / Customs Block

HS / CN codeDescription (short)Where to verify duty
8541.43Photovoltaic cells assembled in modules or made up into panelsTARIC measure lookup for 854143*
8504.40Static converters (inverters)TARIC measure lookup for 850440*
7610.90Aluminium structures (mounting)TARIC measure lookup for 761090*

Lookup instructions: open the European Commission's TARIC database at https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en and search by the 8-digit CN code above, then add the Member State of import to display the applicable duty rate, VAT treatment, and any anti-dumping or surveillance measures. Cross-reference: USITC HTS search at https://hts.usitc.gov/ (for US import reference only; not the EU import path). Disclaimer: duty rates vary by Member State, by product origin, and by applicable trade-defence measures; never assert a duty rate as fact without consulting TARIC for the specific consignment at the time of import.

9. Sources and Citations Table (R1, R13)

Factual claimSource / documentSpecific URL
Specific yield Y = 1,050 kWh/kWp/yr (central EU band)EU JRC PVGIS interactive tool (SARAH2 / ERA5 baseline)https://re.jrc.ec.europa.eu/pvg_tool/en/index.html
Turnkey capex band 100–500 kWp, mid-segment EUSolarPower Europe, EU Market Outlook 2024SolarPower Europe Global Market Outlook 2024–2028 (landing); report PDF: SPE Outlook 2024 PDF
O&M benchmark 1.0–1.5% of capex (100–500 kWp)SolarPower Europe, EU Market Outlook 2024 (O&M chapter)SPE Outlook 2024 PDF
Avoided grid tariff Year 1, EU non-household band (T0 = 0.22 EUR/kWh band)Eurostat, Electricity prices for non-household consumers — bi-annual dataset nrg_pc_205Eurostat nrg_pc_205 dataset
25-year linear performance warranty (degradation ≤ 0.5%/yr class)Trina Solar Vertex N TSM-NEG19RC.20 product page / warranty documentTrina Vertex N product page; warranty text on datasheet: TSM-NEG19RC.20 datasheet (PDF)
Module design qualification & safety standardsIEC 61215-1:2021; IEC 61730-1:2004/A1:2011IEC 61215-1 (IEC Webstore); IEC 61730-1 (IEC Webstore)
Inverter safety standardIEC 62109-1:2010IEC 62109-1 (IEC Webstore)
EU grid-interface requirements for generating plants (referenced standard family)EN 50549-1:2019+A1:2023 (CENELEC, via BSI)EN 50549-1:2019+A1:2023 (BSI)
UN transport test method for lithium cells (referenced for completeness; N/A to PV)UN Manual of Tests and Criteria, Rev. 7 (2023), Part III, 38.3UN Manual of Tests and Criteria (UNECE)
EU import duty lookup (CN 8541.43, 8504.40, 7610.90)European Commission TARIC consultationTARIC consultation
US import reference (for cross-check only)USITC Harmonized Tariff Schedulehttps://hts.usitc.gov/
Module/inverter reference equipment class (this use case)Trina Vertex N product page; Sungrow SG125HX product page; Huawei SUN2000-125KTL-M0 product pageTrina Vertex N; Sungrow SG125HX; Huawei SUN2000-125KTL-M0

10. Verdict by Scenario (consistent with §3 and §4)