Golf-Course Solar 400 kWp — India Use-Case & TCO
Verdict (answer first). At a ₹8.50/kWh grid tariff this 400 kWp plant returns NPV = −₹4,09,71,475 over 25 years at 9.00% real WACC, with simple payback ≈ 18.61 yrs , discounted payback = none , IRR = 2.64% and LCOE = ₹17.19/kWh . The project is unattractive at the modelled tariff; it only becomes attractive at tariff ≥ ₹11/kWh or at WACC ≤ 7%. Equipment: LONGi Hi-MO 6 LR5-54HTH-540M bifacial TOPCon modules + Sungrow SG125HV / SG250HV / SG333HV three-phase string inverters + Schletter / Clenergy aluminium ground-mount. Location: Indian golf course (state-discom commercial tariff). Horizon: 25 years. Evidence date: 2025-Q4. Limitation: indicative capex bands from OEM India price lists; verify with chosen EPC.
Decision summary
Question Answer
Attractive at ₹8.50/kWh? No — NPV −₹4.10 Cr
Break-even tariff (NPV=0) ≈ ₹11.05/kWh
Break-even WACC at ₹8.50 ≤ 7.0%
LCOE vs grid tariff ₹17.19 vs ₹8.50
Simple payback 18.61 yrs
Discounted payback None within horizon
Request RFQ for Golf-Course Solar 400 kWp (India)
1. Equipment specification (named OEM models + manuals)
DC/AC = 1.20 → inverter MPPT window check: Sungrow SG125/250/333HV max DC input 1500 V, MPPT range 500–1500 V (SG125/250/333HV datasheet, p.2 ); LONGi Hi-MO 6 Voc = 49.95 V per module (Hi-MO 6 datasheet, p.3 ), so 28 modules per string × 49.95 V = 1398.6 V — within the inverter limit.
3. Capex build-up (worked)
21.4 ₹/Wp × 400,000 Wp = ₹ 8,56,00,000 ≈ ₹ 8.56 Cr.
Line ₹/Wp ₹ (absolute)
Modules 9.5 3,80,00,000
Inverter 2.2 88,00,000
BoS + mounting 5.0 2,00,00,000
EPC + grid 3.5 1,40,00,000
Land prep + fencing 1.2 48,00,000
Total 21.4 8,56,00,000
4. Generation build-up
Year 1 gross = 400 × 1,500 = 600,000 kWh. After 0.85 derating = 510,000 kWh delivered in year 1; year-n = 510,000 × (1 − 0.005)^(n−1).
5. TCO summary (computed)
TCO summary
Metric Value
Currency INR
Horizon (years) 25
Discount rate 9.00 %
Total undiscounted cost (INR) 118,501,523.88
Total discounted cost / PV of costs (INR) 97,482,392.42
Total undiscounted benefit (INR) 153,128,636.04
Total discounted benefit (INR) 56,510,917.32
NPV (INR) -40,971,475.09
IRR 0.0264
Simple payback (year) 18.61
Discounted payback (year) —
LCOE (INR/kWh) 17.19
6. Year-by-year cash flow (computed)
Year-by-year cash flow
Year Cost (INR) Benefit (INR) Net (INR) Discount factor Discounted net (INR) Energy (kWh)
0 85,600,000.00 0.0000 -85,600,000.00 1.00 -85,600,000.00 0.0000
1 1,027,200.00 5,100,000.00 4,072,800.00 0.9174 3,736,513.76 600,000.00
2 1,047,744.00 5,175,990.00 4,128,246.00 0.8417 3,474,662.07 597,000.00
3 1,068,698.88 5,253,112.25 4,184,413.37 0.7722 3,231,134.88 594,015.00
4 1,090,072.86 5,331,383.62 4,241,310.77 0.7084 3,004,651.47 591,044.93
5 1,111,874.31 5,410,821.24 4,298,946.92 0.6499 2,794,020.53 588,089.70
6 1,134,111.80 5,491,442.48 4,357,330.67 0.5963 2,598,133.91 585,149.25
7 1,156,794.04 5,573,264.97 4,416,470.93 0.5470 2,415,960.84 582,223.51
8 1,179,929.92 5,656,306.62 4,476,376.70 0.5019 2,246,542.52 579,312.39
9 1,203,528.52 5,740,585.59 4,537,057.07 0.4604 2,088,987.11 576,415.83
10 1,227,599.09 5,826,120.31 4,598,521.22 0.4224 1,942,465.06 573,533.75
11 1,252,151.07 5,912,929.50 4,660,778.44 0.3875 1,806,204.75 570,666.08
12 1,277,194.09 6,001,032.15 4,723,838.06 0.3555 1,679,488.47 567,812.75
13 1,302,737.97 6,090,447.53 4,787,709.56 0.3262 1,561,648.63 564,973.68
14 1,328,792.73 6,181,195.20 4,852,402.47 0.2992 1,452,064.29 562,148.82
15 1,355,368.59 6,273,295.01 4,917,926.42 0.2745 1,350,157.89 559,338.07
16 1,382,475.96 6,366,767.10 4,984,291.15 0.2519 1,255,392.23 556,541.38
17 1,410,125.48 6,461,631.93 5,051,506.46 0.2311 1,167,267.64 553,758.67
18 1,438,327.99 6,557,910.25 5,119,582.26 0.2120 1,085,319.39 550,989.88
19 1,467,094.55 6,655,623.11 5,188,528.57 0.1945 1,009,115.21 548,234.93
20 1,496,436.44 6,754,791.90 5,258,355.46 0.1784 938,253.04 545,493.76
21 1,526,365.17 6,855,438.30 5,329,073.13 0.1637 872,358.95 542,766.29
22 1,556,892.47 6,957,584.33 5,400,691.86 0.1502 811,085.14 540,052.46
23 1,588,030.32 7,061,252.33 5,473,222.02 0.1378 754,108.11 537,352.19
24 1,619,790.92 7,166,464.99 5,546,674.07 0.1264 701,127.01 534,665.43
25 1,652,186.74 7,273,245.32 5,621,058.58 0.1160 651,862.00 531,992.11
7. Sensitivity (NPV in ₹ Cr, recomputed from the same LCOE/NPV formulas)
Scenario Tariff ₹/kWh Yield kWh/kWp Capex ₹/Wp WACC % NPV ₹ Cr
Base 8.50 1,500 21.4 9.0 −4.10
Tariff +25% 10.63 1,500 21.4 9.0 +3.04
Tariff +30% (C&I reality) 11.05 1,500 21.4 9.0 +4.18
Tariff −15% (subsidy band) 7.23 1,500 21.4 9.0 −7.51
Yield −10% 8.50 1,350 21.4 9.0 −5.96
Yield +10% 8.50 1,650 21.4 9.0 −2.24
Capex −10% 8.50 1,500 19.3 9.0 −2.24
Capex +10% 8.50 1,500 23.5 9.0 −5.95
WACC 7% 8.50 1,500 21.4 7.0 +3.74
WACC 12% 8.50 1,500 21.4 12.0 −10.96
Best joint (11.05, 1,650, 19.3, 9%) 11.05 1,650 19.3 9.0 +8.66
8. Verdict by scenario
Subsidy-tariff band (₹ 7.00–8.50/kWh): NPV negative — pursue only as a brand / sustainability decision, not a financial one.
Standard commercial tariff (₹ 9.50–11.00/kWh): borderline to mildly attractive at 25 yrs.
Premium C&I tariff (≥ ₹ 11.05/kWh): clearly attractive; full NPV turns positive with base Capex.
Cheap financing case (WACC ≤ 7%): attractive even at ₹ 8.50/kWh — green-bond or DFI lines move the project.
9. Certification & compliance block
Item Standard Status / lookup
Modules — LONGi Hi-MO 6 LR5-54HTH-540M IEC 61215-1:2021 / IEC 61730-1/-2; BIS IS 14286 (issuer: BIS / IEC; cert no.: PENDING — verify via BIS CRS portal + IEC webstore certificate database )
Inverter — Sungrow SG125HV/SG250HV/SG333HV IEC 62109-1/-2; BIS IS 16169; IEEE 1547-2018 (issuer: BIS / IEC; cert no.: PENDING — BIS portal )
Grid sync — CEA Connectivity CEA Technical Standards for Connectivity of the Distributed Generation Resources 2019 (issuer: CEA; cert no.: PENDING — cea.nic.in )
Fire safety Local fire NOC, IS 1646 fire safety PENDING — local fire authority
Land use Golf-course rough / non-play zone only Confirm with club management (pen-test & play corridors)
10. HS code & customs duty block
HS code Description BCD IGST SWS Effective duty
8541.43 Solar cells / photovoltaic cells assembled in modules Per CBIC Customs Tariff Ch.85 Per CBIC GST rate schedule 10% SWS on BCD PENDING — confirm with broker
8504.40 Static converters — PV inverters Per CBIC Ch.85 Per CBIC GST schedule 10% SWS on BCD PENDING
7610.90 Aluminium mounting structures Per CBIC Ch.76 Per CBIC GST schedule 10% SWS on BCD PENDING
For absolute duty rates, look up each code at CBIC Indian Customs Tariff — Chapter 85 and CBIC GST rate schedule ; confirm Social Welfare Surcharge applicability per current Finance Act.
Disclaimer: duty rates above are placeholders. No rate is asserted as fact. Confirm with a licensed customs broker before procurement.
11. Limitations & assumptions
Capex bands are indicative; an EPC quote against a chosen LONGi/Sungrow BOM may shift NPV by ±₹1.5 Cr.
Yield assumes MERIT India Solar Atlas NW India belt; specific golf-course location (albedo, tilt, soiling) must be confirmed with SAM/PVSyst simulation.
Grid tariff is a state-discom average; the actual C&I tariff for the site may be in the ₹ 9–12/kWh band — verify against the relevant state ERC tariff order on cerc.gov.in / state ERC.
No REC / export revenue modelled (net-behind-the-meter assumption).
Currency: INR throughout. No FX hedging modelled.