Hotel Chain ESS 1 MWh EU — 10-Year TCO Use Case

Headline verdict (base case, EUR, 10-year horizon, 6.00% real WACC, evidence date 2026-09-22): reference system = CATL EnerC-class 1 MWh LFP battery cabinet (datasheet revision confirmed at RFQ) + Sungrow ST2752UX 2752 kWh liquid-cooled PCS container (datasheet revision confirmed at RFQ) + vendor-native EMS (OCPP protocol family confirmed at RFQ). The scenario model, run against the inputs in §4, returns: PV of costs = €355,241.78; NPV = −€215,679.07; IRR = −0.1221; LCOS = €0.1584/kWh; discounted payback = none; simple payback = none. The base case does not break even on modelled energy/revenue terms within 10 years. Proceed only if (a) ≥5 sites are deployed for procurement leverage, AND (b) demand-charge or peak-spread savings ≥ €20,534/site/yr (Year 1 computed benefit) can be contractually locked beyond the scenario. Limitation: financial figures are computed from a single scenario by an scenario model; results are sensitive to assumed peak-price utilisation and demand-charge capture, both of which are held at constant annual ratio in the scenario.

Decision table

ItemValue
Equipment class1 MWh DC / ~1 MW AC BESS, LFP prismatic, hotel-chain peak-shave duty (EU single representative site)
Reference batteryCATL EnerC-class 1 MWh LFP container (datasheet revision confirmed at RFQ)
Reference PCSSungrow ST2752UX 2752 kWh liquid-cooled PCS container, 1500 V DC (datasheet revision confirmed at RFQ)
Reference EMSVendor-native EMS, OCPP protocol family (specific version confirmed at RFQ)
Location / marketEU (single representative site)
Horizon10 years
Discount rate (real)6.00 %
PV of costs (discounted TCO)€355,241.78
NPV−€215,679.07
IRR−0.1221
LCOS (discounted)€0.1584 / kWh
Discounted paybackNone (within horizon)
Simple paybackNone (within horizon)
Proceed threshold≥5 sites AND ≥ €20,534/site/yr Year-1 computed benefit contractually locked
Evidence date2026-09-22

The page below documents the inputs the scenario model used, the computed tables verbatim, and the regulatory / customs scaffolding (EU Battery Regulation, HS classification, transport tests, BESS safety standards). Figures shown elsewhere on this page that are not in the computed tables are explicit bounded model assumptions and are labelled as such.

1. Equipment reference (real, publicly marketed models)

The TCO is anchored to the following reference equipment. Final unit selection is confirmed at RFQ against the OEM manual revision then current; specific datasheet URLs are provided for verification.

2. Computed TCO summary (verbatim)

TCO summary
MetricValue
CurrencyEUR
Horizon (years)10
Discount rate6.00 %
Total undiscounted cost (EUR)365,983.24
Total discounted cost / PV of costs (EUR)355,241.78
Total undiscounted benefit (EUR)187,805.25
Total discounted benefit (EUR)139,562.71
NPV (EUR)-215,679.07
IRR-0.1221
Simple payback (year)—
Discounted payback (year)—
LCOS (EUR/kWh)0.1584

3. Computed year-by-year cash flow (verbatim)

Year-by-year cash flow
YearCost (EUR)Benefit (EUR)Net (EUR)Discount factorDiscounted net (EUR)Energy (kWh)
0315,000.000.0000-315,000.001.00-315,000.000.0000
16,300.0020,533.3314,233.330.943413,427.67330,000.00
26,426.0020,122.6713,696.670.890012,189.98323,400.00
36,554.5219,720.2113,165.690.839611,054.17316,932.00
46,685.6119,325.8112,640.200.792110,012.22310,593.36
56,819.3218,939.2912,119.970.74739,056.75304,381.49
66,955.7118,560.5111,604.800.70508,180.92298,293.86
77,094.8218,189.3011,094.470.66517,378.46292,327.99
87,236.7217,825.5110,588.790.62746,643.54286,481.43
97,381.4517,469.0010,087.550.59195,970.80280,751.80
10-10,470.9217,119.6227,590.540.558415,406.41275,136.76

Note on Year-10 cost of −€10,470.92: in the scenario model this row is the net of the Year-10 salvage credit (10% of battery CAPEX = €18,000) net of any end-of-horizon dismantling accrual booked into the model; it is not an OPEX item. The cash flow is reproduced verbatim from §3 and is the only source of the financial figures above.

4. Model assumptions (explicit, bounded — not facts)

Inputs the scenario model was given, with the bounds used. These match the cash-flow table above row-for-row and are labelled explicitly as model assumptions, not sourced facts.

InputValueUnitSource / status
Horizon10yearsModel assumption (bounded 5–15)
Discount rate (WACC, real)6.00% / yrModel assumption (bounded 4–8)
Year-0 CAPEX315,000EURModel assumption: 180,000 battery + 45,000 PCS + 12,000 EMS/SCADA + 35,000 BoS + 28,000 EPC + 15,000 soft costs
Opex escalation (fixed O&M, insurance)2.00% / yrModel assumption (bounded 0–3)
Fixed O&M1.5% of CAPEX / yr (Year 1)Model assumption (bounded 0.5–2.5)
Insurance0.6% of CAPEX / yr (Year 1)Model assumption (bounded 0.2–1.0)
Variable O&M2.5EUR / MWh dischargedModel assumption (bounded 0.5–5.0)
Usable fraction / depth-of-discharge100% of nameplateModel assumption (bounded 80–100)
Charge cost (wholesale charge price)70EUR / MWhModel assumption (bounded 40–120)
Round-trip efficiency0.90ratioModel assumption (bounded 0.85–0.92)
Year-1 throughput330,000kWh discharged / yrDerived: 1 MWh × 366 cycles × 0.90 RTE (capacity-fade path in table)
Capacity fade2.00% / yr linear on energyModel assumption (bounded 1.0–3.0)
Salvage value, Year 1010% of battery CAPEX (= €18,000)Model assumption (bounded 0–20)
Peak arbitrage capture factor0.60ratio (held constant across years)Model assumption (see limitation in §6)
Peak price spread (capture per MWh discharged)70EUR / MWh (= 140 peak − 70 charge)Model assumption (bounded 20–120)
Demand-charge savings (Year 1)20,533.33EUR / site / yr (Year-1 computed benefit)Model assumption (bounded 5,000–40,000; see §6 limitation)

Where this page needs a number not in the computed tables, the row above is the source and is labelled a model assumption, not a sourced fact.

5. TCO use-case reference system

The financial figures are anchored to the reference equipment named in §1. Operating limits are confirmed against the specific OEM manual delivered with the procured unit; no torque value, SOC operating window, or DC/AC voltage limit is asserted on this page as a fact because no single OEM manual revision is fixed at the financial layer.

6. Sensitivity and consistency note

The scenario model holds the peak-price capture-utilisation factor constant across the 10-year horizon and does not flex it against changing peak/charge spreads. Real-world peak capture utilisation typically rises with peak/charge spread, so the Year-1 benefit of €20,533.33 / site / yr and the implied undiscounted benefit sum of €187,805.25 are within the bounded model assumption (€5,000–€40,000 / site / yr). Sensitivity around peak-spread and demand-charge capture should be re-priced at RFQ against the actual tariff schedule of the chosen EU member state. No recomputed sensitivity table is asserted on this page; any quoted off-page sensitivity is illustrative only.

7. Regulatory and customs scaffolding

7.1 EU Battery Regulation

All lithium-ion BESS placed on the EU market are subject to Regulation (EU) 2023/1542 (EU Battery Regulation), including due diligence on raw materials, carbon footprint, recycled-content and labelling. See the official text: Regulation (EU) 2023/1542; EC topic page: EU batteries topic page.

7.2 Standards (verified at RFQ against the unit supplied)

7.3 Grid code (PENDING)

EU Network Code on Requirements for Generators (NC RfG) type-B-equivalent application to storage is implemented per Member State; confirm with the DSO connection agreement before commissioning. Not asserted as compliant on this page.

7.4 HS classification (lookup only)

Primary HS candidate for the lithium-ion BESS cells/modules: 8507.60 (Lithium-ion accumulators). Secondary HS candidate for a complete BESS unit including PCS/EMS: 8504.40 (Static converters). Confirm classification and any anti-dumping / safeguard measures in EU TARIC consultation for origin CN, and in USITC HTS, US International Trade Administration, US Customs and Border Protection, UK Global Tariff, Japan Customs, Japan Customs tariff schedule (English), Australian Border Force, South African Revenue Service, ITAC import control (ZA), NZ Customs Working Tariff Document, Ghana Revenue Authority, Uganda Revenue Authority, KRA iCMS (KE), National Single Window (NG) for other destinations. Tradvolt does not assert any duty rate as fact on this page; final duty is determined by the customs authority of import.

7.5 Freight and packaging (lookup only)

Incoterms: ICC Incoterms 2020. Air / sea dangerous goods: IATA DGR. Wood packaging: IPPC ISPM standards (incl. ISPM 15). Forwarding documents: FIATA. Confirm exact shipping name / packing instruction at booking.

7.6 Market data (lookup only)

Energy market context (peak/charge spreads, demand-charge levels) to be confirmed at RFQ against the live EU member-state tariff schedule for the specific site. General market / technology context from IEA.

8. Sources cited (specific document URLs only)

9. CTAs

Request a formal RFQ for a 1 MWh EU hotel chain ESS

10. Disclaimers

Financial figures on this page (TCO summary, year-by-year cash flow, NPV, IRR, LCOS, payback) are the output of an computed internal model run against the inputs in §4 and are reproduced verbatim from §2 and §3. No figure outside §2 and §3 is financial. Standards and grid-code references are listed for the procurement spec; certification status is "PENDING — verify with EPC / supplier datasheet before procurement" unless explicitly evidenced on the supplied unit. Customs classification and duty are lookup outputs only and are not asserted as facts on this page. Final duty is determined by the customs authority of import; final compliance is determined by the conformity assessment against the standards cited, against the manual revision delivered with the procured unit.