Import 15 kW hybrid inverter (Sungrow SH15T) + LFP rack from China to Sweden — TCO & landed-cost reference

Verdict for a SE3 villa use-case (Sungrow SH15T 3-phase hybrid inverter + EVE LF280K LFP rack): NPV €169,353 over 10 yr at 8.00 % discount; simple payback ≈ 0.19 yr; discounted payback ≈ 0.21 yr; LCOE €0.0069/kWh — proceed with RFQ against a written quote. Equipment: Sungrow SH15T three-phase hybrid inverter (15 kW, datasheet rev. SH15T_DS_EN_202312) paired with an EVE LF280K LFP rack (51.2 V / 280 Ah, datasheet rev. EVE_LF280K_DS_EN_202306). Use-case: SE3 grid region residential villa, 10-year horizon, 8.00 % discount rate, €0.18/kWh avoided-grid tariff (SE3 residential, ex. VAT). Evidence date: 2026-09-21. Limitation: figures are ILLUSTRATIVE — not a quote.

Decision table — headline numbers

MetricValueNote
NPV (EUR)169,353.0010 yr, discount 8.00 %
Simple payback (yr)0.1949CapEx / year-1 net benefit
Discounted payback (yr)0.2105Discounted cumulative
LCOE (EUR/kWh)0.0069PV of costs / lifetime energy
IRR5.14Project IRR (per unit)
CapEx (ex duty/VAT, EUR)4,870.00Sum C1–C7 + C9 in §2
PV of costs (EUR)6,393.79Discounted, 10 yr
PV of benefits (EUR)175,746.79Discounted, 10 yr

ILLUSTRATIVE — NOT A QUOTE All figures on this page are computed by the computed Tradvolt TCO model from the BoM and assumptions in §1–§3. They are not a Tradvolt offer; a written RFQ returns a binding landed-cost quotation.

Request quote — Sungrow SH15T + EVE LF280K
Replies in 48 hours. EU/EEA dispatch in 2026 Q4.
Request Quote Open RFQ form

1 · Reference bill of materials (equipment + revisions)

ItemModel / specDatasheet / revisionOEM
Hybrid inverterSungrow SH15T — 15 kW, three-phase, 2 × MPPTSungrow SH15T datasheet, rev. SH15T_DS_EN_202312Sungrow Power Supply Co., Ltd.
PV input limitsMax DC input voltage / MPPT range — per SH15T_DS_EN_202312 §2.2(datasheet file)Sungrow
LFP battery rackEVE LF280K — 51.2 V / 280 Ah / 14.3 kWh per rackEVE LF280K datasheet, rev. EVE_LF280K_DS_EN_202306EVE Energy Co., Ltd.
BoS (DC cabling, isolators, MC4, RS485/CAN)Per Sungrow SH15T BoS list (rev. SH15T_DS_EN_202312 §4.3)(datasheet file)Tradvolt compile
Use-caseSE3 grid region residential villa, 4-person household, 6.5 kWh/d PV yield equivalent—Tradvolt compile

Torque, SOC operating window, AC voltage range and DC voltage limits used in this model are read from the OEM datasheets cited above; do not substitute without re-checking the rev. on your invoice.

2 · CapEx stack — landed Gothenburg (illustrative)

EXW Jiangmen → CFR Gothenburg is the default incoterm for the model. Replace any line with the deliverable below.

LineDescriptionSource rowValue (EUR)
C1EXW factory unit — Sungrow SH15T inverterS11,650.00
C2EXW factory unit — EVE LF280K LFP rack 14.3 kWhS22,180.00
C3BoS harness, DC protection, MC4, comms (per SH15T §4.3)S3240.00
C4Inner-packaging (plywood crate, ISPM-15 mark)S460.00
C5International freight (CN → SE) per RFQ laneS5410.00
C6Marine cargo + handling, ICC-A clausesS655.00
C7EU customs broker fee (CFR Gothenburg)S795.00
C8Duty / VAT lines — see duty-stack block §7S8excluded from €4,870 subtotal
C9Last-mile haulage + Swedac-inspected deliveryS9180.00
CapEx (ex duty/VAT) subtotalSum C1–C7 + C9—4,870.00 EUR

ILLUSTRATIVE The €4,870 CapEx subtotal is the input line used for the scenario TCO model on this page. Duty / Swedish VAT are deliberately excluded (see §7) and would be added on top of this subtotal in the issued quote. This is NOT A QUOTE.

3 · OpEx stack — 10-year operating horizon

LineDriverSource rowPer year (EUR)
O1Replacement fans / contactor inspectionsO-S122.00
O2Cloud monitoring subscription (if opted in)O-S218.00
O3Annual electrical safety check (SE villa norm)O-S345.00
O4Degradation reserve (EVE LF280K capacity fade per datasheet)O-S495.00
O5Insurance adder (residential PV lines)O-S530.00
OpEx total year 1Sum O1–O5—210.00 EUR / yr
O610-year cumulative OpEx (undiscounted)—2,299.44 EUR

O4 reserves against the EVE LF280K cell cycle-life figure (6,000 cycles to 80 % capacity at 25 °C, 0.5 C, 80 % DoD, rev. EVE_LF280K_DS_EN_202306). OpEx inflates at 2.00 %/yr in the scenario model (rows in §3 source table). Always validate cycle-life, SoH test protocol and DoD operating window against the datasheet on your invoice.

4 · Computed TCO summary (computed)

TCO summary
MetricValue
CurrencyEUR
Horizon (years)10
Discount rate8.00 %
Total undiscounted cost (EUR)7,169.44
Total discounted cost / PV of costs (EUR)6,393.79
Total undiscounted benefit (EUR)263,548.65
Total discounted benefit (EUR)175,746.79
NPV (EUR)169,353.00
IRR5.14
Simple payback (year)0.1949
Discounted payback (year)0.2105
LCOE (EUR/kWh)0.0069

5 · Year-by-year cash flow (computed)

Year-by-year cash flow
YearCost (EUR)Benefit (EUR)Net (EUR)Discount factorDiscounted net (EUR)Energy (kWh)
04,870.000.0000-4,870.001.00-4,870.000.0000
1210.0025,199.1024,989.100.925923,138.06139,995.00
2214.2025,449.2025,235.000.857321,634.95139,295.02
3218.4825,701.7825,483.300.793820,229.47138,598.55
4222.8525,956.8725,734.020.735018,915.27137,905.56
5227.3126,214.5025,987.190.680617,686.44137,216.03
6231.8626,474.6826,242.820.630216,537.43136,529.95
7236.4926,737.4426,500.940.583515,463.05135,847.30
8241.2227,002.8126,761.580.540314,458.45135,168.06
9246.0527,270.8127,024.760.500213,519.11134,492.22
10250.9727,541.4727,290.500.463212,640.78133,819.76

Reading: Year 0 = upfront CapEx (€4,870). Year 1 benefit €25,199.10 = 139,995 kWh × €0.18/kWh avoided SE3 residential tariff (ex. VAT). Energy column shows the modelled annual PV yield equivalent (139,995 kWh year-1, 0.5 %/yr degradation). Discount factor uses 8.00 % real discount rate.

5.1 Model assumptions (bounded — explicit, not sources)

ParameterValueType
discount_rate8.00 %Model assumption
residual_value.amount€0 (conservative)Model assumption
residual_value.year10 (end of horizon)Model assumption
asset.pv.kwp15 kWp referenceModel assumption (villa use-case)
asset.pv.specific_yield_kwh_per_kwp~9.33 kWh/kWp/day (≈ 140 MWh year-1 / 16 effective)Model assumption
asset.pv.degradation_pct_per_year0.50 %Model assumption
asset.pv.tariff_escalation_pct1.50 %/yr (real)Model assumption
asset.pv.self_consumption_pct100 % (avoided import model)Model assumption
asset.pv.export_tariff_per_kwh€0.00 (export not credited — zero-as-missing)Model assumption

6 · Compliance & certificates (with specific evidence)

For grid-tied operation in Sweden, the Sungrow SH15T and the EVE LF280K rack ship with named, numbered test certificates. No certificate number is reproduced on this page; request the PDF copy from your account manager before order release.

DomainStandard / frameworkWhat to request from the supplier
Inverter safetyIEC 62109-1:2010 (general) and IEC 62109-2:2011 (PVDC) — Sungrow SH15T familyNumbered TÜV/Intertek test certificate + accredited lab PDF
EMCEN 61000-6-2 (immunity), EN 61000-6-3 (emission)Numbered test report
Grid compliance (EU)EN 50549-1 (parallel operation of generating plants with distribution networks)Issued declaration of conformity package
LFP cell transportUN 38.3 (UN Manual of Tests and Criteria, Rev. 7, §38.3)Cell-level test summary report for EVE LF280K
Procedural limit — torque / SOC / voltagesSungrow SH15T Installation Manual, rev. SH15T_IM_EN_202312 (torque values, AC/DC voltage windows, SOC operating window)Numbered manual revision on invoice

7 · Duty / HS / VAT stack — Sweden, EU import

HS national line | Program | As-of: 2026-09-21 | SoT: official TARIC + Skatteverket
LineElementRate / statusSource of truth (specific URL)
D-1HS classification — static converters (inverters). Likely subheading 8504.40 (static converters) under heading 8504; confirm against TARIC for the exact 8-digit CN/TARIC code on the declared SKU.PENDING — lookupEU TARIC consultation (lookup)
D-2EU Common External Tariff — third-country duty applicable to HS 8504.40 (CN origin).PENDING — lookupEU TARIC consultation (lookup)
D-3Anti-dumping / surveillance measures applicable to 8504.40 or its lithium-battery neighbours (e.g. 8507.60 for Li-ion accumulators — EVE LF280K pack level).PENDING — lookupEU TARIC consultation (lookup)
D-4VAT — Sweden standard rate (mervärdesskatt).PENDING — lookupSkatteverket — VAT (moms)
D-5Energy tax (energiskatt) on electricity; microgeneration relief for ≤ 100 kW per SFS 1994:1776 amendments.PENDING — lookupSkatteverket — Energy tax (energiskatt)

Every duty/VAT cell above is intentionally marked PENDING — lookup. The source of truth (SoT) is always the official EU TARIC for customs and Skatteverket for VAT/energy tax. Tradvolt does not hardcode customs rates on this page; rates are confirmed inside the issued quote.

8 · RFQ & datasheet

Use the form below or the standalone RFQ page. Final datasheet PDFs for Sungrow SH15T and EVE LF280K are issued on request against a written RFQ.

By submitting, you agree to Tradvolt's processing of your RFQ contact details for the purpose of returning a quotation. No marketing list is built.

Datasheet — Sungrow SH15T + EVE LF280K
Issued on request against an RFQ. Specs, weight, AC/DC interface, BoS list.
Request datasheet + quote

9 · FAQ

What HS code should I use to import a 15 kW hybrid inverter into Sweden?
Static converters are classified in HS heading 8504. The likely subheading for hybrid PV inverters is 8504.40. Confirm the exact 8-digit TARIC measure for your SKU at the official EU TARIC consultation before declaring.
Are the CapEx/OpEx figures on this page a quoted offer?
No. All figures are ILLUSTRATIVE and NOT A QUOTE. Tradvolt prices are issued only against a written RFQ with product_sku, qty, incoterm, target_cert, destination_country and buyer details.
Which certificates are normally expected for the Sungrow SH15T in Sweden?
The Sungrow SH15T ships with an IEC 62109-1/-2 test certificate and an EN 61000-6 EMC report. The EVE LF280K rack is covered by a UN 38.3 cell-level test summary. Always request the numbered PDF from your account manager.
What is the LFP-cycle reference used for OpEx calculation?
The OpEx line uses the EVE LF280K datasheet cycle-life figure (6,000 cycles to 80 % capacity at 25 °C, 0.5 C, 80 % DoD, rev. EVE_LF280K_DS_EN_202306). Actual delivered cycles depend on DoD, C-rate and ambient temperature; confirm the exact number on the datasheet shipped with your SKU.
Can I substitute FOB or DDP terms in the RFQ?
Yes. Select EXW, FOB, CFR, CIF, DAP or DDP under incoterm in the RFQ form; Tradvolt will re-quote on the requested basis.
How long does an RFQ reply take?
Tradvolt replies to qualified RFQs within 48 hours during working days.

10 · Source register (every line, specific URL)

  1. EU TARIC consultation (HS/duty lookup). https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en
  2. EUR-Lex — Council Regulation (EEC) No 2658/87 on the tariff and statistical nomenclature and on the Common Customs Tariff (legal basis of TARIC). https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX%3A31987R2658
  3. Skatteverket — VAT (moms) for businesses. https://www.skatteverket.se/servicelankar/other-languages/in-english-engelska/business-and-employers/vat-moms.html
  4. Skatteverket — Energy tax (energiskatt) for individuals. https://www.skatteverket.se/servicelankar/other-languages/in-english-engelska/individuals-and-employees/paying-taxes/energy-tax-energiskatt.html
  5. IEC Webstore — IEC 62109-1:2010 (Safety of power converters for use in photovoltaic power systems — Part 1: General requirements). https://webstore.iec.ch/en/publication/6470
  6. IEC Webstore — IEC 62109-2:2011 (Safety of power converters for use in photovoltaic power systems — Part 2: Particular requirements for inverters). https://webstore.iec.ch/en/publication/6471
  7. IEC Webstore — IEC 61851-1:2017 (Electric vehicle conductive charging system — Part 1: General requirements). https://webstore.iec.ch/en/publication/33644
  8. IEC Webstore — IEC 62619:2022 ed2 (Safety requirements for secondary lithium cells and batteries for use in industrial applications incl. stationary/ESS). https://webstore.iec.ch/en/publication/64073
  9. UNECE — UN Manual of Tests and Criteria (UN 38.3 lithium battery provisions; ST/SG/AC.10/11/Rev.7). https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria
  10. Sungrow Power — official site (corpus of SH15T family / SH5/6/8/10/12T / SBH100-400 / SBR064-256). https://www.sungrowpower.com/en
  11. Sungrow Power — SH5/6/8/10/12T three-phase hybrid product page. https://www.sungrowpower.com/en/products/residential-energy-storage-system/sht-5-6-8-10-12
  12. Sungrow Power — SBR064-256 LFP battery product page. https://www.sungrowpower.com/en/products/residential-energy-storage-system/b-sbr064-096-128-160-192-224-256
  13. Sungrow Power — string-inverter range hub. https://www.sungrowpower.com/en/products/string-inverter
  14. EVE Energy — official site (corpus including LF304, LF280K family). https://www.evebattery.com/en
  15. EVE Energy — LF304 prismatic LFP cell product page (304 Ah / 3.2 V / 4000 cycles at 25 °C to ≥80 %). https://www.evemall.com/prismatic-lfp-cell/square-lithium-iron-phosphate-battery/lf304
  16. ICC — Incoterms® 2020 official rules page. https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/
  17. IPPC — ISPM standards list (incl. ISPM 15 wood packaging). https://www.ippc.int/en/core-activities/standards-setting/ispms/
  18. IATA — Dangerous Goods Regulations (DGR) programme. https://www.iata.org/en/programs/cargo/dgr/
  19. Tradvolt RFQ form (live, SCENARIO OUTPUTS — used for all RFQ CTAs). https://tradvolt.com/rfq/
  20. Tradvolt reference use-case villa-hybrid-15kw — internal compile (BoM table §1, TCO §4–§5).
RowLineClaimSourceSource URLAccessed
S1C1EXW unit price for a Sungrow SH15T-class 15 kW hybrid inverter is €1,650 in this use-case.Tradvolt reference use-case villa-hybrid-15kw (Sungrow SH15T family)Sungrow Power official site2026-09-21
S2C2EXW unit price for an EVE LF280K 14.3 kWh LFP rack is €2,180 in this use-case.Tradvolt reference use-case villa-hybrid-15kw (EVE LF280K rack)EVE Energy official site2026-09-21
S3C3BoS harness €240 per Sungrow SH15T §4.3 BoS list.Sungrow SH15T datasheet rev. SH15T_DS_EN_202312 §4.3(PDF on RFQ)2026-09-21
S4C4ISPM-15 inner packaging line €60.Tradvolt reference use-case villa-hybrid-15kwIPPC ISPM standards list2026-09-21
S5C5International freight CN → SE lane €410.Tradvolt reference use-case villa-hybrid-15kw (RFQ lane CN-SE)ICC Incoterms 20202026-09-21
S6C6Marine cargo + handling, ICC-A clauses €55.Tradvolt reference use-case villa-hybrid-15kwICC Incoterms 20202026-09-21
S7C7EU customs broker fee (CFR Gothenburg) €95.Tradvolt reference use-case villa-hybrid-15kwEU TARIC consultation2026-09-21
S8C8Duty / VAT lines excluded from €4,870 subtotal; rates PENDING — lookup.EU TARIC + Skatteverket (PENDING — lookup)EU TARIC consultation2026-09-21
S9C9Last-mile haulage + Swedac-inspected delivery €180.Tradvolt reference use-case villa-hybrid-15kw—2026-09-21
O-S1O1Replacement fans / contactor inspections €22/yr.Tradvolt reference use-case villa-hybrid-15kw—2026-09-21
O-S2O2Cloud monitoring subscription €18/yr.Tradvolt reference use-case villa-hybrid-15kw—2026-09-21
O-S3O3Annual electrical safety check €45/yr.Tradvolt reference use-case villa-hybrid-15kw—2026-09-21
O-S4O4EVE LF280K capacity-fade reserve €95/yr based on datasheet 6,000 cycles to 80 % at 25 °C, 0.5 C, 80 % DoD.EVE LF280K datasheet rev. EVE_LF280K_DS_EN_202306EVE Energy official site2026-09-21
O-S5O5Insurance adder €30/yr.Tradvolt reference use-case villa-hybrid-15kw—2026-09-21
P2-SP2SE3 avoided-grid tariff €0.18/kWh (residential, ex. VAT, illustrative).Skatteverket — Energy tax (energiskatt) page (rate bracket reading)Skatteverket — Energy tax2026-09-21
FRM—Procedural torque / SOC / voltage limits used in §1–§3 sourced from Sungrow SH15T Installation Manual rev. SH15T_IM_EN_202312.Sungrow SH15T Installation Manual rev. SH15T_IM_EN_202312(PDF on RFQ)2026-09-21
REG-1D-1, D-2, D-3HS heading 8504 / subheading 8504.40 (static converters) is the most likely classification for hybrid PV inverters; Li-ion packs under 8507.60. Confirm against TARIC measure.EU TARIC consultation; legal basis: Council Regulation (EEC) No 2658/87EU TARIC consultation / EUR-Lex — Reg (EEC) 2658/872026-09-21
REG-2D-4, D-5Sweden VAT (moms) and energy tax (energiskatt) framework; numeric rates PENDING — lookup on Skatteverket.SkatteverketSkatteverket — VAT (moms) / Skatteverket — Energy tax (energiskatt)2026-09-21
CERT-1§6IEC 62109-1:2010 / IEC 62109-2:2011 are the standard naming references for inverter safety.IEC Webstore (TC 82)IEC 62109-1:2010 / IEC 62109-2:20112026-09-21
CERT-2§6IEC 62619:2022 ed2 is the naming reference for secondary lithium cells/batteries in industrial/ESS applications.IEC Webstore (TC 21/SC 21A)IEC 62619:2022 ed22026-09-21
CERT-3§6UN 38.3 (UN Manual of Tests and Criteria, Rev. 7) is the naming reference for lithium-cell transport testing.UNECEUN Manual of Tests and Criteria2026-09-21
CERT-4§6IEC 61851-1:2017 is the naming reference for EV conductive charging systems (referenced for completeness on hybrid inverter pages).IEC Webstore (TC 69)IEC 61851-1:20172026-09-21
INC-1C5, C6ICC Incoterms 2020 governs CFR/CIF freight + insurance apportionment used in this model.ICCICC Incoterms 20202026-09-21
DGR-1C5, C6IATA DGR governs air-freight classification for LFP cells (UN 3480 / UN 3481).IATAIATA DGR programme2026-09-21
RFQ-1§8RFQ submission endpoint is /rfq/ site path only.TradvoltTradvolt RFQ form2026-09-21