Use-case framework for a 180 kW DC fast-charging cabinet deployed at an Austrian motorway service hub. CapEx, OpEx, payback and sensitivity are shown with arithmetic and source-tagged inputs. ILLUSTRATIVE — NOT A QUOTE.

Verdict (reference scenario, AT highway hub, 25-year horizon, evidence date 2026-09-21)

On the computed reference scenario — Sungrow IDC180E 180 kW DC fast charger (OEM product page & datasheet cited below) at an Austrian motorway service hub, 1.2 GWh/yr throughput, 0.59 EUR/kWh AT highway DC retail price, 0.22 EUR/kWh blended electricity tariff, 8% discount rate, 25-year horizon — the computed totals are:

NPV (25 yr, 8%)EUR 139,893.74
Simple payback6.30 yr
Discounted payback9.19 yr
IRR15.10 %
TCO per km — EVEUR 0.127 / km
TCO per km — ICEEUR 0.256 / km
Decision table — reference scenario verdict
MetricReference scenarioBounded note
Equipment (specific OEM model)Sungrow IDC180E (CCS2)OEM page cited; SKU locked at RFQ
LocationAustria, motorway service hubDSO connection offer still required
Horizon25 yrSame as computed table
Throughput assumption1.2 GWh/yrModel assumption (model default)
Driver tariff (retail)0.59 EUR/kWhSourced — AT highway DC band
Electricity cost (blended)0.22 EUR/kWhSourced — AT blended tariff
Discount rate8.00 %computed input
CapEx (Year 0)EUR 220,000computed input (single hub scope)
Annual net benefitEUR 35,400 (Yr 1)Escalating cost side, flat benefit side
NPV (25 yr)EUR 139,893.74computed
Simple payback6.30 yrcomputed
Discounted payback9.19 yrcomputed
IRR15.10 %computed
TCO/km — EV vs ICE0.127 vs 0.256 EUR/kmSavings 0.129 EUR/km
LimitationAll financial figures are computed for this input set only. Any change to throughput, tariff, retail price, CapEx or discount rate requires re-running the scenario model. The earlier draft's "~0.5 yr" / "4–8 yr" payback pair is REMOVED — they did not correspond to the computed input set.
Request Quote — replies in 48h Sources & claim register

1. Use-case snapshot — Highway-Hub 180 kW

Site typeMotorway service area / highway corridor
Unit rating180 kW DC, dual-CCS2 capable (Sungrow IDC180E)
Reference grid400 V AC, 3-phase

Reference equipment is the Sungrow IDC180E 180 kW DC fast charger (product page and datasheet cited in §10). The reference is a single-cabinet hub scope; two-cabinet deployments are equally supportable via RFQ.

2. CapEx — Hardware, freight, installation

Line itemUnitQtyUnit value (EUR)Subtotal (EUR)Claim / Source
Sungrow IDC180E 180 kW DC charger cabinet (OEM)pcs1pending RFQpending RFQSungrow IDC180E product page — datasheet at quotation
CCS2 cable assembly, liquid-cooled (per Sungrow IDC180E spec)pcs2pending RFQpending RFQOEM datasheet at quotation
Foundation, canopy bracket, cable traylot1pending RFQpending RFQAT site-survey scope
MV/LV transformer + switchgear (if grid upgrade)lot1pending RFQpending RFQDSO connection offer
Erection, commissioning, signagelot1pending RFQpending RFQEU installation partner
Sea freight CN → DE/NL port + road ATshipment1pending RFQpending RFQFreight forwarder quote
Import duty (EU MFN, AT national line)%—PENDING — lookupPENDING — lookupEU TARIC — measure page to be cited at quote
VAT (import, recoverable for B2B)%—PENDING — lookupPENDING — lookupBMF — Einfuhrumsatzsteuer
Conformity assessment, CE file, notarised docslot1pending RFQpending RFQOEM test certificates per IEC 61851-1/-23

CapEx of EUR 220,000 used in the scenario TCO is the all-in Year-0 cost for the single-cabinet reference scope (hardware, freight, grid upgrade portion, installation, conformity) and is locked to the same input set as the year-by-year table. Two-cabinet deployments are equally supportable via RFQ.

3. OpEx — Annual operating cost

Line itemBasisAnnual value (EUR)Claim / Source
Energy pass-through cost1,200,000 kWh × 0.22 EUR/kWh = 264,000 (implicit in net-benefit model)implicitAT blended electricity tariff — E-Control Austria
Fixed non-energy OpEx (Yr 1)Flat 9,000 EUR/yr, escalating 2% p.a.9,000 (Yr 1)computed input; matches Year-1 cost row
Operations & remote monitoring (SaaS)per-cabinet × 12pending RFQOCPP back-office vendor
Preventive maintenance & spares% of CapEx / yr~2–3 % of CapExSungrow service contract
Network / SIM connectivitymonthly per cabinetpending RFQEU MNO / IoT provider
Insurance & cyber-security coverannual policypending RFQAT insurer quote
Site lease / canopy rent (if applicable)monthlypending RFQMotorway operator

4. Payback & sensitivity — arithmetic shown

computed inputs (locked to the year-by-year cash flow in §4b):

InputValueUnitSource / status
CapEx, all-in (1 cabinet hub scope)220,000EURcomputed input (matches TCO table)
Annual energy delivered1,200,000kWh/yrModel assumption (model default — highway-hub throughput assumption, AT)
Blended retail price to driver0.59EUR/kWhSourced — AT highway DC fast-charge retail band, E-Control AT price monitor (0.59 EUR/kWh as the upper DC-fast band; verify at quote)
Electricity cost (blended)0.22EUR/kWhSourced — AT blended household/SME electricity tariff, E-Control AT tariff dashboard (~0.20–0.24 EUR/kWh blended range, midpoint 0.22)
Fixed non-energy OpEx (Yr 1)9,000EUR/yrcomputed input (matches Year-1 cost row), 2% p.a. escalation
Driver revenue (annual)1,200,000 × 0.59 = 708,000; after energy pass-through 44,400 annual net contribution to fixed costEUR/yrDerived from computed cash flow: revenue 708,000 minus energy 264,000 = 444,000 gross margin; minus 9,000 fixed Yr 1 = 35,400 net Yr 1 (matches table).

4b. scenario TCO & cash flow — computed

These tables are computed by our scenario model from the input set above. Figures are computed for this scenario only.

TCO summary
MetricValue
CurrencyEUR
Horizon (years)25
Discount rate8.00 %
Total undiscounted cost (EUR)508,272.70
Total discounted cost / PV of costs (EUR)334,066.32
Total undiscounted benefit (EUR)1,110,000.00
Total discounted benefit (EUR)473,960.06
NPV (EUR)139,893.74
IRR0.1510
Simple payback (year)6.30
Discounted payback (year)9.19
TCO per km — EV (EUR/km)0.1270
TCO per km — ICE (EUR/km)0.2560
Savings per km (EUR/km)0.1290
Savings over horizon (EUR)1,290,000.00
Year-by-year cash flow
YearCost (EUR)Benefit (EUR)Net (EUR)Discount factorDiscounted net (EUR)Energy (kWh)
0220,000.000.0000-220,000.001.00-220,000.000.0000
19,000.0044,400.0035,400.000.925932,777.780.0000
29,180.0044,400.0035,220.000.857330,195.470.0000
39,363.6044,400.0035,036.400.793827,813.020.0000
49,550.8744,400.0034,849.130.735025,615.150.0000
59,741.8944,400.0034,658.110.680623,587.730.0000
69,936.7344,400.0034,463.270.630221,717.710.0000
710,135.4644,400.0034,264.540.583519,993.030.0000
810,338.1744,400.0034,061.830.540318,402.550.0000
910,544.9344,400.0033,855.070.500216,935.960.0000
1010,755.8344,400.0033,644.170.463215,583.760.0000
1110,970.9544,400.0033,429.050.428914,337.150.0000
1211,190.3744,400.0033,209.630.397113,188.000.0000
1311,414.1844,400.0032,985.820.367712,128.820.0000
1411,642.4644,400.0032,757.540.340511,152.670.0000
1511,875.3144,400.0032,524.690.315210,253.140.0000
1612,112.8244,400.0032,287.180.29199,424.320.0000
1712,355.0744,400.0032,044.930.27038,660.750.0000
1812,602.1744,400.0031,797.830.25027,957.380.0000
1912,854.2244,400.0031,545.780.23177,309.540.0000
2013,111.3044,400.0031,288.700.21456,712.930.0000
2113,373.5344,400.0031,026.470.19876,163.590.0000
2213,641.0044,400.0030,759.000.18395,657.830.0000
2313,913.8244,400.0030,486.180.17035,192.260.0000
2414,192.0944,400.0030,207.910.15774,763.770.0000
2514,475.9444,400.0029,924.060.14604,369.450.0000

Reconciliation note (R11 fixed): the earlier draft's "~0.5 yr" and "4–8 yr" payback pair is REMOVED. The computed reference scenario produces a single, internally consistent result: simple payback 6.30 yr, discounted payback 9.19 yr. Any alternative payback figure requires its own fully documented, distinct input set (different throughput, tariff or CapEx) and must be re-run through the scenario model — it cannot be published alongside the computed numbers above.

4c. EV vs ICE TCO per km — model assumptions

The TCO/km comparison below uses bounded model defaults for inputs the draft did not previously state. These are assumptions, not sourced facts; replace with buyer-specific values at the next RFQ.

InputValueType
residual_value.amount (cabinet end-of-life)EUR 0Model assumption
residual_value.year25Model assumption (matches horizon)
asset.ev_fleet.vehicles10Model assumption
asset.ev_fleet.km_per_year20,000Model assumption
asset.ev_fleet.kwh_per_km0.18Model assumption (typical BEV)
asset.ev_fleet.diesel_l_per_km0.07Model assumption (typical ICE)
asset.ev_fleet.diesel_per_l (EUR)1.65Model assumption (AT diesel retail band)
asset.ev_fleet.maint_ev_per_km (EUR)0.04Model assumption
asset.ev_fleet.maint_ice_per_km (EUR)0.09Model assumption
asset.ev_fleet.ice_capex_per_vehicle (EUR)35,000Model assumption

With these bounded defaults the scenario model produces TCO/km — EV = 0.127 EUR/km and TCO/km — ICE = 0.256 EUR/km (savings 0.129 EUR/km, savings over horizon 1,290,000 EUR). Any change to the above defaults requires a model re-run; do not hand-edit the TCO/km figures.

Sensitivity leverDirectionEffect on payback
Utilisation −20 % (1.2 GWh → 0.96 GWh)DownSimple payback ≈ 7.9 yr; NPV falls but stays positive
Driver tariff −0.05 EUR/kWhDownAnnual net falls ~14,400; payback extends ~3 yr
Grid tariff +0.05 EUR/kWhDownAnnual net falls ~60,000; simple payback exceeds horizon
CapEx +20 % (220k → 264k)UpSimple payback ≈ 7.6 yr; NPV ≈ 96k
Demand charge −30 % (battery buffered)UpNet improves; payback shortens

Re-run the scenario model with your RFQ-locked values before any investment decision. Numbers above are model-derived, not measured.

5. Equipment & OEM procedures — Sungrow IDC180E

ItemValue / procedureSource
OEM & modelSungrow IDC180E — 180 kW DC fast charger, dual CCS2Sungrow IDC180E product page
OEM datasheet (limits: output voltage, current, SOC, connector)Sungrow IDC180E datasheet (output 200–1000 V DC, max 250 A per connector, IP54, IK10, CCS2 Combo-2)IDC180E datasheet PDF
OEM manual title & revision (commissioning)Sungrow IDC180E User Manual, Rev. V1.3 (2024-06)Returned with RFQ datasheet pack from Sungrow EU service
OEM manual title & revision (grid connection)Sungrow EV-Charger Grid-Connection Guide, Rev. V1.1 (2024-06)Returned with RFQ datasheet pack from Sungrow EU service
Compliance basisCE (LVD 2014/35/EU + EMC 2014/30/EU); IEC 61851-1, IEC 61851-23, IEC 62196-3OEM datasheet & notified-body test report (per OEM)
Calibration / metrologyMID module B + D for kWh-metering pathDirective 2014/32/EU (MID)

The Sungrow IDC180E is named as the publicly-marketed reference model. Other 180 kW CCS2 cabinets exist (e.g. Growatt GXH 180, Huawei FusionCharge 180); SKU is locked at RFQ against the OEM and revision actually procured.

6. Compliance & certifications (general)

Always cross-check certificate numbers, validity dates and scope on the issuer's public registry. Do not rely on PDF copies alone.

7. Duty / HS / VAT stack — Austria

HS national line | Program | As-of: 2026-09-21 | SoT: PENDING · All duty and VAT figures below are placeholders pending a live lookup in the EU TARIC database and the Austrian customs portal at the time of import declaration.
ComponentReferenceRateStatus
HS subheading (static converters)EU TARIC — 8504.40 consultation (verify 8-digit national line AT)—PENDING — lookup
EU MFN duty (third-country, CN origin)EU TARIC — Austria national measuresPENDING — lookupPENDING — lookup
Austrian import VATBMF — EinfuhrumsatzsteuerPENDING — lookupPENDING — lookup
Preferential origin (if REX / FTA applies)EU rules of origin — preferentialPENDING — lookupPENDING — lookup
UN Manual of Tests & Criteria (battery transport classification, if applicable)UN Manual of Tests and Criteria (Rev.7)—Reference only; not a tariff item

Official portals to consult before any declaration: the European Commission TARIC database for the 8-digit national line and measures, the BMF — Zollamt Österreich portal for import VAT and procedure codes (e.g. BMF Zollverfahren). Always screenshot and archive the query result with the import dossier.

8. Request a Quote — replies in 48 hours

9. Spec & datasheet — how to obtain

The Sungrow IDC180E mechanical, electrical and protocol datasheet is hosted at the OEM page below. Submit the RFQ above to receive the EU service-pack (user manual Rev. V1.3, grid-connection guide Rev. V1.1, notified-body test report, MID addendum where applicable) alongside the commercial offer.

Request Quote — replies in 48h Sungrow IDC180E product page (OEM)

10. FAQ

What is the HS code for a 180 kW DC EVSE exported to Austria?

The applicable HS subheading for static converters (which covers DC fast-charging rectifier assemblies) is 8504.40; the national 8-digit code must be confirmed in the EU TARIC / Austrian customs portal at quotation stage.

Which compliance marks are typically required to operate a 180 kW DC charger in Austria?

A typical package includes the CE mark under the EU Low-Voltage Directive 2014/35/EU, EMC Directive 2014/30/EU, and the IEC 61851-1 / IEC 61851-23 series for conductive DC charging. ATEX does not apply unless the site is classified hazardous. Always verify with the OEM datasheet and an accredited test laboratory.

What is the indicative payback window for a highway-hub 180 kW site?

On the computed reference scenario, simple payback is 6.30 years and discounted payback is 9.19 years at an 8% discount rate over a 25-year horizon. ILLUSTRATIVE — NOT A QUOTE; site-specific numbers require an RFQ against your load profile and grid tariff.

Does Tradvolt provide an installation partner in Austria?

Tradvolt coordinates with EU-listed civil and electrical installation partners for highway-hub projects. Final scoping is signed off after an RFQ and a site survey.

What is the lead time for a 180 kW DC unit shipped CN → AT?

Typical production lead time for a single 180 kW cabinet is 8–12 weeks ex-works; sea freight to a Northern European port adds 4–6 weeks; final road transit and commissioning depend on site readiness and grid connection appointment.

Are the duty and VAT figures on this page binding?

No. Every duty/VAT rate on this page is marked PENDING — lookup and must be re-verified against the official EU TARIC / Austrian customs portal at the time of import declaration. Rates shown as placeholders must not be used for customs filings.

11. Sources & claim register

ClaimSource nameURLAccessed
Sungrow IDC180E — 180 kW DC fast charger product pageSungrow Powerhttps://www.sungrowpower.com/ev-charging-product/idc180e2026-09-21
Sungrow IDC180E datasheet (output V/I, IP54/IK10, CCS2)Sungrow Powerhttps://www.sungrowpower.com/Public/Uploads/uploadfiles/20240619/IDC180E-Datasheet.pdf2026-09-21
180 kW is within the DC fast-charging envelope governed by IEC 61851-23IEC — IEC 61851-23https://webstore.iec.ch/publication/341232026-09-21
Conductive AC/DC charging system requirements — IEC 61851-1IEC — IEC 61851-1https://webstore.iec.ch/publication/336112026-09-21
EU Low-Voltage Directive 2014/35/EU governs CE marking for electrical equipmentEUR-Lex — Directive 2014/35/EUhttps://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:32014L00352026-09-21
EU EMC Directive 2014/30/EU governs electromagnetic compatibilityEUR-Lex — Directive 2014/30/EUhttps://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:32014L00302026-09-21
Measuring Instruments Directive (MID) 2014/32/EU — metering path basisEUR-Lex — Directive 2014/32/EUhttps://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:32014L00322026-09-21
HS subheading for static converters (chargers) — 8504.40 (8-digit AT national line to be looked up)European Commission — TARIC consultationhttps://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Taric=850440&Lang=en2026-09-21
EU rules of origin — preferential treatment overviewEuropean Commission — DG TAXUDhttps://ec.europa.eu/taxation_customs/business/calculation-customs-duties/rules-origin/general-aspects-preferential-origin_en2026-09-21
Austrian customs import VAT (Einfuhrumsatzsteuer)Bundesministerium für Finanzen — Zollhttps://www.bmf.gv.at/zoll/einfuhrumsatzsteuer.html2026-09-21
Austrian customs procedure codes (Zollverfahren)Bundesministerium für Finanzen — Zollhttps://www.bmf.gv.at/zoll/zollverfahren.html2026-09-21
AT highway DC fast-charge retail price band (~0.59 EUR/kWh) and AT blended electricity tariff (~0.22 EUR/kWh)E-Control Austria — price monitor & tariff dashboardhttps://www.e-control.at/2026-09-21
1.2 GWh/yr utilisation assumption for Austrian highway-hub DC siteE-Control Austria — public charging infrastructure statistics (used as model assumption)https://www.e-control.at/2026-09-21
UN Manual of Tests and Criteria (Rev.7) — battery transport classification referenceUNECEhttps://www.unece.org/trans/danger/publi/manual/manual_e.html2026-09-21