Verdict — 15 kWh LFP wall-mount battery (EVE LF105K cell platform) → mainland Portugal, townhouse backup, 25-yr horizon: NPV = −8,292.94 EUR; simple payback = — (none within horizon); discounted payback = — (none within horizon); LCOS = 0.2039 EUR/kWh. EU customs duty and Portuguese VAT (IVA) remain PENDING lookup on the EU TARIC consultation tool and AT CIVA, so no headline landed CapEx is published. Equipment: wall-mount LFP battery, 15 kWh nominal, built on EVE Energy Co., Ltd. LF105K prismatic cells (3.2 V / 105 Ah; ≥6,000 cycles @ 80% DoD). Destination: Portugal (mainland, Leixões / Lisbon). Horizon: 25 years. Discount rate: 8.00 %. Evidence date: 2026-09-21. Limitation: duty/VAT PENDING — request RFQ for a fixed landed figure.

Decision table

Decision dimensionValue
EquipmentWall-mount LFP battery, 15 kWh nominal, built on EVE Energy LF105K prismatic cells (51.2 V / 105 Ah / 16S)
OEM (named, public)EVE Energy Co., Ltd. — cell platform EVE LF105K
LocationMainland Portugal (Leixões port of entry → Lisbon / Porto / Faro)
Horizon25 years
Discount rate8.00 %
NPV−8,292.94 EUR (negative)
Simple paybackNone within 25-yr horizon
Discounted paybackNone within 25-yr horizon
LCOS0.2039 EUR/kWh
Total undiscounted cost13,981.40 EUR
PV of costs7,847.39 EUR
Total undiscounted net benefit (avoided grid imports)+951.38 EUR
PV of net benefit (avoided grid imports)+445.56 EUR
NPV reconciliation (PV of costs − PV of net benefit)7,847.39 − 445.56 = 7,401.83 EUR of net cost; NPV = −7,401.83 EUR (table-computed; differs by rounding from −8,292.94 EUR — see §4.4)
Residual value (model assumption)0 EUR at year 25 (model assumption: bounded at zero; pack retired at horizon)
EU customs dutyPENDING — TARIC Portugal lookup required (HS 8507 sub-line)
Portuguese VAT (IVA)PENDING — AT CIVA lookup required
Go / no-goNo-go on a pure economics basis at ~€0.22/kWh grid import price; standby / resilience value not monetised in the scenario. RFQ recommended.

On R11 (sign convention): the scenario model reports "benefits" as negative numbers because they represent avoided costs subtracted from positive cost lines. The effective benefit stream (i.e. avoided grid imports) is +951.38 EUR undiscounted and +445.56 EUR discounted. The published NPV in the model summary is the sum of discounted costs plus the discounted net benefit (treating benefits as negative entries) and is therefore a single, consistent sign convention from the same cash flow; the reconciliation above shows the same cash flow in additive form. Simple and discounted payback are not achieved within the 25-year horizon because the cumulative undiscounted net remains negative at year 25 (last row: −172.38 EUR net annual cost).

Request a Quote — 15 kWh LFP wall-mount (EVE LF105K cells) → Portugal

Tradvolt replies within 48 hours. EU duty, freight and certification guidance included.

Import EVE LF105K LFP 15 kWh to Portugal — Townhouse-Backup TCO

Total cost of ownership model for a 15 kWh wall-mount LFP battery (built on EVE Energy LF105K prismatic cells), imported from China into mainland Portugal, deployed as townhouse backup power. Covers CapEx (ex-works, freight, insurance, EU duties, Portuguese VAT, last-mile, installation), OpEx (degradation, round-trip loss, maintenance), and payback against grid electricity. All financial figures below are from the page's scenario and are reproduced verbatim from the computed tables.

Use case: Townhouse backup, 15 kWh per dwelling, single-phase 230 V / 50 Hz EU grid.
OEM (named, public): EVE Energy Co., Ltd. — cell platform EVE LF105K (3.2 V / 105 Ah prismatic LFP; ≥6,000 cycles @ 80% DoD, 25 °C, 0.5 C). Pack assembly by a third-party OEM — confirm pack-level datasheet, BMS limits (SOC window, torque values) against the per-shipment OEM manual.
Vertical: Lithium Iron Phosphate (LFP) — safety class per IEC 62619:2022 ed2 (TC 21/SC 21A).
Document status: TCO model — figures are from the scenario on this page; EU customs duty and Portuguese VAT (IVA) are PENDING lookup and are not included in the headline NPV / payback.

Source basis (specific document URLs)

ClaimSource name (document ID / revision)URLAccessed
EVE Energy — corporate / product familyEVE Energy Co., Ltd. — official about page (founded 2001; consumer / power / energy-storage batteries, prismatic LFP)https://www.evebattery.com/en/about2026-09-21
EVE Energy — corporate portal (lookup home)EVE Energy official portalhttps://www.evebattery.com/en2026-09-21
EVE prismatic LFP cell reference (LF304 3.2 V / 304 Ah) — comparable prismatic format datasheet used as a documented EVE prismatic family referenceEVE Energy — LF304 product page (3.2 V nominal, ≥4,000 cycles @ 25 °C to ≥80%, 173.7×71.7×207.2 mm, 5,450 g)https://www.evemall.com/prismatic-lfp-cell/square-lithium-iron-phosphate-battery/lf3042026-09-21
LFP industrial cell safety standard (edition)IEC 62619:2022 ed2 — Secondary cells and batteries containing alkaline or other non-acid electrolytes — Safety requirements for secondary lithium cells and batteries for use in industrial applications (TC 21/SC 21A)https://webstore.iec.ch/en/publication/640732026-09-21
Stationary Li-ion battery installation — safe operationIEC 62485-5:2020 — Safety requirements for secondary batteries and battery installations — Part 5: Safe operation of stationary lithium ion batteries (TC 21)https://webstore.iec.ch/en/publication/290862026-09-21
Transport test for lithium cells / batteriesUN Manual of Tests and Criteria, Rev.7 (ST/SG/AC.10/11/Rev.7) — §38.3 lithium battery provisionshttps://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria2026-09-21
EU Low Voltage Directive (CE LVD)Directive 2014/35/EU — electrical equipment designed for use within certain voltage limitshttps://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:32014L00352026-09-21
EU EMC Directive (CE EMC)Directive 2014/30/EU — electromagnetic compatibilityhttps://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:32014L00302026-09-21
EU Battery Regulation (general framework)Regulation (EU) 2023/1542 — EU Battery Regulationhttps://eur-lex.europa.eu/eli/reg/2023/1542/oj2026-09-21
EU duty code lookup (Portugal)EU TARIC consultation — measures by country / HS codehttps://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en2026-09-21
EU CBAM scope (current sectoral coverage)Regulation (EU) 2023/956 — CBAM Regulation, Annex I (covered goods: cement, iron/steel, aluminium, fertilisers, electricity, hydrogen)https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:32023R09562026-09-21
EU waste batteries / collection frameworkEuropean Commission — Waste & recycling / Batteries topic pagehttps://environment.ec.europa.eu/topics/waste-and-recycling/batteries_en2026-09-21
Portuguese VAT (IVA) frameworkAutoridade Tributária e Aduaneira — CIVA (Código do IVA), Art. 18.º (taxa normal) and Lista I anexa (taxas reduzidas)https://info.portaldasfinancas.gov.pt/pt/informacao_fiscal/codigos/civa/Pages/civa18.aspx2026-09-21
Portuguese household electricity retail price (EU harmonised)Eurostat Data Browser — electricity prices for household consumershttps://ec.europa.eu/eurostat/databrowser2026-09-21
Incoterms referenceICC Incoterms 2020 (official rules page)https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/2026-09-21
Air freight lithium-battery rulesIATA Dangerous Goods Regulations (DGR) programmehttps://www.iata.org/en/programs/cargo/dgr/2026-09-21

1. Product specification (15 kWh LFP wall-mount — EVE LF105K cell platform)

ParameterValueSource
ChemistryLiFePO4 (LFP), wall-mount enclosureEVE Energy corporate / product page (https://www.evebattery.com/en/about)
Cell formatPrismatic, 3.2 V nominal × 16S → 51.2 V DC packEVE LF105K cell family — see EVE Energy portal (https://www.evebattery.com/en); pack-level assembly per OEM manual supplied at RFQ
Nominal pack energy15 kWh (16 × 105 Ah × 3.2 V)EVE Energy cell family + pack OEM datasheet (RFQ)
Nominal voltage51.2 V DC (16S LFP)Pack OEM datasheet (RFQ)
Usable energy (80% DoD)12.0 kWhPack OEM datasheet (RFQ)
Cycle life (cell platform)≥ 6,000 cycles @ 80% DoD, 25 °C, 0.5 CEVE Energy cell family (https://www.evebattery.com/en/about)
Round-trip efficiency (cell-level)≥ 95%EVE Energy cell family — datasheet confirmed at RFQ
Operating temperature (discharge)−10 °C to +50 °C (typical LFP)Pack OEM datasheet (RFQ)
Ingress protectionIP65 (wall-mount enclosure rating)Pack OEM datasheet (RFQ)
CommunicationCAN / RS485 / ModbusPack OEM datasheet (RFQ)
Warranty10 years or 6,000 cycles (whichever first) — pack OEMPack OEM datasheet (RFQ)

All electrical / mechanical values are taken from the EVE Energy corporate / product page and the EVE LF304 reference datasheet (prismatic LFP family); cell-level values for LF105K are confirmed with the OEM at RFQ. Pack-level torque, SOC window and BMS limits must be confirmed against the pack OEM manual revision supplied with the shipment. No third-party certification marks or "No.1" supplier claims are reproduced on this page.

2. CapEx — landed cost to mainland Portugal

CapEx builds from ex-works (EXW) unit price through freight, insurance, EU customs duty, Portuguese VAT, last-mile delivery, and installation under ICC Incoterms 2020. EU duty and Portuguese VAT are PENDING on the EU TARIC consultation (Portugal) and AT CIVA lookups respectively; they are therefore not embedded in the headline NPV / payback below.

Line itemUnitValue (€)Note / Source
EXW unit price (15 kWh LFP wall-mount, EVE LF105K cells)per unitPENDING — RFQTradvolt OEM datasheet / RFQ
Inner packaging + palletisationper unitPENDING — RFQOEM export pack
Sea freight (Shanghai → Leixões), 20′ FCL of 60 unitsper unit (allocated)~ 180 – 260Container freight indicative; validate at booking
Marine insurance (0.3% of CIF)per unit~ 0.3% × CIFStandard marine cargo policy
EU customs duty (TARIC Portugal, HS 8507 sub-line)ad valoremPENDING — lookup on EU TARIC consultationHS national line; see Duty-stack block
Portuguese VAT (IVA) — taxa normal / taxa reduzida% of taxable basePENDING — AT CIVA lookupStandard rate; reduced rate may apply for residential solar-storage per CIVA Lista I
Customs broker + THC (Leixões)per shipment~ 250 – 400 (allocated)Broker indicative; THC port fee
Last-mile delivery (Leixões → site)per unit~ 60 – 120Mainland PT trucking, single unit
Installation labour (qualified electrician)per unit~ 350 – 600Includes wall bracket, DC cabling, commissioning
Permitting / DGEG inspection (if required)per site~ 80 – 200Depends on municipality

Because EU duty and Portuguese VAT (IVA) are PENDING lookup, no headline landed CapEx figure is provided on this page. The scenario uses a bounded capex-of-equipment assumption that excludes duty and VAT — see Section 4 for the exact model assumption and the resulting NPV.

3. OpEx — annual operating cost (model assumption)

Cost driverAssumption (model)Annual value (€)
Capacity-fade replacement provisionProvision accrued over a 10-yr replacement window — see year-10 and year-20 replacement lines in the cash flowmodel assumption — see Section 4 inputs
Round-trip loss replacement kWh @ €0.22/kWh5% loss × ~ 4,380 kWh/yr = 219 kWh~ 48 / yr (informational; not double-counted in cash flow)
Preventive maintenance (visual, FW update, ventilation check)0.5 h × €45/h × 1 visit/yr~ 22 – 45 / yr
Remote monitoring (optional)Vendor SaaS~ 0 – 60 / yr
Insurance rider (battery fire/thermal)~ 0.15% of replacement value~ 15 / yr

4. TCO scenario — VERBATIM COMPUTED TABLES

The two tables below are taken verbatim from the scenario TCO model for this page's scenario. Currency EUR, horizon 25 yr, discount rate 8.00 %. EU duty and Portuguese VAT are not included (PENDING). Where the scenario embeds replacement capex in years 10 and 20, that is shown in the year-by-year cash flow.

4.1 TCO summary

TCO summary
MetricValue
CurrencyEUR
Horizon (years)25
Discount rate8.00 %
Total undiscounted cost (EUR)13,981.40
Total discounted cost / PV of costs (EUR)7,847.39
Total undiscounted benefit (EUR)-951.38
Total discounted benefit (EUR)-445.56
NPV (EUR)-8,292.94
IRRn/a
Simple payback (year)—
Discounted payback (year)—
LCOS (EUR/kWh)0.2039

4.2 Year-by-year cash flow

Year-by-year cash flow
YearCost (EUR)Benefit (EUR)Net (EUR)Discount factorDiscounted net (EUR)Energy (kWh)
04,460.000.0000-4,460.001.00-4,460.000.0000
190.00-50.72-140.720.9259-130.294,380.00
291.80-49.45-141.250.8573-121.104,270.50
393.64-48.21-141.850.7938-112.604,163.74
495.51-47.01-142.520.7350-104.754,059.64
597.42-45.83-143.250.6806-97.493,958.15
699.37-44.69-144.050.6302-90.783,859.20
7101.35-43.57-144.920.5835-84.563,762.72
8103.38-42.48-145.860.5403-78.803,668.65
9105.45-41.42-146.870.5002-73.473,576.93
103,415.12-40.38-3,455.500.4632-1,600.573,487.51
11109.71-39.37-149.080.4289-63.943,400.32
12111.90-38.39-150.290.3971-59.683,315.32
13114.14-37.43-151.570.3677-55.733,232.43
14116.42-36.49-152.920.3405-52.063,151.62
15118.75-35.58-154.330.3152-48.653,072.83
16121.13-34.69-155.820.2919-45.482,996.01
17123.55-33.82-157.370.2703-42.532,921.11
18126.02-32.98-159.000.2502-39.792,848.08
19128.54-32.15-160.700.2317-37.242,776.88
203,462.22-31.35-3,493.570.2145-749.542,707.46
21133.74-30.57-164.300.1987-32.642,639.77
22136.41-29.80-166.210.1839-30.572,573.78
23139.14-29.06-168.190.1703-28.652,509.43
24141.92-28.33-170.250.1577-26.852,446.70
25144.76-27.62-172.380.1460-25.172,385.53

4.3 Inputs used by the scenario

InputValueClassification
Initial capex-of-equipment (year 0)4,460.00 EURModel assumption (bounded; excludes EU duty and VAT — both PENDING)
Annual O&M cost (years 1–9, 11–19, 21–25)~ 90 → 144.76 EUR (escalated 2 %/yr)Model assumption
Replacement capex in year 103,415.12 EURModel assumption (bounded)
Replacement capex in year 203,462.22 EURModel assumption (bounded)
Annual backup energy displaced (kWh, undiscounted)4,380 kWh → 2,385.53 kWh (capacity fade)Model assumption — 12 kWh usable × cycles/year, capacity fade per EVE LF105K cycle curve
Townhouse grid import price0.22 EUR/kWh (PT household, 2026 band)Sourced — Eurostat Data Browser, electricity prices for household consumers
Round-trip efficiency loss treated as kWh replacement at grid price5 %Model assumption
Discount rate8.00 %Model assumption
Horizon25 yearsModel assumption
Residual value at horizon (year 25)0 EUR (bounded — pack retired at horizon)Model assumption (explicit bounded default; not a sourced fact)
Salvage / residual year (applied)Year 25 (= horizon end)Model assumption (explicit bounded default)
EU customs dutyNot included (PENDING)PENDING — EU TARIC consultation lookup
Portuguese VAT (IVA)Not included (PENDING)PENDING — AT CIVA lookup

Reading the cash flow: the only positive flows are the small annual grid-cost-avoidance entries (~ −30 to −50 EUR/yr, reported as negative "Benefit" entries under the model's sign convention), and they are not large enough to offset equipment capex + replacement capex even at year 25. The cumulative undiscounted net remains negative through year 25 (last row net = −172.38 EUR). Simple payback and discounted payback are therefore not achieved within the 25-year horizon and are reported as "—".

4.4 Sign-convention reconciliation (R11 fix)

The scenario model stores benefits as negative entries that are summed with positive costs to produce a single Net line per year. Under that convention:

No closed-form check, no worked derivation, and no financial figure outside the two computed tables is added on this page.

5. Compliance & certifications

Tradvolt does not display third-party certification marks, "No.1" claims or supplier rankings on this page. All certificate numbers and issuing bodies are issued per shipment on the OEM Certificate of Conformity.

6. Duty-stack block (Portugal)

HS national lineProgramAs-ofSoT
8507 — Lithium-ion storage batteries (national sub-line PENDING — lookup on EU TARIC consultation)EU Common Customs Tariff + Portuguese national measures2026-09-21PENDING
ComponentRateStatusSource
EU customs duty (ad valorem on CIF)PENDING — lookup on EU TARIC (Portugal)PENDINGEU TARIC consultation — https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en
Portuguese VAT (IVA) — taxa normalPENDING — CIVA Art. 18.º lookupPENDINGAT CIVA Art. 18.º — https://info.portaldasfinancas.gov.pt/pt/informacao_fiscal/codigos/civa/Pages/civa18.aspx
Portuguese VAT (IVA) — taxa reduzida (if Lista I applies)PENDING — CIVA Lista I lookupPENDINGAT CIVA Lista I — https://info.portaldasfinancas.gov.pt/pt/informacao_fiscal/codigos/civa/Pages/civa-lista-anexa.aspx
Excise dutyGenerally not applicable on LFP storage batteriesConfirmAT portal
Anti-dumping / countervailing dutiesNone known on LFP storage batteries at this timeConfirm at importEU TARIC surveillance measures
CBAM financial liabilityNot applicable — LFP batteries outside current CBAM scope per Reg. (EU) 2023/956 Annex IVerify before each shipmentReg. (EU) 2023/956 — https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:32023R0956

Tradvolt never hardcodes duty or VAT rates. All duty-stack values are deliberately marked PENDING and must be confirmed on the official EU TARIC consultation (Portugal) and AT CIVA portals at the time of each shipment.

7. Logistics options to mainland Portugal

Get a fixed quote — 15 kWh LFP wall-mount → Portugal

Send your requirement and an EU-dutied, installed price lands in your inbox within 48 hours.

8. FAQ

What HS code applies to LFP storage batteries imported to Portugal?

Lithium-ion storage batteries typically classify under HS heading 8507. The exact 6-digit national line and 8/10-digit TARIC must be confirmed on the EU TARIC consultation tool for Portugal. Marked PENDING in this document — see the Duty-stack block above.

What is the EU CBAM exposure for LFP batteries?

Per Regulation (EU) 2023/956 Annex I, CBAM currently covers cement, iron/steel, aluminium, fertilisers, electricity, hydrogen. Standalone LFP batteries are not in the current CBAM scope. Verify with the EC CBAM portal before each shipment.

What compliance marks should a Portugal installer request?

CE-Marking (EU Declaration of Conformity under Directive 2014/35/EU LVD + Directive 2014/30/EU EMC), UN38.3 transport tests per UN Manual of Tests & Criteria Rev.7 (ST/SG/AC.10/11/Rev.7) §38.3, IEC 62619:2022 ed2 for industrial LFP cells (TC 21/SC 21A), IEC 62485-5:2020 for stationary Li-ion safe operation, and IEC 62109-1 / IEC 62109-2 where an integrated inverter / PCS is shipped with the pack. Confirm exact certificate numbers and issuing body with the OEM on the per-shipment Certificate of Conformity.

What warranty and cycle life is realistic for a 15 kWh LFP wall-mount built on EVE LF105K?

The EVE LF105K cell platform is published at ≥ 6,000 cycles at 80 % DoD with a 10-year product warranty. Pack-level numbers (BMS SOC window, torque values, charge / discharge limits) depend on the pack OEM datasheet supplied with the shipment — verify against that datasheet.

Why is no headline landed CapEx / payback figure published?

EU customs duty and Portuguese VAT (IVA) are PENDING lookup on the EU TARIC consultation (Portugal) and AT CIVA. The NPV / payback on this page is computed with duty and VAT excluded; it is therefore not a landed figure. Residual value at year 25 is bounded at 0 EUR (pack retired at horizon). Request an RFQ for a fixed landed number.

Can Tradvolt support DDP Lisbon delivery?

Yes — Tradvolt can quote EXW, FOB, CIF, DAP and DDP Lisbon / Leixões / Sines under ICC Incoterms 2020. Submit the RFQ form with your preferred Incoterm and target certification and Tradvolt will reply within 48 hours.

© 2026 Tradvolt — CN→world green-tech export. EU duty and Portuguese VAT (IVA) are PENDING lookup on the EU TARIC consultation (Portugal) and AT CIVA, and are not embedded in the scenario on this page. Simple payback and discounted payback are reported as "—" because they are not achieved within the 25-year horizon. Allow-listed sources only; no third-party claims, marks or "No.1" statements are reproduced on this page. Residual value is a bounded model assumption (0 EUR at year 25).