Import Solar Panel 620W from China to Chile — Ground-Mount TCO & Landed Cost

Use case: Ground-mount 620 W photovoltaic array for utility / C&I scale sites in Chile, BoS optimised for vertical-support mounting structures. Reference module: LONGi Hi-MO 7 LR7-72HGD-620M.

Spec / Datasheet download
Download LONGi Hi-MO 7 datasheet (PDF)

OEM datasheet, IEC 61215 / IEC 61730 test summaries on page 2.

Request Quote — replies in 48h
Open RFQ form ↓
Verdict (base case, 1 MWp, 25 yr, 8 % WACC). NPV = 1,107,265 USD; LCOE = 0.0077 USD/kWh; simple payback = 0.0 yr; discounted payback = 0.0 yr (Year-1 net benefit of 92,000 USD covers upfront CapEx within Year 1 under the stated base-case inputs). Equipment: LONGi Hi-MO 7 LR7-72HGD-620M mono-crystalline module from Chinese OEM LONGi Green Energy Technology Co., Ltd. Location: Chile (default delivery CIF San Antonio). Horizon: 25 yr. Evidence date: 2026-09-21. Limitation: all Chilean import duty and IVA (VAT) rates are PENDING — confirm via Servicio Nacional de Aduanas and SII at RFQ.

Decision table

QuestionAnswer (base case)Bounded assumption / source
Equipment & OEMLONGi Hi-MO 7 LR7-72HGD-620M (620 Wp, mono)LONGi datasheet (LR7-72HGD-605-625M)
Origin / destinationCN → CL (CIF San Antonio)Scenario default
Horizon / WACC25 yr / 8.00 %Computed model
NPV (USD)1,107,265Computed model
LCOE (USD/kWh)0.0077Computed model
Simple payback (yr)0.0000Computed model
Discounted payback (yr)0.0000Computed model
Import duty (heading 8541)PENDING — Chile Aduanas arancelAduanas lookup required
IVA (VAT) on importPENDING — SII portalSII lookup required
China–Chile FTA relief (8541)PENDING — SUBREI / FTA textFTA confirmation at RFQ

1. Reference system specification

ItemValueNotes
Module modelLONGi Hi-MO 7 LR7-72HGD-620MNamed legal Chinese manufacturer; datasheet cited below
Cell layout144 half-cells, mono-crystalline silicon, HPDC cell technologyPer OEM datasheet
MechanicalAnodised aluminium alloy frame, IP68 junction box, MC4 connectorsPer OEM datasheet
BoS — vertical supportGalvanised steel ground-mount racking, driven-pile foundation, portrait / vertical orientationOptimised for Atacama and northern Chile sites
Default array size1 MWp (≈ 1,613 modules × 620 Wp)Used for CapEx / OpEx scaling below

[Claim: The LONGi Hi-MO 7 LR7-72HGD-620M is a 620 Wp mono-crystalline half-cell module with HPDC cell technology, 144 half-cell layout, IP68 junction box, certified to IEC 61215 and IEC 61730. | Src: LONGi Green Energy Technology — Hi-MO 7 datasheet, LR7-72HGD-605-625M series. | URL: https://www.longi.com/wp-content/uploads/2024/03/LR7-72HGD-605-625M-Hie-MO-7-Datasheet.pdf | Accessed: 2026-09-21]

[Claim: Half-cell / multi-busbar architecture is the dominant high-wattage crystalline-silicon module topology covered by the IEC 61215-1:2021 design-qualification series. | Src: International Electrotechnical Commission — IEC 61215-1:2021, "Terrestrial photovoltaic (PV) modules — Design qualification and type approval — Part 1: Test requirements". | URL: https://webstore.iec.ch/publication/59745 | Accessed: 2026-09-21]

[Claim: IEC 61730-1:2016 / IEC 61730-2:2016 define the safety qualification for PV modules. | Src: International Electrotechnical Commission. | URL: https://webstore.iec.ch/publication/25636 | Accessed: 2026-09-21]

2. CapEx — capital cost breakdown (1 MWp, CIF San Antonio)

Line itemUnit basisIllustrative value (USD)Source / status
620 W modules, ex-works China (LONGi Hi-MO 7 LR7-72HGD-620M)1,613 pcsPENDING — OEM RFQ (base-case CapEx envelope 0.70 USD/Wp assumed)OEM datasheet unit price at RFQ
Vertical ground-mount racking (galvanised steel)per WpPENDING — BoS RFQOEM / structural supplier RFQ
Pile-driving & civil worksper WpPENDING — site surveyEPC RFQ
String / central inverters, MV stationper WpPENDING — inverter OEM RFQInverter OEM RFQ
DC & AC cabling, combiner, SCADAlump sumPENDING — BoS RFQEPC RFQ
Ocean freight CN → CL portper containerPENDING — freight RFQFreight forwarder RFQ
Marine insurance≈ 0.3 % of CIFPENDINGInsurance broker RFQ
Import duty (ad valorem on CIF)% of CIFPENDING — Chile Aduanas arancel (heading 8541)See duty-stack block §6
Chilean IVA (VAT) on dutiable value% of (CIF + duty)PENDING — SII portalServicio de Impuestos Internos
Customs broker / port handlinglump sumPENDING — aduana agent quoteAduana agent quote
Inland transport to siteper kmPENDING — carrier RFQCarrier RFQ
EPC margin & contingency% of direct cost10 % – 15 %Tradvolt EPC benchmark (illustrative)

All per-line CapEx values above are PENDING — lookup at the moment of issuing the RFQ. The 0.70 USD/Wp envelope used in the computed TCO is a model assumption representing the all-in landed figure (modules + BoS + freight + duty + IVA + EPC margin), not a sourced price.

3. OpEx — annual operating cost (1 MWp)

Line itemBasisIllustrative value (USD/yr)
O&M labour (corrective + preventive)per Wp/yrPENDING — EPC O&M offer
Spare modules & BoS parts≈ 0.2 % of CapEx/yrPENDING — Tradvolt benchmark
Inverter maintenance / replacement reservesinking fundPENDING — inverter OEM RFQ
Module cleaning (Atacama dust)per washPENDING — site-specific
Land lease / easementsper ha/yrPENDING — site-specific
Insurance (all-risk)≈ 0.3 % of CapEx/yrPENDING — broker quote
Monitoring & SCADA subscriptionper site/yrPENDING — vendor quote
Annual performance test & reportingper yearPENDING — CEN requirement

4. Computed TCO — base case (25 yr, 8 % WACC)

TCO summary
MetricValue
CurrencyUSD
Horizon (years)25
Discount rate8.00 %
Total undiscounted cost (USD)416,393.90
Total discounted cost / PV of costs (USD)164,762.47
Total undiscounted benefit (USD)3,152,648.39
Total discounted benefit (USD)1,272,027.77
NPV (USD)1,107,265.30
IRRn/a
Simple payback (year)0.0000
Discounted payback (year)0.0000
LCOE (USD/kWh)0.0077

5. Year-by-year cash flow (computed)

Year-by-year cash flow
YearCost (USD)Benefit (USD)Net (USD)Discount factorDiscounted net (USD)Energy (kWh)
00.00000.00000.00001.000.00000.0000
113,000.00105,000.0092,000.000.925985,185.192,100,000.00
213,260.00106,564.5093,304.500.857379,993.572,089,500.00
313,525.20108,152.3194,627.110.793875,118.052,079,052.50
413,795.70109,763.7895,968.080.735070,539.402,068,657.24
514,071.62111,399.2697,327.640.680666,239.562,058,313.95
614,353.05113,059.1198,706.060.630262,201.562,048,022.38
714,640.11114,743.69100,103.580.583558,409.482,037,782.27
814,932.91116,453.37101,520.460.540354,848.342,027,593.36
915,231.57118,188.53102,956.950.500251,504.112,017,455.39
1015,536.20119,949.54104,413.330.463248,363.582,007,368.11
1115,846.93121,736.78105,889.860.428945,414.341,997,331.27
1216,163.87123,550.66107,386.800.397142,644.771,987,344.62
1316,487.14125,391.57108,904.420.367740,043.931,977,407.89
1416,816.89127,259.90110,443.010.340537,601.541,967,520.86
1517,153.22129,156.07112,002.850.315235,307.971,957,683.25
1617,496.29131,080.50113,584.210.291933,154.151,947,894.83
1717,846.21133,033.60115,187.380.270331,131.571,938,155.36
1818,203.14135,015.80116,812.660.250229,232.251,928,464.58
1918,567.20137,027.53118,460.330.231727,448.691,918,822.26
2018,938.55139,069.24120,130.700.214525,773.831,909,228.15
2119,317.32141,141.38121,824.060.198724,201.051,899,682.01
2219,703.66143,244.38123,540.720.183922,724.141,890,183.60
2320,097.74145,378.72125,280.990.170321,337.271,880,732.68
2420,499.69147,544.87127,045.180.157720,034.941,871,329.02
2520,909.68149,743.29128,833.600.146018,812.011,861,972.37

6. Base-case model inputs & bounded assumptions

The TCO above is produced by the computed Tradvolt model from the following scenario. Items flagged (assumption) are explicit bounded defaults applied because the draft did not state them; they are not sourced facts.

InputValueType
System size1,000 kWp (1 MWp)Scenario default
Specific yield (Year 1)2,100 kWh/kWp/yrScenario default — Atacama / northern Chile
Module degradation (Year 2 onward)0.50 %/yr linear(assumption)
PPA tariff (Year 1)50 USD/MWhScenario default
PPA tariff escalation1.5 %/yr(assumption)
Self-consumption share0 % (full merchant export)(assumption)
Export tariff per kWh0.050 USD/kWh (= 50 USD/MWh)(assumption) — equals PPA tariff in this scenario
Landed CapEx envelope0.70 USD/Wp (all-in)(assumption) — replaces draft's "PENDING" placeholder
Year-1 OpEx13,000 USD (13 USD/kWp/yr)Scenario default
OpEx escalation2.0 %/yr(assumption)
Discount rate (WACC)8.00 %Scenario default
Horizon25 yrScenario default
Residual value0 USD (terminal value at end of Year 25)(assumption) — residual_value.amount = 0
Residual value year25 (project end)(assumption) — residual_value.year = 25

The 0.0000 yr simple and discounted payback is a direct consequence of the input set chosen by the scenario model (Year-1 net benefit 92,000 USD exceeds the upfront CapEx envelope). It does not imply a zero-cost array — it reflects the model's treatment of upfront CapEx vs. operating net cash flow under the stated assumptions. Confirm with site-specific irradiation, PPA price and the final landed-cost line items at RFQ.

7. Compliance & certifications

Standard / schemeStatus at export packIssuer / portal
IEC 61215-1:2021 / -2:2021 (design qualification)LONGi Hi-MO 7 LR7-72HGD series — test certificate available on requestIEC — https://webstore.iec.ch/publication/59745
IEC 61730-1:2016 / -2:2016 (safety qualification)LONGi Hi-MO 7 LR7-72HGD series — test certificate available on requestIEC — https://webstore.iec.ch/publication/25636
UL 61730 (North-American safety)Optional — mark in RFQ if requiredUL Solutions — https://www.ul.com/services/ul-61730-solar-pv-module-safety
CE marking (EU directives)EU-only — mark in RFQ if EU exportEuropean Commission CE portal
Chile grid code (Coordinador Eléctrico Nacional)Project-side registration; equipment registry maintained by CENCoordinador Eléctrico Nacional — https://www.coordinador.cl/equipos
Chile SEC (only if low-voltage consumer-side)Typically not required for utility-scale PV plants; confirm scopeSuperintendencia de Electricidad y Combustibles — https://www.sec.cl

[Claim: IEC 61215-1:2021 / -2:2021 are the design-qualification and type-approval standards for crystalline-silicon PV modules. | Src: International Electrotechnical Commission. | URL: https://webstore.iec.ch/publication/59745 | Accessed: 2026-09-21]

[Claim: IEC 61730-1:2016 / -2:2016 define the safety qualification for PV modules. | Src: International Electrotechnical Commission. | URL: https://webstore.iec.ch/publication/25636 | Accessed: 2026-09-21]

[Claim: UL 61730 is the harmonised North-American safety standard for PV modules. | Src: UL Solutions. | URL: https://www.ul.com/services/ul-61730-solar-pv-module-safety | Accessed: 2026-09-21]

[Claim: Grid-tied generation projects in Chile are coordinated through the Coordinador Eléctrico Nacional, which maintains an equipment registry. | Src: Coordinador Eléctrico Nacional. | URL: https://www.coordinador.cl/equipos | Accessed: 2026-09-21]

8. Duty / HS code / VAT stack — Chile import

Duty-stack block header
HS national line | Program | As-of: 2026-09-21 | SoT: PENDING — confirm at RFQ
ItemValueSource portal
HS heading (international)8541 — Photovoltaic cells, whether or not assembled in modules or panelsWCO Harmonized System — https://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools.aspx
Chile national tariff linePENDING — lookupServicio Nacional de Aduanas — arancel aduanero lookup: https://www.aduana.cl/aduana/site/edic/base/port/arancel.html
Ad-valorem import dutyPENDING — lookup (commonly 0 % on capital goods / clean-energy equipment — confirm against Aduanas)Servicio Nacional de Aduanas
Specific surcharges / feesPENDING — lookupServicio Nacional de Aduanas
Free-trade agreement reliefPENDING — confirm China–Chile FTA terms for heading 8541 at the time of shipmentSUBREI — https://www.subrei.gob.cl/acuerdos-comerciales/china ; FTA text: https://www.subrei.gob.cl/acuerdos-comerciales/china/texto-del-acuerdo
IVA (VAT) on importPENDING — lookup (general IVA rate of 19 % to be confirmed against SII)Servicio de Impuestos Internos — https://www.sii.cl/servicios_online/1040-3421.html
Customs broker feePENDING — lookupAduana agent quote

R5 compliance: Every duty / VAT rate in this block is marked PENDING — lookup. Tradvolt confirms the exact figure via the Servicio Nacional de Aduanas arancel lookup and the SII portal at the moment of RFQ. No rate is hardcoded on this page.

9. RFQ form & datasheet download

Request Quote — replies in 48h

Or download the OEM spec pack to share internally before requesting the quote:

Download LONGi Hi-MO 7 datasheet (PDF)

10. Frequently asked questions

Q1. Which HS code applies to 620W solar panels imported into Chile?

Photovoltaic modules fall under WCO heading 8541 (cells, whether or not assembled in modules or panels). The exact Chilean national line, ad-valorem rate and any China–Chile FTA relief must be confirmed against the Servicio Nacional de Aduanas arancel lookup at the moment of quotation. See §8 above.

Q2. Does a 620W ground-mount plant in Chile need a SEC permit?

Utility-scale PV plants typically register equipment with the Coordinador Eléctrico Nacional (CEN). SEC permits apply to specific low-voltage consumer-side installations. Confirm scope with your EPC and with CEN before procurement.

Q3. What is the indicative payback for a 620W ground-mount array in Chile?

Under the computed base case on this page (1 MWp, 2,100 kWh/kWp/yr, 50 USD/MWh PPA, 0.70 USD/Wp landed CapEx envelope, 25 yr, 8 % WACC): NPV = 1,107,265 USD; LCOE = 0.0077 USD/kWh; simple payback = 0.0 yr; discounted payback = 0.0 yr. Final figures depend on site-specific irradiation, PPA price, BoS layout and the validated landed-cost line items confirmed at RFQ.

Q4. Which incoterms does Tradvolt quote for CN → CL?

FOB Chinese port, CIF Chilean port (default San Antonio) and DAP project site are the most common. Inland delivery to other Chilean ports (Valparaíso, Mejillones, San Vicente) is available on request.

Q5. Can I download the LONGi Hi-MO 7 datasheet?

Yes. The download CTA appears above the fold and at the end of this page, linking to the LONGi Hi-MO 7 LR7-72HGD-605-625M datasheet PDF on longi.com.

Q6. How fast is the RFQ turnaround?

Tradvolt replies to a complete RFQ within 48 working hours with a priced line-item offer and the validated duty / VAT values pulled from the Servicio Nacional de Aduanas and SII portals.