Equipment: LONGi Hi-MO 7 (LR7-72HGD-xxxM) modules + Sungrow SG125CX-P2 string inverters + K2 Systems S-Dome 6.10 mounting, on an Australian industrial-park rooftop. Location: AU east-coast industrial park (PVGIS-SARAH2 reference site, tilt 10°, azimuth 0°). Horizon: 25 years. Discount rate: 7.00% real (corporate WACC). Evidence date: 2026-01-15. Limitation: computed by Tradvolt's scenario TCO model from the inputs and equipment list declared on this page; buyer must re-verify HS codes, duties, DNSP export limits, and yields at RFQ award.

Decision table (computed)

MetricValue
LCOE (real)0.0821 AUD/kWh
NPV @ 7% real, 25 yr4,177,236.33 AUD
IRR0.1826 (18.26%)
Simple payback5.56 years
Discounted payback7.22 years
PV of costs3,985,797.59 AUD
PV of benefits8,163,033.92 AUD
Total undiscounted cost4,868,399.87 AUD
Total undiscounted benefit18,415,970.38 AUD
Verdict vs avoided retail 0.18–0.28 AUD/kWhGo — base-case NPV ≈ 4.18 M AUD, discounted payback 7.22 yr

1. Equipment BOM template (named OEM models)

The TCO below assumes the following BOM family. Substitute equivalents are acceptable, but the model here uses these specific products and their public datasheets/manuals.

LineEquipment (model / family)Qty / sizingOEM manual / datasheet
PV moduleLONGi Hi-MO 7 LR7-72HGD-xxxM (n-type HPBC, bifacial, 580–600 Wp class)~5,000 modules for 3.0 MWp DCLONGi Hi-MO 7 product page (datasheet PDF linked from page); module operating limits per OEM datasheet revision current at RFQ
String inverterSungrow SG125CX-P2 (125 kW, 3-Phase, 12 MPPT)24 units (DC/AC ≈ 1.00 at inverter level, system DC/AC 1.20 via PV-side oversizing)Sungrow SG125CX-P2 product page (datasheet & user manual linked from page)
Mounting structureK2 Systems S-Dome 6.10 (aluminium rail-less, ballast / fixed-tilt for flat-roof)~3.0 MWp coverageK2 Systems S-Dome 6.10 product page (installation manual revision referenced from page)

Module/inverter limits (torque, SOC, voltages) must be re-checked against the OEM manual revision current at RFQ award — values such as Max system voltage and backrail clamp torque are model-specific and outside this TCO's arithmetic scope.

2. Inputs table (every numerical claim has a named source or is flagged as model assumption)

InputValueUnitSource / basis
System size (DC)3.0MWpBuyer scope — input (BOM template assumes LONGi Hi-MO 7 LR7-72HGD family + Sungrow SG125CX-P2)
Performance ratio (PR)0.82—Model assumption — mid-case PR for well-built commercial rooftop, consistent with NREL/TP-5K00-84978 (Bolinger et al., 2023) and IEA PVPS Snapshot 2024
Specific yield (kWh/kWp/yr)1,450kWh/kWp/yrPVGIS-SARAH2 query, AU east-coast industrial site, tilt 10°, azimuth 0° — see PVGIS-SARAH2 interactive query (re-run at RFQ award for actual roof coordinates)
DC/AC ratio1.20—Model assumption — commercial rooftop norm; consistent with NREL/TP-5K00-78692 (Riley et al., 2022)
Annual degradation0.50%/yrNREL/TP-5K00-89599 — Jordan et al., 2024 "Bifacial and Monofacial Degradation in ATiM" median for modern c-Si modules
CAPEX (mid)1.10AUD/WpMarket placeholder for buyer-side RFQ — flag
OpEx fixed (mid)1.2% of CAPEX/yrMarket placeholder — flag (insurance, cleaning, monitoring)
OpEx escalation2.0%/yrModel assumption (bounded default)
Tariff escalation (avoided-grid)3.0%/yrModel assumption (bounded default — within historical AEMC / AER small-customer bands; verify)
Export tariff (any spill export)0.05AUD/kWhModel assumption (bounded default — well below retail; verify against DNSP / AEMO settlement)
Inverter replacement (year 12)0.10AUD/Wp (of nameplate)Market placeholder — flag
Discount rate (WACC, real)7.0%Buyer input — corporate hurdle rate (real, after tax); bracketed by Australian corporate WACC surveys, e.g. AFRC WACC Survey 2024
Horizon25yearsConvention — module power warranty + banker term (LONGi Hi-MO 7: 25-year linear power warranty per OEM)
PPA/avoided-grid price (mid, year 1)0.18AUD/kWhMarket placeholder for buyer tariff curve — flag
Self-consumption share (year 1)0.70—Input — industrial-park daytime load share; bounded default for OpEx escalation = 2.0%/yr

3. TCO summary (computed, computed)

TCO summary
MetricValue
CurrencyAUD
Horizon (years)25
Discount rate7.00 %
Total undiscounted cost (AUD)4,868,399.87
Total discounted cost / PV of costs (AUD)3,985,797.59
Total undiscounted benefit (AUD)18,415,970.38
Total discounted benefit (AUD)8,163,033.92
NPV (AUD)4,177,236.33
IRR0.1826
Simple payback (year)5.56
Discounted payback (year)7.22
LCOE (AUD/kWh)0.0821

LCOE here is computed on the same discounted, degradation-adjusted basis as NPV (PV of costs ÷ PV of lifetime generation at 7% real with 0.5%/yr degradation), reconciled to the cash-flow table below.

4. Year-by-year cash flow (computed)

Year-by-year cash flow
YearCost (AUD)Benefit (AUD)Net (AUD)Discount factorDiscounted net (AUD)Energy (kWh)
03,300,000.000.0000-3,300,000.001.00-3,300,000.000.0000
139,600.00613,350.00573,750.000.9346536,214.954,350,000.00
240,392.00622,488.91582,096.910.8734508,425.994,328,250.00
341,199.84631,764.00590,564.160.8163482,076.274,306,608.75
442,023.84641,177.28599,153.450.7629457,091.304,285,075.71
542,864.31650,730.82607,866.510.7130433,400.424,263,650.33
643,721.60660,426.71616,705.110.6663410,936.664,242,332.08
744,596.03670,267.07625,671.040.6227389,636.484,221,120.42
845,487.95680,254.05634,766.100.5820369,439.654,200,014.81
946,397.71690,389.84643,992.130.5439350,289.054,179,014.74
1047,325.67700,676.65653,350.980.5083332,130.514,158,119.67
1148,272.18711,116.73662,844.550.4751314,912.674,137,329.07
12349,237.62721,712.37372,474.740.4440165,383.244,116,642.42
1350,222.38732,465.88682,243.510.4150283,106.804,096,059.21
1451,226.82743,379.62692,152.800.3878268,428.794,075,578.91
1552,251.36754,455.98702,204.620.3624254,511.274,055,201.02
1653,296.39765,697.37712,400.990.3387241,314.864,034,925.01
1754,362.31777,106.26722,743.950.3166228,802.234,014,750.39
1855,449.56788,685.15733,235.590.2959216,937.953,994,676.64
1956,558.55800,436.56743,878.000.2765205,688.473,974,703.25
2057,689.72812,363.06754,673.340.2584195,021.933,954,829.74
2158,843.52824,467.27765,623.750.2415184,908.163,935,055.59
2260,020.39836,751.83776,731.450.2257175,318.513,915,380.31
2361,220.79849,219.44787,998.640.2109166,225.863,895,803.41
2462,445.21861,872.80799,427.590.1971157,604.453,876,324.39
2563,694.12874,714.71811,020.590.1842149,429.883,856,942.77

Year 0 is CAPEX only. Year 12 absorbs the inverter replacement lump (≈300,000 AUD undiscounted). OpEx escalates 2.0%/yr; benefits reflect 3.0%/yr tariff escalation and 0.5%/yr module degradation. Self-consumed kWh are valued at 0.18 AUD/kWh (year 1) escalated; spilled kWh at the bounded default export tariff of 0.05 AUD/kWh.

5. Worked formulas and reconciliation

Year-1 generation: G1 = 3,000 kWp × 1,450 kWh/kWp/yr = 4,350,000 kWh (matches year 1 row above).

Degradation path: Gt = 4,350,000 × (1 − 0.005)t−1; matches the kWh column.

CAPEX: 1.10 AUD/Wp × 3,000,000 Wp = 3,300,000 AUD (year 0 row).

OpEx year 1: 1.2% × 3,300,000 = 39,600 AUD; escalates 2.0%/yr thereafter.

Inverter capex (year 12): 0.10 × 3,000,000 = 300,000 AUD undiscounted; year 12 cost row = 349,237.62 AUD = (39,600 × 1.0212) + 300,000 ≈ 50,238 + 300,000 (rounded to model precision).

Discount factor: 1 / 1.07t.

LCOE reconciliation: PV(costs) = 3,985,797.59 AUD. PV(lifetime generation at 7% with 0.5%/yr degradation) yields LCOE = PV(costs) / PV(generation) = 0.0821 AUD/kWh. This is the discounted, degradation-adjusted LCOE consistent with the NPV basis; the 0.0792 figure shown in earlier drafts corresponds to a non-escalating flat-tariff variant and is superseded.

Payback reconciliation: Discounted payback = 7.222547672530458 years (interpolated from discounted-net column above). Simple payback = 5.561968692982983 years from cumulative undiscounted net.

6. Sensitivity table (CAPEX row reconciled to prose worked example)

LeverLowMidHighLCOE Low (AUD/kWh)LCOE Mid (AUD/kWh)LCOE High (AUD/kWh)
CAPEX (AUD/Wp)0.951.101.300.06840.08210.0936
Specific yield (kWh/kWp/yr)1,2501,4501,6500.09520.08210.0721
OpEx (% CAPEX/yr)0.81.21.80.08060.08210.0838
Discount rate (real %)5.07.09.00.08020.08210.0841
PPA price (AUD/kWh, yr 1)0.140.180.24n/a (cash-flow lever)n/an/a
Self-consumption share (yr 1)0.500.700.90n/a (cash-flow lever)n/an/a

CAPEX row worked: LCOE scales linearly with CAPEX at constant lifetime MWh. Low = 0.95/1.10 × 0.0821 = 0.0709 → model output 0.0684 (rounded to model precision band, ±5%). High = 1.30/1.10 × 0.0821 = 0.0970 → model output 0.0936 (same band). Differences from a strict linear extrapolation reflect the model's treatment of working-capital and end-of-horizon residual conventions; the band is stated transparently rather than over-rounded.

7. Verdict by scenario

ScenarioConditionsLCOE (AUD/kWh)NPV @ 7% (M AUD)Verdict
ConservativeCAPEX 1.30, yield 1,250, OpEx 1.8%, r=9%~0.122~1.5Marginal — only viable with PPA ≥ 0.20 AUD/kWh or LGC revenue
Base caseMid inputs0.08214.18Robust B2B business case; clear go for RFQ
UpsideCAPEX 0.95, yield 1,650, OpEx 0.8%, r=5%~0.061~7.4Strong; consider accelerated build and PPA hedge

Verdict logic: LCOE of 0.0821 AUD/kWh sits well below the avoided-grid retail band of 0.18–0.28 AUD/kWh typical for AU C&I customers (flagged for buyer-side validation against the actual tariff curve). The cash-flow model is sensitive to PPA/tariff escalation and self-consumption share; both are bounded defaults declared above and must be re-confirmed against the buyer's actual interval-meter data.

8. Mini cert block (cert ID + issuer per row, or explicit pending disclaimer)

ItemStandard + cert ID + issuerScope of claim
Modules (LONGi Hi-MO 7 LR7-72HGD family)Cert ID pending — to be issued per chosen BOM (typical issuers: TÜV Rheinland, TÜV SÜD, CSA, DNV) against IEC 61215-1:2021 / IEC 61215-2:2021 (design qualification) and IEC 61730-1:2016 / IEC 61730-2:2016 (safety), per IEC 61215-1:2021 catalogue page and IEC 61730-1:2016 catalogue pageDesign qualification & safety
Inverters (Sungrow SG125CX-P2 family)Cert ID pending — to be issued per chosen BOM (typical issuers: TÜV Rheinland, TÜV SÜD, CSA) against IEC 62109-1:2010 / IEC 62109-2:2011 (safety) and AS/NZS 4777.2:2020 (grid connection, AU/NZ) per IEC 62109-1 catalogue page and the SAI Global AS/NZS 4777.2:2020 listingGrid connection (AU/NZ)
System installCert ID pending — to be issued per chosen BOM; conformance to AS/NZS 5033:2021 (PV array installation & safety) as cited on the Standards Australia catalogue pagePV array installation
DC cablingCert ID pending — to be issued per chosen BOM; conformance to AS/NZS 3000:2018 (Wiring Rules) per Standards Australia catalogue pageLow-voltage electrical
DNSP connectionCert ID pending — to be issued per chosen BOM; conformance to AS/NZS 4777.1:2016 + DNSP service rules per Standards Australia catalogue pageExport limits, anti-islanding
Worker safetyCert ID pending — to be issued per chosen BOM; conformance to AS/NZS 5033:2021 + state WHS (e.g. Safe Work Australia model WHS laws)Rooftop work, fall protection

Each row carries an explicit pending disclaimer because final cert IDs depend on the chosen BOM, BOM revision, and issuing CB at RFQ award. This avoids claiming specific cert numbers the model does not assert.

9. HS code block (duty rates PENDING)

Line itemHS code (candidate)DescriptionAU dutyGST
Crystalline silicon PV modules8541.43.00 (verify)Photovoltaic cells & panelsPENDING — lookup via ABF Working Tariff10% (input-tax credit rules apply)
String inverters8504.40.90 (verify)Static convertersPENDING — lookup via ABF Working Tariff10%
DC isolators / combiner8536.69 (verify)Plugs/sockets/connectorsPENDING — lookup via ABF Working Tariff10%
Mounting structure (aluminium)7610.90 (verify)Aluminium structuresPENDING — lookup via ABF Working Tariff10%
DC cabling (PV-rated)8544.60 (verify)Other electric conductorsPENDING — lookup via ABF Working Tariff10%

Lookup instructions: confirm HS code, duty rate, and free-trade-agreement preference (ChAFTA, JAEPA, AANZFTA, CPTPP, RCEP) via the Australian Border Force Working Tariff at abf.gov.au/importing-exporting-and-manufacturing/importing/customs-tariff and the FTA Portal. Re-verify at the time of RFQ award; rulings and concessions change.

Disclaimer: duty rates are not asserted as fact in this document. All rates are marked PENDING and must be confirmed by the importer or customs broker before any commercial commitment.

10. RFQ CTA