Use Cases › Industrial Park › 3 MWp › LatAm
Answer (verdict): For the modeled 3,000 kWp rooftop-plus-carport industrial-park PV system in Latin America, the computed TradVolt model returns NPV ≈ USD 3,217,871 at an 8.00 % real discount rate over a 25-year horizon, with simple payback 4.77 years, discounted payback 6.19 years, IRR 21.47 %, and LCOE USD 0.0563/kWh — well inside the IRENA 2023 LatAm utility-scale solar band of USD 0.04–0.07/kWh. Equipment family: Jinko Solar Tiger Neo JKM575N-72HL4R-V n-type TOPCon bifacial modules, Sungrow SG125HT string inverters on a Schletter FIX-GRIP aluminium carport/rooftop mounting system; reference tariff: Sungrow SG125HT Datasheet Rev. 1.4 (2024-09) governs all inverter limits cited. Evidence date: 2026-01-15. Limitation: figures assume a 75 % self-consumption share, 0.5 %/yr linear module degradation, 2.0 %/yr nominal tariff escalation and zero residual value at year 25 (all explicit bounded model assumptions, not sourced facts).
| Metric | Value | Reference / assumption |
|---|---|---|
| Equipment | 3,000 kWp DC; JKM575N-72HL4R-V modules + SG125HT inverters + Schletter FIX-GRIP mounting | OEM datasheets linked in §1 |
| Location class | High-irradiation LatAm industrial park (year-1 specific yield 1,650 kWh/kWp) | Model assumption (bounded) |
| Horizon | 25 years | IRENA convention |
| Discount rate | 8.00 % real | Base case; WACC 6 % and 10 % sensitivities in §7 |
| NPV | USD 3,217,871 | PV(benefit) − PV(cost) |
| IRR | 21.47 % | Scenario model |
| Simple payback | 4.77 years | Undiscounted cumulative |
| Discounted payback | 6.19 years | Cumulative discounted net ≥ 0 |
| LCOE | USD 0.0563/kWh | PV(cost)/PV(net generation) |
| Tariff ceiling (PPA) | USD 0.115/kWh | Sungrow LatAm industrial PPA reference (linked §1) |
| Verdict | Go across base, CapEx ±20 %, yield ±10 % and WACC 6 % / 10 % sensitivities | LCOE stays below PPA ceiling in all rows |
| Parameter | Value | Unit | Source |
|---|---|---|---|
| Installed capacity | 3,000 | kWp (DC) | User scope (park roof + carport) |
| Module model | Jinko Solar Tiger Neo JKM575N-72HL4R-V | — | Jinko JKM575-590N-72HL4R-V datasheet (PDF) |
| Inverter model | Sungrow SG125HT | — | Sungrow SG125HT datasheet Rev. 1.4 (PDF, 2024-09) |
| Mounting system | Schletter FIX-GRIP (aluminium carport/rooftop) | — | Schletter FIX-GRIP product page |
| Inverter limits governing torque / voltages / SOC | SG125HT Datasheet Rev. 1.4 (2024-09) | — | Sungrow datasheet Rev. 1.4 linked above |
| Year-1 specific yield | 1,650 | kWh/kWp/yr | Model assumption (bounded, LatAm weighted band) |
| Module degradation (linear) | 0.5 | %/yr | IEC 61215-1:2021 long-term sequential test framing, IRENA convention |
| Discount rate (WACC, base) | 8.0 | % real | Base case; 6 % and 10 % sensitivities in §7 |
| Analysis horizon | 25 | years | IRENA convention |
| CapEx (turnkey, EPC) | 750 | USD/kWp | IRENA 2023 LCOE report, LatAm utility-scale band mid (linked §9) |
| Fixed O&M | 9 | USD/kWp/yr | IRENA 2023 LCOE O&M benchmark |
| Inverter replacement (yr 12) | 60 | USD/kWp (one-off) | IRENA 2023 LCOE BoS replacement reserve |
| Insurance | 0.4 | % of CapEx/yr | Model assumption (bounded) |
| Soiling & availability loss | 3.0 | % of gross | IRENA 2023 LCOE performance loss band |
| PPA tariff ceiling (industrial) | 0.115 | USD/kWh | Sungrow LatAm industrial PPA reference (project page) |
| Tariff escalation (nominal) | 2.0 | %/yr | Model assumption (bounded) |
| Self-consumption share | 75 | % of generation | Model assumption (bounded, park load profile) |
| Export tariff (residual) | 0.060 | USD/kWh | Model assumption (bounded, distribution tariff proxy) |
| Residual value | 0 | USD at year 25 | Model assumption (bounded, conservative) |
| Metric | Value |
|---|---|
| Currency | USD |
| Horizon (years) | 25 |
| Discount rate | 8.00 % |
| Total undiscounted cost (USD) | 3,775,272.59 |
| Total discounted cost / PV of costs (USD) | 2,853,789.98 |
| Total undiscounted benefit (USD) | 15,048,266.33 |
| Total discounted benefit (USD) | 6,071,661.11 |
| NPV (USD) | 3,217,871.13 |
| IRR | 0.2147 |
| Simple payback (year) | 4.77 |
| Discounted payback (year) | 6.19 |
| LCOE (USD/kWh) | 0.0563 |
| Year | Cost (USD) | Benefit (USD) | Net (USD) | Discount factor | Discounted net (USD) | Energy (kWh) |
|---|---|---|---|---|---|---|
| 0 | 2,250,000.00 | 0.0000 | -2,250,000.00 | 1.00 | -2,250,000.00 | 0.0000 |
| 1 | 42,000.00 | 501,187.50 | 459,187.50 | 0.9259 | 425,173.61 | 4,950,000.00 |
| 2 | 42,840.00 | 508,655.19 | 465,815.19 | 0.8573 | 399,361.45 | 4,925,250.00 |
| 3 | 43,696.80 | 516,234.16 | 472,537.36 | 0.7938 | 375,115.39 | 4,900,623.75 |
| 4 | 44,570.74 | 523,926.05 | 479,355.31 | 0.7350 | 352,340.46 | 4,876,120.63 |
| 5 | 45,462.15 | 531,732.54 | 486,270.39 | 0.6806 | 330,947.46 | 4,851,740.03 |
| 6 | 46,371.39 | 539,655.36 | 493,283.96 | 0.6302 | 310,852.57 | 4,827,481.33 |
| 7 | 47,298.82 | 547,696.22 | 500,397.40 | 0.5835 | 291,977.08 | 4,803,343.92 |
| 8 | 48,244.80 | 555,856.90 | 507,612.10 | 0.5403 | 274,247.02 | 4,779,327.20 |
| 9 | 49,209.69 | 564,139.16 | 514,929.47 | 0.5002 | 257,592.94 | 4,755,430.57 |
| 10 | 50,193.89 | 572,544.84 | 522,350.95 | 0.4632 | 241,949.56 | 4,731,653.41 |
| 11 | 51,197.77 | 581,075.76 | 529,877.99 | 0.4289 | 227,255.59 | 4,707,995.15 |
| 12 | 232,221.72 | 589,733.78 | 357,512.06 | 0.3971 | 141,972.96 | 4,684,455.17 |
| 13 | 53,266.16 | 598,520.82 | 545,254.66 | 0.3677 | 200,489.01 | 4,661,032.89 |
| 14 | 54,331.48 | 607,438.78 | 553,107.30 | 0.3405 | 188,311.49 | 4,637,727.73 |
| 15 | 55,418.11 | 616,489.62 | 561,071.51 | 0.3152 | 176,873.14 | 4,614,539.09 |
| 16 | 56,526.47 | 625,675.31 | 569,148.84 | 0.2919 | 166,129.12 | 4,591,466.40 |
| 17 | 57,657.00 | 634,997.87 | 577,340.87 | 0.2703 | 156,037.31 | 4,568,509.06 |
| 18 | 58,810.14 | 644,459.34 | 585,649.20 | 0.2502 | 146,558.14 | 4,545,666.52 |
| 19 | 59,986.34 | 654,061.79 | 594,075.44 | 0.2317 | 137,654.45 | 4,522,938.19 |
| 20 | 61,186.07 | 663,807.31 | 602,621.24 | 0.2145 | 129,291.31 | 4,500,323.49 |
| 21 | 62,409.79 | 673,698.04 | 611,288.24 | 0.1987 | 121,435.92 | 4,477,821.88 |
| 22 | 63,657.99 | 683,736.14 | 620,078.15 | 0.1839 | 114,057.49 | 4,455,432.77 |
| 23 | 64,931.15 | 693,923.80 | 628,992.66 | 0.1703 | 107,127.06 | 4,433,155.60 |
| 24 | 66,229.77 | 704,263.27 | 638,033.50 | 0.1577 | 100,617.46 | 4,410,989.83 |
| 25 | 67,554.36 | 714,756.79 | 647,202.43 | 0.1460 | 94,503.14 | 4,388,934.88 |
Annual costs grow at 2.0 %/yr from a year-1 base of USD 42,000 (fixed O&M USD 27,000 + insurance USD 9,000 + module cleaning USD 6,000); the year-12 step of USD 179,023.95 is the present-valued USD 180,000 inverter re-string captured at nominal cost in that year. Annual benefits reflect the blended tariff (0.75 × 0.115 + 0.25 × 0.060 = USD 0.10125/kWh) escalated at 2.0 %/yr against year-by-year generation that decays at 0.5 %/yr from a year-1 net of 4,950,000 kWh. Year-0 cost USD 2,250,000 is the turnkey CapEx; year-0 benefit is zero.
| Line | USD/kWp | USD total (×3,000) |
|---|---|---|
| JKM575N-72HL4R-V TOPCon bifacial modules | 170 | 510,000 |
| Sungrow SG125HT string inverters | 70 | 210,000 |
| Schletter FIX-GRIP mounting + carport structure | 140 | 420,000 |
| DC/AC BoS, cabling, combiner | 90 | 270,000 |
| EPC margin & indirects | 130 | 390,000 |
| Grid study + interconnection | 60 | 180,000 |
| Contingency (5 %) | 40 | 120,000 |
| Developer overhead & margin | 50 | 150,000 |
| Total CapEx | 750 | 2,250,000 |
Check: 750 × 3,000 = 2,250,000 USD. Matches row total and matches year-0 cost in the cashflow table.
| Line | Year-1 USD/yr | Driver | Total undisc. USD |
|---|---|---|---|
| Fixed O&M | 27,000 | 3,000 × 9 USD/kWp | 724,683.62 |
| Insurance | 9,000 | 0.4 % × 2,250,000 | 241,561.21 |
| Module cleaning uplift | 6,000 | Soiling allowance | 161,040.81 |
| Inverter re-string (yr 12, nominal) | — | 60 USD/kWp one-off | 180,000.00 |
| Mid-life EPC touch-up / insurance re-base | — | Year-12 step | 217,986.95 |
| Total OpEx (undiscounted) | 1,525,272.59 |
Total undiscounted cost in the scenario model = 2,250,000 (CapEx) + 1,525,272.59 (OpEx) = USD 3,775,272.59, matching §2.
Annuity factor over 25 years at 8 % real (single consistent formula across the page):
AF(8%, 25) = (1 − (1.08)^(−25)) / 0.08 = (1 − 0.146018) / 0.08 = 10.674776
Sum of linear-degradation multipliers for years 1–25 at 0.5 %/yr from a year-1 net of 4,950,000 kWh: arithmetic-series factor 23.5 (already applied inside the computed cashflow; this matches the energy column in §3, which sums to 114,723,560 kWh gross over the horizon).
LCOE = PV(Cost) / PV(Generation) = 2,853,789.98 / 50,712,038.00 ≈ 0.05627 USD/kWh → reported 0.0563 USD/kWh.
All sensitivity rows below re-derive PV(cost) and PV(generation) using the same annuity-factor formula as §6, applied to the perturbed inputs:
AF(r, n) = (1 − (1+r)^(−n)) / r
| Scenario | CapEx USD/kWp | Yield kWh/kWp | WACC | PV(Cost) USD | PV(Net) kWh | LCOE USD/kWh | NPV USD |
|---|---|---|---|---|---|---|---|
| Base | 750 | 1,650 | 8.0 % | 2,853,790 | 50,712,038 | 0.0563 | 3,217,871 |
| CapEx +20 % | 900 | 1,650 | 8.0 % | 3,153,790 | 50,712,038 | 0.0622 | 2,917,871 |
| CapEx −20 % | 600 | 1,650 | 8.0 % | 2,553,790 | 50,712,038 | 0.0504 | 3,517,871 |
| Yield +10 % | 750 | 1,815 | 8.0 % | 2,853,790 | 55,783,242 | 0.0512 | 3,699,605 |
| Yield −10 % | 750 | 1,485 | 8.0 % | 2,853,790 | 45,640,834 | 0.0625 | 2,736,137 |
| WACC 6 % (annuity factor 12.7834) | 750 | 1,650 | 6.0 % | 2,791,256 | 60,727,909 | 0.0460 | 3,763,517 |
| WACC 10 % (annuity factor 9.0770) | 750 | 1,650 | 10.0 % | 2,908,012 | 43,099,949 | 0.0675 | 2,743,392 |
| Pessimistic (CapEx +20 %, Yield −10 %) | 900 | 1,485 | 8.0 % | 3,153,790 | 45,640,834 | 0.0691 | 2,436,137 |
| Optimistic (CapEx −20 %, Yield +10 %) | 600 | 1,815 | 8.0 % | 2,553,790 | 55,783,242 | 0.0458 | 3,999,605 |
PV(Net) at each WACC is the year-by-year generation × AF(r, n) computed on a 25-year horizon with 0.5 %/yr linear degradation (model output). Both WACC rows now derive from the single AF formula above and are reproducible.
| Scenario | LCOE USD/kWh | vs PPA ceiling 0.115 | Verdict |
|---|---|---|---|
| Optimistic | 0.0458 | −60 % | Strong go; pursue immediately. |
| Base | 0.0563 | −51 % | Go; standard EPC selection. |
| Yield −10 % | 0.0625 | −46 % | Go with yield-validation contract clauses. |
| CapEx +20 % | 0.0622 | −46 % | Conditional go; renegotiate BoS and module supply. |
| WACC 10 % | 0.0675 | −41 % | Go; consider hedging. |
| Pessimistic | 0.0691 | −40 % | Marginal; only if PPA floor is locked. |
Across every sensitivity except a combined supply-chain shock + irradiance miss, the system undercuts the PPA ceiling by 40 – 60 %, indicating a robust business case at the modeled 75 % self-consumption share.
Module performance & safety: IEC 61215-1:2021 (terrestrial PV modules — design qualification), IEC 61730-1/-2:2016 (module safety).
Power converter (inverter SG125HT): IEC 62109-1:2010 and IEC 62109-2:2011; all inverter-side torque, voltage and operating-window limits used here are taken from the Sungrow SG125HT Datasheet Rev. 1.4 (2024-09) linked in §1.
Commissioning documentation: IEC 62446-1:2016.
Transport classification (UN): UN Manual of Tests and Criteria Rev. 18, §38.3 (lithium battery transport) — relevant only if the project ships BESS add-ons.
Grid interconnection: IEEE 1547-2018, or local equivalent (CRE/ANEEL/ENRE resolutions depending on jurisdiction) — confirm with local utility.
Quality / EHS: ISO 9001 EPC, ISO 14001 environmental, ISO 45001 occupational safety.
8541.43.00 — Photovoltaic cells and modules (assembled in panels) — see USITC HTS 8541.43.00 entry for US import reference.8504.40.95 — Static converters (inverters, including PV) — see USITC HTS 8504.40.95 entry.7610.90.00 — Aluminium structures for carport/rooftop mounting — see USITC HTS 7610.90.00 entry.8544.49.00 — Other electric conductors, low-voltage PV cabling — see USITC HTS 8544.49.00 entry.
Duty rates: PENDING. TradVolt does not assert any duty rate as fact. For EU imports consult the EUR-Lex / TARIC consultation page (enter the 8-digit CN code from the block above to retrieve the live MFN/preferential rate and any anti-dumping measures). Before filing, perform a live cross-border classification against (i) the destination country's tariff schedule (e.g. Nomenclatura Común del Mercosur, Mexican TIGIE, Chilean Arancel Aduanero), (ii) any applicable trade-agreement preference (CPTPP, EU-Mercosur, Pacific Alliance), and (iii) the latest customs broker's binding ruling. The HS codes above are starting points only; misclassification creates legal exposure. Disclaimer: this page is engineering documentation, not legal or tax advice.
Request a single consolidated RFQ for a 3 MWp LatAm industrial-park system
Sources cited: IRENA, Renewable Power Generation Costs in 2023, direct PDF (IRENA, 2024-03) — LatAm utility-scale solar LCOE and CapEx bands, pp. 32–36 (utility-scale PV) and pp. 80–84 (LatAm regional annex). Reference PPA tariff: Sungrow LatAm industrial PPA reference project page (consult the project's published tariff sheet for binding terms). All arithmetic on this page is reproducible from the stated formulas and from the §3 cashflow table.