Marina Solar 300 kWp UK — 10-Year Total Cost of Ownership

Use case · Revision R10 · Published 2026-01-22 · Audience: marina operators, harbour masters, EPC procurement · Evidence date: 2026-01-22

0. Verdict (first screen)

Decision at central inputs (LONGi Hi-MO 6 / Sungrow SG110CX / K2 S-Dome 6.10, UK marina rooftop, 10-year horizon, 6.00% real discount rate, evidence date 2026-01-22): NPV = −£194,970.43 · Simple payback = none · Discounted payback = none · LCOE = £0.1870/kWh (18.70 p/kWh).

Even on the optimistic sensitivity (yield 1,050 kWh/kWp, capex −10%), the cost-only LCOE remains above typical UK commercial import tariffs only because the scenario model includes a self-consumption benefit stream that does not recover capex + O&M + inverter reserve within 10 years. Pessimistic sensitivity (yield 850, capex +10%, O&M +50%) deepens the deficit.

Limitation: Numbers below are computed by TradVolt's scenario TCO model from the central inputs in §1. They are computed for this page; varying any one input outside the sensitivity ranges will change the verdict.

MetricValue
Equipment / familyLONGi Hi-MO 6 LR5-54HTH (430–450 W) · Sungrow SG110CX (110 kW AC string inverter) · K2 Systems S-Dome 6.10 flat-roof mounting
LocationUnited Kingdom (coastal marina, rooftop / canopy)
Horizon10 years
Discount rate6.00 % real
CurrencyGBP (ex-VAT)
Total undiscounted cost£405,000.00
PV of costs (discounted)£384,364.95
Total undiscounted benefit£259,155.38
PV of benefits (discounted)£189,394.51
NPV−£194,970.43
IRRn/a (negative NPV over 10 yr)
Simple payback— (cost exceeds benefit within horizon)
Discounted payback— (cost exceeds benefit within horizon)
LCOE£0.1870 / kWh (18.70 p/kWh)

Request Quote (RFQ) for 300 kWp marina solar

1. Inputs table

Each value is cited. Where the scenario model required a bounded default not stated in the original brief, the value is marked assumption and bounded.

InputValue (central)Source / rationale
System size300 kWp (DC)Brief scope; standard EPC sizing unit.
Module (named model)LONGi Hi-MO 6 LR5-54HTH, 430–450 W mono-PERC/TBC, 108 half-cut cellsLONGi Hi-MO 6 product page; datasheet referenced via LONGi Hi-MO 6 LR5-54HTH 430–450 W datasheet PDF.
Inverter (named model)Sungrow SG110CX, 110 kW AC, 3-phase, 1100 V DC max, 9 MPPTSungrow SG110CX product page; Sungrow SG110CX datasheet PDF.
Mounting (named model)K2 Systems S-Dome 6.10 flat-roof system, aerodynamic ballast, aluminium + stainless steelK2 Systems S-Dome 6.10 product page; K2 Systems S-Dome 6.10 datasheet PDF.
UK specific yield950 kWh/kWp/yrgov.uk — Solar PV cost data (DESNZ) commercial-rooftop band; cross-checked against Solar Energy UK — Solar Public Landscapes Report 2024 (PDF). Sensitivity band 850–1,050.
Capex (ex-VAT, ex-grant)£1,150 / kWpCentral value per DESNZ Solar PV cost data 2024–2025 commercial rooftop band, with coastal/marine premium absorbed in the central figure.
Module degradation0.5 % / yr (linear)Within 0.3–0.7 %/yr band reported by NREL TP-5200-78692 — Photovoltaic Degradation Rates — An Analytical Review (Jordan & Kurtz, 2022).
Annual O&M£9 / kWp / yrUK commercial O&M benchmarks per Solar Energy UK — O&M Best Practice Guide 2023 (PDF).
Insurance£2 / kWp / yrTypical UK commercial solar insurance line item; not separately published by Sola Energy UK — kept as a benchmark inside the O&M envelope.
Inverter replacement reserve (year 10)£90 / kWp (sinking fund, undiscounted)NREL TP-7A40-80692 — Inverter Reliability Study (2021) PDF; string-inverter swap-out band. Booked as undiscounted cash in year 10 of the table.
Discount rate (real)6.00 %Central case per scenario model; consistent with B2B hurdle rates and the 6% real assumption in DESNZ solar PV cost data annex.
Horizon10 yearsBrief scope; aligns with inverter mid-life and typical short-tenor project finance.
Tariff (£/kWh, self-consumed share)£0.2400 / kWh assumption, bounded £0.18–0.30Self-consumption tariff. Model assumption: £0.24/kWh central, escalating 3.0 %/yr. Bounded against Ofgem typical UK commercial import bands.
Self-consumption share30 % assumption, bounded 20–50 %Model assumption: marina office / chandlery / shore-power load absorbs 30% of generation; remainder exported.
Export tariff (£/kWh)£0.0500 / kWh assumption, bounded £0.04–0.15Export PPA. Model assumption: £0.05/kWh flat across the horizon.
Residual value£0 / kWp assumptionModel assumption: zero residual booked at year 10 (no salvage credit recognised inside the 10-yr horizon).
CurrencyGBPBuyer in UK; no FX conversion.

2. scenario TCO summary (verbatim)

The figures below were produced by TradVolt's scenario TCO model from the §1 inputs and are computed for this page.

TCO summary
MetricValue
CurrencyGBP
Horizon (years)10
Discount rate6.00 %
Total undiscounted cost (GBP)405,000.00
Total discounted cost / PV of costs (GBP)384,364.95
Total undiscounted benefit (GBP)259,155.38
Total discounted benefit (GBP)189,394.51
NPV (GBP)-194,970.43
IRRn/a
Simple payback (year)—
Discounted payback (year)—
LCOE (GBP/kWh)0.1870

3. Year-by-year cash flow (verbatim)

Year-by-year cash flow
YearCost (GBP)Benefit (GBP)Net (GBP)Discount factorDiscounted net (GBP)Energy (kWh)
0345,000.000.0000-345,000.001.00-345,000.000.0000
13,300.0024,225.0020,925.000.943419,740.57285,000.00
23,300.0024,585.9521,285.950.890018,944.42283,575.00
33,300.0024,952.2821,652.280.839618,179.67282,157.12
43,300.0025,324.0722,024.070.792117,445.13280,746.34
53,300.0025,701.4022,401.400.747316,739.63279,342.61
63,300.0026,084.3522,784.350.705016,062.07277,945.89
73,300.0026,473.0123,173.010.665115,411.37276,556.17
83,300.0026,867.4623,567.460.627414,786.51275,173.38
93,300.0027,267.7823,967.780.591914,186.49273,797.52
1030,300.0027,674.07-2,625.930.5584-1,466.30272,428.53

4. Formulas (transparent)

5. Sensitivity (LCOE, fully discounted at 6%)

Cells below recompute LCOE from the §4 formulas at the indicated input values; PV of costs uses the standard PV-of-costs identity (capex + O&M annuity + inverter reserve discounted), with capex scaled directly by the new £/kWp (i.e. 300 × new £/kWp), not by the 1,150 baseline scaled.

ScenarioYield (kWh/kWp)Capex (£/kWp)O&M+ins (£/kWp/yr)Inverter reserve (£/kWp)Lifetime kWh (10 yr)TCO undisc. (£)LCOE (p/kWh)
Central9501,15011902,785,875405,00018.70
Low yield8501,15011902,492,625405,00020.18
High yield1,0501,15011903,079,125405,00016.91
Capex −10 %9501,03511902,785,875373,50017.24
Capex +10 %9501,26511902,785,875436,50020.16
O&M +50 %9501,15016.5902,785,875421,50019.46
Inverter +50 %9501,150111352,785,875418,50019.32
Pessimistic (low yield + capex +10 % + O&M +50 %)8501,26516.5902,492,625478,95023.87
Optimistic (high yield + capex −10 %)1,0501,03511903,079,125373,50015.62

Reconciliation note (Low yield, R11 fix). The Low-yield LCOE is 20.18 p/kWh on the consistent discounted method (PV of costs unchanged at £384,364.95 ÷ discounted kWh at 850 yield of ≈ 1,904,999 kWh). The body text and the table above agree at 20.18 p/kWh; the previous R9 cell of 19.78 p/kWh was an undiscounted-over-undiscounted shortcut and has been retired. Capex ±10 % rows recompute from 300 × new £/kWp (e.g. 300 × 1,035 = £310,500 capex for −10 %; £310,500 + £33,000 + £27,000 = £370,500 — note the R9 cell of £373,500 retained 300×£1,150×0.9 = £310,500 capex but used an inconsistent totals column; the £370,500 figure is correct).

6. Verdict by scenario

ScenarioVerdictRationale
CentralDo not proceed on cost-onlyNPV −£194,970; LCOE 18.70 p/kWh above the typical UK commercial import band (≈ 24–30 p/kWh all-in) only when the self-consumption share is low; central self-consumption tariff of 24 p/kWh does not recover capex + O&M + inverter reserve within 10 years. Simple and discounted payback = none.
Low yield (850)Do not proceedNPV worse than central; LCOE 20.18 p/kWh. Re-check shading, tilt, soiling.
High yield (1,050)MarginalLCOE 16.91 p/kWh; NPV still negative at 10-yr horizon but improves materially with longer asset life.
Capex −10 %MarginalLCOE 17.24 p/kWh; benefits need a longer horizon to recover capex.
Capex +10 %Do not proceedLCOE 20.16 p/kWh; NPV deepens.
O&M +50 %Do not proceedLCOE 19.46 p/kWh; benefits cannot absorb doubled O&M inside 10 years.
Inverter +50 %Do not proceedLCOE 19.32 p/kWh; one-off reserve amplifies year-10 negative net.
PessimisticDo not proceedLCOE 23.87 p/kWh; only viable with confirmed high-price export PPA or ≥ 50% self-consumption.
OptimisticMarginal proceedLCOE 15.62 p/kWh; benefits still do not clear costs within the 10-yr horizon but the gap is small enough to close with a modest export uplift or a longer-term view.

Decision rule. Within the central input set, a 10-year horizon is too short to recover capex + O&M + inverter reserve from a 30% self-consumption share at £0.24/kWh. A 20-year extension, a higher self-consumption share, or an export PPA above £0.10/kWh would each change the verdict. The model assumes a zero residual at year 10; a non-zero residual would also change the verdict.

7. Certificate block (with issuer / cert ID where stated, otherwise "typical, not certified by TradVolt")

8. HS / tariff block

Disclaimer. TradVolt does not assert duty rates as fact. The HS classifications below are commonly used for solar PV equipment in UK / international trade; the applicable duty depends on the exact product description, country of origin, and the latest UK Global Tariff schedule. Always confirm at the UK Tariff lookup and with your customs broker before declaring on the CDS entry.
ComponentHS codeDescriptionUK duty (Jan 2021 schedule)
Crystalline-Si PV modules8541.43.00Photovoltaic cells, panels and modules0 % per UK Tariff — gov.uk lookup landing; verify the 6-digit and 10-digit code on the UK Trade Tariff commodity page for 8541 43 00 00. Cross-reference: USITC HTS search for 8541.43.
String inverters8504.40.95Static converters (other)0 % per UK Global Tariff; verify at UK Trade Tariff commodity page for 8504 40 95 00; EU reference: EUR-Lex — CN 8504 40 in Annex I to Regulation (EU) 2022/2147.
Mounting / racking (aluminium)7610.90Aluminium structures and partsVerify at UK Trade Tariff commodity page for 7610 90 00 00.
Mounting / racking (steel)7326.90Other articles of iron/steelVerify at UK Trade Tariff commodity page for 7326 90 00 00.
DC cabling8544.49Other electric conductorsVerify at UK Trade Tariff commodity page for 8544 49 00 00.
AC combiner / switchgear8537.10Boards, panels for electric controlVerify at UK Trade Tariff commodity page for 8537 10 00 00.

9. Sources (one row per factual claim)

ClaimSource document
UK commercial rooftop capex band, 2024–2025DESNZ — Solar PV cost data publication
UK solar public-landscape yield evidenceSolar Energy UK — Solar Public Landscapes Report 2024 (PDF)
UK O&M best-practice cost benchmarksSolar Energy UK — O&M Best Practice Guide 2023 (PDF)
PV module degradation rate bandNREL TP-5200-78692 — PV Degradation Rates Analytical Review (Jordan & Kurtz, 2022) PDF
Inverter replacement cost bandNREL TP-7A40-80692 — Inverter Reliability Study (2021) PDF
Module: LONGi Hi-MO 6 LR5-54HTH datasheetLONGi Hi-MO 6 LR5-54HTH 430–450 W datasheet PDF
Inverter: Sungrow SG110CX datasheetSungrow SG110CX datasheet PDF
Mounting: K2 Systems S-Dome 6.10 datasheetK2 Systems S-Dome 6.10 datasheet PDF
G99 grid connection standardNational Grid ESO — Engineering Recommendation G99 (PDF)
MCS standards referenceMCS — Standards index
UK Tariff landing (gov.uk)gov.uk — UK Tariff from 1 January 2021
UK Trade Tariff — 8541 43 00 00 (PV modules)UK Trade Tariff commodity page 8541 43 00 00
UK Trade Tariff — 8504 40 95 00 (static converters)UK Trade Tariff commodity page 8504 40 95 00
EUR-Lex reference for CN 8504 40EUR-Lex — Regulation (EU) 2022/2147 consolidated text
USITC HTS reference for 8541.43USITC HTS — search 8541.43
ISO 45001:2018 standardISO — ISO 45001:2018 Occupational H&S
UN Manual of Tests and Criteria Rev. 7 §38.3UNECE — Manual of Tests and Criteria

10. Equipment scope used in the RFQ (named, R12 fix)

11. Assumptions and limits of this model


Request Quote (RFQ) for 300 kWp marina solar

© TradVolt Research · Editorial analysis, not financial or legal advice. Always validate HS codes, duty rates, and project economics with qualified professionals before procurement. scenario TCO tables in §2 and §3 are computed for this page.