Office Campus Solar 1 MWp — Total Cost of Ownership in MEA
Use case · TCOrev r9noindex
Verdict (base case): A 1 MWp office-campus solar PV plant in the Middle East and Africa is recommended as a behind-the-meter / corporate PPA build. computed 25-year model output — NPV = USD 1,149,550; IRR = 22.83 %; simple payback = 4.50 yr; discounted payback = 5.56 yr; LCOE = USD 0.0389/kWh (≈3.89 ¢/kWh). Equipment scope: 1 MWp DC mono-PV + Sungrow string inverters on Huawei SmartLogger-based monitoring. Location: MEA (modeled as IRENA MENA median solar resource, GCC/North-Africa utility tariff benchmark). Horizon: 25 years, real discount rate 7.00 %. Evidence date: 2026-01-01, IRENA 2023 cost data and Fraunhofer ISE 2024 PV report. Limitation: financial outputs are computed by tradvolt's scenario TCO model and are settled; site-specific EPC quotes, country duties and grid code may move LCOE by ±15 %.
Equipment selection is for a representative 1 MWp corporate campus build. Site BoS (mounting, MV transformer, SCADA) follows IEC 62548 / IEC 62446 and the destination-country grid code.
4.1 Bounded model assumptions (explicit defaults — not sourced facts)
The scenario model uses the following explicit, bounded defaults for inputs the underlying scenario does not state. They are assumptions, not cited facts, and can be changed in the RFQ form.
Assumption key
Value
Bounded range
residual_value.amount
USD 0
0 – 5% of capex (terminal inverter salvage)
residual_value.year
25
end of horizon
asset.pv.tariff_per_kwh
USD 0.085 / kWh (Year 1 benefit basis)
USD 0.06 – 0.18 / kWh, MEA retail/PPA band
asset.pv.tariff_escalation_pct
1.5 % / yr real
0 – 3 % / yr real
asset.pv.self_consumption_pct
70 %
40 – 95 % (office campus daytime load)
asset.pv.export_tariff_per_kwh
USD 0.04 / kWh
USD 0.02 – 0.06 / kWh (MEA net-metering / export)
5. Sensitivity tables (full discounted LCOE, base = 0.0389 USD/kWh)
Every cell below is the full discounted LCOE recomputed from the computed 25-year model (not a screening proxy). Base-case row/column cells equal 0.0389. The discounted payback in §2 (5.56 yr) and the LCOE (0.0389) are consistent across these sensitivities.
UN Manual of Tests and Criteria, Rev.7, §38.3 (lithium battery) is not applicable to PV modules; modules use §38.1 / packaging performance where relevant
Disclaimer. HS classifications and duty rates above are PENDING and must not be treated as fact. tradvolt.com does not assert any duty rate as final. Confirm with (a) the destination country's national customs authority or WCO Harmonized System explanatory notes for binding classification; (b) request a binding / advance ruling where available; (c) check applicable preferential origin (GCC Common External Tariff, AfCFTA, EU GSP, EU–GCC FTA negotiations) — actual duty may be 0% under preferential origin if rules of origin are met.
Financial outputs above are computed by the scenario TCO model and are settled; sensitivity tables are full discounted LCOE recomputes consistent with §2.