Office ESS 2 MWh — India TCO & Use Case

Verdict (modeled, base scenario). For a 2 MWh LFP office BESS in India climatic Region-9 over a 15-year horizon at a 10.00 % discount rate, the computed net present value (NPV) of the cash-flow stream is INR −14,09,68,730.25 (net cost of approximately ₹14.10 Cr). Both simple payback and discounted payback are none (no cumulative break-even within horizon). The levelised cost of storage (LCOS) is INR 25.05 / kWh, the internal rate of return is −40.70 %, and the present value of total discounted costs is INR 225,817,500.31 against a present value of total discounted benefits of INR 84,848,770.06. Evidence date: 2026-09-22. Limitation: this page models cash-flow arithmetic only; tariff structure, demand-charge design, OEM warranty terms, and replacement logistics need separate evaluation at RFQ stage.

Decision table — Office ESS 2 MWh IN-R9
Decision inputResult
Equipment / location / horizon2 MWh LFP office BESS, India Region-9, 15 years
Discount rate10.00 %
NPV (INR)-140,968,730.25
IRR-0.4070
Simple payback (year)—
Discounted payback (year)—
LCOS (INR/kWh)25.05
Total undiscounted cost (INR)298,692,225.67
PV of costs (INR)225,817,500.31
Total undiscounted benefit (INR)161,678,528.50
PV of benefits (INR)84,848,770.06
TCO summary
MetricValue
CurrencyINR
Horizon (years)15
Discount rate10.00 %
Total undiscounted cost (INR)298,692,225.67
Total discounted cost / PV of costs (INR)225,817,500.31
Total undiscounted benefit (INR)161,678,528.50
Total discounted benefit (INR)84,848,770.06
NPV (INR)-140,968,730.25
IRR-0.4070
Simple payback (year)—
Discounted payback (year)—
LCOS (INR/kWh)25.05
Year-by-year cash flow
YearCost (INR)Benefit (INR)Net (INR)Discount factorDiscounted net (INR)Energy (kWh)
0180,000,000.000.0000-180,000,000.001.00-180,000,000.000.0000
12,700,000.0012,368,739.139,668,739.130.90918,789,762.851,314,000.00
22,754,000.0012,121,364.359,367,364.350.82647,741,623.431,287,720.00
32,809,080.0011,878,937.069,069,857.060.75136,814,317.851,261,965.60
42,865,261.6011,641,358.328,776,096.720.68305,994,192.151,236,726.29
52,922,566.8311,408,531.158,485,964.320.62095,269,116.191,211,991.76
62,981,018.1711,180,360.538,199,342.360.56454,628,315.011,187,751.93
73,040,638.5310,956,753.327,916,114.790.51324,062,218.571,163,996.89
83,101,451.3010,737,618.257,636,166.950.46653,562,328.241,140,716.95
93,163,480.3310,522,865.897,359,385.560.42413,121,097.891,117,902.61
103,226,749.9410,312,408.577,085,658.640.38552,731,828.141,095,544.56
113,291,284.9310,106,160.406,814,875.460.35052,388,572.281,073,633.67
1275,357,110.639,904,037.19-65,453,073.440.3186-20,855,366.311,052,160.99
133,424,252.859,705,956.456,281,703.600.28971,819,585.781,031,117.77
143,492,737.909,511,837.326,019,099.420.26331,585,017.001,010,495.42
153,562,592.669,321,600.575,759,007.910.23941,378,660.71990,285.51
Request Quote — Office ESS 2 MWh IN-R9 Open Sizing & RFQ Form

1. Use Case Definition

A 2 MWh office energy storage system (BESS) serves a commercial office park in India Region-9 climatic conditions. Target revenue streams: peak-shaving (ToU arbitrage), demand-charge management, and diesel-displacement for backup. Throughput is sized at two full daily cycles (≈730 cycles/yr) consistent with Indian commercial load profiles and tariff windows.

1.1 Equipment identity (procurement-grade)

The model is sized around utility-scale LFP containerised BESS products that are publicly marketed for commercial and industrial use; exact model family, OEM manual revision, and PCS pairing must be confirmed at RFQ. The list below names real, publicly marketed product families and is not an endorsement of any single vendor:

Voltage, torque, and state-of-charge (SOC) limits are OEM-manual revision-specific; the selected vendor's manual revision must be cited on the project data sheet before construction. CATL EnerC-class containerised BESS families are also publicly marketed for utility/C&I use in this size class; the CATL ESS product family is at catl.com/en/ess — model family and revision confirmed at RFQ.

2. Inputs Table

Inputs below are model assumptions; values match the COMPUTED TABLES. Source links marked model assumption denote inputs the scenario does not externally source.

ParameterValueUnitSource / basis
Usable capacity2,000kWhModel assumption (project size, IN-R9)
Round-trip efficiency (DC)92%Model assumption (LFP utility-scale typical)
Depth of discharge90%Model assumption (LFP operating DoD)
Calendar life15yearsModel assumption (horizon)
Cycle life to 80 % SOH6,000cyclesModel assumption (LFP cell median)
Cycles per year730cycles/yrModel assumption (2 cycles/day commercial profile)
CAPEX (turnkey, year 0)180,000,000INRModel assumption (turnkey CAPEX)
Annual fixed OPEX (year 1)1.5 % of CAPEX → 2,700,000INR/yrModel assumption (BESS O&M band)
OPEX inflation2.0 % per year%Model assumption (rupee-denominated)
Auxiliary load (idle)1.5 % of nameplate / day → 30 kWh/day idlekWh/dayModel assumption (BESS aux)
Replacement reserve (year 12)Step-up to ₹75,357,110.63 in year 12 (module refurb / partial replacement reserve, including the OPEX step)INRModel assumption (module refurb reserve)
Discount rate10.00%Model assumption (INR corporate WACC)
Base electricity tariff (year 1)9.50INR/kWhModel assumption (C&I average, India R9)
Tariff CAGR (base)3.0%Model assumption (base scenario)
ESS throughput degradation2.0 % per year (capacity fade)%/yrModel assumption (asset.ess.degradation_pct_per_year)
Value per kWh discharged (benefit stream)= energy × tariff × efficiency; ₹12,368,739.13 in year 1, scaling with degradationINRModel assumption (asset.ess.value_per_kwh_discharged)
Charge cost per kWh (auxiliary / grid-side charge input)Embedded in net benefit stream; not separately itemisedINR/kWhModel assumption (asset.ess.charge_cost_per_kwh)
Residual value (asset salvage)0 INR at horizon endINRModel assumption (residual_value.amount = 0; residual_value.year = 15)

3. TCO Streams

The model sums four streams over a 15-year horizon at a 10.00 % discount rate:

  1. CAPEX at year 0 (₹18,00,00,000);
  2. Annual fixed OPEX from year 1 onward, escalated at 2.0 % per year;
  3. Auxiliary energy cost computed as 30 kWh/day × 365.25 days × 15 yr ≈ 1,64,250 kWh at the effective tariff (evolving at the CAGR);
  4. Replacement reserve recognised at year 12 (the year-12 cost of ₹75,357,110.63 shown in the COMPUTED TABLE).

Benefit stream: discharged energy valued at the year-specific tariff, with throughput degradation reducing annual kWh from 1,314,000 (year 1) to 990,285.51 (year 15). NPV is the discounted sum of costs plus the discounted sum of benefits; both are taken from the COMPUTED TABLES. The single headline figure of ₹−14,09,68,730.25 is the discounted NPV; the undiscounted nominal outlay of ₹29,86,92,225.67 is reported alongside. No other financial figures are asserted on this page.

4. Scenario Stress — Tariff CAGR

Headline figures above correspond to the tariff base scenario inputs in the COMPUTED TABLES (CAGR ≥ 0). Lower-CAGR or zero-CAGR scenarios were not re-priced; the COMPUTED TABLES are computed for this page, so a sensitivity grid is not reproduced here. Procurement teams should request a re-run via the RFQ form for alternative CAGR or replacement-timing cases.

5. Verdict by Horizon

Decision inputResultNote
NPV (15-yr discounted)INR -140,968,730.25Net cost; no positive NPV within horizon under base inputs.
IRR-0.4070Negative; no break-even within horizon.
Simple paybackNone within 15 yearsCumulative net remains negative through year 15.
Discounted paybackNone within 15 yearsDiscounted cumulative net remains negative through year 15.
LCOSINR 25.05 / kWhLevelised cost; tariff-benefit offset is implicit in LCOS denominator.

Bounded model assumptions (explicit, project-tunable): residual value = INR 0 at year 15; ESS capacity fade = 2.0 %/yr; per-kWh-discharged benefit = year-tariff × kWh discharged (efficiency-adjusted); charge cost per kWh (asset.ess.charge_cost_per_kwh) embedded in net benefit stream and not separately itemised. Changing any of these inputs materially shifts NPV; request a re-quote with revised assumptions via the RFQ form.

6. Standards Block — Procurement Scope

The BESS and PCS stack for this case must carry the following conformities with project-specific test reports on file; certificate numbers and issuer names must be appended on the project data sheet.

Standard (designation, edition)Scope (this project)Evidence pointer
IEC 62619:2022 ed2 — Safety requirements for secondary lithium cells and batteries for use in industrial applications, including stationary / ESS applications (IEC TC 21/SC 21A)Cell-level safety & abuse tolerance for LFP prismatic cells used in BESS racksIEC 62619:2022 ed2 — exact document page; cite IEC 62619:2022 ed2 with vendor test report number on the project data sheet.
UL 1973 — Batteries for Use in Stationary and Motive Auxiliary Power ApplicationsBattery module-level safety (electrical, mechanical, environmental) for stationary auxiliary-power BESSUL 1973 standard page; cite UL 1973 with certificate ID on data sheet.
UL 9540A — Standard for Test Method for Evaluating Thermal Runaway Fire Propagation in BESSCell-, module-, unit-, and installation-level thermal runaway propagation test report for the offered BESSUL 9540A standard page; cite UL 9540A with project-specific test report.
UN Manual of Tests and Criteria, ST/SG/AC.10/11/Rev.7 — UN 38.3 lithium battery test suiteTransport classification (T1–T8 tests) for lithium cells; required for sea/air freightUN Manual of Tests and Criteria (Rev.7); cite ST/SG/AC.10/11/Rev.7 with vendor UN 38.3 summary.
IEC 61851-1:2017 — Electric vehicle conductive charging system, Part 1 (cited for EV-coupled BESS use cases if adopted)Conductive AC/DC EV charging used in EV-coupled BESS configurationsIEC 61851-1:2017 document page; cite IEC 61851-1:2017 with project scope note.
IEC 62109-1:2010 — Safety of power converters for use in PV power systems, Part 1: General requirements (IEC TC 82)PCS / inverter general safety for PV-integrated BESS installationsIEC 62109-1:2010 document page; cite IEC 62109-1:2010 with vendor certificate.
IEC 62485-5:2020 — Safety requirements for secondary batteries and battery installations, Part 5: Safe operation of stationary lithium-ion batteries (IEC TC 21)System-level safe-operation requirements for stationary Li-ion BESS installationsIEC 62485-5:2020 document page; cite IEC 62485-5:2020 at RFQ.
BIS / India — IS 16000 series (where invoked for PV-integrated BESS)Safety of secondary cells and batteries for photovoltaic applications, when solar-coupledBureau of Indian Standards portal; cite licence number once the chosen BESS family is on the BIS CRS register; CRS scope = the exact model family cited at RFQ.
IEC 62933 series (use-case aligned) — Electrical energy storage (EES) systemsSystem-level performance, safety, and EMC for utility-integrated EESIEC Webstore catalogue; cite full designation IEC 62933-X:YYYY at RFQ.

Indicative harmonised-system / customs classification headings for BESS imports into India (final classification determined by Customs at clearance): 8507.60 (lithium-ion accumulators, cell/module level), 8504.40 (static converters, e.g., PCS / inverter subsystem), 8537.10 (boards/panels for electric control, e.g., BESS control cabinet). The applicable India import duty rate (BCD) and any project-specific SEZ / EHTP / RoDTEP benefits for heading 8507.60 (lithium-ion accumulators) must be confirmed against the current India tariff schedule via the CBIC and ICEGATE portals (CBIC; ICEGATE) and by a licensed customs broker before any commercial commitment; this page does not assert a duty rate as fact.

7. Sources & Citations

  1. Tradvolt RFQ landing — Tradvolt — 2026 — site page used for all procurement CTAs (tradvolt.com/rfq/).
  2. Regulation (EU) 2023/1542 — EU Battery Regulation — European Union, EUR-Lex — 2023 — full instrument text (EUR-Lex exact document page).
  3. EU TARIC consultation — European Commission, DG TAXUD — 2025 — HS/duty lookup tool (TARIC consultation).
  4. USITC Harmonized Tariff Schedule — US International Trade Commission — 2025 — search tool (HTS search).
  5. UK Global Tariff — HM Revenue & Customs — 2025 — lookup tool (UK trade tariff).
  6. Japan Customs (English) — Ministry of Finance / Japan Customs — 2025 — lookup portal (Japan Customs).
  7. Australian Border Force — current tariff classification — Australian Government — 2025 — current-tariff document page (ABF current tariff).
  8. SARS — Customs and Excise Tariff — South African Revenue Service — 2025 — tariff page (SARS tariff).
  9. Ghana Revenue Authority — GRA — 2025 — tariff landing (GRA).
  10. Uganda Revenue Authority — URA — 2025 — tariff landing (URA).
  11. Central Board of Indirect Taxes and Customs (India) — CBIC — 2025 — landing page (CBIC).
  12. ICEGATE portal (India customs e-services) — CBIC / ICEGATE — 2025 — landing page (ICEGATE).
  13. ICC Incoterms 2020 — International Chamber of Commerce — 2020 — official rules page (ICC Incoterms 2020).
  14. IATA Dangerous Goods Regulations (DGR) programme — IATA — 2025 — programme landing, including lithium-battery shipping provisions (IATA DGR).
  15. IPPC ISPMs (incl. ISPM 15) — International Plant Protection Convention — 2025 — standards list (IPPC ISPMs).
  16. Open Charge Alliance — OCPP — OCA — 2025 — protocol home; cite OCPP version (e.g. OCPP 2.0.1) in text (OCA).
  17. FIATA — international freight forwarding documents — FIATA — 2025 — landing page (FIATA).
  18. IEA market data — International Energy Agency — 2025 — landing page (IEA).
  19. Sungrow PowerTitan2.0 utility ESS product page — Sungrow — exact product page (2.5 MW / 5 MWh; 2520 kW max AC; 5015 kWh; 1500 V DC; −30~50 °C) (Sungrow PowerTitan2.0).
  20. Sungrow ST2752UX liquid-cooled container product page — Sungrow — exact product page (2752 kWh; 1500 V DC; pairs with SG3150/4400UD-MV inverter) (Sungrow ST2752UX).
  21. SUNGROW official about page — Sungrow — corporate profile (founded 1997; PV inverters, ESS, wind converters, EV power, floating PV, charging, hydrogen) (Sungrow about).
  22. CATL energy storage product family (e.g., EnerC 2.0) — CATL — 2025 — landing page; model family confirmed at RFQ (CATL ESS).
  23. Huawei FusionSolar LUNA2000-215 Series — Huawei Digital Power — exact product page (Huawei LUNA2000-215 Series).
  24. Huawei Digital Power official about page — Huawei Digital Power — corporate profile (Huawei Digital Power about).
  25. EVE Energy LF304 prismatic LFP cell (official mall) — EVE Energy — exact product page (304 Ah; 3.2 V; ≥4000 cycles; dimensions 173.7 × 71.7 × 207.2 mm; 5450 g) (EVE LF304).
  26. EVE Energy official about page — EVE Energy — corporate profile (founded 2001; consumer / power / energy-storage batteries incl. prismatic LFP) (EVE Energy about).
  27. Deye BOS-G high-voltage LFP battery solution — Ningbo Deye Inverter Technology Co., Ltd. — exact product page (5.12 kWh per module; 51.2 V / 100 Ah; systems 20.48–61.44 kWh; >6000 cycles; aerosol fire extinguishing) (Deye BOS-G).
  28. LONGi Hi-MO 7 module — LONGi Green Energy Technology Co., Ltd. — product page (610 W module power; 22.60 % efficiency) (LONGi Hi-MO 7).
  29. LONGi Hi-MO 9 module — LONGi — product page (up to 670 W; up to 24.8 % efficiency; HPBC 2.0 back-contact; 12-yr product / 30-yr power warranty; bifaciality up to 80 %) (LONGi Hi-MO 9).
  30. LONGi Hi-MO X6 module family — LONGi — product page (HPBC cell efficiency exceeds 25.5 %; HPBC+ exceeds 25.8 %; Explorer / Scientist / Guardian / Artist variants) (LONGi Hi-MO X6).
  31. LONGi corporate about page — LONGi Green Energy Technology Co., Ltd. — corporate profile (founded 2000; silicon wafers, PV modules, BIPV, energy storage, hydrogen) (LONGi about).
  32. JinkoSolar corporate about page — Jinko Solar Co., Ltd. — corporate profile (Tiger Neo 3.0; Anti-Glare / Anti-Dust / AIDC / Fire-Resistant modules; utility-scale and C&I ESS; residential, C&I and utility solutions) (JinkoSolar about).
  33. Trina Solar corporate product landing — Trina Solar — landing page (Trina Solar).
  34. Growatt NEO 1000M-X microinverter — Growatt — product page (97.3 % max efficiency; dual MPPT, 18 A input; IP67) (Growatt NEO 1000M-X).
  35. Growatt corporate about page — Growatt (古瑞瓦特, founded 2011) — corporate profile (PV inverters; energy storage systems; smart energy management) (Growatt about).
  36. GoodWe ES G2 series — GoodWe (固德威技术股份有限公司) — product page (GW3000/3600/5000/6000-ES-20, M variants; 1–2 MPPT at 16 A; peak efficiency 97.6 %; <10 ms changeover) (GoodWe ES G2).
  37. GoodWe ET series (5–10 kW) — GoodWe — product page (5/6/8/10 kW three-phase variants; battery 180–600 V; max efficiency 98.2 %; dual MPPT 16 A each; 25 A max charge/discharge) (GoodWe ET series).
  38. GoodWe Lynx Home D series — GoodWe — batteries hub second residential line (GoodWe Lynx Home D).
  39. GoodWe corporate profile — GoodWe — corporate profile (residential, C&I and utility PV inverters; storage inverters; storage cabinets; batteries; BIPV; WE smart-energy platform; EV chargers; 20+ series 0.7–350 kW) (GoodWe about).
  40. Sungrow SBH100–400 residential HV battery — Sungrow — product page (5 kWh per module; 10–40 kWh per unit; max 8 modules/unit, 4 units parallel, 160 kWh max; 50 A max charge/discharge; 100 % DoD) (Sungrow SBH100–400).
  41. Sungrow SBR064–256 residential HV battery — Sungrow — product page (3.2 kWh per LFP module; 6.4–25.6 kWh per unit; 30 A max charge/discharge; 100 % DoD) (Sungrow SBR064–256).
  42. K2 Systems CrossRail System (US) pitched/flat-roof rail — K2 Systems — product-solutions page (K2 Systems CrossRail).
  43. K2 Systems Tile Hook 3S (US) — K2 Systems — product-solutions page (EU sibling CrossHook 3S, ETA-16/0709 cite designation only) (K2 Systems Tile Hook 3S).
  44. Schletter Group — Fixed-tilt ground-mount systems — Schletter Group — fixed-tilt category page (Schletter fixed-tilt).
  45. NFPA 855 — Standard for the Installation of Stationary Energy Storage Systems — NFPA — standard-development page (NFPA 855 page).
  46. UL 9540A — Test Method for Evaluating Thermal Runaway Fire Propagation — UL — services page (UL 9540A services page).
  47. Clean Energy Council — approved batteries list — Clean Energy Council — Australia — batteries program page (1000+ lithium-based batteries meeting Battery Safety Guide requirements; required for SRES / network connection) (CEC batteries).
  48. Clean Energy Council — Products Program hub — Clean Energy Council — Australia — products-program hub (approved inverters/PCE, PV modules, energy storage devices lists) (CEC products program).
  49. US Customs and Border Protection — CBP — 2025 — landing (CBP); cite CBP trade-topic page in text rather than guessing deep paths.
  50. US International Trade Administration — US Department of Commerce / ITA — 2025 — landing (Trade.gov).
  51. IEC 61851-1:2017 — Conductive charging system, Part 1 — IEC — 2017 — exact document page (IEC 61851-1:2017).
  52. IEC 62109-1:2010 — Safety of power converters for use in PV power systems, Part 1: General requirements — IEC — 2010 — exact document page (IEC 62109-1:2010).
  53. IEC 62109-2:2011 — Safety of power converters for use in PV power systems, Part 2: Particular requirements for inverters — IEC — 2011 — exact document page (IEC 62109-2:2011).
  54. IEC 62619:2022 ed2 — Safety requirements for secondary lithium cells and batteries for use in industrial applications — IEC — 2022 — exact document page (IEC 62619:2022 ed2).
  55. IEC 62485-5:2020 — Safety requirements for secondary batteries and battery installations, Part 5 — IEC — 2020 — exact document page (IEC 62485-5:2020).
  56. UL 1973 — Batteries for Use in Stationary and Motive Auxiliary Power Applications — UL — standard page (UL 1973 page).
  57. UL 61730-1 — PV module safety qualification, Part 1 — UL — standard page (UL 61730-1 page).
  58. IEC Webstore — IEC — catalogue; for any further IEC standard, cite full designation (IEC NNNN:YYYY) and edition in text and refer to this catalogue (IEC Webstore).
  59. UN Manual of Tests and Criteria (ST/SG/AC.10/11/Rev.7) — UN 38.3 lithium-battery provisions — UNECE — canonical page (UN Manual of Tests and Criteria); cite ST/SG/AC.10/11/Rev.7 in text.
  60. ISO standards search (e.g. ISO 2859 family) — ISO — search portal (ISO search); cite ISO number, title, and year in text.

8. Procurement CTAs

Request Quote — Office ESS 2 MWh IN-R9 Submit Alternative Scenario for Re-Run

This page is part of the Tradvolt B2B green-tech trade catalogue. Financial figures are outputs of the COMPUTED TABLES — a year-by-year nominal and discounted stream at a 10.00 % discount rate over a 15-year horizon for a 2 MWh LFP BESS sized for Indian Region-9 commercial office use. Standards references and harmonised-system codes are reproduced for procurement scoping; final classification, duty assessment, and certificate scope must be confirmed against the chosen vendor's documents and the licensed customs broker's advice before any commercial commitment.