Bundle B6: ITAD & Third-Party Maintenance (TPM) EOS Rescue Kit
Turnkey multi-factory server refurbishment and End-of-Support (EOS/EOL) rescue kit combining cross-coded 100G/400G optical transceivers, cross-generation Gen4/Gen5 MCIO/SlimSAS/U.2 storage backplane cables, and replacement hot-swap server fans/heatsinks under one unified Hong Kong QC dossier.
Engineering Architecture & Commercial Scope
IT Asset Disposition (ITAD) refurbishers, Third-Party Maintenance (TPM) providers, and regional ISPs routinely face OEM End-of-Support (EOS) transceiver lockouts, discontinued storage backplane cables, and degraded cooling fans when reconditioning enterprise servers and switches. Sourcing individual replacement parts across multiple workshops creates inconsistent quality and high minimum-order barriers.
Canonical Bundle B6 delivers a rapid, audit-backed refurbishment kit. Optical modules are EEPROM cross-coded from MOQ=1 for Arista, Cisco, Juniper, Extreme, Nokia, and Aruba platforms (strictly excluding MACsec crypto chips to preserve EAR99 / 5A991 export status), paired with reverse/standard-pinout MCIO-to-SlimSAS/U.2 harnesses and thermal-screened fan/power assemblies.
Sub-Component Bill of Materials (BOM) & Compliance Matrix
| Canonical SKU / Track | Sub-Assembly & Technical Specification | HS6 / Export Class | Qty / Kit | Verification Artifact |
|---|---|---|---|---|
GO-SKU-16 · D1 | Cross-Coded 100G QSFP28 SR4 (100m) / CWDM4 (2km) / LR4 (10km) EOS/EOL Replacement Optical Transceivers (Multi-vendor EEPROM coded for Arista/Cisco/Juniper/Extreme/Nokia/Aruba, No-MACsec, 400x end-face interferometry + MPO/LC jumpers). | HS 851762 · 5A991/EAR99 | 12 units | FIBER_400X · EEPROM_LOG |
GO-SKU-14 / 15 · D1 | Cross-Coded 400G QSFP-DD DR4 (500m) / FR4 (2km) Single-Mode Uplinks (CMIS 4.0/5.0 compliant, 4x100G PAM4, No-MACsec, 100% 15-minute live switch traffic burn-in + Tx bias current aging screen + optical cleaning pens). | HS 851762 · 5A991/EAR99 | 4 units | FIBER_400X · EEPROM_LOG |
GO-SKU-03 · D2 | MCIO 8i (SFF-TA-1016 74-pin) to 2x SlimSAS 4i (SFF-8654) Cross-Generation Storage Backplane Harnesses (Solves PCIe Gen5 host board to refurbished Gen4 storage backplane interop; supports Broadcom/NVIDIA standard & reverse pinout, 0.4m–0.85m). | HS 854442 · EAR99 | 8 cables | TDR_EYE_S4P · QC_PACK |
GO-SKU-04 · D2/D8 | MCIO 8i to 4x U.2 / U.3 (SFF-8639) High-Density NVMe Storage Fanout Cables (Includes independent 12V/3.3V SATA/4-pin power breakout for 24-bay/36-bay storage servers, 85-Ohm silver-plated twinax, 100% continuity + 5% TDR batch test). | HS 854442 · EAR99 | 6 cables | TDR_EYE_S4P · QC_PACK |
D11-EOS-SPARE · D11/D3 | Hot-Swap Counter-Rotating Server Fan Modules, Copper-Base Heatsinks & 12V-2x6 / CRPS Power Whip Kit (8x high-static-pressure PWM hot-plug fan cartridges + 4x 1U/2U CPU heatsinks + 4x 16-AWG terminal thermal-validated power whips). | HS 841459 · EAR99 | 1 rescue set | UL_CB · QC_PACK |
Unified Hong Kong Quality Control & Trade Compliance Protocol
Live Switch Traffic & Tx Bias Screening: 100% of 100G/400G transceivers undergo 15-minute live switch traffic burn-in plus laser Tx bias current stability screening to rule out remarked or aged optical sub-assemblies.
400x Optical End-Face Interferometry: Every optical port is inspected at 400x magnification (IEC 61300-3-35) with per-serial end-face photographs and fiber cleaning pens packed in the kit.
Cross-Generation Backplane Pinout & TDR Check: 100% continuity and sideband (PERST#/CLKREQ#/SMBus) mapping verification plus 5% TDR impedance batch testing (85 Ohm +/- 5%) on all MCIO/SlimSAS/U.2 cables.
Neutral Hong Kong Consolidation: All 5 sub-component lines are consolidated in Hong Kong under a single English Proforma Invoice preserving original factory CoO and CE/UL/FCC compliance documents.
Kwun Tong Bonded 3PL Advance-Replacement SLA Tiers
| SLA Dispatch Tier | Carrier Handoff Window | Annual Pool Retainer | Operational Mechanics & Title Lock |
|---|---|---|---|
SLA-72H | Within 72 Hours (HK Cutoff) | +12% / year on covered spare value | Pre-coded spares staged in Kwun Tong 3PL; flash-title drawdown upon cleared funds and dispatch authorization. |
SLA-48H | Within 48 Hours (HK Cutoff) | +15% / year on covered spare value | Priority bonded pull with pre-attached 400x optical / TDR reports and tamper-evident QC seal. |
SLA-24H | Within 24 Hours (HK Cutoff) | +18% / year on covered spare value | Same-day air courier handoff (FCA Hong Kong / DAP Buyer-IOR) for mission-critical colocation and fleet recovery. |
Commercial Terms, Volumetric Freight & Neutral Kitting Rules
- Single English Proforma Invoice (PI): Consolidates 4 to 5 specialized manufacturing plants into one shipment and one unified quality dossier.
- Incoterms 2020 Discipline: Available under FCA Hong Kong (air courier/freight), FOB Hong Kong (ocean), CPT, CIP, or DAP Buyer-IOR.
- Volumetric Air-Freight Rule: Coiled high-speed DAC/AEC/MPO cables and foam-protected harnesses are calculated at 2.0x actual gross weight for air chargeable weight.
- Neutral Kitting & Traceability: Preserves original Country of Origin markings, factory serial numbers, and CE/UL/FCC declarations beneath the Tradvolt master QC cover sheet.
Frequently Asked Technical & Procurement Questions
Can Bundle B6 optics be pre-coded for mixed OEM switch environments in a single kit?
Yes. We support multi-vendor dual-EEPROM and asymmetric coding across Arista, Cisco, Juniper, Extreme, Nokia, Aruba, and Mellanox within the same kit, with 24–48h coding turnaround and logged EEPROM checksums.
How do you prevent refurbished or degraded optical components from entering Bundle B6?
Every transceiver in Bundle B6 is sourced brand-new from audited optical factories and subjected to Tx bias current screening, 15-minute live switch traffic testing, and 400x end-face microscopy in Hong Kong prior to sealing.
What are the export control and Incoterms rules for Bundle B6 shipments?
All optical modules in Bundle B6 exclude MACsec encryption hardware to remain EAR99 / 5A991 compliant. Shipments execute under FCA Hong Kong, FOB Hong Kong, CPT, CIP, or DAP Buyer-IOR.