TradvoltProcess & SOP › CE Machinery Risk-Assessment File (CN→SA)

CE Machinery Directive Risk-Assessment File SOP — Corridor CN→SA

Standard Operating Procedure for compiling the Machinery Directive 2006/42/EC technical file and EN ISO 12100:2010 risk assessment for EVSE hardware shipped China → Saudi Arabia. Vertical: Electric Vehicle Supply Equipment.

1. Scope and applicability

This SOP governs the assembly of the Machinery Directive 2006/42/EC technical file for fixed or semi-fixed EVSE units exported from manufacturers in the People's Republic of China to end users in the Kingdom of Saudi Arabia under DAP Jeddah or DAP Riyadh (Incoterms 2020) [Claim | Src: ICC Incoterms 2020 | https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/ | accessed 2026-09-21]. It applies whenever the goods are placed on the EU/EEA market or the Kingdom of Saudi Arabia requires a CE-style technical file as part of the conformity evidence package [Claim | Src: Regulation (EU) 2024/1689 (Machinery Regulation, recast) and EUR-Lex consolidated Machinery Directive page | https://eur-lex.europa.eu/eli/dir/2006/42/oj | accessed 2026-09-21].

The risk-assessment methodology follows EN ISO 12100:2010, the type-B safety standard for general principles for design — risk assessment and risk reduction [Claim | Src: ISO/TC 199 catalogue entry for ISO 12100:2010 | https://www.iso.org/standard/51528.html | accessed 2026-09-21]. Electrical safety verification follows EN 60204-1:2018 for the electrical equipment of machines [Claim | Src: IEC Webstore entry for IEC 60204-1:2016 (adopted as EN 60204-1) | https://webstore.iec.ch/publication/26037 | accessed 2026-09-21].

2. Roles and owners

3. Input documents checklist

Filename (literal)Purpose
OEM_ServiceManual_EVSE_[model].pdfSource-of-truth drawings, BOM, and safety information from the manufacturer.
RiskAssessment_ENISO12100_Worksheet.xlsxHazard list, severity, probability, risk-reduction measures.
HarmonisedStandardsMatrix_v01.xlsxApplied EN/IEC clauses with edition dates.
DoC_MachineryDirective_2006-42-EC.pdfDeclaration of Conformity template, populated per unit.
AQL_Report_ISO2859-1_Lot[n].pdfInspection report for the production lot.
CE_Marking_Artwork_v01.dwgCE graphic with height ≥ 5 mm per Annex III.
CommercialInvoice_DAP_Jeddah.pdfShipping commercial document.
PackingList_CN_to_SA.xlsxCarton-level serial number trace.

4. Step sequence

Step #ActionOwnerInput docOutput docDone-when
1Receive OEM technical file package (manual, BOM, DoC template, harmonised standards list).Compliance LeadOEM_ServiceManual_EVSE_[model].pdfFile index entry opened in TFS registerIndex row created with receipt date, OEM contact, model code.
2Verify Machinery Directive 2006/42/EC scope and select conformity assessment route (Module A self-certification, or Module B+C/D).Compliance LeadOEM_ServiceManual_EVSE_[model].pdfScope memo (1 page, signed)Scope memo references Annex I hazards and the chosen route.
3Compile the harmonised standards matrix listing EN ISO 12100:2010, EN 60204-1, EN 61851-1, EN 61000-6-2/6-4 where applicable.Compliance LeadOEM_ServiceManual_EVSE_[model].pdfHarmonisedStandardsMatrix_v01.xlsxEach clause has edition date and pass/fail tick.
4Draft the risk assessment per EN ISO 12100:2010: iterate hazard identification, severity, probability, risk reduction.Compliance LeadRiskAssessment_ENISO12100_Worksheet.xlsx (blank)RiskAssessment_ENISO12100_Worksheet.xlsx (filled)Every hazard has residual-risk score ≤ acceptable threshold.
5Send risk assessment, general assembly drawings, and BOM to OEM for review and revision marking.Compliance LeadRiskAssessment_ENISO12100_Worksheet.xlsx (filled)OEM review transmittal email + tracked PDFOEM returns the package with at least one signed revision page.
6Receive OEM sign-off; apply CE marking artwork with height ≥ 5 mm per Annex III of 2006/42/EC.Compliance LeadCE_Marking_Artwork_v01.dwgMarked-up drawing set with CE graphic calloutCE graphic callout dimensioned on at least one view.
7Perform lot inspection at the OEM plant against ISO 2859-1:1999, AQL 1.5 General Inspection Level II [Claim | Src: ISO/TC 69 catalogue entry for ISO 2859-1:1999 | https://www.iso.org/standard/1146.html | accessed 2026-09-21].Quality LeadProduction lot pullAQL_Report_ISO2859-1_Lot[n].pdfReport records lot size, sample size, Ac/Re numbers, and disposition.
8Sign Declaration of Conformity naming responsible person, applied directives, and harmonised standards.Compliance LeadDoC_MachineryDirective_2006-42-EC.pdf (template)DoC_MachineryDirective_2006-42-EC.pdf (signed)DoC signed and dated; PDF is not editable.
9Assemble final technical file as one PDF with table of contents, version-control page, and document checklist.Compliance LeadAll upstream outputsTechnicalFile_EVSE_[model]_[serial].pdfPDF opens, TOC links resolve, file size < 100 MB.
10Archive the technical file for the retention period stated in 2006/42/EC and notify Logistics Lead that the file is released for export.Compliance LeadTechnicalFile_EVSE_[model]_[serial].pdfArchive record + release email to Logistics LeadArchive location, retention date, and release email are logged.
11Book consignment under ICC Incoterms 2020 DAP Jeddah or DAP Riyadh; attach file cover sheet to the commercial invoice; forward haulier booking.Logistics LeadTechnicalFile_EVSE_[model]_[serial].pdf (cover sheet) + CommercialInvoice_DAP_Jeddah.pdfBooking confirmation + shipper's letter of instructionBooking reference is logged in the shipment register and the consignee is notified.

5. Timeline with dependencies

DayActivityDependency
D + 0Step 1 — receive OEM technical file package.None (start).
D + 2Step 2 — scope verification and route selection.Depends on Step 1.
D + 4Step 3 — harmonised standards matrix.Depends on Step 2.
D + 7Step 4 — draft risk assessment.Depends on Step 3.
D + 8Step 5 — send to OEM for sign-off.Depends on Step 4.
D + 11Step 6 — receive OEM sign-off and apply CE marking.Depends on Step 5.
D + 13Step 7 — AQL inspection at OEM plant.Depends on production lot being released to inspection.
D + 15Step 8 — sign Declaration of Conformity.Depends on Steps 6 and 7.
D + 17Step 9 — compile final technical file PDF.Depends on Step 8.
D + 18Step 10 — archive and release to Logistics.Depends on Step 9.
D + 20Step 11 — book DAP Jeddah / DAP Riyadh shipment.Depends on Step 10 and consignee's delivery slot.

6. Duty / HS code block

HS code for the EVSE unit (charging station for electric vehicles) is 8537.10 — "Boards, panels, consoles, desks, cabinets and other bases, equipped with two or more apparatus for switching, protecting, connecting to or controlling electrical circuits, for a voltage not exceeding 1,000 V" — commonly used for EV charging stations and accepted by the SFDA customs portal and the Saudi ZATCA single-window for goods classification [Claim | Src: Saudi ZATCA HS Code Inquiry (official customs portal) | https://www.zatca.gov.sa/en/rulings/pages/hscode-inquiry.aspx | accessed 2026-09-21]. Spare parts fall under heading 8538 ("parts suitable for use solely or principally with the apparatus of heading 8537") [Claim | Src: WCO Harmonized Commodity Description and Coding System, Explanatory Notes to Chapter 85 | http://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools/hs-nomenclature-2022-edition.aspx | accessed 2026-09-21].

Disclaimer. Applicable import duty rates, VAT treatment, and any Saudi Conformity Assessment (SALEH/SASO IECEE) programme fees are PENDING — lookup on the official ZATCA and SASO portals at the time of each shipment. Do not hardcode rates in this SOP. Always verify against the live ZATCA HS Code Inquiry and the SASO Product Safety portal before quoting [Claim | Src: Saudi SASO Product Safety portal | https://saso.gov.sa/en/Product-Safety/ | accessed 2026-09-21].

7. Cost slots

Cost lineStatusNotes
Notified Body certificate (Module B, if applicable)UNCERTAINQuoted per OEM request; certificate number not yet issued.
AQL inspection day-rateindicativeIndicative day-rate provided on RFQ; final rate depends on lot size.
Translation of the technical file to Arabic (consignee requirement)indicativeIndicative per-page rate; final quote depends on document length.
Saudi import duty (HS 8537.10)PENDING — lookupVerify on ZATCA HS Code Inquiry at time of shipment.
SASO IECEE certificate feePENDING — lookupVerify on SASO Product Safety portal at time of shipment.
Sea freight CN → Jeddah (40' HC, indicative)indicativeIndicative only; final rate depends on sailing schedule.

8. Output documents

Request Quote — replies in 48h Download Checklist (PDF)

9. Named sources cited

  1. EUR-Lex consolidated text of Directive 2006/42/EC (Machinery Directive) — https://eur-lex.europa.eu/eli/dir/2006/42/oj — accessed 2026-09-21.
  2. ISO catalogue entry for ISO 12100:2010 (Safety of machinery — General principles for design — Risk assessment and risk reduction) — https://www.iso.org/standard/51528.html — accessed 2026-09-21.
  3. IEC Webstore entry for IEC 60204-1:2016 (Safety of machinery — Electrical equipment of machines) — https://webstore.iec.ch/publication/26037 — accessed 2026-09-21.
  4. ISO catalogue entry for ISO 2859-1:1999 (Sampling procedures for inspection by attributes) — https://www.iso.org/standard/1146.html — accessed 2026-09-21.
  5. ICC Incoterms 2020 official page — https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/ — accessed 2026-09-21.
  6. FIATA — International Federation of Freight Forwarders Associations documentation overview — https://fiata.org — accessed 2026-09-21.
  7. Saudi ZATCA HS Code Inquiry (official customs portal) — https://www.zatca.gov.sa/en/rulings/pages/hscode-inquiry.aspx — accessed 2026-09-21.
  8. Saudi SASO Product Safety portal — https://saso.gov.sa/en/Product-Safety/ — accessed 2026-09-21.
  9. WCO Harmonized System Nomenclature 2022 Edition, Explanatory Notes — http://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools/hs-nomenclature-2022-edition.aspx — accessed 2026-09-21.