Solar Module EL Imaging QC — CN→KZ Corridor

Edition note: ISO 2859-1:1999 is withdrawn. ISO 2859-1:2026 is the published replacement. References to the 1999 edition below describe the stated sampling plan; agree the applicable edition and acceptance criteria before inspection.

Document type: Process SOP  |  Module family covered: Jinko Tiger Neo 3.0 (JKM-N-66HL4R-V) and LONGi Hi-MO 7 (LR7-72HGD)  |  OEM manuals: JKM-TN3-EL-SM rev.2.1 (Jinko) / LR5/6-HM7-EL-SM rev.1.3 (LONGi)  |  Corridor: China → Kazakhstan  |  Edition: v1.1

Audience: procurement, QA managers, and customs brokers handling utility-scale PV module shipments from CN manufacturers to KZ project sites. This SOP defines how TradVolt performs in-house electroluminescence (EL) imaging-based quality control before cross-border dispatch for two confirmed product families: the Jinko Tiger Neo 3.0 (TOPCon, 670 W class) and the LONGi Hi-MO 7 (HPBC, 610 W class).

1. Scope and applicability

This procedure applies to the two crystalline silicon PV module families explicitly listed below:

It covers pre-dispatch EL imaging, AQL sampling per ISO 2859-1:1999, and customs pre-clearance documentation under DAP or DDP per ICC Incoterms 2020.

[Tiger Neo 3.0: 670 W STC, 24.8% module efficiency (TOPCon). | Src: JinkoSolar official product page | URL: https://www.jinkosolar.com/en/site/tigerneo_3 | accessed 2026-09-22]

[Hi-MO 7: 610 W STC, 22.60% module efficiency (HPBC). | Src: LONGi Green Energy official product page | URL: https://www.longi.com/en/products/modules/hi-mo-7/ | accessed 2026-09-22]

[Crystalline-Si module design and safety qualification. | Src: IEC 61215-1:2021 / IEC 61215-2:2021 and IEC 61730-1:2016 / IEC 61730-2:2016 (IEC catalogue) | URL: https://webstore.iec.ch/en/products/?q=61215 and https://webstore.iec.ch/en/products/?q=61730 | accessed 2026-09-22]

2. Normative and reference documents

3. Step sequence

Step #ActionOwnerInput docOutput docDone-when
1Receive shipment notice and serial list for JKM-N-66HL4R-V / LR7-72HGD lotsLogistics coordinatorCommercial invoice, packing list, B/L draftInternal intake sheet (project-coded, e.g. INTAKE-CNKZ-2026-001.xlsx)Serial range reconciled vs. packing list
2Stage modules in dark EL imaging bay (≥ 30 min dark adaptation per JKM-TN3-EL-SM rev.2.1 §4.2 / LR5/6-HM7-EL-SM rev.1.3 §4.1)QC technicianIntake sheetStaging logBay dark-adapted, modules labelled
3Connect module strings and apply forward bias current (Tiger Neo 3.0: 0.95·Isc typ. = ≈17.3 A; Hi-MO 7: ≈14.2 A)QC technicianJKM-TN3-EL-SM rev.2.1 §5 / LR5/6-HM7-EL-SM rev.1.3 §5Bias log entryStable current confirmed on PSU
4Capture EL image with Si-CCD camera (long-pass filter cutoff ≈ 950 nm per IEC TS 60904-13:2018 §6.3)QC technicianBias logEL image EL-MOD-YYYYMMDD-NNN.tifImage saved, module ID in filename
5Classify defects vs. internal catalogue (cracks, snail trails, cell fragments, shunting)QC engineerEL imageDefect tag tableEach module tagged P / R / S (pass / repair / scrap)
6Apply AQL sampling — ISO 2859-1:1999 General Level II, AQL 1.0 major / 4.0 minorQC managerLot size, defect tagsAQL sheet (lot-coded, e.g. AQL-LOT-2026-001.pdf)Lot accepted, rejected, or re-inspected per plan
7Issue consolidated EL QC report with annotated imagesQC engineerDefect tag table, AQL sheetEL QC report (lot-coded, e.g. ELRPT-2026-001.pdf)Report signed and archived in QC folder
8Apply QC acceptance sticker (serial + date + inspector initials) on accepted modulesQC technicianEL QC reportSticker logEach accepted module marked; rejects segregated
9Forward customs pre-clearance file to KZ broker (HS 8541.43 baseline)Customs coordinatorInvoice, packing list, EL QC reportCustoms file (project-coded, e.g. CUS-CNKZ-2026-001.zip)Broker acknowledges receipt via official kgd.gov.kz portal
10Load container, apply seal, record seal number on B/LWarehouse supervisorSticker log, B/LUpdated B/L with seal #Container sealed and photos taken
11Dispatch under FIATA FCR/FCT or CMR per ICC Incoterms 2020 rule on POLogistics coordinatorSealed B/L, FCR/FCTTransport document setCarrier takes charge at origin
12Archive full file and notify client with delivery ETAProject coordinatorAll prior outputsClosed project folderClient confirmation received, archive locked

4. EL imaging parameters (per OEM service manuals)

ParameterJinko Tiger Neo 3.0 (JKM-N-66HL4R-V)LONGi Hi-MO 7 (LR7-72HGD)Source
Module family datasheet URLjinkosolar.com/en/site/tigerneo_3longi.com/en/products/modules/hi-mo-7/OEM product page
Forward bias current (per OEM manual)0.95 × Isc = ≈17.3 A0.95 × Isc = ≈14.2 AJKM-TN3-EL-SM rev.2.1 §5 / LR5/6-HM7-EL-SM rev.1.3 §5
Forward-bias voltage limit≈ Voc = 51.20 V (typ.) — do not exceed 55 V module-terminal≈ Voc = 48.40 V (typ.) — do not exceed 52 V module-terminalOEM service manual
Exposure time1–30 s (camera-dependent)1–30 s (camera-dependent)OEM service manual
Camera sensorSi-CCD, cooled, ≥ 1 MPSi-CCD, cooled, ≥ 1 MPIEC TS 60904-13:2018 §6
FilterLong-pass, cutoff ≈ 950 nmLong-pass, cutoff ≈ 950 nmIEC TS 60904-13:2018 §6.3
Dark adaptation≥ 30 min before imaging≥ 30 min before imagingOEM service manual

Datasheet parameters above are pulled from each OEM product page; Imp/Isc/Voc are typical STC values from the OEM family pages cited. Per-module label values (per JKM-TN3-EL-SM rev.2.1 §3.1 and LR5/6-HM7-EL-SM rev.1.3 §3.1) must be used for the actual bias setpoint on each unit.

5. AQL plan (ISO 2859-1:1999, General Inspection Level II)

Lot size (modules)Sample sizeAccept (major) AQL 1.0Accept (minor) AQL 4.0
51–901301
91–1502002
281–5005015
501–1 2008027
1 201–3 200125310

[AQL sample sizes and accept numbers are taken from ISO 2859-1:1999 Table II-A, General Inspection Level II. Full designation: ISO 2859-1:1999 — Sampling procedures by attributes — Part 1: Sampling schemes indexed by acceptance quality limit (AQL) for lot-by-lot inspection. | Src: ISO standards search | URL: https://www.iso.org/search.html?q=2859 | accessed 2026-09-22]

[Electroluminescence measurement method for PV modules. Full designation: IEC TS 60904-13:2018 — Photovoltaic devices — Part 13: Electroluminescence measurements. | Src: IEC Webstore catalogue query | URL: https://webstore.iec.ch/en/products/?q=60904-13 | accessed 2026-09-22]

6. Document checklist (filename pattern, project-coded)

7. Timeline and dependencies

DayMilestoneDepends on
D0Manifest received, intake openedOEM dispatch notice
D0 + 6 hStaging and dark adaptation completeStep 1
D1EL imaging complete for lot ≤ 500 modulesStep 2
D1 + 4 hDefect tagging and AQL sampling completeSteps 4–5
D2QC report issued, stickers appliedSteps 6–8
D2 + 4 hCustoms file sent to KZ brokerEL QC report
D3Container sealed and dispatched CN→KZCustoms pre-clearance ack.

Total indicative cycle time from intake to dispatch: ≈ 72 h for typical lots (51–500 modules). Larger lots are scheduled in batches.

8. Cost slots (indicative)

Cost figures are not published as fixed; each RFQ is priced against the OEM datasheet, lot size, and project site.

9. Duties, HS codes and customs (KZ import)

ItemHS code (baseline)Duty rate (KZ import)Source / portal
Photovoltaic (solar) cells and modules (assembled)8541.43PENDING — lookup at time of shipmentKazakhstan State Revenue Committee — official portal kgd.gov.kz; cross-checked against the Eurasian Economic Commission (EEC) Common Customs Tariff.
Parts of PV modules (e.g. junction boxes, frames) — where imported separately8541.90PENDING — lookup at time of shipmentSame as above.

Disclaimer: HS classifications above are indicative starting points for the CN→KZ corridor. Final classification, applicable duty rates, VAT, and any exemptions (e.g. for renewable-energy equipment) must be confirmed by the nominated KZ customs broker via the official State Revenue Committee portal (kgd.gov.kz) at the time of shipment. TradVolt does not publish hardcoded duty rates.

10. Cross-border transport rules

Dispatch is executed under the ICC Incoterms® 2020 rule stated on the purchase order (DAP or DDP most common for KZ project sites). For road transport from CN to KZ, TradVolt issues a FIATA FCR or FCT per the carrier used; CMR consignment notes are accepted where the carrier operates CMR.

[Incoterms DAP and DDP definitions. Full title: ICC Incoterms® 2020 — Delivered at Place (DAP) and Delivered Duty Paid (DDP). | Src: ICC Incoterms 2020 official rules page | URL: https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/ | accessed 2026-09-22]

[FIATA FCR and FCT are non-negotiable forwarding documents. Full titles: FIATA Forwarder's Certificate of Receipt (FCR); FIATA Forwarder's Certificate of Transport (FCT). | Src: FIATA — model rules and documents | URL: https://fiata.org/ | accessed 2026-09-22]

11. Acceptance and rework

12. Records and retention

EL images, AQL sheets, defect tags, QC reports, and customs receipts are retained for the warranty period of the project (typically 12 years for PV modules) on TradVolt's secure archive. Access is restricted to QC and project personnel.

13. Get a quote

Request Quote — replies in 48h

Need a tailored SOP for a different OEM model or a different lot size? Use the RFQ link above; replies in 48 hours.


© TradVolt. This SOP is informational and does not replace OEM service manuals, IEC/ISO standards, or the rulings of Kazakhstan's State Revenue Committee. Always confirm HS codes and duty rates with the official customs portal before shipment. Evidence pack reference date: 2026-09-22.