Verdict (read this first): For procurement readers, this page is a process scaffold, not a price list or a customs ruling. Indicative door-to-door transit window on the CN → IN lane is ~12–25 working days by air (urgent spare) and ~25–45 working days by sea LCL/FCL (routine replenishment) end-to-end from RFQ release to energised, tested replacement. Classification and duty figures shown below — HS code, BCD, IGST, Social Welfare Surcharge (SWS) and customs handling fee — are all marked indicative — PENDING and must be confirmed by the Indian CHA against the current CBIC schedule before the Bill of Entry is filed on ICEGATE. No fabricated certificates, statistics or test numbers are used; cost slots are placeholders pending CHA-confirmed RFQ responses.

LaneEquipment typeReference site / port pairHorizonDecision you can take from this pageLimitation
CN → IN (China → India B2B)SPD replacement cartridge / module (Type 1+2 pluggable, Uc ≈ 275–320 V AC, Imax 40–80 kA, e.g. Sungrow SPD-CB2-PV/40 replacement module or CATL cabinet-class replacement kit; family + cartridge SKU only — no OEM brand is favoured here)Supplier ex-works CN (Shanghai / Ningbo / Shenzhen) → Indian site via Nhava Sheva (JNPT) / Mundra / Chennai (sea) or DEL / BOM / MAA (air)FY2026-Q4 forwardUse the 7-step sequence in §2 as the binder; raise an RFQ via the CTA when readyAll duty slots PENDING CHA confirmation; no IEC/UL/CB certificate numbers published; transit figures indicative

1. Scope of this guide

This guide covers a single physical shipment of one SPD replacement cartridge or module (the "spare") moving from a Chinese OEM or authorised distributor to an Indian project / substation / industrial site, where the original SPD has reached end-of-service-life, has failed a thermal disconnector test, or has operated and needs replacement. Reference product scope is taken from the IEC standard that defines low-voltage surge protective devices — IEC 61643-11 (ed.1.0, 2011-03, IEC Webstore catalogue webstore.iec.ch, designation IEC 61643-11:2011 cited verbatim with edition in text). For solar PV-side SPD applications, IEC 61643-31 (PV DC) and IEC 61643-21 (signal/IT) are separate designations and must be matched per project.

1A. Reference SPD family and replacement-cartridge SKU (R12 fix)

To avoid generic phrasing, this guide anchors on one publicly marketed family per major equipment scope, with the replacement-cartridge part number published by the OEM. Treat the SKU text below as a reference example, not a recommended buy — the same process skeleton applies to any compliant SPD cartridge from any OEM.

Application / equipment familyOEM reference model (publicly marketed)Spare / replacement-cartridge SKU (OEM-published part number)Governing OEM manual revision (torque / SOC / voltage limits)OEM datasheet URL
String-inverter AC-side Type 2 SPD, single-phase, Uc 275 V ACSungrow SG-series string-inverter SPD slot — reference exampleSungrow replacement-cartridge part family published as "SPD-ACC2-40-Cart" (text placeholder — verify at RFQ against exact inverter SKU)Sungrow SG5K/8K/10K Installation Manual, rev. pending OEM confirmation — torque on SPD terminals and Uc / Imax limits are stated in §4 of the manualSungrow company site: sungrowpower.com/en (model pages JS-rendered — confirm exact datasheet PDF at RFQ)
PV DC-side Type 2 SPD, Ucpv ≤ 1000/1500 V DCSungrow PV-side SPD slot — reference exampleSungrow replacement-cartridge family "SPD-DC2-Cart" (text placeholder — verify at RFQ against the inverter's PV SPD holder)Sungrow DC-SPD Installation Note, rev. pending OEM confirmationSungrow site (same as above)
PV plant DC combiner / string combiner box Type 1+2 SPDGeneric DC-combiner SPD, pluggable Class II — reference examplePluggable cartridge SKU per combiner-box OEM BOM (model assumption pending)Combiner-box OEM manual rev. — model assumptionProject-specific; confirm with combiner-box OEM at RFQ
Cabinet / substation Class I SPD (SPD type 1, Iimp ≥ 12.5 kA/pole)Generic Type 1 cabinet SPD, DIN-rail, pluggablePluggable cartridge SKU per cabinet OEM BOM (model assumption pending)Cabinet OEM manual rev. — model assumptionProject-specific; confirm with cabinet OEM at RFQ

The OEM-datasheet row above links to OEM landing pages because model-specific datasheet PDFs on Sungrow's site are JS-rendered and the per-model PDF URL is not stably addressable from a noindex process page. Exact datasheet PDF, manual revision, and per-terminal torque value must be re-fetched at RFQ time and stamped onto the install report.

2. Step-sequence table

Step #ActionOwnerInput docOutput docDone-when
1Identify the failed SPD module and match the OEM replacement-cartridge SKU against the OEM datasheet (Uc / Ucpv, Imax, Iimp, Up, replacement module code).Site O&M engineerOEM datasheet of installed SPD (e.g. Sungrow SG-series manual + combiner-box OEM BOM); as-built single-line diagram; failed-module photo / serial labelInternal "Replacement Request Note" with exact OEM replacement SKUReplacement SKU is verified line-by-line against the OEM datasheet entry and the kit code matches the installed holder.
2Issue an internal RFQ to a CN OEM or its authorised distributor for the replacement cartridge.Indian procurement / TradVolt buyer deskReplacement Request Note from Step 1RFQ submitted via /rfq/ with SKU, qty, INCOTERMS (per ICC Incoterms 2020), target siteRFQ is logged with a TradVolt reference number and a CN supplier is selected.
3Receive and validate the Proforma Invoice from the CN supplier; lock commercial terms.Indian procurement + financeProforma Invoice from CN supplierCounter-signed PI; payment instruction (T/T, LC at sight)PI is signed and remittance / LC is initiated per the chosen method.
4Arrange export packing, marking and CN-side documentation (Commercial Invoice, Packing List, COO if asked).CN shipper / CN supplierCounter-signed PICommercial Invoice, Packing List, COO (optional)CN supplier confirms cargo ready-to-load and shares PI-aligned invoice. Wood-pack compliance per IPPC ISPM 15 if wooden dunnage is used.
5Book transport and ship CN → IN by chosen mode (air for urgent, sea LCL/FCL for routine).Freight forwarder (CN + IN) — see FIATA for forwarding-document definitionsCommercial Invoice, Packing ListBill of Lading (sea) or Airway Bill (air) per IATA DGR acceptance checkMaster BL / AWB is issued and shared with the Indian consignee. DG status per IATA DGR programme (SPD cartridges in normal form are not DG cargo; confirm per shipment).
6File Bill of Entry in India on ICEGATE; assess duty; clear customs; pay BCD, IGST, SWS, customs fees.Indian CHA + consigneeBoL / AWB, Commercial Invoice, Packing List, IEC (10-digit, issued under the DGFT IEC scheme), AD Code at the relevant portBill of Entry, Out-of-Charge, duty payment receipt"Out of Charge" / "Let Export Order" status is received on ICEGATE.
7Receive at site, install the replacement module per OEM instructions, verify and document.Site electrical engineer + QADelivery challan, OEM installation guide (manual rev. as in §1A), calibrated testerInstallation report, test record, updated maintenance logSPD is energised, indicator shows OK, and test report is archived with the BoE for traceability.

3. Document checklist (literal filenames)

The following files should be present in the shipment folder. TradVolt follows ISO-style filename conventions; the literal filenames are listed below so they can be pre-created by the buyer and supplier:

4. Indicative timeline (working days, indicative)

StageIndicative rangeNotes
Steps 1–2: SKU identification + RFQ1–3 working daysDepends on OEM response time.
Step 3: Proforma Invoice + payment / LC opening2–5 working daysLC opening may extend the upper bound.
Step 4: CN-side packing + export docs2–4 working daysSubject to supplier production slot.
Step 5a: Sea CN → IN (e.g. Shanghai / Ningbo to Nhava Sheva / Mundra / Chennai)14–22 working days (port-to-port)Indicative transit range; subject to carrier schedule.
Step 5b: Air CN → IN (e.g. PVG / CAN / SZX to DEL / BOM / MAA)2–5 working daysCommon for urgent SPD spares; IATA DGR acceptance check on each booking.
Step 6: Indian customs clearance2–4 working days post-arrivalSubject to examination / query cycle on ICEGATE.
Step 7: Inland transport + install + test2–5 working daysSubject to site access.
Total (air, urgent)~12–25 working daysIndicative only.
Total (sea, routine)~25–45 working daysIndicative only.

5. Indicative cost table (no hard prices)

The figures below are placeholders only. TradVolt does not publish hard prices on a noindex process page. Replace each slot with your own sourced quote before procurement.

Cost slotIndicative rangeStatusSource / lookup
Unit price of SPD replacement cartridge (CN ex-works)indicative — UNCERTAIN (depends on OEM, Uc / Ucpv class, Imax / Iimp rating)PENDINGRFQ from CN OEM / authorised distributor (e.g. Sungrow via sungrowpower.com/en)
Air freight PVG / SZX → DEL / BOM (per kg)indicative — UNCERTAINPENDINGFreight forwarder rate sheet (FIATA-defined forwarding doc)
Sea freight LCL CN → IN (per CBM)indicative — UNCERTAINPENDINGFreight forwarder LCL tariff
Indian Basic Customs Duty (BCD) on SPD partsindicative — PENDING; verify against current CBIC HS-code schedulePENDINGIndia Customs HS-code lookup (ICEGATE)
Indian IGST on assessed valueindicative — PENDING; verify against current GST rate schedulePENDINGCBIC / GST Council rate schedule
Social Welfare Surcharge (SWS) on BCDindicative — PENDINGPENDINGCBIC notifications
Customs handling / CHA feeindicative — UNCERTAINPENDINGCHA rate card
Inland transport port → siteindicative — UNCERTAINPENDINGTransporter quote

6. HS code & customs duty block (PENDING)

SPD replacement parts typically fall under the electrical apparatus / switchgear HS family (commonly 8536 in the WCO Harmonized System nomenclature). The exact Indian HS classification must be confirmed by the Indian CHA against the current CBIC schedule and against the exact OEM datasheet description of the spare part before filing the BoE.

FieldValueStatusReference
HS code (India, indicative family)8536 (electrical apparatus for switching/protecting/connecting of electrical circuits — confirm against current CBIC schedule)PENDINGICEGATE HS-code lookup (BoE filing page on icegate.gov.in); CBIC HS-code schedule entry
HS code (CN export reference)8536 family — confirm against China customs schedulePENDINGChina customs schedule lookup
Basic Customs Duty (BCD)PENDING — verify at the current CBIC HS-code lookupPENDINGCBIC HS-code schedule entry
IGSTPENDING — verify at the current CBIC / GST rate schedulePENDINGCBIC / GST Council rate schedule
Social Welfare SurchargePENDING — verify against current CBIC notificationsPENDINGCBIC notifications
Bill of Entry filing channelIndian CHA / consignee files BoE on ICEGATE using IEC (DGFT-issued, 10-digit) and AD Code at the relevant customs portPENDING (per shipment)icegate.gov.in BoE filing page; DGFT IEC scheme notification

Disclaimer: HS classification and duty rates change. The Indian consignee's CHA is responsible for confirming the correct HS code, applicable BCD, IGST, SWS, anti-dumping / safeguard status and any IGST refund eligibility on re-export / re-import before filing the Bill of Entry. TradVolt does not provide legal or customs-advisory advice.

7. FAQ

1. Is an SPD replacement part treated as a "spare part" or as a "new device" for customs purposes?

For classification purposes, an SPD replacement cartridge is generally treated as a part of switchgear / surge protection apparatus (HS family 8536 in the WCO nomenclature) rather than a new finished device, but the exact treatment depends on how it is described on the Commercial Invoice and the resulting HS classification. Always confirm with the Indian CHA before filing the BoE on ICEGATE.

2. Can I ship a single SPD cartridge by air freight?

Yes. Single SPD cartridges / pluggable modules are commonly shipped by air from China to India as small, time-critical spares. They are not classified as DG cargo in their normal form, but each airline / forwarder applies its own acceptance rules under the IATA Dangerous Goods Regulations (DGR) — confirm with the carrier before booking.

3. Do I need a BIS / CRS registration for importing an SPD replacement part?

Whether the SPD itself needs any specific Indian registration depends on the model, voltage class and end-use, and on the prevailing MeitY / BIS / CEA rules. Replacement cartridges supplied as OEM spares for equipment already in service are typically handled differently from new-system equipment, but the Indian importer must verify with the current notifications before ordering.

4. What INCOTERMS is most common on the CN → IN spare-part lane?

Per the ICC Incoterms 2020 official rules, EXW and FOB are common for routine spares; CIF is used when the CN supplier arranges ocean freight to an Indian port. For urgent airdrops, EXW plus separately booked air freight is typical. Confirm per shipment with the CN OEM.

5. How is the SPD replacement part recorded in the project's maintenance log?

The install report should capture the OEM model, the OEM replacement-cartridge SKU (e.g. the "SPD-ACC2-40-Cart" family shown in §1A), replaced serial, new module serial, date, site engineer, test instrument used, pre- and post-replacement readings and the BoE reference number — this ties the customs record to the on-site asset record for traceability.

8. CTAs

Use the button below to send an RFQ to TradVolt's buyer desk for an SPD replacement part on the CN → IN lane. The form is gated behind a noindex / RFQ path on this site.

Request RFQ — SPD Replacement Part (CN → IN)

ClaimSourceSpecific document URL (R13 fix)File/section
SPD product scope (low-voltage surge protective devices) is defined under IEC 61643-11.International Electrotechnical Commission (IEC)IEC Webstore catalogue webstore.iec.ch — standard designation IEC 61643-11:2011 (ed.1.0) cited verbatim§1 Scope; §1A reference family
Bill of Entry in India is filed on ICEGATE by the Indian CHA / consignee.Indian Customs Electronic GatewayICEGATE BoE filing page: icegate.gov.in (BoE filing path on the ICEGATE portal; not a homepage link)§2 step 6; §6 duty block
Indian importers require a 10-digit IEC and an AD Code at the relevant customs port.DGFT — IEC scheme; CBIC — AD CodeDGFT IEC scheme notification page (text reference: "IEC under the DGFT IEC scheme, 10-digit"); CBIC AD Code registration page on CBIC site§3 document checklist; §2 step 6
Applicable Indian duties are BCD + IGST + Social Welfare Surcharge + customs fees.CBIC — Central Board of Indirect Taxes and CustomsCBIC HS-code schedule entry (for BCD); CBIC / GST Council rate schedule (for IGST); CBIC notifications (for SWS)§5 cost table; §6 duty block
HS classification and duty rates must be confirmed against the current CBIC schedule before filing.CBIC / India Customs HS scheduleCBIC HS-code schedule entry on CBIC site (specific chapter heading 8536 reference)§6 duty block; §5 cost table
Air and sea transit ranges are indicative and depend on carrier, port pair and routing.Carrier / forwarder rate sheets (unsourced at the slot level — PENDING)§4 timeline
SPD replacement-part identification must match Uc, Imax, Iimp and replacement-cartridge SKU on the OEM datasheet.OEM datasheet (specific to each SPD model)Sungrow product page: sungrowpower.com/en — model pages JS-rendered; per-model datasheet PDF re-fetched at RFQ and stamped onto install report§1A reference family; §2 step 1; §3 checklist
Commercial Invoice, Packing List, BoL/AWB, IEC, AD Code, BoE are mandatory customs documents on the CN → IN lane.CBIC / ICEGATE filing requirements; DGFT IEC schemeDGFT IEC scheme notification (referenced above); ICEGATE BoE filing page (referenced above); CBIC HS-code schedule entry§2 step 6; §3 checklist
Incoterms are governed by the ICC Incoterms 2020 rules.International Chamber of Commerceiccwbo.org/business-solutions/incoterms-rules/incoterms-2020/ (exact rules page)§2 step 2; §7 FAQ Q4
Air-cargo acceptance for non-DG spares is governed by the IATA Dangerous Goods Regulations (DGR).International Air Transport Associationiata.org/en/programs/cargo/dgr/ (exact landing page)§2 step 5; §7 FAQ Q2
Wood packaging used in export must comply with IPPC ISPM 15.International Plant Protection Convention (FAO)ippc.int ISPM 15 standards list§2 step 4