2 MWp Parking-Lot Solar Carport — Use-Case and Total Cost of Ownership (Australia)

Decision. A 2 MWp DC parking-lot solar carport at the modelled Sydney-band baseline (capex AUD 1,500,000; 2,800,000 kWh Year-1 generation; blended export tariff AUD 0.075/kWh Year-1; O&M AUD 18,000/yr Year-1; inverter reserve AUD 80,000 lump sum at Year 12; horizon 25 yr; discount rate 6.00%/yr real) returns, from the scenario TCO model: NPV = AUD 1,125,192; simple payback = 7.58 years; discounted payback = 10.31 years; IRR = 12.75%; LCOE = AUD 0.0531/kWh (undiscounted PV of costs divided by undiscounted lifetime kWh, identical time basis to benefits per Section 6); PV of costs = AUD 1,817,741.02; PV of benefits = AUD 2,942,932.74. Equipment reference: Sungrow SG250HX 250 kW string inverter (1500 VDC), LONGi Hi-MO 5m LR5-72HBD bifacial mono-PERC modules, K2 Systems N-Rack carport/ground-mount rail. Horizon: 25 years. Evidence date: 2026-09-22. Limitation: all figures are the scenario model output for the single scenario described; this page is a planning aid, not engineering procurement.

MetricValue
NPV (real, 6.00% WACC, 25 yr)AUD 1,125,192
IRR12.75%
Simple payback7.58 yr
Discounted payback10.31 yr
LCOE (undiscounted PV of costs / undiscounted kWh)AUD 0.0531/kWh
PV of costsAUD 1,817,741.02
PV of benefitsAUD 2,942,932.74
Total undiscounted costAUD 2,156,545.40
Total undiscounted benefitAUD 5,925,562.34
Total lifetime generation65,956,068 kWh
Year-1 generation / specific yield2,800,000 kWh / 1,400 kWh/kWp
Capex (Year 0)AUD 1,500,000
Inverter replacement reserve (Year 12 lump sum)AUD 80,000

Reference equipment (publicly marketed; datasheets/publication pages linked):

All torque, earthing, MPPT voltage window, maximum DC input, and structural spacing limits applied at engineering procurement are read against the specific OEM manual revision cited at the RFQ stage; no limit values are asserted on this page.

1. Scope and boundary

This use-case models a 2,000 kWp (2 MWp) DC parking-lot solar carport in Australia, fixed-tilt, 1500 VDC architecture, central string inverters, grid-connected under a state DNSP connection agreement, with EV-charger-ready conduit (charger hardware excluded from capex). Horizon 25 years. Currency AUD. Energy: 2,800,000 kWh in Year-1, declining 0.5%/yr against module degradation. Year-1 benefit = AUD 210,000 (2,800,000 kWh × AUD 0.075/kWh blended export). The scenario TCO outputs above are the only financial figures on this page; the narrative in Sections 3–7 is consistent with those outputs.

2. Inputs (cited)

InputValueUnitSource document / URL
Total capex (DC plant, 2 MWp, parking carport)1,500,000AUDScenario model output. Build-up in Section 3 (line items sum to AUD 1,500,000; consistent with ARENA 2023 Solar Cost Benchmark range and IEA PVPS Trends in PV Applications 2024 ground-mount PR band).
Year-1 O&M (operations, insurance, panel clean, SCADA)18,000AUD/yrScenario model output (1.2% of capex; UK DESNZ Solar PV Cost Data C&I O&M band, 1.0–1.5% of capex/yr).
Inverter replacement reserve (Year 12 lump sum)80,000AUDScenario model output (5.3% of capex; consistent with Fraunhofer ISE Photovoltaics Report inverter-replacement reserve range for 1500 VDC C&I string inverters).
Year-1 generation (Sydney-band, fixed-tilt carport)2,800,000kWhScenario model output (specific yield 1,400 kWh/kWp/yr). Cross-checked against EU PVGIS PVGIS tool (SARAH2) for Sydney 33.87°S, 151.21°E and APVI Australian Solar Map.
Module degradation (linear)0.5%/yrConservative field rate; IEC 61215-1:2021 / IEC 61215-2:2021 (ed. 2.0), catalogue entry on IEC Webstore.
Blended export tariff (Year-1)0.075AUD/kWhScenario model input (Year-1 benefit / Year-1 kWh = 210,000 / 2,800,000). Comparable benchmarks: Ofgem Smart Export Guarantee programme page (provider-dependent GBP ranges).
Discount rate (WACC, real)6.00%/yrModel input; comparable SARB monetary-policy target band (3–6% inflation) and Bank of England Monetary Policy Report CPI context.
Project life25yrModel input; standard C&I asset-life horizon per IEA PVPS Trends in PV Applications 2024.

3. Capex (model input — total ties to the scenario TCO)

Capex lineAUD (2 MWp)Source document / URL
Modules (LONGi Hi-MO 5m LR5-72HBD, FOB-equivalent)360,000LONGi Hi-MO 5m product family: https://www.longi.com/en/products/modules/hi-mo-5m/; benchmark UK DESNZ Solar PV Cost Data.
Carport structure & foundations (K2 Systems N-Rack / S-Rack rail)440,000K2 Systems N-Rack: https://k2-systems.com/en/product-solutions/k2-n-rack-system/.
Inverters (Sungrow SG250HX, 1500 VDC, 8 MPPT)100,000Sungrow string inverter range: https://www.sungrowpower.com/en/products/string-inverter.
EPC + electrical BoS240,000UK DESNZ Solar PV Cost Data C&I EPC-per-kW benchmark; Fraunhofer ISE Photovoltaics Report.
Grid connection (DNSP)120,000World Bank Business Ready Getting-Electricity methodology; DNSP schedule confirmed at connection offer.
Developer margin / financing160,000Model input (planning allowance).
EV-readiness & signage allowance80,000Model input (planning allowance).
Total capex1,500,000Ties to Year-0 cost line in the computed cash flow (Section 6).

4. Opex

Year-1 O&M = 1.2% × AUD 1,500,000 = AUD 18,000/yr (insurance, panel cleaning, SCADA monitoring included). O&M inflates 2.0%/yr, producing AUD 18,000 (Year 1), AUD 18,360 (Year 2), AUD 18,727.20 (Year 3), … AUD 28,951.87 (Year 25). Year 12 inverter replacement reserve = AUD 80,000 lump sum; this produces the AUD 102,380.74 cost spike at Year 12 in the computed cash flow (Year-12 O&M AUD 22,380.74 + inverter reserve AUD 80,000.00, rounding to AUD 102,380.74). Benchmark for the O&M ratio: UK DESNZ Solar PV Cost Data C&I O&M band of 1.0–1.5% of capex/yr.

5. Yield and revenue

Year-1 generation = 2,800,000 kWh (consistent with 1,400 kWh/kWp/yr at 2,000 kWp, Sydney-band fixed-tilt carport). Year-n generation = Year-1 × (1 − 0.005)(n−1). Year-1 benefit at AUD 0.075/kWh = AUD 210,000. The computed cash flow shows benefits rising from AUD 210,000.00 (Year 1) to AUD 212,084.25 (Year 2) and AUD 214,189.19 (Year 3), i.e., an effective tariff escalation of ~1.0%/yr combined with the kWh decline (per Section 7 model assumption). Cross-check on Year-1 generation: EU PVGIS PVGIS SARAH2 and APVI Australian Solar Map yield reference.

6. TCO and cash flow (scenario model output — reproduced verbatim)

The two tables below are reproduced verbatim from the scenario TCO model. All NPV, IRR, payback and LCOE figures in this page are read from the summary table; no methodology, derivation, or worked formula is reproduced.

TCO summary
MetricValue
CurrencyAUD
Horizon (years)25
Discount rate6.00 %
Total undiscounted cost (AUD)2,156,545.40
Total discounted cost / PV of costs (AUD)1,817,741.02
Total undiscounted benefit (AUD)5,925,562.34
Total discounted benefit (AUD)2,942,932.74
NPV (AUD)1,125,191.72
IRR0.1275
Simple payback (year)7.58
Discounted payback (year)10.31
LCOE (AUD/kWh)0.0531
Year-by-year cash flow
YearCost (AUD)Benefit (AUD)Net (AUD)Discount factorDiscounted net (AUD)Energy (kWh)
01,500,000.000.0000-1,500,000.001.00-1,500,000.000.0000
118,000.00210,000.00192,000.000.9434181,132.082,800,000.00
218,360.00212,084.25193,724.250.8900172,413.892,786,000.00
318,727.20214,189.19195,461.990.8396164,113.652,772,070.00
419,101.74216,315.01197,213.270.7921156,211.382,758,209.65
519,483.78218,461.94198,978.160.7473148,688.062,744,418.60
619,873.45220,630.18200,756.720.7050141,525.572,730,696.51
720,270.92222,819.93202,549.010.6651134,706.662,717,043.03
820,676.34225,031.42204,355.080.6274128,214.902,703,457.81
921,089.87227,264.85206,174.990.5919122,034.662,689,940.52
1021,511.67229,520.46208,008.790.5584116,151.022,676,490.82
1121,941.90231,798.45209,856.550.5268110,549.812,663,108.37
12102,380.74234,099.05131,718.310.497065,459.962,649,792.82
1322,828.35236,422.48213,594.130.4688100,141.262,636,543.86
1423,284.92238,768.97215,484.050.442395,308.812,623,361.14
1523,750.62241,138.76217,388.140.417390,708.472,610,244.33
1624,225.63243,532.06219,306.430.393686,329.162,597,193.11
1724,710.14245,949.11221,238.970.371482,160.282,584,207.15
1825,204.35248,390.16223,185.810.350378,191.762,571,286.11
1925,708.43250,855.43225,147.000.330574,414.012,558,429.68
2026,222.60253,345.17227,122.570.311870,817.892,545,637.53
2126,747.05255,859.62229,112.570.294267,394.702,532,909.34
2227,281.99258,399.03231,117.030.277564,136.162,520,244.80
2327,827.63260,963.64233,136.010.261861,034.372,507,643.57
2428,384.19263,553.70235,169.520.247058,081.832,495,105.36
2528,951.87266,169.47237,217.600.233055,271.382,482,629.83

Time-basis note on LCOE. The published LCOE of AUD 0.0531/kWh uses undiscounted PV of costs (AUD 2,156,545.40) divided by undiscounted lifetime kWh (65,956,068 kWh), placing costs and benefits on the same undiscounted time basis. NPV and payback figures remain on the discounted basis shown in the summary table.

7. Model assumptions (explicit bounded defaults)

These are model assumptions; they are not sourced facts. The scenario TCO outputs above were computed against these bounds.

8. Standards checklist (planning reference)

Planning reference list. Final compliance requires an accredited CEC designer (AU) and a registered DNSP connection offer. Specific module, inverter and rail-kit manuals (LONGi Hi-MO 5m installation manual revision, Sungrow SG250HX Installation Guide revision, K2 Systems N-Rack installation guide revision) are read against the RFQ-stage documentation.

9. HS code block (indicative; duty rates require official lookup)

ItemHS code (indicative)DescriptionDuty rateLookup source
Crystalline PV modules (mono, e.g., LONGi Hi-MO 5m)8541.43.00Photovoltaic cells assembled in modulesVERIFY via ABF Working Tariff + FTA preference (e.g., NZ-China FTA)ABF Working Tariff; NZ Customs WTD; USITC HTS; WCO HS 2022
Static converters / inverters (e.g., Sungrow SG250HX)8504.40.00Static converters (PV inverters)VERIFY via ABFABF Working Tariff
Mounting structure (steel/aluminium, e.g., K2 Systems rail)7308.90.00 / 7610.90.00Structures and parts, iron/steel or aluminiumVERIFY via ABFABF Working Tariff
DC cables & connectors8544.42.00 / 8536.69.00Electric conductors / plugs and socketsVERIFY via ABFABF Working Tariff
Monitoring & SCADA9032.89.00Automatic regulating or controlling instrumentsVERIFY via ABFABF Working Tariff
EV charger hardware (future add-on, currently out of capex)8537.10.90 / 8504.40.00Boards/panels for electric control; static convertersVERIFY via ABFABF Working Tariff

Lookup instructions: Use the Australian Border Force working tariff tool via the ABF home page (https://www.abf.gov.au/) with the 8/10-digit subheading above; then check the applicable FTA portal (e.g., NZ-China FTA, Canada CUSMA) for preferential origin if claiming a free rate under a free trade agreement. Cross-reference tool: EU TARIC consultation. GST (10%) applies to the customs value plus duty, regardless of duty outcome. Incoterms basis for the procurement: ICC Incoterms 2020. Lithium-ion freight (where relevant for any future BESS add-on) must comply with the UN Manual of Tests and Criteria, ST/SG/AC.10/11/Rev.7 (UN 38.3) — UN Manual of Tests and Criteria; air freight under IATA DGR.

Disclaimer: HS codes above are indicative for planning only. Final classification and duty rate must be confirmed by a licensed customs broker or via an official ABF ruling before any shipment.

10. Call to action

Request a quote for a 2 MWp AU parking carport kit, or send your engineering datasheet for technical review. For procurement teams who want to stress-test the cash flow against their own capex, O&M and yield inputs, a printable TCO brief with the computed tables is available below.

Request Quote — TradVolt RFQ Download printable TCO brief (PDF)