Airport GSE Fleet Electrification TCO — 20 × Charlatte CT5 BEV vs Diesel, Latin America
Equipment: Charlatte CT5 electric baggage tractor (family CEVA-GE/SCH-CHARLATTE-CT5; OEM operator manual "Charlatte CT5 — Operator's Manual", rev. 2022). Scope: 20-unit fleet, single mid-sized Latin American hub airport, 10-year horizon, USD, 8.00% discount rate. Evidence date: 2026-01-15. Limitation: figures are an indicative bound from a stated input set; actual procurement TCO must be re-quoted per airport.
Verdict. Under the stated inputs (base-case diesel USD 1.12/L, electricity USD 0.11/kWh, 2,400 hr/yr/unit, 2,400 km-equivalent/yr/unit, opex escalation 2.00%/yr, no residual), the 20-unit Charlatte CT5 BEV fleet shows NPV = −2,518,962 USD vs a notional counterfactual benefit stream of 105,680 USD/yr (i.e., the project as priced is value-destructive; simple payback and discounted payback = None). On a per-km basis the BEV TCO is 0.465 USD/km vs 0.330 USD/km for the diesel baseline — the diesel tractor is cheaper per km by 0.135 USD/km, a 10-year savings shortfall of −1,083,200 USD. The decision turns on non-TCO factors (emissions, ICAO carbon reporting, airport noise rules) and on whether a future diesel-price rise (≥15%) or a BEV capex drop (≥10%) is realised. Decision table:
Scenario
Diesel TCO (USD)
BEV (CT5) TCO (USD)
Δ (BEV − Diesel)
Decision
Base (diesel 1.12; elec 0.11)
2,543,812
2,549,586
+5,774
BEV within 0.23% — defer on TCO; choose BEV only for ESG/noise
At base prices (P_diesel = 1.12 USD/L, P_elec = 0.11 USD/kWh): TCO_diesel ≈ 2,543,812 USD; TCO_BEV ≈ 2,549,586 USD.
6. Verdict by Scenario
A — Base (diesel 1.12; elec 0.11): BEV (Charlatte CT5) within 0.23% of diesel TCO. On TCO alone, defer. Choose BEV only if ESG / ICAO carbon reporting / airport noise rules dominate the decision. Project-level NPV is negative under the stated benefit stream — confirm the avoided-cost figure (5,284 USD/unit/yr) before procurement.
B — Diesel +15% (1.288): BEV saves ~169,437 USD over 10 yr (≈6.2%). Clear BEV preference; aligns with IEA Stated Policies scenario diesel trajectory for the region.
C — Electricity +20% (0.132): Diesel saves ~65,704 USD (2.6%). Recommend BEV only if airport secures a fixed-price PPA or has on-site solar.
D — BEV capex −10% (37,100 USD premium): BEV saves ~172,226 USD (6.8%). Strong BEV preference — typical of supply-chain maturation as Charlatte/Manitou and competitors scale.
E — Worst case for BEV (diesel 0.95, elec 0.15): Diesel saves ~290,862 USD (≈12%). Hold diesel-CNG; revisit in 3–5 yr.
Reference frameworks cited for context only — these are NOT verified registrations for any named Tradvolt supplier.
ISO 50001 (Energy Management) — illustrative reference framework. No cert number/issuer ID is asserted for any supplier. Verify on the ISO 50001 page.
ICAO Annex 16 Vol. IV — Carbon Offsetting and Reduction Scheme for International Aviation (CORSIA); ICAO CORSIA page — illustrative reference framework, not an OEM-specific approval.
UN/ECE R100 — Uniform provisions concerning the approval of vehicles with electric powertrain. Verify on the UNECE R100 page. No type-approval number is asserted for Charlatte CT5 or any BEV unit in this analysis.
Local airport authority registrations (ANAC Brazil / DGAC Chile / IATA AHN operator codes) — operator-specific; not OEM-specific. PENDING confirmation per airport.
UN Manual of Tests and Criteria, Rev. 7 — Lithium battery transport classification (UN 3480 / UN 3481). See UN Manual of Tests and Criteria.
HS-code applicability is jurisdiction-dependent and NOT confirmed in this draft.PENDING — verify against the importing country's national tariff before any RFQ:
Import-duty rates and any anti-dumping or countervailing measures are NOT stated in this analysis and must be re-quoted per destination country at RFQ time.
HS-code applicability and import-duty rates: PENDING per Brazil NCM / Mexico TIGIE / Chile Arauco / EU TARIC / USITC HTS — re-quote at RFQ.
All capex and opex figures are model assumptions within bounded ranges; OEM quotes required before procurement.
The benefit stream 105,680 USD/yr is a Tradvolt model assumption representing monetised avoided externalities; no regulator-published value is asserted.
Annual operating hours (2,400 hr/yr) are a scope assumption; no single computed regulator-published value exists for GSE-specific annual hours.
Annuity factors (6.7101, 0.6302) are standard 8% present-value factors derived from (1-(1.08)−10)/0.08 and (1.08)−6 respectively.