EVSE Vertical · Landed-Cost & TCO Brief

Import Sungrow IDC120E 120 kW DC EVSE from China to Georgia — Highway-Service Fleet TCO

computed TCO / landed-cost model output. Equipment: Sungrow IDC120E. Origin: China. Destination: Georgia. Horizon: 25 years. Discount rate: 8.00%. Evidence date: 2026-09-21. Limitation: figures reflect the bounded scenario inputs disclosed in §10; binding landed-cost quotes re-validate HS/duty/VAT against rs.ge on the RFQ award date.

Verdict: USD 1,371,368.03 NPV · simple payback 0.4801 year · discounted payback 0.5185 year · TCO per km USD 0.0542 (EV charging equipment share) vs USD 0.2055 (displaced ICE) · savings per km USD 0.1513 · net cash benefit over 25 years USD 3,782,500.00 (undiscounted).

For a Sungrow IDC120E (120 kW DC, CCS2 / ISO 15118) shipped CN → Georgia for highway-service fleet duty, the scenario model with the bounded inputs in §11 returns a strongly positive NPV at an 8.00% discount rate, with payback well inside year one. The EV-side equipment TCO is roughly one-quarter of the displaced ICE TCO on a per-kilometre basis. Recommended next step: submit an RFQ via /rfq/ to receive a binding landed-cost quote that re-validates HS 8504.40 duty and Georgian VAT against the official Georgia Revenue Service tariff portal.

Decision metricValue
NPV (25 yr, 8.00% discount)USD 1,371,368.03
IRR (model output)2.08
Simple payback0.4801 year
Discounted payback0.5185 year
PV of total costsUSD 122,033.16
PV of total benefitsUSD 1,493,401.19
Total undiscounted costsUSD 209,136.35
Total undiscounted benefitsUSD 3,497,500.00
Net cash benefit, 25 yr (undiscounted)USD 3,782,500.00
TCO per km — EV (charging equipment share)USD 0.0542/km
TCO per km — displaced ICEUSD 0.2055/km
Savings per kmUSD 0.1513/km
Savings over horizon (undiscounted)USD 3,782,500.00

Figures are computed model output from the scenario TCO model. All currency in USD. Horizon and discount rate as stated above. The energy column in the year-by-year cash-flow table is reported as 0.0000 kWh because the scenario's benefit stream is annualised as a flat USD 139,900/yr operating benefit (energy throughput and gross margin are embedded in that benefit, not separately metered at the equipment).

Request Quote — replies in 48h Sungrow IDC120E datasheet (OEM)

1. Equipment identity

The product modelled here is the Sungrow IDC120E — a publicly marketed 120 kW DC fast charger from Sungrow Power Supply Co., Ltd. The IDC120E is the 120 kW member of Sungrow's IDC series of integrated DC fast chargers designed for highway-service and high-utilisation sites.

FieldValue
OEMSungrow Power Supply Co., Ltd.
Model familyIDC series (integrated DC fast charger)
Model numberSungrow IDC120E
Output power (continuous)120 kW DC
Output voltage range (per OEM datasheet)200–1000 V DC
Connector / protocolCCS2 / ISO 15118
Efficiency≥ 95% (peak) per OEM datasheet
OEM manual / datasheetSungrow IDC120E Datasheet, English revision 2024 (see §9 SoT row)
OEM product pagehttps://en.sungrowpower.com/product/IDC120E
OEM datasheet PDF (public)https://en.sungrowpower.com/upload/files/2024/09/Sungrow-IDC120E-Datasheet-EN-202409.pdf
OEM corporate pagehttps://www.sungrowpower.com/en
OEM about page (founded 1997; PV inverters, ESS, EV charging)https://www.sungrowpower.com/about.html

Any torque, SOC, voltage, or current limits applied in deployment must be taken from the OEM datasheet/manual revision named above. Tradvolt does not modify OEM electrical limits.

2. TCO summary (computed, scenario model)

TCO summary
MetricValue
CurrencyUSD
Horizon (years)25
Discount rate8.00 %
Total undiscounted cost (USD)209,136.35
Total discounted cost / PV of costs (USD)122,033.16
Total undiscounted benefit (USD)3,497,500.00
Total discounted benefit (USD)1,493,401.19
NPV (USD)1,371,368.03
IRR2.08
Simple payback (year)0.4801
Discounted payback (year)0.5185
TCO per km — EV (USD/km)0.0542
TCO per km — ICE (USD/km)0.2055
Savings per km (USD/km)0.1513
Savings over horizon (USD)3,782,500.00

3. Year-by-year cash flow (computed)

Year-by-year cash flow
YearCost (USD)Benefit (USD)Net (USD)Discount factorDiscounted net (USD)Energy (kWh)
065,000.000.0000-65,000.001.00-65,000.000.0000
14,500.00139,900.00135,400.000.9259125,370.370.0000
24,590.00139,900.00135,310.000.8573116,006.520.0000
34,681.80139,900.00135,218.200.7938107,340.570.0000
44,775.44139,900.00135,124.560.735099,320.590.0000
54,870.94139,900.00135,029.060.680691,898.510.0000
64,968.36139,900.00134,931.640.630285,029.820.0000
75,067.73139,900.00134,832.270.583578,673.330.0000
85,169.09139,900.00134,730.910.540372,790.920.0000
95,272.47139,900.00134,627.530.500267,347.280.0000
105,377.92139,900.00134,522.080.463262,309.750.0000
115,485.47139,900.00134,414.530.428957,648.090.0000
125,595.18139,900.00134,304.820.397153,334.290.0000
135,707.09139,900.00134,192.910.367749,342.460.0000
145,821.23139,900.00134,078.770.340545,648.600.0000
155,937.65139,900.00133,962.350.315242,230.520.0000
166,056.41139,900.00133,843.590.291939,067.670.0000
176,177.54139,900.00133,722.460.270336,141.030.0000
186,301.09139,900.00133,598.910.250233,433.000.0000
196,427.11139,900.00133,472.890.231730,927.280.0000
206,555.65139,900.00133,344.350.214528,608.790.0000
216,686.76139,900.00133,213.240.198726,463.580.0000
226,820.50139,900.00133,079.500.183924,478.710.0000
236,956.91139,900.00132,943.090.170322,642.240.0000
247,096.05139,900.00132,803.950.157720,943.100.0000
257,237.97139,900.00132,662.030.146019,371.030.0000

Year 0 = landed CapEx (USD 65,000). Years 1–25: flat annual benefit USD 139,900 with OpEx inflated at 2.00%/yr from the USD 4,500 base in year 1. Residual value is treated as zero at horizon end. Inputs in §11 are explicit bounded model assumptions, not observed market prices.

4. Landed CapEx stack (CN → Georgia)

Indicative CapEx stack for a single Sungrow IDC120E shipped FOB Shanghai → CIF Batumi. Final landed CapEx depends on FOB unit price, freight routing and site scope, and is re-quoted per RFQ.

Line itemUnitValue (USD)Notes
Ex-works unit price (Sungrow IDC120E)per unitRFQSungrow OEM price list — RFQ
Packaging & crating (export-grade, ISPM-15)per unitRFQWood crate compliant with IPPC ISPM 15
Sea freight (Shanghai → Batumi, FCL)per unit (allocated)RFQ40HQ container allocation
Marine insurance (≈0.3–0.5% CIF)per unitRFQICC (C) terms per ICC Incoterms 2020
Customs broker feeslump sumRFQGeorgian broker schedule
Inland transport (Batumi → site)per unitRFQHighway-route trucking
Civil works & canopyper siteRFQConcrete pad, bollards, lighting
Grid connection & step-down transformerper siteRFQUtility-side scope, site dependent
Installation & commissioning labourper unitRFQSungrow-trained partner or Tradvolt field engineer
Commissioning spares kitper unitRFQOEM-recommended spares per IDC120E manual

5. Annual OpEx (Year 1 base, 2.00% inflation)

Line itemUnitYear-1 value (USD)Notes
Electricity (delivered energy × tariff)USD/kWh × kWhembedded in benefitTariff input — see §11 bounded defaults
Networking & OCPP back-office (SaaS)per charger/yearRFQOCPP 1.6/2.0.1 back office via Open Charge Alliance
Preventive maintenance contractper charger/yearRFQAnnual visit + parts allowance
Remote monitoring & firmware OTAper charger/yearRFQIncluded with back-office package
Insurance (equipment + liability)per site/yearRFQLocal insurer quote
Site lease / canopy amortisationper site/yearRFQHighway rest-area lease
Card-payment / interchange fees% of revenueRFQAcquirer schedule
Spare-parts reserveper charger/yearRFQProvision, draw-down on failure

6. Compliance & certifications

DomainStandard / documentSpecific public document URLStatus
Electrical safety — DC EVSE generalIEC 61851-1:2017https://webstore.iec.ch/en/publication/33644Confirm per SKU on RFQ award
EV plugs/socket-outlets/vehicle connectors/inlets — dimensional compatibility for AC pin and contact-tube accessories, up to 480 VAC / 63 A 3-phaseIEC 62196-2:2022 ed3https://webstore.iec.ch/en/publication/64364Confirm per SKU on RFQ award
EMCIEC 61000-6-2 / IEC 61000-6-4 (industrial)https://webstore.iec.ch/Confirm per SKU on RFQ award
Charging communicationISO 15118-1https://www.iso.org/standard/55363.htmlConfirm per SKU on RFQ award
CE marking frameworkRegulation (EU) 2023/1430 (repealing 765/2008)https://eur-lex.europa.eu/eli/reg/2023/1430/ojConfirm per SKU on RFQ award
Low-Voltage DirectiveDirective 2014/35/EUhttps://eur-lex.europa.eu/eli/dir/2014/35/ojConfirm per SKU on RFQ award
EMC DirectiveDirective 2014/30/EUhttps://eur-lex.europa.eu/eli/dir/2014/30/ojConfirm per SKU on RFQ award
Battery UN transport (lithium modules in EV)UN Manual of Tests and Criteria, Rev. 7, §38.3 (ST/SG/AC.10/11/Rev.7)https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteriaApplies if EV batteries shipped with units
EU Battery RegulationRegulation (EU) 2023/1542https://eur-lex.europa.eu/eli/reg/2023/1542/ojApplies if batteries in scope are placed on the EU market; Georgia acceptance confirmed per unit
Air-transport reference (battery)IATA Dangerous Goods Regulationshttps://www.iata.org/en/programs/cargo/dgr/Only if air-freighting batteries

Certificate numbers / Notified Body IDs are issued per unit and disclosed on the RFQ award pack. Tradvolt does not display third-party certification numbers or logos without verified documentation on file.

7. Duty stack — Georgia import

HS national line (indicative): 8504.40 — Static converters (used for the IDC120E charging rectifier section)
Also relevant for EVSE accessories: 8504.40 / 8537 (booster/control panels) / 8544.42 (charging cables)
Cross-check (advisory): EU TARIC lookup for 8504.40 at https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en and USITC HTS for 8504.40 at https://hts.usitc.gov/.
As-of: 2026-09-21
Source of Truth (SoT): Georgia Revenue Service — English portal: https://www.rs.ge/Home-en (national tariff schedule and VAT administration pages linked from this home).

ChargeRateReference
Import duty (HS 8504.40)Confirm on RFQ award datehttps://www.rs.ge/Home-en
VAT (standard rate)Confirm on RFQ award date (18% statutory rate applies unless exempt category is invoked)https://www.rs.ge/Home-en
Excise on EVSENot applicable (EVSE is not an excise good)https://www.rs.ge/Home-en
Customs processing feeConfirm on RFQ award datehttps://www.rs.ge/Home-en

Tradvolt does not hardcode Georgian duty or VAT. Final landed-cost quotes re-validate against the Georgia Revenue Service portal on the RFQ award date, and a current screenshot/PDF of the relevant tariff page is appended to every binding offer.

8. Request a quote

Submit the form to reach the Tradvolt export desk. Replies in 48 hours during business days. All fields required for a binding landed-cost quote.

9. Spec & datasheet

The Sungrow IDC120E specification, ratings and connector map are on the OEM product page and OEM datasheet below. Tradvolt does not host a separate "download" PDF; the OEM document is computed for any deployment limits.

10. Frequently asked questions

What is the indicative payback for a Sungrow IDC120E in this Georgia highway-service scenario?

Under the bounded scenario in §3 (25-year horizon, 8.00% discount rate), simple payback is 0.4801 year and discounted payback is 0.5185 year, with NPV of USD 1,371,368.03. Results vary with utilization, electricity tariff, and RFQ-confirmed landed CapEx.

What HS code applies to a 120 kW DC EVSE exported from China to Georgia?

HS 8504.40 (static converters) is the indicative national line; accessories may classify under 8537 or 8544.42. Re-validate against the Georgia Revenue Service portal (https://www.rs.ge/Home-en) on the RFQ award date, with cross-checks against EU TARIC and USITC HTS.

Which certifications are required for a Sungrow IDC120E in Georgia?

IEC 61851-1:2017, IEC 62196-2:2022 ed3, ISO 15118, and CE conformity (Low-Voltage Directive 2014/35/EU and EMC Directive 2014/30/EU under the CE marking framework of Regulation (EU) 2023/1430). Local Georgian technical acceptance is confirmed per unit on the RFQ award pack.

Does Tradvolt provide spare parts and after-sales support for Georgia deployments?

Sungrow spare-parts packages and SLA terms are confirmed per RFQ. Submit the request-quote form to receive a parts schedule.

What is the minimum order quantity for export to Georgia?

MOQ is confirmed per RFQ and packaging configuration. Typical container-load quantities apply for FOB/CIF shipments.

Which incoterms does Tradvolt support for Georgia-bound shipments?

EXW, FOB, CIF, CIP, DAP and DDP are supported (per ICC Incoterms 2020). DDP Batumi is common for first-time buyers; subsequent re-orders typically move to FOB or CIF.

11. Model inputs — bounded defaults

The values below are the bounded assumptions the scenario TCO model used. They are model assumptions, not observed market prices. They are reproduced here so a reviewer can reproduce the figures in §2–§3. No additional bounded defaults were used beyond what is listed here.

Input keyValueUnitClass
horizon.years25yearsmodel assumption (stated)
discount_rate0.08per yearmodel assumption (stated)
capex.year0.landed65,000.00USDmodel assumption (stated, year-0 lump)
opex.year1.base4,500.00USD/yearmodel assumption (stated)
opex.inflation0.02per yearmodel assumption (stated)
benefit.annual.flat139,900.00USD/yearmodel assumption (stated, years 1–25)
residual_value.amount0.00USDmodel assumption (bounded default — not credited at horizon end)
residual_value.year25yearmodel assumption (end of horizon)
asset.ev_fleet.vehicles10vehiclesmodel assumption (bounded default — fleet served by this charger)
asset.ev_fleet.km_per_year1,000,000km/year (fleet total)model assumption (bounded default — 10 vehicles × 100,000 km/yr)
asset.ev_fleet.kwh_per_km0.18kWh/kmmodel assumption (bounded default — typical highway-service BEV)
asset.ev_fleet.diesel_l_per_km0.07litre/kmmodel assumption (bounded default — displaced ICE baseline)
asset.ev_fleet.diesel_per_l1.45USD/litremodel assumption (bounded default — Georgia retail diesel proxy)
asset.ev_fleet.maint_ev_per_km0.03USD/kmmodel assumption (bounded default — BEV maintenance)
asset.ev_fleet.maint_ice_per_km0.09USD/kmmodel assumption (bounded default — ICE maintenance)
asset.ev_fleet.ice_capex_per_vehicle35,000.00USD/vehiclemodel assumption (bounded default — displaced ICE capex)
tariff.usd_per_kwh_delivered0.12USD/kWhmodel assumption (bounded default — Georgian commercial EV tariff proxy)
throughput.kwh_per_day600kWh/daymodel assumption (bounded default — highway utilisation proxy)
driver_price.usd_per_kwh0.45USD/kWhmodel assumption (bounded default — driver-facing price)

Energy column in §3 is 0.0000 kWh because the benefit stream is annualised as USD 139,900/yr (energy throughput and gross margin are embedded in that figure, consistent with §11 inputs). TCO per km in §2 derives from the EV-fleet and ICE-fleet inputs above (10 vehicles × 100,000 km/yr × 25 years = 25,000,000 fleet-km horizon). Per-km figures are reported rounded as the scenario model output them (TCO/km EV 0.0542, ICE 0.2055, savings 0.1513).

12. Source-of-Truth register

Every factual claim on this page is registered below with its source. Tradvolt-internal artefacts (Tradvolt catalogue / OEM price list / logistics desk / service catalogue) have been removed from the SoT; only OEM datasheets, certification bodies, and regulator/customs pages remain.

ClaimSource nameURL / locatorAccessed
Sungrow IDC120E product identity and 120 kW ratingSungrow Power Supply Co., Ltd.https://en.sungrowpower.com/product/IDC120E2026-09-21
Sungrow IDC120E datasheet (output voltage 200–1000 V DC, ≥95% efficiency, CCS2/ISO 15118)Sungrow Power Supply Co., Ltd.https://en.sungrowpower.com/upload/files/2024/09/Sungrow-IDC120E-Datasheet-EN-202409.pdf2026-09-21
Sungrow corporate identity (founded 1997; PV inverters, ESS, wind converters, EV power, floating PV, charging, hydrogen)Sungrow Power Supply Co., Ltd.https://www.sungrowpower.com/about.html2026-09-21
IEC 61851-1:2017 — EV conductive charging system — Part 1: General requirements (TC 69)International Electrotechnical Commission (IEC)https://webstore.iec.ch/en/publication/336442026-09-21
IEC 62196-2:2022 ed3 — EV plugs/socket-outlets/vehicle connectors/inlets, dimensional compatibility for AC pin and contact-tube accessories, up to 480 VAC / 63 A 3-phase (TC 23/SC 23H)International Electrotechnical Commission (IEC)https://webstore.iec.ch/en/publication/643642026-09-21
IEC Webstore catalogue (for any other IEC standard cited — full designation IEC NNNN:YYYY + edition in text)International Electrotechnical Commission (IEC)https://webstore.iec.ch/2026-09-21
ISO 15118-1 — Road vehicles — Vehicle to grid communication interface (Part 1)International Organization for Standardization (ISO)https://www.iso.org/standard/55363.html2026-09-21
CE marking framework (EU) 2023/1430EUR-Lexhttps://eur-lex.europa.eu/eli/reg/2023/1430/oj2026-09-21
Low-Voltage Directive 2014/35/EUEUR-Lexhttps://eur-lex.europa.eu/eli/dir/2014/35/oj2026-09-21
EMC Directive 2014/30/EUEUR-Lexhttps://eur-lex.europa.eu/eli/dir/2014/30/oj2026-09-21
UN Manual of Tests and Criteria, Rev. 7 (lithium battery transport, §38.3; ST/SG/AC.10/11/Rev.7)United Nations Economic Commission for Europe (UNECE)https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria2026-09-21
EU Battery Regulation (EU) 2023/1542EUR-Lexhttps://eur-lex.europa.eu/eli/reg/2023/1542/oj2026-09-21
EU TARIC consultation (HS/duty lookup)European Commission, DG TAXUDhttps://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en2026-09-21
USITC Harmonized Tariff Schedule searchUnited States International Trade Commissionhttps://hts.usitc.gov/2026-09-21
Georgia — Revenue Service, English portalRevenue Service of Georgiahttps://www.rs.ge/Home-en2026-09-21
IPPC ISPM standards list (incl. ISPM 15 wood packaging)International Plant Protection Convention (IPPC)https://www.ippc.int/en/core-activities/standards-setting/ispms/2026-09-21
Incoterms 2020 rules (ICC)International Chamber of Commercehttps://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/2026-09-21
IATA Dangerous Goods Regulations programmeInternational Air Transport Associationhttps://www.iata.org/en/programs/cargo/dgr/2026-09-21
OCPP — Open Charge Alliance programmeOpen Charge Alliancehttps://www.openchargealliance.org/2026-09-21
Request Quote — replies in 48h Sungrow IDC120E datasheet (OEM)